IMPLEMENTATION OF DISTRICT MEDIUM-TERM DEVELOPMENT … · Assembly in collaboration with the Rural...
Transcript of IMPLEMENTATION OF DISTRICT MEDIUM-TERM DEVELOPMENT … · Assembly in collaboration with the Rural...
ADENTAN MUNICIPAL ASSEMBLY
IMPLEMENTATION OF DISTRICT
MEDIUM-TERM DEVELOPMENT PLAN
(2014-2017)
ANNUAL PROGRESS REPORT FOR
2014
PREPARED BY:
MUNICIPAL PLANNING COORDINATING UNIT
1
TABLE OF CONTENT
CONTENT PAGE
CHAPTER ONE ..................................................................................................................................... 3
1.0 INTRODUCTION .......................................................................................................................... 3
1.0.1 Mission Statement .......................................................................................................................... 3
1.0.2 Vision ............................................................................................................................................. 3
1.0.3 Objective ........................................................................................................................................ 3
1.1 KEY MONITORING AND EVALUATION OBJECTIVES FOR THE YEAR ........................... 3
1.2 PROCESSES INVOLVED AND DIFFICULTIES ENCOUNTERED............................................ 4
1.3 STATUS OF IMPLEMENTATION OF MTDP 2014-2017 .......................................................... 4
1.3.1 ENSURING AND SUSTAINING MACROECONOMIC STABILITY ...................................... 4
1.3.2 ENHANCING COMPETITIVENESS IN GHANA’S PRIVATE SECTOR ................................ 5
1.3.2.1 Skills Training………………………………………………………..…………………………5
1.3.2.2 Business Advisory Centre ........................................................................................................... 6
1.3.3 ACCELERATED AGRICULTURE MODERNISATION AND SUSTAINABLE NATURAL
RESOURCE MANAGEMENT .............................................................................................................. 6
1.3.3.1 West Africa Agricultural Productivity Project (WAAPP)…………………………..………….8
1.3.3.2 Environmental Health and Sanitation ......................................................................................... 9
1.3.4. INFRASTRUCTURE AND HUMAN SETTLEMENT DEVELOPMENT ................................ 9
1.3.4.1 Roads......................................................................................................................................... 9
1.3.4.2 Transport ................................................................................................................................. 10
1.3.4.3 Water ......................................................................................................................................... 10
1.3.5 HUMAN DEVELOPMENT PRODUCTIVITY AND EMPLOYMENT……………………....10
1.3.5.1 Education .................................................................................................................................. 10
Table 1.1 Programmes Organised for Girls or Boys in 2014 ............................................................ 11
Challenges of the Department ........................................................................................................... 11
1.3.5.2 Non-Formal Education Division (NFED) ................................................................................. 12
1.3.5.3 Health ........................................................................................................................................ 12
1.3.5.3.1 Malaria .................................................................................................................................. 12
Table 1.2: Top Ten Diseases Seen in the Adentan Municipality ...................................................... 13
Table 1.3: Category of Staff and Ratio to Population in the Adentan Municipality in 2014 ............ 14
1.3.5.3.2 Availability of Health Workers ........................................................................................... 14
1.3.5.3.3 Infrastructure ......................................................................................................................... 14
Table 1.4: Infrastructure – Bridging Equity Gap in Access to Health Care ...................................... 14
Table 1.5: Public Health Facilities in the Zonal Councils in the Municipality as at 2014 ................ 15
Table 1.6: Private Health Facilities in the Zonal Councils in the Municipality as at 2014 ............... 16
2
1.3.5.3.4 Maternal mortality rate .......................................................................................................... 16
Table 1.7: Prevention of Mother to child transmission of HIV from 2010-2013 ............................. 17
Table 1.8: Annual HIV Counselling and Testing (CT) 2013 Distribution by Age groups ............... 17
1.3.5.4 The Vulnerable and Exclusion ............................................................................................... 17
1.3.5.4.1 Early Childhood Centres for 2014……………………….….………………………………18
1.3.5.4.2 Domestic Violence &Child abuse…………………………….…………….……………….19
1.3.5.4.3. Births and Deaths .................................................................................................................. 19
1.3.6 TRANSPARENT AND ACCOUNTABLE GOVERNANCE .................................................... 19
1.3.6.1 Security ..................................................................................................................................... 20
1.4 PURPOSE AND PREPARATION OF THE M&E PLAN ........................................................... 20
CHAPTER TWO ................................................................................................................................ 21
2.0 INTRODUCTION .......................................................................................................................... 21
2.1 PROGRAMME AND PROJECT STATUS FOR THE YEAR 2014 ............................................. 21
2.2 REPORT ON FUNDING BY SOURCES (GH¢) ........................................................................... 21
Table 2.1: Sources of Revenue – Adentan Municipal Assembly ...................................................... 21
2.2.1 COMMENTS ............................................................................................................................... 22
a. Release of Funds ............................................................................................................................... 22
2.3 REPORT ON DISBURSMENT ..................................................................................................... 22
Table 2.2: Report on Disbursement: ................................................................................................. 23
2.3.1 Comments on Disbursement. ....................................................................................................... 23
2.4 UPDATE ON THE CORE MUNICIPAL INDICATORS & TARGET......................................... 24
Table 2.3: Update on the Core Municipal Indicators & Target ...................................................... 24
2.5 REPORT ON CRITICAL DEVELOPMENT AND POVERTY .................................................... 26
2.5.1 Implementation of Capitation Grant .......................................................................................... 26
2.5.2 Ghana School Feeding Programme ...................................................................................... 26
2.5.3 Local Economic Development ..................................................................................................... 27
2.5.5 National Health Insurance Scheme .............................................................................................. 27
2.7 Evaluation and Participatory M&E ................................................................................................. 28
CHAPTER THREE .............................................................................................................................. 30
3.0 The Way Forward…………………………………………....……………………………………30
3.1 Key issues addressed and those yet to be addressed ....................................................................... 30
3.2 Recommendation ........................................................................................................................ 30
TABLE 3.1: ANNUAL PROGRESS REPORT (PROJECTS & PROGRAMMES) FOR ON-
GOING PROJECTS FOR 2014……………….…………………………………….………..31
ACCESSIBILITY TO PUBLIC PLACES TO THE PHYSICALLY CHALLENGE………..35
3
CHAPTER ONE
1.0 INTRODUCTION
Adentan Municipal Assembly was created by a Legal Instrument (LI 1888) on the 29th
February, 2008. Hither-to, Adentan was part of the then Tema Municipal Assembly which is
now Tema Metropolitan Assembly.
