Impact of different pretreatments on the anaerobic digestion of ...
Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth...
Transcript of Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth...
![Page 1: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager](https://reader033.fdocuments.us/reader033/viewer/2022053113/608afebd3ef18b735e307507/html5/thumbnails/1.jpg)
Implementation of Rare Earth Primers and Pretreatments
for Military Applications
Dr. Eric Morris Technical Manager
Deft, Inc.
August, 2012
![Page 2: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager](https://reader033.fdocuments.us/reader033/viewer/2022053113/608afebd3ef18b735e307507/html5/thumbnails/2.jpg)
Report Documentation Page Form ApprovedOMB No. 0704-0188
Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering andmaintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, ArlingtonVA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if itdoes not display a currently valid OMB control number.
1. REPORT DATE AUG 2012 2. REPORT TYPE
3. DATES COVERED 00-00-2012 to 00-00-2012
4. TITLE AND SUBTITLE Implementation of Rare Earth Primers and Pretreatments for Military Applications
5a. CONTRACT NUMBER
5b. GRANT NUMBER
5c. PROGRAM ELEMENT NUMBER
6. AUTHOR(S) 5d. PROJECT NUMBER
5e. TASK NUMBER
5f. WORK UNIT NUMBER
7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Deft, Inc.,17451 Von Karman Avenue,Irvine,CA,92614
8. PERFORMING ORGANIZATIONREPORT NUMBER
9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S)
11. SPONSOR/MONITOR’S REPORT NUMBER(S)
12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited
13. SUPPLEMENTARY NOTES ASETSDefense 2012: Sustainable Surface Engineering for Aerospace and Defense Workshop, August27-30, 2012, San Diego, CA. Sponsored by SERDP/ESTCP.
14. ABSTRACT
15. SUBJECT TERMS
16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT Same as
Report (SAR)
18. NUMBEROF PAGES
19
19a. NAME OFRESPONSIBLE PERSON
a. REPORT unclassified
b. ABSTRACT unclassified
c. THIS PAGE unclassified
Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18
![Page 3: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager](https://reader033.fdocuments.us/reader033/viewer/2022053113/608afebd3ef18b735e307507/html5/thumbnails/3.jpg)
Chrome-Free Primer Success
• F-35 JSF Program – Lockheed, Northrop, BAE – F-15’s, F-22’s, Apache’s, E3’s, T-45 (3 weeks)
Photo Courtesy of: http://www.jsf.mil/gallery/
![Page 4: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager](https://reader033.fdocuments.us/reader033/viewer/2022053113/608afebd3ef18b735e307507/html5/thumbnails/4.jpg)
Total NC Systems Flying • Spray Applied, Total Non-Cr Conversion Coating
USAF F-15 Fleet Royal Norwegian AF Sea King Trial
USAF C-130
![Page 5: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager](https://reader033.fdocuments.us/reader033/viewer/2022053113/608afebd3ef18b735e307507/html5/thumbnails/5.jpg)
RE System Performance Spirit’s Data
• Performance of RECC Systems
RECC/093 1000+ Hrs Spirit
RECC/NCP 2000 Hrs Spirit
RECC/093 2000 Hrs Deft
![Page 6: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager](https://reader033.fdocuments.us/reader033/viewer/2022053113/608afebd3ef18b735e307507/html5/thumbnails/6.jpg)
