Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w...

31
implementation of rlink-pppi at a pulp mill

Transcript of Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w...

Page 1: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

implementation of rlink-pppi at a pulp mill

Page 2: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 2

Klabin Group Klabin Group Klabin group is the

largest paper manufacturer and the second largest pulp manufacturer in Brazil, as well as leading 10 out of the 11 markets for packaging and tissue paper items in which it is active.

Page 3: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 3

location of klabin’s siteslocation of klabin’s sites

Page 4: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 4

klabin bacellklabin bacell Klabin Bacell, located in Camaçari,

State of Bahia, produces dissolving pulp used primarily in the textile filaments, acetate grade and food industry.

Page 5: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 5

the plantthe plant thethe plant is one of the world's plant is one of the world's

most modern bleach most modern bleach dissolving pulp plantsdissolving pulp plants which which works with modern works with modern technology alternatives and technology alternatives and high automation degree in its high automation degree in its process control, managed by process control, managed by an ISO 9002 certified Quality an ISO 9002 certified Quality System. It is the first System. It is the first industrial unit in its category industrial unit in its category to produce to produce pre-hydrolysis pre-hydrolysis Kraft Dissolving Pulp through Kraft Dissolving Pulp through TCF system (Total Chlorine TCF system (Total Chlorine Free), which is by itself one of Free), which is by itself one of the most significant the most significant evidences of its evidences of its environmental performance.environmental performance.

Page 6: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 6

SAP/R3 at Klabin contextSAP/R3 at Klabin context

Almost all sites of Klabin in Brazil Almost all sites of Klabin in Brazil run SAP/R3;run SAP/R3;

Page 7: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 7

The RLINK project at Klabin The RLINK project at Klabin BacellBacell Bacell was the first Klabin mill where PI Bacell was the first Klabin mill where PI

System was installed ( PI 2 System in System was installed ( PI 2 System in 1995);1995);

The implementation of SAP/R3 4.6c at The implementation of SAP/R3 4.6c at Bacell started in March, 2001Bacell started in March, 2001 and the go- and the go-live happened on December 1stlive happened on December 1st;;

RLINK PPPI implementation at Bacell RLINK PPPI implementation at Bacell started three months later ( June );started three months later ( June );

Project Team:Project Team:• Maria Helena Del Grande (Project manager - Maria Helena Del Grande (Project manager -

Klabin Bacell)Klabin Bacell)• Adroaldo Munhoz (Team Leader - Cybertecnica)Adroaldo Munhoz (Team Leader - Cybertecnica)• Flavio Maeda (Analyst - Cybertecnica)Flavio Maeda (Analyst - Cybertecnica)

Page 8: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 8

RLINKRLINK C Cybertecnicaybertecnica’s’s experexpertisetise

Both Adroaldo and Flavio Both Adroaldo and Flavio attendedattended the RLINK class at OSI office in the RLINK class at OSI office in Germany;Germany;

The whole implementation of The whole implementation of RLINK at Klabin Bacell;RLINK at Klabin Bacell;

CComplementation of theomplementation of the RLINK RLINK solution solution at CSN at CSN with standard PI with standard PI monitoring tools (PI-PB and VBA).monitoring tools (PI-PB and VBA).

Page 9: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 9

project overviewproject overview

RLINK PPPI project was divided in RLINK PPPI project was divided in two major parts:two major parts:• migration from PI 2 system to PI 3.3 migration from PI 2 system to PI 3.3

system running in a system running in a WW22KK machinemachine;;• implementation of RLINK PPPI (implementation of RLINK PPPI (WNTWNT

machine).machine).