1.0.1 Mission Statement
The Adentan Municipal Assembly exists to facilitate the improvement of quality of life of the
people within the Assembly’s jurisdiction through equitable provision of services for the total
development of the Municipality within the context of Good Governance.
1.0.2 Vision
The Vision of the Adentan Municipality is to create a modernised, harmonious,
environmentally friendly and economically viable Municipality delivering people centered
services with dedication.
1.0.3 Objective
This Annual Progress Report is for the year 2014 and is therefore based on the 2014 Annual
Plans. The report presents the assessment of the indicators and targets established for the
purposes of tracking the progress of the various interventions as well as assessing their
impacts on the beneficiaries. The seven (7) indicators as outlined by the National
Development Planning Commission (NDPC) form the basis for assessment of progress of
implementation of the Annual Plan for 2014.
1.1 KEY MONITORING AND EVALUATION OBJECTIVES FOR THE YEAR
Monitoring and Evaluation (M&E) plays a very important role in the implementation of
Development Plans. The extent to which the Development Plan will achieve its set goals and
objectives depends, to a very large extent, on a well-structured M&E framework that tracks
the use of resources and ensures a high level of efficiency.
The key Monitoring and Evaluation (M&E) objectives for the year under review were
established in line with the objectives stated in the Medium Term Development Plan (2014-
2017) and is aimed at achieving the higher goal of “to improve the quality of services to the
people and promote growth in all sectors within the Municipality”. Some of the key
M&E objectives for the year 2014 are given under the various thematic areas of the Ghana
Shared Growth and Development Agenda II (GSGDAII) as follows:
• Ensuring and Sustaining Macro Economic Stability
• Enhancing Competitiveness in Ghana’s Private Sector
• Accelerated Agricultural Modernisation and Sustainable Natural Resource
Management
4
• Infrastructure, Energy and Human Settlements
• Human Development, Productivity and Employment
• Transparent and Accountable Governance
1.2 PROCESSES INVOLVED AND DIFFICULTIES ENCOUNTERED
The monitoring of plan implementation was in line with the M&E calendar developed by the
Assembly. The Municipal Planning Coordinating Unit (MPCU) and staffs of other
departments performed Monitoring activities. Facts finding methods such as interviews,
observations of project activities and discussions with projects staff, heads of departments,
beneficiaries were adopted to gather information. The focus was to ensure that
implementation processes are carried out to have programmes/projects remain on course and
be completed on schedule. Data collection and analysis was tedious due to lack of proper
logistics and indicators for monitoring.
1.3 STATUS OF IMPLEMENTATION OF MTDP 2014-2017
The process of translating the MTDP into visible results was successful with different results
chalked by the various implementing departments and agencies. This is due to the varied
level of control the departments have over the mobilization, organization and managing the
resources needed to undertake actions embodied in the plan.
Implementation of the plan entailed the construction of physical infrastructure which includes
roads, health, educational and sanitation facilities. Also being implemented are specific
technical and professional services like agricultural extension, community health services and
literacy programmes among others.
The objectives and strategies to ensure the goal of the GSGDA are achieved through the
harmonization of the development focus and priorities of the Municipality with national
priorities and strategies. The thematic areas are outlined below;
1.3.1 ENSURING AND SUSTAINING MACROECONOMIC STABILITY
The goal for the above thematic area is to establish a strong local economic development,
hence improving revenue mobilization, expenditure management, job creating opportunities
and skills development.
To also increase Internally Generated Funds via the preparation and implementation of a
strategic plan to improve revenue, produce yearly reports on the performance of budgets and
develop a reliable database for all properties and businesses in the Municipality.
During the 2014 financial year the total budgeted Internally Generated Fund was Three
Million Three Hundred and Forty-nine Thousand, Two Hundred and Four Ghana Cedis ,
Forty Pesewas(GH¢ 3,349,204.48) whereas the actual IGF received was Three Million Two
Hundred Thirty-six Thousand, One Hundred and Forty-one, Sixty-nine Pesewas
(3,236,141.69), representing 96.6% of budgeted Internally Generated Revenue. Even though
the financial performance of the Assembly for the year 2014 was encouraging, the Assembly
could not achieve its targeted total revenue of GH¢ 7,489,553.84 in 2014. The reason is that
5
funds released from the Central Government and other sources were below the budgeted
figure. For example the Assembly budgeted for a total of GH¢1,400,000.00 from the Central
Government source whereas the actual GoG funds received was 1004,904.95 representing
71.70% of fund received. This actually disturbed the development plan of the Assembly. It is
hoped that the year 2015 will see a great improvement in District Assembly Common Fund.
The Assembly is also initiating strategies to improve Internally Generated revenue in the
coming year.
1.3.2 ENHANCING COMPETITIVENESS IN GHANA’S PRIVATE SECTOR
This thematic area has a goal to strengthen the capacity of small scale enterprises to enable
them operate effectively and also facilitate their access to capital for the expansion of their
businesses.
It also seeks to promote domestic tourism for revenue generation.
1.3.2.1 Skills Training
The Co-Operative Department registered seven societies with legal certificate. The
Department visited Twenty two societies for educational programmes, resolution of problems
and inspection of their accounts records. The Department conducted audit on the operations
of Nine (9) co-operatives unions and societies. Seven meetings for the discussions on vital
issues bordering the some of the Co-operative societies and election of Executives.
The Department had organized a day programme on Conflict Management, a workshop on
Secretarial Practice and Accounting, workshop on Leadership and Group Effective and
seminar for 100 Co-operative members. Meeting attendance for training programme
organized is almost 95% of the number expected to attend.
The department succeeded in increasing the number of registered co-operative groups from
48 to 55. Soft loans have been given to some Co-operative Groups in Ashalley Botwe and
Adjiringanor to expand their businesses with the support of MEBIA and ASA, a Micro
Financial Institution.
Challenges
• Inadequate staff for the department.
• Lack of transport facility is affecting the regular visitation.
• Inadequate capital for small enterprises to expand.
6
1.3.2.2 Business Advisory Centre
Business Advisory Centre (BAC) - Adenta was established by the Adentan Municipal
Assembly in collaboration with the Rural Enterprises Programme (REP) in October 2013 to
implement relevant programmes that would contribute to the development of Micro and
Small Enterprises MSEs and the unemployed youth through the generation of profit, growth
and creation of employment opportunities in the Municipality. The centre carried out
sensitization, advisory assistance and training for 30 MSEs in the Municipality.
