IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel, P.E. California Department of Transportation BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 1 ISU Spring Transportation Seminar Series April 1, 2016

Transcript of IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY...

Page 1: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA

Mark Mahan, PhD, P.E.Ron Bromenschenkel, P.E.

California Department of Transportation

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 1

ISU Spring Transportation Seminar SeriesApril 1, 2016

Presenter
Presentation Notes
The presentation follows the layout strip found at the bottom of the slide. Viewers will always know where the presenter is in the presentation by referring to this layout strip. ABC is depicted here as a growing subset of Caltrans’ larger program.
Page 2: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 2

San Mateo-Hayward Bridge Widening (2002)

• Up to 270 feet of structure completed per week • 5.15 mile long portion of south bay crossing• PC Hollow Piles• PC Cap Tubs• PC Girders• PC Deck Forms

Page 3: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 3

California Experience:• Three major California earthquakes.• Influence of earthquakes on Caltrans’ Seismic Design Criteria

(SDC).

Concepts of “Confinement”, “Continuity”, and “Balance” in the SDC.

Proof of Ductility in California Columns.

Page 4: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 4

1971 San Fernando EQ: Collapse of multiple structures including Route I-5/I-405 Separation Structure resulted in a drastic increase in “Confinement” reinforcement in columns.

Page 5: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 5

Caltrans’ new confined columns

Confinement:Caltrans’ SDC 4.1.1

∆C > ∆D

Caltrans’ pre- 1971 columns,1994 damage.

Page 6: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 6

Caltrans’ post-1989 Column Testing

Page 7: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 7

Caltrans’ post-1989 Column Testing

Page 8: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 8

1989 Loma Prieta Earthquake: The San Francisco-Oakland Bay Bridge lost a deck segment due to insufficient hinge seat.

Page 9: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 9

1989 Loma Prieta Earthquake: The Cypress Viaduct collapsed partly due to excessive joints in the structure

Page 10: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 10

Caltrans’ columns and shafts, new construction

Page 11: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 11

Caltrans’ hinge seat, before 1971

Continuity:• Caltrans’ SDC 7.2.5.4 and 7.8.3

Equation 7.5, minimum 24” seat width for in-span hinges and Equation 7.46, minimum 30” at abutments.

• Caltrans’ Cast-In-Place, post-tensioned box girder bridges have excellent continuity and framing. They meet the SDC requirements.

• Do Pre-Cast bridges meet the continuity requirements?

Page 12: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 12

1994 Northridge Earthquake: I-5/SR-14 collapse, lack of stiffness and mass “Balance”from bent to bent.

Page 13: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 13

1994 Northridge Earthquake: I-5/SR-14 collapse.

Page 14: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 14

BENT 2

BENT 3

BENT 4

BENT 6

BENT 5

m2 m5m3 m4 m6

k2k3 k4 k5

k6

FRAME 1 FRAME 2

T1 T2

BENT 3

k2 k1

Caltrans’ Seismic Design Criteria

Balance:Caltrans’ SDC 7.1.1, Any two bents or columns:

Adjacent bents or columns:

50.0≥

imejk

jmeik

75.0≥

imejk

jmeik

Page 15: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 15

UCSD 4-foot Diameter Column Test

Page 16: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 16

UCSD 4-foot Diameter Column Test

Test IDEQ

Record Magnitude Scale Table PGA Target Ductility

2 Loma Prieta 1 6.9 1.0 0.409 2

3 Loma Prieta 2 6.9 1.0 0.526 4

5 Kobe-Takatori 6.9 -0.8 -0.533 8

7 Kobe-Takatori 6.9 1.0 0.646 ?

8 Kobe-Takatori 6.9 -1.2 -0.829 ?

9 Kobe-Takatori 6.9 1.2 0.819 ?

10 Kobe-Takatori 6.9 1.2 0.851 ?

Videos 3, 5, 10 are shown as examples of performance

Page 17: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 17

Video 3 at ductility demand of 4Video 5 at ductility demand of 8Video 10 at ductility demand beyond 8

UCSD 4-foot Diameter Column Test

Page 18: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 18

• Single Column Bents supported on fixed foundation μD ≤ 4

• Multi-Column Bents supported on fixed or pinned footings μD ≤ 5

• Columns designed for ductility values of 4 and 5 are proved to perform to ductility values of 8 to 10 in laboratory testing.

• CIP post-tensioned box girder and properly detailed PC bridges can meet the above seismic requirements.

Summary of Cast-In-Place (CIP) practice

Page 19: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 19

Page 20: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 20

0

5,000,000

10,000,000

15,000,000

20,000,000

25,000,000

30,000,000

35,000,000

40,000,000

1980 1985 1990 1995 2000 2005 2010 2015

Western States Population: US Census Bureau

.California

.Washington

.Arizona

.Utah

.Nevada

.Alaska

CA

WAAZUTNVAK

Page 21: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 21

CISN ShakeMapLoma Prieta EQM6.9October 198963 lives lost$ 6,000,000,000 damage

CISN ShakeMapNapa EQM6.0August 20140 lives lost$ 1,000,000,000 damage (est)

Page 22: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 22

Page 23: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 23

ABC Column Connection Research

Testing at University of Nevada, Reno

PC Column with partially debondedbars plunged into UHPC filled voids

Page 24: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 24

PC Girder Continuity through Bent Caps

Page 25: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 25

PC Girder Continuity through Bent Caps

Page 26: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 26

ISOLATED ABC BRIDGE LIFE CYCLE COST ANALYSIS

Page 27: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 27

ISOLATED ABC BRIDGE LIFE CYCLE COST ANALYSIS

Page 28: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 28

PC Shear Key Concept (2013)

Page 29: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 29

Page 30: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 30

Proposed Type II shaft with PC Column

Page 31: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 31

Page 32: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 32

Patch Spalls, 1009, 23%

Potholes, 90, 2%

Rehab, 100, 2%

Resurface, 109, 3%

Overlay, 188, 4%

Methacrylate, 2646, 59%

Replace, 2, 0%Misc, 307, 7%

CA BRIDGE DECK REPAIR 2005-2015

Page 33: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 33

Page 34: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 34

Caltrans positive moment connections for joining PC girders to bent capsare based on proof testing done at Iowa State University.

Six details are being developed to provide designers with options atdifferent ABC (and non-ABC) sites.

Page 35: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

35

Strand tails lapped and hooked, then tied into place for longitudinal continuity

PC Girder ContinuityHwy 50, El Dorado Hills, CA (2013)

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS

Page 36: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 36

PC multi-column bentsusing pinned bases canoffer construction fit-uptolerance challenges. .

This detail allows the PCcolumn to be spun orshifted to better alignwith top of column barsbeing inserted into a PCcap.

PC Column with adjustable Pipe Pin base

Page 37: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

37

Excerpt from two-span Caltrans ABC pilotproject featuring PC columns, inverted T bentcap, and PC girders. Looped strand girdercontinuity detail used.

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS

Page 38: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

38BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS

Excerpt from second two-span Caltrans ABC pilotproject featuring PC columns, drop-bent cap, and PCgirders. Hooked strand girder continuity detail used.

Page 39: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 39

Comments?

Questions?

Page 40: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

BACKGROUND • RESEARCH • DETAILS • GUIDANCE • PROJECTS 40

Page 41: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

41

Page 42: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

42

Page 43: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

43

Page 44: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

44

Page 45: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

45

Page 46: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

46

6’-diameter column/shaft test at UCLA

Page 47: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

47

6’-diameter column/shaft test at UCLA

Page 48: IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE ... · PDF fileIMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel,

48