Dr. Joan A. BurtnerAssociate Professor and Chair
Department of Industrial Engineering and Industrial Management
Mercer University School of EngineeringMacon, GA
IMPLEMENTATION OF LEAN AT RHEEM
MANUFACTURING
![Page 2: Implementation of Lean at Rheem Manufacturing](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1ace7f8b9ab059970914/html5/thumbnails/2.jpg)
Background on the Evolution of Lean Manufacturing
Overview to Lean PrinciplesHighlights of Implementation of Lean
Practices at Rheem Manufacturing Co. in Milledgeville, GA
Dr. Joan Burtner Chair, Dept of Ind. Egr/ Ind Mgt 2014 Slide 2
INTRODUCTION
![Page 3: Implementation of Lean at Rheem Manufacturing](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1ace7f8b9ab059970914/html5/thumbnails/3.jpg)
EVOLUTION OF LEAN MANUFACTURING
Total Quality ManagementToyota Production System Six Sigma Process ImprovementTheory of ConstraintsValue Stream MappingWomack and Jones - Lean Thinking Rother and Shook - Learning to See
Dr. Joan Burtner Chair, Dept of Ind. Egr/ Ind Mgt 2014 Slide 3
![Page 4: Implementation of Lean at Rheem Manufacturing](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1ace7f8b9ab059970914/html5/thumbnails/4.jpg)
1. Clarify improvement needs (objectives)2. Observe operation(s) through your own
eyes3. Identify problems based on observations4. Resolve problems (kaizen)5. New ideas become new standard
operating procedure6. Maintain new methods7. Continuously repeat steps 1 through 6
Dr. Joan Burtner Chair, Dept of Ind. Egr/ Ind Mgt 2014 Slide 4
CONTINUOUS IMPROVEMENT PROCESS (WITH A LEAN SPIN)
![Page 5: Implementation of Lean at Rheem Manufacturing](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1ace7f8b9ab059970914/html5/thumbnails/5.jpg)
WASTEFUL PRACTICES
WaitingTransportationOverproductionProcessingInventoryMotionDefective Products
Dr. Joan Burtner Chair, Dept of Ind. Egr/ Ind Mgt 2014 Slide 5
![Page 6: Implementation of Lean at Rheem Manufacturing](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1ace7f8b9ab059970914/html5/thumbnails/6.jpg)
Dr. Joan Burtner Chair, Dept of Ind. Egr/ Ind Mgt 2014 Slide 6
5S’S MODIFIED FROM BESTERFIELD
(SIMPLIFY or SORT) SIMPLIFY MEANS CLEARLY DISTINGUISHING BETWEEN WHAT IS NEEDED AND KEPT AND WHAT IS UNNEEDED AND THROWN OUT
(STRAIGHTEN) STRAIGHTEN MEANS ORGANIZING THE WAY WE KEEP NECESSARY THINGS, MAKING IT EASIER TO FIND AND USE THEM
(SCRUB or SHINE) SCRUB MEANS KEEPING THE FLOORS SWEPT, MACHINES AND FURNITURE CLEAN, AND ALL AREAS NEAT AND TIDY
(STABILIZE or STANDARDIZE)
STABILIZE DEVELOP BEST PRACTICES AND STANDARD OPERATING PROCEDURES BASED ON WHAT WAS LEARNED FROM THE FIRST THREE S’S
(SUSTAIN) SUSTAIN MEANS ACHIEVING THE DISCIPLINE OR HABIT OF PROPERLY MAINTAINING CORRECT 5S PROCEDURES
![Page 7: Implementation of Lean at Rheem Manufacturing](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1ace7f8b9ab059970914/html5/thumbnails/7.jpg)
LEAN METRICS (QUANTITATIVE)
Lead-times Inventory Inventory TurnsWork In Process Workable Floor Space Efficiency Cycle Time
Dr. Joan Burtner Chair, Dept of Ind. Egr/ Ind Mgt 2014 Slide 7
![Page 8: Implementation of Lean at Rheem Manufacturing](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1ace7f8b9ab059970914/html5/thumbnails/8.jpg)
Dr. Joan Burtner Chair, Dept of Ind. Egr/ Ind Mgt 2014 Slide 8
Building Blocks of a World Class Company
One – Piece Work FlowWork Balancing
Quality ImprovementsTPM
5’s
KanbansCellular Layout
Poka YokeSMED
Visuals Work Teams
![Page 9: Implementation of Lean at Rheem Manufacturing](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1ace7f8b9ab059970914/html5/thumbnails/9.jpg)
Time studiesLine BalancesCreating work cellsHousekeeping (5 S’s)Visual Control
Dr. Joan Burtner Chair, Dept of Ind. Egr/ Ind Mgt 2014 Slide 9
TYPICAL IMPROVEMENT PROJECTS
![Page 10: Implementation of Lean at Rheem Manufacturing](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1ace7f8b9ab059970914/html5/thumbnails/10.jpg)
GENERAL GUIDELINES FOR VISUAL CONTROL AT RHEEM
Work instructions (S.O.P.’S)Quality instructionsSafety remindersClearly marked part delivery