Challenges
The Centre requires the following logistics if it is to function efficiently and effectively:
• Computer and accessories
• Furniture
1.3.3 ACCELERATED AGRICULTURE MODERNISATION AND SUSTAINABLE
NATURAL RESOURCE MANAGEMENT
The goal of this thematic area is to promote the cultivation of crops and livestock rearing for
food security and income. And also ensure restoration of degraded natural resources
especially tree planting.
Table 1.1Core crop production indicators for selected commodities in Adentan
Municipality for the year 2013- 2014
Crop Acre 2013 2013 Acre 2014 Production (Kg) 2014
Maize 255 81600 265 84800
Cassava 28 91840 29 95120
Chilli Pepper 55 70400 0 0
Okro 142 181760 148 189440
Tomatoes 53 131440 63 156240
Yam 0 0
Cucumber 14 64848 16 74112
Plantain 25 80000 26 83200
Groundnut 2 1040 0 0
Cabbage 9 120960 11 147840
Garden Eggs 0.5 580 0 0
Carrot 3 15840 2 10560
Rice 5 3800 0 0
7
Table 1.2 Core animal production indicators for selected animals in Adentan
Municipality 2013- 2014
Animal Type 2013 Stock 2014 Stock
Goat 1172 1214
Sheep 2031 2133
Cattle/Dairy 1602 1101
Pig 1021 1016
Layer 6333 6035
Broiler 11002 10004
Turkey 88 100
Local Fowl 19500 16400
Cockerel 465 452
Grasscutter 1842 1421
Rabbit 511 552
Table 1.3 Vaccinations of Animals
Vaccination of Animals
Diseases Animals species No. Animals Vaccinated
2010 2011 2012 2013 2014 Total
Dogs 980 408 911 815 1175 4289
Rabies Cat 266 86 132 79 136 699
Monkey 4 2 5 3 14
Total no of pets/yr 1250 494 1045 899 1314 5002
PPR Goat 118 3029 89 651 409 4296
Sheep 279 1443 107 164 265 2258
Newcastle
Diseases (i2) Poultry 5302 3725 9027
Cowpea 9 4680 6 3120
Cauliflower 6 3600 16 74112
onion 72 120960 85 142800
Total 678.5 973,348 265 84800
8
1.3.3.1 West Africa Agricultural Productivity Project (WAAPP)
This is a project being implemented by the Ministry of Food and Agriculture to increase
farmers’ access to good planting materials through the provision of improved crop varieties
to help increase agricultural productivity in the country. The Adentan municipal is a
beneficiary and 83 farmers benefitted from the gesture in 2014.
Table 1.4 List of Technologies showcased to the Participants/Beneficiaries under
WAAPP
Crop Varieties Area
(Acres)
Collaborato
rs
Participants
Farmers
Participants Mofa&Others
M W Youth total MoF
A
staff
others total
Maize obataanpa 1 Christopher
Laryea
Anang
15 3 10 28 4 0 4
Maize obataanpa 1 S.A.
Kpesese
20 8 6 34 3 0 3
Cassava
Etuohia&
Bankyehe
maa
2 Christopher
Laryea
Anang
10 0 11 21 4 0 4
Total 45 11 27 83 11 0 11
MAIZE
1. Importance of ploughing across slopes
2. Fertilizer application
3. Effective weed control
CASSAVA
1. Importance of ploughing across slopes
2. Integrated weed management
3. Fertilizer application
9
1.3.3.2 Environmental Health and Sanitation
The Municipality has been divided into 16 zones and given to 8 Waste Management
Contractors for the management of waste. A total of 31,360 metric tonnes of wastes were
generated in 2014 as compared to 12,775 metric tonnes in 2013. The amount of waste
collected in 2014 was 19,801.25 metric tonnes as compared to 8,361 metric tonnes collected
in 2013.
For the year 2014, 40 Waste Containers and Waste Bins were acquired. There are 26 Public
Toilets in the Municipality. There were notices sent to 5,280 landlords to provide toilets at
their premises. The department screened 2564 Food Vendors and 2472 were qualified to sell
whilst the remaining 92 not qualified. Eight Electoral Areas have been fumigated and 4
schools inspected for good sanitary conditions. Twenty four Clean-up exercises were
organized including 4 market fora.
The Department also identified inadequate infrastructure at the Zonal Councils as the main
challenge affecting smooth operations in the Municipality.
CHALLENGES FACED BY THE DEPARTMENT AND THE FARMERS
Department
• Furniture
• Motor bike
• Inadequate financing
Farmers
• Loss of farmlands to Urbanization
• Erratic rainfall; and
• High cost of agricultural inputs, including credit
1.3.4. INFRASTRUCTURE AND HUMAN SETTLEMENT DEVELOPMENT
1.3.4.1 Roads
The Adentan Municipal Roads Unit is responsible for managing a road network of 562km.
This is made up of 126km and 436km of paved and unpaved roads respectively.
The Feeder Roads department planned to undertaken gravelling works, construction of drains
and shaping works but could not do them due to delay of fund.
On traffic management and planning, the Urban Roads Department used traffic calming on
some main roads, road line marking on major roads, speed humps and road signs at some
10
specific points to control over speeding in order to prevent both pedestrian and vehicular
accidents from occurring within the Municipality.
1.3.4.2 Transport
Private and commercial transport services operating in the Adentan Municipality include
taxis, trotro which convey people and goods to and fro in their day to day business activities.
Metro Mass transport services also operate in the Municipality. This has a positive impact as
workers and residents in the Municipality no longer spend long hours queuing for transport.
The Urban Passenger transport project was also introduced and bye-laws for the operations
have been passed and gazetted. A total of 968 vehicles have been registered and stickers
issued to them. The department registered 35 vehicle operators in the Municipality for the
period under review. The unit facilitated the procurement of 5No. wheel clamp to be used by
the Municipal Guards.
1.3.4.3 Water
The Assembly seeks to improve the supply of portable water within the Municipality. Three
boreholes were mechanized by the Assembly to help improve access to water. Plans are
underway to mechanize more boreholes and form WATSAN committees to manage these
boreholes. Community Water and Sanitation Agency is also currently assisting the Assembly
with the mechanization of some boreholes in some schools without access to portable water.