Page 10: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 10

original pi system original pi system configurationconfiguration

PIPI

OVMS 7.1PI-HOME

Dec-Alpha-OVMS

V2.2

V2.2

Ethernet TCP/IP

Client applications:

•PI-ProcessBook•PI-DataLink

PI-IN-FI-CHIP-AXP

PI-API-OVMS

PI-IN-YO-CPLUS

P I - API - OVMS

YOKOGAWA(DCS)

CENTAP

NT 4.0

V 1.3

PI-IN-FI-CHIP-AXP

PI OVMS

PI-IN-OS-RELDB-NT

PI - API - NTI

SCALES

SCALES

RDB

SICP

Page 11: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 11

actualactual pi configuration pi configuration

PIPI

Windows 2000PI-HOME

Dec-Alpha-OVMS

V2.3

V3.3

Ethernet TCP/IP

Client applications:

•PI-ProcessBook•PI-DataLink•PI ManualLogger

PI-IN-FI-CHIP-AXP

PI-API-OVMS

PI-IN-YO-CPLUS

PI-API-OVMS

YOKOGAWA(DCS)

CENTAP

MSQL

RLINK - PPPI

Page 12: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 12

SAP R/3

RLINK• Win-NT 4 sp6• SQL Server 7.0• SAP GUI

PI Server 3.3

PI API

project environment project environment

Test environment

TCP / IP

YOKOGAWA(DCS)

PI e RLINK• Win-NT 4 sp6• SQL Server v7• SAP GUI

Production environment

PRD

DB

DEV

DB

RLINK 1.4RLINK 1.4

Page 13: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 13

Registry configurationRegistry configurationRegistry Key Parameter Value

PI_INIFILEWITHPATH C:\PIPC\DAT\PILOGIN.INIPI_PASSWORD

PI_USERNAME piadminDBNAME plant_suitePASSWORDSERVERNAME KBSRV05USERNAME rlinkCLIENT 900DESTINATION OSISOFTLANGUAGE PTPASSWORDSERVER_DEST OSI_2TCRDPATH C:\RLINK\PPPI\CLIENT\FETCRPPATH C:\RLINK\PPPI\CLIENT\FEUSERNAME KBRLINKSAP Service sapgw00SAP Host 10.0.0.174PROGRAM ID KBSRV05.tcrd.exe

PI_INFO

PLANT_SUITE_INFO

SAP_INFO

Page 14: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 14

integration: plant floor - integration: plant floor - erperp

PROCESSO

DCS

ERP - SAP R/3

PI System MS-SQL

Plant Suite -Server

R/3 Link

Client applications

Scales

PP-PI QMPM MM

Manual Entry

Packaging areadiscrete process

Pulp production area - continuous process

Page 15: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 15

data flow diagramdata flow diagram

DCS

Pulp production plant

PI System MS-SQL

Plant Suite -Server

RLink

Scales

ERP - SAP R/3

PP-PI

Campaign Manager

InstructionsMessages

•Manual production reporting •activity info

•Process info. •Dry rate •consumptions •activities

•Process order info.•Process order status

(manual entry) •production•consumptions •activities

•process information

•status

•status•production reporting•activities •batch characteristics

•discrete production information

•Process Order Info.

SRM

•Qty of wood consumed in a process order

Packaging line- bales- reels

Wood receiving and preparation

Page 16: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 16

pulp propulp productionduction stages stages

cooking

Delignification / bleaching

Recuperation

Drying

liquid effluentsWood Preparation

Bales

Reels

steam

White liquor

Bleachedpulp

unbleached pulp

Bits of wood

woodraw materials

Continuous process Discrete process

Black liquor

raw materialswater

waterraw materials

raw materials

PMADE

PMARR

PBRAN

RECUP

SBOBI

SFARD

Page 17: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 17

Resource networksResource networks Continuous processContinuous process

• PMADE PMADE - wood preparation- wood preparation• PMARRPMARR - - unbleachedunbleached pulp pulp

productionproduction• PBRANPBRAN - - bleachedbleached pulp pulp

productionproduction• RECUPRECUP - recuperation phase- recuperation phase

Discrete processDiscrete process• SFARD SFARD - packaging of the final - packaging of the final

product product into balesinto bales• SBOBSBOB - packaging of the final - packaging of the final

product product into reelsinto reelsHowever all sub-plants are of type BPI (PI-Batch Plant)