locationsTool boards (where needed)Production boards (where needed)Layouts
Dr. Joan Burtner Chair, Dept of Ind. Egr/ Ind Mgt 2014 Slide 10
Work Stations Should Include:
![Page 11: Implementation of Lean at Rheem Manufacturing](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1ace7f8b9ab059970914/html5/thumbnails/11.jpg)
Spring and Summer 2003Kaizen and 5 S All Assembly LinesCreated Zoned Housekeeping Layouts for All Major Production Areas
Designated Part Delivery and Storage Locations
Placed Production and Quality Status Boards Began Drafting Standard Operating Procedures and Safety Reminders for All Work Stations
Dr. Joan Burtner Chair, Dept of Ind. Egr/ Ind Mgt 2014 Slide 11
IMPLEMENTATION OF VISUAL CONTROL AT RHEEM
![Page 12: Implementation of Lean at Rheem Manufacturing](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1ace7f8b9ab059970914/html5/thumbnails/12.jpg)
Dr. Joan Burtner Chair, Dept of Ind. Egr/ Ind Mgt 2014 Slide 12
KAIZEN OF AN ASSEMBLY LINE 1
Before After
![Page 13: Implementation of Lean at Rheem Manufacturing](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1ace7f8b9ab059970914/html5/thumbnails/13.jpg)
Dr. Joan Burtner Chair, Dept of Ind. Egr/ Ind Mgt 2014 Slide 13
KAIZEN OF AN ASSEMBLY LINE 2
Before After
![Page 14: Implementation of Lean at Rheem Manufacturing](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1ace7f8b9ab059970914/html5/thumbnails/14.jpg)
Cross-functional work teams for solving problems
Composition of Work TeamsUpper managementSupervisorsCo-op StudentsEngineersAssembly Line Workers
Dr. Joan Burtner Chair, Dept of Ind. Egr/ Ind Mgt 2014 Slide 14
USING WORK TEAMS AT RHEEM
![Page 15: Implementation of Lean at Rheem Manufacturing](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1ace7f8b9ab059970914/html5/thumbnails/15.jpg)
Dr. Joan Burtner Chair, Dept of Ind. Egr/ Ind Mgt 2014 Slide 15
CONTINOUS IMPROVEMENT TOOLS FOR BALANCING WORK Takt Time Available Daily Work Time Time Observation Standard Work Flow Diagrams Cellular Layout Work Distribution Sheet
![Page 16: Implementation of Lean at Rheem Manufacturing](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1ace7f8b9ab059970914/html5/thumbnails/16.jpg)
Observe a process or machineEnter each task component onto a formNote exceptions or non-repeating tasksCalculate the average cycle time for
each taskAdd all average element times to find
the cycle time of the total process
Dr. Joan Burtner Chair, Dept of Ind. Egr/ Ind Mgt 2014 Slide 16
TIME OBSERVATION
![Page 17: Implementation of Lean at Rheem Manufacturing](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1ace7f8b9ab059970914/html5/thumbnails/17.jpg)
Used to help identify the flow of the operation(s) you are observing
Used as a layout for developing an improved process
An excellent tool to use to develop standard work procedures
Dr. Joan Burtner Chair, Dept of Ind. Egr/ Ind Mgt 2014 Slide 17
STANDARD WORK FLOW DIAGRAM
![Page 18: Implementation of Lean at Rheem Manufacturing](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1ace7f8b9ab059970914/html5/thumbnails/18.jpg)
Dr. Joan Burtner Chair, Dept of Ind. Egr/ Ind Mgt 2014 Slide 18
CELLULAR LAYOUTS
The arrangement of manufacturing work cells to allow for a flowing process
With this concept, work can performed without the need for large inventory batches
The parts enter the beginning of the cell as raw materials and exit the cell as completed units
![Page 19: Implementation of Lean at Rheem Manufacturing](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1ace7f8b9ab059970914/html5/thumbnails/19.jpg)
Rheem Manufacturing Permission to use training materials Permission to use photos
ISE and IDM Students Permission to use student work
Dr. Joan Burtner Chair, Dept of Ind. Egr/ Ind Mgt 2014 Slide 19
ACKNOWLEDGMENTS
![Page 20: Implementation of Lean at Rheem Manufacturing](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1ace7f8b9ab059970914/html5/thumbnails/20.jpg)
Contact Information Dr. Joan Burtner [email protected] 478 301-4127
Dr. Joan Burtner Chair, Dept of Ind. Egr/ Ind Mgt 2014 Slide 20
QUESTIONS AND DISCUSSION