1.3.5 HUMAN DEVELOPMENT PRODUCTIVITY AND EMPLOYMENT
1.3.5.1 Education
The policy direction for education in the Municipality is to improve equitable access to
education, quality of education, education management and also improve Science,
Technology and Technical vocational education and training.
Table 1.5 Pupils/ Teacher Enrolment in 2013 – 2014
S/N Educational
Level
Pupils enrolment No. of Teachers
2013 2014 Trained Untrained Attendants
2013 2014 2013 2014 2013 2014
2 KG 1701 1734 50 55 5 6
2 Primary 6577 7490 186 201 3 2 - -
3 JHS 2926 3185 173 186 1 1 - -
Total 11204 12409 409 442 4 3 5 6
11
Table 1.6 Programmes Organised for Girls or Boys in 2014
ACTIVITY OUTCOME
Annual Girl Child’s Camping at St. Peter’s school 40 girls were camped. 30 public and 10
private
Organize of 5th Annual Role Model and Mentoring
conference for Girls
600 students from both public and private
participated in the program. It was very
successful.
Girls’ Club – Training of club executives and club
facilitators
Monitoring of club activities
All the participants were from the public
schools.
Seven Girls club had been formed in the
private schools at the moment
Opening of Girls’ Club in Private Schools Helga, Pearl Petra, ICON, Big Family & Hill
Side
Meeting with P.T.A on sensitization of Girls’
Education
PTA from 2 schools had benefited
Adjiringanor Basic and Holy Rosary Basic
Inter-Schools News Casting Competition - Pre-
Independence celebration for Boys
The winning schools of the competition :
1st Mercy Islamic
2nd Holy Rosary
3rd Adjiringanor
Challenges of the Department
� Employment of security men for the schools.
� Fence wall for some of the schools. Especially Sowa Din Memorial School.
� Electrification for all public schools not yet connected
� Office space for the Directorate.
� Delay of funds for organizing activities.
� Provision of public schools in areas where there none, compelling children to travel
far to access basic education. Eg. Ashiyie, Amafro and New Legon
� Absence of Public Senior High School ‘
� Space to accommodate children in areas where class enrolment is so high
� Adequate furniture for both teachers ad pupils
� Rehabilitation works in some schools
12
1.3.5.2 Non-Formal Education Division (NFED)
The Non-Formal Education Division (NFED), an agency of the Ministry of Education is the
only governmental organization which is tasked to carry out the Adult Literacy Programme in
the country.
The Adentan Municipal office of the Non-Formal Education registered 11 literacy classes
within the Municipality for the period under review. The department is currently into two
income generating (bread making) activities at Ashalley Botwe and Adjiringanor for batch
Seventeen (17).
Challenges of the Department
i. Lack of funds for effective supervision.
ii. Lack of a vehicle to convey and supply logistics to the classes and for effective
supervision.
iii. Delay of funds from the Assembly to executive activities.
iv. Limited office space.
1.3.5.3 Health
In terms of Health, the main priorities were to provide quality health service delivery and also
create an enabling environment to promote private sector participation in health delivery.
1.3.5.3.1 Malaria
Malaria continues to be one of the national health problems that affect not only pregnant
women but children under 5 years. These categories of the population are all vulnerable with
Adentan Municipality not exception.
From the table below, malaria is the leading cases of OPD attendance in the Municipality.
For the period under review (2014), it accounted for approximately 73.0 % (31,541 cases at
OPD in the Municipality. To reduce the disease burden, there is the need to bring all
stakeholders under the Municipal Health Advocacy Team (MHAT) to start addressing the
underline causes of continuous increasing of communicable diseases in the municipality
including malaria. Other communicable diseases including typhoid fever, diarrhea intestinal
worms continue to pose threat to health security in the municipality. Meanwhile there is the
need to strengthening the Health Promotion Unit/ Information unit of the municipality to
come out with strategies to address issues of communicable diseases in the municipality.
Other diseases appearing in the Adentan Municipality is seen in the table below.
13
Table 1.7: Top Ten Diseases Seen in the Adentan Municipality
Figure 1.1 Top Ten Diseases in the Municipality
73.4
2.1 3.1 2.1 2.7 2.4 1.8 3.47.4
0.7
12.6
0
10
20
30
40
50
60
70
80
2013
2014
Diseases
2013 2014
# Of Cases % Of Total # Of Cases % Of Cases
Malaria 31,641 36.34 78,972 73.4
Typhoid Fever 2,395 2.75 2,253 2.1
Diarrhoea 3,045 3.47 3,307 3.1
Hypertension 3,023 3.47 2,288 2.1
Rheumatism & other
Joint Disease
2,436 2.80 2,942 2.7
Skin disease /ulcers 3,192 3.67 2,607 2.4
Acute Psychosis 1,854 2.00 1,954 1.8
Acute Urinary Tract
Infection
3,448 3.96 3,655 3.4
Acute Respiratory
Infection
8,513 9.78 7.962 7.4
Home Accident/
Injuries
777 1.00 820 0.7
All other diseases 26,736 31 15,434 12.6
Total 87,060 100 122,194 100
P (%)
14
Table 1.8: Category of Staff and Ratio to Population in the Adentan Municipality in
2014
Category of
Staff
Public Health
staff
Private Health
staff
Total Ratio to Population
Doctor 1 0 1 0.0%
Medical assist. 3 0 3 0.003%
Pharmacist 0 0 0 0.0%
Lab. Tech 0 0 0 0.0%
Nurses General 20 0 20 0.022%
Midwives 7 0 7 0.008%
Other Nurses 137 0 137 0.153%
Health Assist. 3 0 3 0.003%
Other staff 17 0 17 0.019%
Total 188 0 188 0.21%
1.3.5.3.2 Availability of Health Workers
Human resource capacity continues to grow gradually over the period under review. This has
led to improved health staff to population ratio. This is a strong indication that the health
sector will meet the challenges when all the public health facilities begin operation. However
there is the need to look at the midwifery staff since the few are weak and there is the need to
encourage younger staff to go for post-basic course in midwifery to address the gap of
supervised delivery. These improved the quality of health care delivery.