Page 18: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 18

Activities and materials - Activities and materials - PMADEPMADE

0,856 MIN

ORG_COZ EFLORG 0,5 M3INO_COZ EFLINO 0,1 M3

ACTIVITY1 0,2 MIN

ACTIVITY2 0,15 MIN

ACTIVITY3 0,23 MIN

ACTIVITY4 0,31 MIN

ACTIVITY5 0,07 MIN

ACTIVITY6 0,23 MIN

0,8 TAS0,019 XY

0,477 XX

0,252 ZZ

0,252 XY

14,133 KWH

0,505 M3

RESOURCE ID

ELAPSED TIME

RESOURCE

MATERIAL3

MATERIAL4

ENERGY

MATERIAL

INDUSTRIAL WATER

WOOD

MATERIAL1

MATERIAL2

Page 19: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 19

production reporting -data production reporting -data flowflow

PI System

PINet Node

DCS

Quantity of energy and water consumed in the PO

CampaignManager

...quantity of each type of wood consumed in

the P.O.

SRM

PI-ProcessBook

RLINK

SAP/R3

PI_PROD ; PI_CONS ; PI_PHACT ; PI_PHST ; PI_CRST

ODBC

Page 20: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 21

material tag and common material tag and common name tablesname tables - PMADE - PMADE

material_id resource_id quantity_tag_id batch_tag_id misc_tag1INDUSTRIAL WATER PICADOR 100AGUACONS.CALC C CAV_RECEITA_1 PICADOR 102CAVACO.MI P 102STORAGE_LOCATION.MICAV_RECEITA_2 PICADOR 102CAVACO.MI P 102STORAGE_LOCATION.MICAV_RECEITA_3 PICADOR 102CAVACO.MI P 102STORAGE_LOCATION.MICAV_RECEITA_4 PICADOR 102CAVACO.MI P 102STORAGE_LOCATION.MICAV_RECEITA_5 PICADOR 102CAVACO.MI P 102STORAGE_LOCATION.MIENERGY PICADOR 100ENERCAV.CALC C WOOD PICADOR 101WOOD_TAG.MI C 101BATCHID_TAG.MI MATERIAL1 PICADOR 101MATERIAL_TAG1.MI C 101BATCHID_TAG1.MI MATERIAL2 PICADOR 101MATERIAL_TAG2.MI C 101BATCHID_TAG2.MI MATERIAL3 PICADOR 101MATERIAL_TAG3.MI C 101BATCHID_TAG3.MI MATERIAL4 PICADOR 101MATERIAL_TAG4.MI C 101BATCHID_TAG4.MI MATERIAL5 PICADOR 101MATERIAL_TAG5.MI C 101BATCHID_TAG5.MI MATERIAL6 PICADOR 101MATERIAL_TAG6.MI C 101BATCHID_TAG6.MI

resource_id Common_name tag_id

INO_CAV SAP_EI 100EFLINORG.CALCORG_CAV SAP_EO 100EFLORG.CALCPICADOR SAP_02 100MAQHCAV.TOT PICADOR SAP_03 100HHCAV.TOT PICADOR SAP_61 100DIFCAV.TOT PICADOR SAP_62 100OUTVARCAV.TOT PICADOR SAP_64 100MAPCAV.TOT PICADOR SAP_DP 100DEPRECAV.TOT

Page 21: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 22

activities for wood activities for wood preparationpreparation

Organic liquid effluent Inorganic liquid effluent Machine working hours - direct costing

Machine working hours - indirect costing Man working hours - direct costing Depreciation

Page 22: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 23

campaign managercampaign manager

Page 23: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 24

campaign manager is campaign manager is used...used...

