Implementation of PoA standards The point of view of a DOE Environmental Management and Climate...
-
Upload
jada-donnelly -
Category
Documents
-
view
215 -
download
0
Transcript of Implementation of PoA standards The point of view of a DOE Environmental Management and Climate...
![Page 1: Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.](https://reader035.fdocuments.us/reader035/viewer/2022062619/55153d3555034673228b5cc0/html5/thumbnails/1.jpg)
Implementation of PoA standards
The point of view of a DOE
Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG.
Bonn, 24 – 25 March 2012
![Page 2: Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.](https://reader035.fdocuments.us/reader035/viewer/2022062619/55153d3555034673228b5cc0/html5/thumbnails/2.jpg)
• PRESENTATION OF AENOR
• PoA EXPERIENCE
• MAIN ISSUES ON PoA VALIDATION
• NEW PoA STANDARD EB 65
• OPPORTUNITIES
SUMMARY
![Page 3: Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.](https://reader035.fdocuments.us/reader035/viewer/2022062619/55153d3555034673228b5cc0/html5/thumbnails/3.jpg)
• AENOR = ASOCIACIÓN ESPAÑOLA DE NORMALIZACIÓN Y CERTIFICACIÓN (SPANISH ASSOCIATION FOR STANDARDIZATION AND CERTIFICATION)
• AENOR: Spain + 12 branch offices in Europe, Africa and America
• Non profitable association
• Standardization body of Spain + certification company
PRESENTATION OF AENOR
![Page 4: Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.](https://reader035.fdocuments.us/reader035/viewer/2022062619/55153d3555034673228b5cc0/html5/thumbnails/4.jpg)
• Validation of 17 Poas
• 2 registered: waste compost programme (Uganda); Turbococinas (El Salvador)
• 1 PoA requesting registration (energy efficient lighting, Senegal)
• 14 validation on going
• Sectoral scopes: 1; 3; 13; 15.
PoA EXPERIENCE
![Page 5: Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.](https://reader035.fdocuments.us/reader035/viewer/2022062619/55153d3555034673228b5cc0/html5/thumbnails/5.jpg)
PoA EXPERIENCE
![Page 6: Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.](https://reader035.fdocuments.us/reader035/viewer/2022062619/55153d3555034673228b5cc0/html5/thumbnails/6.jpg)
• Eligibility criteria not enough clear or detailed
• Demonstration of additionality is based on opinions, non on substantiated facts
• CPA starting date is not in accordance with requirements
• Additionality and eligibility
•Some eligibility criteria are not verifiable
MAIN ISSUES ON PoA VALIDATION
![Page 7: Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.](https://reader035.fdocuments.us/reader035/viewer/2022062619/55153d3555034673228b5cc0/html5/thumbnails/7.jpg)
• Monitoring plan is not detailed and it is non described according to the Procedure for Registration of a programme of activities as a single CDM project activity. (EB 55 annex 38) (sampling vs. surveys)
• Guidelines on the assessment of investment analysis is not properly and completely explained.
• Emission Factor: PoA-DD does not specify if the EF is fixed ex ante
or each CPA will use its own Emission Factor.
MAIN ISSUES ON PoA VALIDATION
![Page 8: Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.](https://reader035.fdocuments.us/reader035/viewer/2022062619/55153d3555034673228b5cc0/html5/thumbnails/8.jpg)
NEW PoA STANDARD EB 65
• Eligibility criteria: “Validating DOE and/or the Board may specify additional criteria depending on the specific characteristics of a PoA”.
• The CME shall develop and implement a management system
• The revision of eligibility criteria of a registered PoA may be initiated by the Board at any time during the lifetime of the PoA if an issue related to environment integrity is identified.
•Application of multiple CDM methodologies (…) Combinations of technologies/measures and methodologies vary across CPAs of a PoA.
![Page 9: Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.](https://reader035.fdocuments.us/reader035/viewer/2022062619/55153d3555034673228b5cc0/html5/thumbnails/9.jpg)
• Further clarification on additionality
• New procedures for CPA withdrawal
• DOE liability
OPPORTUNITIES
![Page 10: Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.](https://reader035.fdocuments.us/reader035/viewer/2022062619/55153d3555034673228b5cc0/html5/thumbnails/10.jpg)
Thank you very much for your kind attention
Luis Fernando Robles Olmos
Head, Climate Change Unit
AENOR
E-mail: [email protected]