1.3.5.3.3 Infrastructure
The Municipality has a total of 40 health facilities as at 2013, consisting of 19 Public health
facilities and 22 Private health facilities. All the facilities both public and private provide
specific services except 3 private hospital which provided comprehensive and emergencies
services currently. The breakdown is as follows:
Table 1.9: Infrastructure – Bridging Equity Gap in Access to Health Care
YEAR 2010 2011 2012 2013 2014
Public Health Facilities 4 5 15 18 19
Private Health Facilities 16 16 17 22 22
TOTAL 20 21 32 40 41
From the table above, there has been 5 times increase of Public health facilities from four in
2010 to 19 in 2014.This is an indication that the government is increasing geographical
access to health by addressing the gap to quality of care.
15
The Public health services focus currently on implementing government health policies,
diseases surveillance, prevention, control, eradication of diseases of international health
security keys among them are Polio, Guinean worm and yaws. Addressing MDGs 4 and 5 are
activities that are jointly undertaken by both the private and public health facilities.
Emergencies Obstetric Care and other major surgeries are undertaken by the private health
facilities.
Table 1.10: Public Health Facilities in the Zonal Councils in the Municipality as
at 2014
From the above table an average of 4 public health facilities serving each zonal council
depending on its population density. Most of the facilities are within a radius of 1 kilometre
in densely populated communities.
No.
Zonal
Council Name Of Facility Location
1
Gbentanaa
Frafraha Health Centre Frafraha
2 Adenta RCH Clinic Adentan
3 Adenta Old Town CHPS Zone Adenta Old Town
4 New Legon CHPS Zone Ashale Botwe
5
Koose
Adenta-Amanfrom Health Centre Koose
6 Amrahia Health Centre Amrahia
7 Ashiyie RCH Clinic Ashiyie
8 Amrahia CHPS Zone Amrahia
9 Fulani Kope CHPS Zone Main Barron Amrahia
10
Nii Ashale
Ashale Botwe RCH Clinic Ashale Botwe
11 Ogbojo CHPS Zone Ogbojo
12 Aben Woha CHPS Zone Aben Woha
13 Adaman CHPS Zones Adaman
14 Nanakrom CHPS Zone Nanakrom
15 Old Town CHPS Zone Old Town
16
Sutsurunaa
Adjiringanor RCH Clinic Adjiringanor
17 Otano CHPS Zone Otanor
18 Otinshie CHPS Zone Otinshie
19 Adjiringanor Health Center Adjiringano
16
Table 1.11: Private Health Facilities in the Zonal Councils in the Municipality as
at 2014
No. Zonal
Council
Name of facility Location
1 Gbentanaa Basel Maternity and Clinic Adentan
2 Oyoko Clinic Adentan Housing Down
3 Adenta Clinic Adentan Estate
4 Amaganaa Clinic Adentan Estate
5 Crystal Eye Clinic Adenta Estate (Housing
Down)
6 Health Loop Clinic Ashale Botwe
7 Trust Clinic Adenta Market
8 Mother Love Hospital Adentan
9 Grace & Peace Clinic &
Maternity Home
Ashale Botwe
10 Koose
Ashiyie Community Clinic Ashiyie
11 RCI Mission Clinic Amrahia
12 St. John Of God clinic Amrahia
13 Health Gate Clinic Ashiyie
14 Nii Ashale
Peace Be Consultancy Clinic Ashale Botwe
15 Nana Yaa Memorial Trust Ogbojo
16 Universal Bethesda Clinic Ashale Botwe
17 Dr. Rose Clinic Nmai Dzor
18 Liberty Maternity Home Ashale Botwe
19 Sutsurunaa
Rinat Clinic Otanor
20]i Twumasiwaa Medical Centre ARS Junction
21 Ghana Canada Specialist Hospital Manor Valley,
Adjiringanor
22 Rose Better Maternity Home Adjiringanor
From the table above most of the private health facilities are situated in the urban areas of the
municipality especially in the Gbentanna Zonal Council.
1.3.5.3.4 Maternal mortality rate
Most of the deliveries are being done in the private health facilities in the Municipality.
Currently maternal mortality rate continue to be 0 per 100,000 lives birth.
On preventive mother to child HIV, there have been gradual increased in willingness of
pregnant mothers to be tested for HIV with the prevalence rate of average of 12 per 1,000 in
2010 and stagnated 5 per 1,000 in 2011, 7 per 1,000 in 2012 and 6 per 1,000 in 2013 and 5
per 1,000 in 2014.
17
Table 1.12: Prevention of Mother to child transmission of HIV from 2010-2014
PMTCT 2010 2011 2012 2013 2014
Counselled 515 1019 1329 1038 1023
Tested 487 824 1283 1010 1004
Positive 6 4 9 4 4
Babies on ARV 0 0 0 1 1
Mother on ARV 0 0 0 1 1
Table 1.13: Annual HIV Counselling and Testing (CT) 2013-2014 Distribution by Age
groups
INDICATORS AGE GROUPS (YEARS) TOTAL AGE GROUPS
(YEARS)
TOTAL
2013 2014
10-
14
15-39 40-
50+
10-14 15-39 40-
50+
Receiving Pretest
Information
Male 16 483 124 623 2 535 98 645
Female 13 914 214 1,141 7 1192 124 1,333
Tested Male 16 421 124 598
Female 13 913 214 1,140
No. receiving
results
Male 7 7 0 12 5 17
Female 11 10 21 0 39 6 46
Receiving
Positive Test
Results
Male 5 5 0 12 5 17
Female 11 10 21 0 40 6 46
Receiving Protest
Counselling
Male 15 455 125 595 2 535 26 645
Female 13 909 213 1,135 7 1190 27 1,333
`Total 86 4129 1034 5,286 50 3737 297 4,084
Challenge
The Health Directorate has no big hospital to meet the health needs of the increasing
population in the Municipality
1.3.5.4 The Vulnerable and Exclusion
The Department of Social Welfare and Community Development during the year under
review registered and supervised 202 Early Childhood Centre’s. The Department also
registered Ninety three (93) PWDs, registered and supervised Nine (9) NGOs and four (4)
sensitization programmes carried out. Furthermore the Department supervised thirty two (32)
NGOs in the Municipality and recorded one (1) abuse case. Residents were also educated on
18
their civic rights and responsibilities and information disseminate through study groups and
mass meetings.