to view general information of all to view general information of all recipes available in rlink for the recipes available in rlink for the specific resource network:specific resource network:• process order id;process order id;• control recipe id;control recipe id;• control recipe status in rlink;control recipe status in rlink;• material produced / planned quantity;material produced / planned quantity;• total produced and remaining total produced and remaining

quantity;quantity;

Page 24: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 25

campaign manager is campaign manager is used...used... to view further information about the to view further information about the

bill of material of each Control bill of material of each Control Recipe:Recipe:• material id;material id;• description;description;• quantity programmed to be consumed / quantity programmed to be consumed /

produced;produced;• total quantity already reported to SAP;total quantity already reported to SAP;• last quantity reported of each material last quantity reported of each material

(PI_CONS and PI_PROD);(PI_CONS and PI_PROD);• timestamp of the last production report timestamp of the last production report

(partial finish);(partial finish);

Page 25: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 26

campaign manager is campaign manager is used...used... to change the control recipe status:to change the control recipe status:

To start the control recipe when there is no other process order in progress

To interrupt the process order in progress

To partially finish the process order reporting production to SAP

To finish the process order

Page 26: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 27

manual input screenmanual input screen

the manual input box is automatically opened only when there are materials that need manual reports of production (all information associated with .MI

tags in material_tag and common_name tables)

Timestamo of either the last production report or the start time of the control recipe

Current Time

Wood consumption in this process order for this period of time

Bacth id sent to SAP with the PI_CONS

Produced material Storage location

SEND TO PI

All the values are validated using the zero and span of each .MI tag before sending to PI

Page 27: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 28

control recipe status control recipe status changingschangings

timestamp when the process order was started in RLINK

first production reported to SAP (partial finish)

process order current status

Page 28: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 29

discrete process - discrete process - packaging area packaging area after the production of the after the production of the

BleachedBleached Pulp this material (HALB) Pulp this material (HALB) is available for the next phase of is available for the next phase of the process: the drying phase;the process: the drying phase;

after the after the bleachedbleached pulp has been pulp has been dried it needs to be prepared to be dried it needs to be prepared to be shipped to the customer. The final shipped to the customer. The final product (FERT) can be shipped product (FERT) can be shipped into reels or bales. Each unit into reels or bales. Each unit shipped to the customer is called shipped to the customer is called Bacell lot;Bacell lot;

Page 29: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 30

the interaction between the interaction between RLINK and the packaging RLINK and the packaging lineline The process control is performed by The process control is performed by

a software that controls the a software that controls the packaging line. It communicates with packaging line. It communicates with equipments situated in the plant equipments situated in the plant floor such as the scale and the floor such as the scale and the printer;printer;

This application sends and receives This application sends and receives data from RLINK and PI;data from RLINK and PI;

The process information is The process information is continuously sent to RLINK in continuously sent to RLINK in background.background.

Page 30: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 31

the process flowthe process flow

RLINK Plant_Suite Database

Download ofprocess orders

information

PI_PROD ; PI_CONS ; PI_PHACT ;PI_BT_CR ; PI_BT_CL

SRP

From the available process ordersthe operator chooses just one to start

1. The process control software (SRP) start the production of a Lot.2. Each SAP Lot produced is weighted by the scale;3. When a Lot is closed, the PCS sends the information of each SAP Lot directly to RLINK (using customized stored procedures)

Upload of production information of each SAP Lot produced for the P.O by the endof the bacell lot.

scale

Each SAP Lot generate:- 01 PI_PROD (corresponding to the lot’s dry weight);- n PI_CONS (for each material - obtained from PI tags);- n PI_PHACT (for each activity - obtained from PI tags);- n PI_BT_CL (for each batch characteristic).

This information is sent together to RLINK

PI

PMU SAP/R3

Page 31: Implementation of rlink-pppi at a pulp mill. © Cybertécnica 2002 / Flávio Maeda 2 Klabin Group w w Klabin group is the largest paper manufacturer and.

© Cybertécnica 2002 / Flávio Maeda 32

questions ??questions ??