F-15 System Performance Battelle’s Data
F-15 System F-15 System
• System Testing – Comparison of N.S.S. to Beach Exposure
15 Months - Daytona 3000 N.S.S.
![Page 7: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager](https://reader033.fdocuments.us/reader033/viewer/2022053113/608afebd3ef18b735e307507/html5/thumbnails/7.jpg)
F-15 System Performance Battelle’s Data
• Comparison of NCr to RE Primer/APC – 15 Months Daytona
Non Cr6+ System F-15 System
Visible Oxidation No Visible Oxidation
![Page 8: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager](https://reader033.fdocuments.us/reader033/viewer/2022053113/608afebd3ef18b735e307507/html5/thumbnails/8.jpg)
F-15 System Performance Lockheed’s Data
• RECC 1015/3021/02GN093/99GY01
No Report of Change by LM During Exposure
Close-Up
Exposed in 2008
![Page 9: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager](https://reader033.fdocuments.us/reader033/viewer/2022053113/608afebd3ef18b735e307507/html5/thumbnails/9.jpg)
Non-Cr System For F-15’s
• Over 100 F-15’s Treated – T.O. 1F -15A-23
![Page 10: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager](https://reader033.fdocuments.us/reader033/viewer/2022053113/608afebd3ef18b735e307507/html5/thumbnails/10.jpg)
Technical Information
RECC deposits darker in areas of unpassivated / exposed metal (Areas of weakened passivation, rivets, abrasion, etc are conversion coated)
(Areas of previous passivation are reinforced for adhesion/max corrosion protection)
![Page 11: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager](https://reader033.fdocuments.us/reader033/viewer/2022053113/608afebd3ef18b735e307507/html5/thumbnails/11.jpg)
Benefits of Deft NC System • Rivet Rash on Singapore F-15
– Current Cr System
![Page 12: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager](https://reader033.fdocuments.us/reader033/viewer/2022053113/608afebd3ef18b735e307507/html5/thumbnails/12.jpg)
Benefits of Rare Earth NC System
No erosion observed No Rivet Rash
• No Erosion on Inlet/Rivet Rash Resolved • NOANG
![Page 13: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager](https://reader033.fdocuments.us/reader033/viewer/2022053113/608afebd3ef18b735e307507/html5/thumbnails/13.jpg)
C-130 Applications
• Second of Three USAF C-130’s
Photo Courtesy of Eric Morris
![Page 14: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager](https://reader033.fdocuments.us/reader033/viewer/2022053113/608afebd3ef18b735e307507/html5/thumbnails/14.jpg)
Deft RECC Application
• C-130 Robins AFB
![Page 15: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager](https://reader033.fdocuments.us/reader033/viewer/2022053113/608afebd3ef18b735e307507/html5/thumbnails/15.jpg)
Northrop Grumman Evaluation Candidate 2 – 1001, 3030XD, 3050X 14 Days NSS
Bare Al 2024-T3
![Page 16: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager](https://reader033.fdocuments.us/reader033/viewer/2022053113/608afebd3ef18b735e307507/html5/thumbnails/16.jpg)
Optical Microscope Characterization
• Self-Healing Characteristics – After 4 Days S.S.
– CeCC Al 2024-T3 At 50 X Magnification
Barrier Coating/No Healing Barrier and Self-Healing
![Page 17: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager](https://reader033.fdocuments.us/reader033/viewer/2022053113/608afebd3ef18b735e307507/html5/thumbnails/17.jpg)
Non-Chrome Conversion Coating Process
WASTE RINSE WATER
COLD DI WATER
IMMERSION RINSE
HOT DI WATER IMMERSION
RINSE
AQUEOUS DE GREASER
(BRULIN 81 5 GD)
Typical Immersion Conversion Coating Process
Deox
idiz
er
DI
WAT
ER
IMM
ERSI
ON
RIN
SE
DI
WAT
ER
IMM
ERSI
ON
RIN
SE
CO
NVE
RSIO
N C
OAT
ING
(A
LODI
NE
600)
DI
WAT
ER
IMM
ERSI
ON
RIN
SE
DI
WAT
ER
IMM
ERSI
ON
RIN
SE
HEATED HEATED HEATED
WASTE RINSE WATER WASTE RINSE WATER (Chromated)
WASTE RINSE WATER
BENEFITS • Eliminate HEATED Aqueous Cleaning Tank, Support GhG initiative. • Reduce the number of Tanks, reducing cycle time and waste rinse water. • Eliminate the use of CHROMATED conversion coating. Reduce chrome WASTE. • Safer Working Environment.
1 2 5 3 4 6 7 8 9 11 12 10
De
grea
se/D
EOXI
DIZE
R
(ALD
OX
V)
DI
WAT
ER
IMM
ERSI
ON
RIN
SE
DI
WAT
ER
IMM
ERSI
ON
RIN
SE
DI
WAT
ER
IMM
ERSI
ON
RIN
SE
O
ptio
nal S
eal
IMM
ERSI
ON
RIN
SE
1 2 3 5 6 4
AQUEOUS DEGREASER
(BRULIN 815 GD)
Deft Immersion Conversion Coating Process
![Page 18: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager](https://reader033.fdocuments.us/reader033/viewer/2022053113/608afebd3ef18b735e307507/html5/thumbnails/18.jpg)
Deft Clean 4000 Performance
• Deft Clean 4K brightens ferrous and non-ferrous parts
Treated Parts
Parts to be treated
![Page 19: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager](https://reader033.fdocuments.us/reader033/viewer/2022053113/608afebd3ef18b735e307507/html5/thumbnails/19.jpg)
Future Direction
• New NC System – Spray Applied Bare 2024 / 02-Type / Deft APC
![Page 20: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager](https://reader033.fdocuments.us/reader033/viewer/2022053113/608afebd3ef18b735e307507/html5/thumbnails/20.jpg)
Performance-Bottom Line
• Active Duty Environment – 200-400 F – Mach 2+
Photos Courtesy of Google images