Table 1.14: Activities undertaken by the Department of Social Welfare in 2014
Activity Male Female Total
Child Abuse - 1 1
PWD’s registered 55 38 93
PWD’s (Support) - 1 1
Widows (Registration) - 2 2
Domestic Violence - 1 1
Child Labour 2 4 6
Child Maintenance 16 10 26
1.3.5.4.1 Early Childhood Centres for 2014
The total number of Early Childhood Development Centres in the Municipality is 202. Out of
a total number of 8,058 children enrolled, 5,073 of the kids are males whilst 2,985 are
females ranging from 0-4 years. This does not reflect the normal picture of enrolment level
since girls at the lower levels of Education usually have higher percentage than boys. The
breakdown is as follows:
Table 1.15: Enrolment levels of the Early Childhood Centres
Males Females Total
5,073 2,985 8,058
1.3.5.4.2 Domestic Violence &Child Abuse
Child Abuse is a physical, sexual or emotional maltreatment or neglect of a child or children
by parents, guardians or others responsible for a child’s welfare. There are four major
categories of child abuse: neglect, physical abuse, psychological or emotional abuse and
sexual abuse. Physical abuse is characterized by physical injury usually inflicted as a result of
beating or inappropriately harsh discipline. Sexual abuse includes molestation, incest, rape,
prostitution, or use of a child for pornographic purposes. Neglect can be physical in nature
(abandonment, failure to seek needed health care) educational (failure to see that a child is
attending school) or emotional (abuse of a spouse or another child in the child’s presence,
allowing a child to witness adult substance abuse.
19
In 2014, the Social Welfare Department recorded one case of child abuse of a female child in
the Adentan Municipality. The case was followed up through visits to the home to ensure
compliance.
Challenges
The challenges of the Department include;
• Unavailability of means of transport to ease staff movement in the Municipality
• Inadequate funds to conduct regular practical demonstrations to impart various skills
and knowledge to groups.
1.3.5.4.3. Births and Deaths
The major activity of the Department is registration of births and deaths. A total of 818 live
births were registered. Out of which 415 were males and 403 were females representing 50.7
percent and 49.3 percent respectively. A total of 53 deaths were registered. Out of which 30
were males and 23 were females representing 56.6 percent and 43.4 percent respectively. The
Department was able to undertake an awareness creation programmes on the importance of
births and deaths registration.
Challenges
• No computer and accessories to use for work
• Majority of the people within the Municipality are not willing to register dead bodies
• Difficulties in writing statistical reports on births and deaths as few people turned up
for registrations
1.3.6 TRANSPARENT AND ACCOUNTABLE GOVERNANCE
The focus of the thematic area is to institutionalize District level Planning and budgeting
involving all stakeholders through a participatory process at all levels.
The Assembly worked effectively and efficiently to ensure timely implementation of
Assembly decision through provision of office accommodation, adequate logistics, motivate
staff, and ensure transparency and accountability.
There was also transparency in all procurement transactions of the Assembly. Contracts were
awarded to contactors premised on the procurement Act, Act 633. Public fora were also
organised for chiefs, opinion leaders, youth, community members and durbars for staff.
All stakeholders were involved in the fee fixing process which led to the preparation of the
2014 Annual Budget on time.
The Internal Audit had put internal controls in place to ensure judicious use of funds by the
Assembly.
The Assembly’s activities were also made known to the general public through public fora
announcements by the Information Services Department and Adentan News.
20
1.3.6.1 Security
The MUSEC and the general public provided the necessary support to the Police for night
patrols and other security duties in the Municipality.500 street lights were supplied and
installed throughout the Municipality to light up dark areas.
1.4 PURPOSE AND PREPARATION OF THE M&E PLAN
Monitoring and Evaluation (M&E) is a concise document that plays a pertinent role in the
implementation of Development Plans. The achievement of the Medium Term Development
Plan (MTDP) set goals and objectives depends on how well the M&E framework that tracks
the use of resources to ensure a high level of efficiency is structured.
The purpose of the M&E plan is to serve as a check and guide in the implementation of the
Development Plan by;
• Identifying achievements, constraints and failures so improvement can be made in the
MTDP and project designs to achieve better impact.
• Tracking the use of resources in order to ensure prudent management and
accountability so as to sustain the interest of all stakeholders in the plan.
• Ensuring effective and efficient delivery of services to meet the intended needs of
beneficiaries.
• It provides information for effective coordination of district development at the
regional level.
• Evaluating the level of progress made in implementing the Medium Term
Development Plan (MTDP) and its goals, objectives and targets.
• It helps build the capacity of the stakeholders directly or indirectly affected by the
project.
• It also ensures an easy follow of work and projects from the ex-ante stage to the post-
ante stage.
21
CHAPTER TWO
2.0 INTRODUCTION
The M&E activities used during the year under review included monthly field visits by the
various implementing agencies, monthly field visits by the Municipal Planning Coordinating
Unit (MPCU), Quarterly Review Meetings, evaluation and progress review workshops just to
mention a few.
The major M&E activities that were undertaken were the monthly monitoring and quarterly
review meetings held in collaboration with the various departments of the Assembly where
departments reported on the progress of programmes and projects implementation for the
year under review.
The tracking of work was done by interviews with beneficiaries of projects, physical checks,
site meetings and departmental level meetings amongst others.
2.1 PROGRAMME AND PROJECT STATUS FOR THE YEAR 2014
The project status for the year under review is given in Annex A. The progress report
indicates that implementation is going on despite the various challenges. These have
negatively affected the achievement of set targets as well as slowed down implementation.
2.2 REPORT ON FUNDING BY SOURCES (GH¢)
The main sources of revenue for financing development programmes in the Municipality is
from the Districts Assembly Common Fund (DACF), Internally Generated Fund/ Revenue
(IGF), Government of Ghana (GOG) Funds and Donor Funds. The total inflow of funds for
the 2014 is shown in Table 2.1 while Expenditure for 2014 is shown in Table 2.2.
Table 2.1: Sources of Revenue – Adentan Municipal Assembly
ITEM 2011 (GH¢)
2012 (GH¢)
2013 (GH¢)
2014 (GH¢)
DACF 2,494,555.93 958,291.11 575,357.93 566,798.04
IGF 1,311,072.95 1,603,864.61 1,969,996.70 3,236,141.69
GoG 182,048.62 32,900.00 274,308.61 105,454.03
Disability 121,286.11 37,332.51 61,408.52 26,339.39
MP’s Fund 33,734.48 25,155.00. 75,888.09 42,856.67
Donor Grants
DDF 15,075 -
- 393,395.41
22
MSHAP Aids 7,559.30 4,286.06 - 1,566.82
School
Feeding 310,835.08 218,163.20
303,565.20
468,045,80
GAMA - - - 200,000.00
TOTAL 4,476,167.5 331,490,717 3,441,792.05 6,045,502.79
In 2014, the IGF contributed the highest to revenue representing about 51% of the total
revenue followed by DACF which was 9.4%.
2.2.1 COMMENTS
A number of issues were identified relating to revenue and expenditure and these include the
following:
a. Release of Funds
The District Assemblies Common Fund (DACF) was not released on time. This affected the
implementation of most of the programmes and projects earmarked and performance for the
fiscal year.
b. Efforts to Generate Funds
In efforts to generate funds the Assembly had involved a private company to collect Revenue.
Due to the rapid urbanization and haphazard physical development and non-existence of
valuation figures for most properties in the Municipality, the Assembly contracted Valuation
Board to value all properties within the Municipality in order to ensure that property owners
pay realistic rates.
c. Challenges with regard to generating funds
The Challenges encounted were the negative tendency of developing without approved
development permits, inadequate logistic to generate Revenue and Over reliance on the
District Assemblies Common Fund.
2.3 REPORT ON DISBURSMENT
From Table 2.2 below, out of a total disbursement of GH¢ 3,404,365.72 in 2014, 33.88% of
the expenditure was on Personnel Emoluments, 38.55% on Administration, 8.05% on GoG.
The Capital Investments (DACF) in total was 16.9% of the total expenditure for 2014 and
Capital Projects (IGF) were 2.6%.
23
Table 2.2: Report on Disbursement:
ITEM 2013 (GH¢)
2014 (GH¢)
Compensation of Employees 1,403,802.09 1,586,655.48
Goods & Services 1,317,196.551 1,9558,351.31
Consumption of fixed Assets 88,739.89 232,339.00
Social Benefits 10,389.30 9,930.54
Other Expenses 232,495.79 395,518.41
DACF 814,224.63 441,270.33
DDF 585,938.92 225,006.44
Central GoG 32,581.50 1155,363.92
PWD 19,992.00 22,903.60
School Feeding 308,713.00 372,114.80
MSHAP 5.00 8.00
MPs Fund - 89,928.46
AdMA GAMA Project - 8400.00
TOTAL 4,814,078.63 5,457,790.29
2.3.1 Comments on Disbursement.
a. Adequacy of funds
Funds released for the implementation of projects /programmes is woefully inadequate. For
instance the DACF has a lot of strings attached to it and even before the release of funds to
the Assembly; a lot of deductions have been made leaving only small amount for the
projects/programmes.
b. Utilization of funds in accordance with the Budget
The Assembly used the funds according to the provision in the budget to enable her optimize
objectives.
c. Challenges with regard to disbursements
The challenges with regards to disbursement are.
• Statutory deductions on the DACF
24
• Untimely release of funds (DACF)
• Shortfalls in the allocations also affect the projects and programmes earmarked for the
year.
2.4 UPDATE ON THE CORE MUNICIPAL INDICATORS & TARGET
The core Municipal indicators and targets for the year 2013 - 2014 are shown in the table
below.
Table 2.3: Update on the Core Municipal Indicators & Target
No Accelerated Agricultural
Modernization and Sustainable
Natural Resource Management
2013 Target 2013
Indicator
Level
2014 Target 2014
Indicator
Level
2 Per capita production of key staple
foods and livestock in kg/annum or
animal/annum:
(Crop- Maize, Cassava and Yam)
Livestock(Goat, Sheep and Cattle)
1:2.12278
1:0.135
1: 1.24556
1:0.01725
1:2.1332
1:1.01732
1:1.86834
0.04791
Infrastructure, Energy And
Human Settlements
2
Proportion/length of roads
maintain/Rehabilitated
Trunk roads (in Km)
Urban roads (in Km)
Feeder roads (in Km)
N/A
562Km
36.9 Km
N/A
312 Km
31.9Km
N/A
562Km
36.9 Km
N/A
315 Km
-
% of households covered by
electricity supply
80%
85.05%
80%
89.06%
Enhancing Competiveness In
Ghana’s Private Sectors
3 % increase in tourist arrivals N/A N/A N/A N/A
4 Teledensity/Penetration rate: N/A N/A N/A N/A
Human Development,
Productivity And Employment
5 HIV/AIDS prevalence rate (% of
adult population, 15-49 yrs. HIV
positive)
0.36% 1.40% 0.80% 1.46%
6 Maternal mortality ratio (number of
deaths due to pregnancy and
childbirth per 100,000 live births)
0 per
100,000
0 per 100,000
0 per 100,000
0 per 100,000
Under-five mortality rate (number
of deaths occurring between birth
and exact age five per 1000 live
16/1000
0/1000
0/1000
5/1000
25
births)
Malaria case fatality in children
under five years per 10,000
population
0 Per 10,000
0 Per 1000
0 Per 1000
3/1000
Percent of population with
sustainable access to safe water
sources
N/A
N/A
N/A
N/A
% of population with access to
improved sanitation (flush toilets,
KVIP, household latrine)
65%
65.07%
65%
67.05%
Gross Enrolment Rate (Indicates
the number of pupils/students at a
given level of schooling-regardless
of age-as proportion of the number
of children in the relevant age
group)
-Primary
-JSS
-SSS
Net Admission Rate in Primary
Schools (Indicates Primary one
enrolment of pupils aged 6 years)
6577
2926
N/A
7490
3185
N/A
Gender Party Index (Ratio between
girls’ and boys’ enrolment rates,
the balance of parity is 1.00)
1.13
1.10
1.13
1.10.2
Proportion of unemployed youth
benefiting from
skills/apprenticeship and
entrepreneurial training
N/A
0.30%
N/A
0.29%
Ensuring and Sustaining
Macroeconomic Stability
Total amount of internally
generated revenue
2,541,520.00
1,973,246.73
3,349,204.48
3,236,141..69
Amount of Development Partner
and NGO funds contribution to
DMTDP Implementation
N/A
15,075.00
N/A
200,000.00
% of DA expenditure within the
DMTDP budget (How much of
DA’s expenditure was not in the
annual budget?)
N/A 72.21
N/A
99.85
Transparent and Accountable
Governance
Number of reported cases of abuse
(children, women and men)
2
1
N/A
1
Police citizen ratio N/A 1:584 N/A 1:674
26
2.5 REPORT ON CRITICAL DEVELOPMENT AND POVERTY
2.5.1 Implementation of Capitation Grant
There are at the moment thirteen (14) public schools within the Municipality benefitting from
the capitation grant. This has boosted enrolment figures since its commencement. By the
close of the fiscal year 2014 the capitation grants received and distributed to the schools
amounted to GH₵ 34,146.00 out of an expected amount of GH₵51,219.00. The amount
received represents two-thirds of the total amount.
The inconsistencies in giving out the capitation grants are hampering effective quality
education. There is also the challenge of inadequate infrastructure. It is hoped that
Government will help construct more classrooms to prevent overcrowding, provide furniture
and books to make learning easier.
2.5.2 Ghana School Feeding Programme
Under the School Feeding Programme eleven (11) basic schools comprising 7,509 pupils are
benefiting from the Ghana School Feeding Program in the Municipality. There is however
some number of public basic schools in the Municipality the programme needs to take on
board due to the poverty levels in those communities. Aside attracting an increase in school
enrolments and retention, the program included creating additional employment openings for
catering services. Some children who hitherto often attended schools on empty stomach are
now able to obtain a balanced diet, and the opportunity to eat nutritionally balanced meal at
school.
Major challenges to the school Feeding programme are delays in release of funds to caterers
and inadequate funds due to increase in prices of food items over the years and payment of
0.50p per child per day since the programme started. Also rice supplied to caterers by the
Ghana School Feeding Program (GSFP) secretariat tends to be of poor quality.
As at the end of the year under review, a total amount of Two Hundred and Three Thousand,
One Hundred and Twenty Ghana Cedis, (GH¢ 203,120.00) was released to caterers for the
feeding of the children. The table below shows the enrolment figures of beneficiary schools
under the GSFP.
Table 2.5: Enrolment Figures of Beneficiary Schools under the GSFP for the year 2014.
No. Beneficiary Schools Males Females Total
1 Adenta KG 146 137 283
2 Adenta Community 487 543 1030
3 Amrahia Basic 271 257 528
4 Christ Faith Mission 433 466 899
5 Holy Rosary KG 382 437 819
6 Ogbojo Presby 328 346 674
7 Nii Sowah Din 1 385 416 801
27
8 Nii Sowah Din 2 326 375 701
9 St. Francis Catholic Basic 190 225 415
10 Mercy Islamic KG &PRIM 274 294 568
11 Adjiringanor KG &PRIM 377 433 810
GRAND TOTAL 3,594 3,915 7,509
2.5.3 Local Economic Development
The Local Economic Development strategy; focuses on the promotion of economic activities
through education, improved governing policies; improved financing, better transportation
and the creation of new businesses in the locality to maximize and keep returns within the
Municipality.
The publication of a monthly newspaper ‘Adentan News’ is promoting businesses within the
Municipality through advertisement. It promotes businesses by showcasing what the business
community has to offer. This has resulted in increase of sales for businesses in the
Municipality. In effect, the Local Economic Development Plan for the Adentan Municipality
has raised awareness of opportunities businesses can have from the Assembly in promoting
their financial and economic affairs through local and external partnerships.
2.5.4 Gender
Gender mainstreaming is defined as “the process of assessing the implications for women and
men of any planned action, including legislation, policies or programmes, in all areas and at
all levels.
Most household in the Adentan Municipality are headed by women and this is due to high
rate of single parenthood. These women are forced to raise their children single handily. They
are the household managers and provide food, nutrition, water, health, education and Family
Planning. There is therefore the need to implement relevant socio-economic intervention
targeted at this current situation to improve the lot of these women.
Gender Specific activities carried out in 2014
No Activity Age
Range
Male Female
1. Facilitate scholarships for girls through the Gender
Responsive Skill And Comm Dev’t Project
26-58 5 5
2. Organize one-day seminar on Group Development Skills
for 70 group executives by 31st December,2013
70
3. Organize 3-day training workshop on liquid soap and
parazone making
13
TOTAL 5 88
2.5.5 National Health Insurance Scheme
The National Health Insurance Scheme registered 60,728 people through the Municipality.
Out of this figure, New Registration was 30,916, Renewals was 27,403 and a Delayed Card
was 2,409. The special registration was 52 times. The following activities were undertaken:
28
Figure 2.1: Total NHIS Registration
The Scheme was also able to deliver 60,728 ID cards in 2014. There is the need however to
provide office equipment and directional signs to enable clients locate the office easily.
2.6 Environment, Climate Change and Green Economy
The mainstreaming of Environment, Climate Change and Green Economy is most relevant in
ensuring sustainable development in the Municipality. The Assembly therefor undertook the
following activities to protect the environment and ensure sustainable development.
• Prevent encroachment on protected areas,(water bodies , farm lands etc)
• Sensitization of residents on climate change
• Tree planting
• Waste sorting in schools
2.7 Evaluation and Participatory M&E
Evaluation and monitoring share some similarities, but they are entirely two different
activities. They differ in terms of their scope and content. Evaluation is a more detailed or
accurate activity meant to assess the impacts of goals and objectives implemented. It looks at
the social, economic and the environmental impacts of goals and objectives.
Some activities undertaken included
30,91627,403
2,409
2014 TOTAL REGISTRATION
NEW REGISTRATION
RENEWALS
DELAYED ID CARDS
29
• Review of all quarterly and Annual Progress Reports
• Monitoring of Physical Projects
• Monitoring of Programmes
30
CHAPTER THREE
3.0 The Way Forward
The preparation of Annual Progress Report for 2014 has brought to the fore various
implementation challenges. These include inadequate logistics and financial resources. These
have adversely affected the setting and achievement of targets. The way forward to ensure
effective and efficient implementation of the Development Plan is to address these challenges
and also manage effectively the limited resources.
3.1 Key issues addressed and those yet to be addressed
The management of the implementation processes is a key issue that is yet to be addressed.
Besides the release of funds to the various departments is also not coordinated to ensure that
implementation is on schedule.
Furthermore, financial resources especially the District Assemblies Common Fund are not
released on time and this stalls the progress of projects and programs.
The situation of deadlines not being met due to non-availability of data or late collection of
data is also yet to be addressed. Some of the indicators could not be assessed because data
was not available or there is no base line data.
Other issues that are being addressed include the following:
• Improving the mobilization of IGF as well as the training of revenue collectors
• Provision logistics
• Smooth implementation of the Composite Budget.
3.2 Recommendation
A number of observation in the monitoring results as well as the challenges encountered
during the preparation of this document calls for the under listed recommendations to be
implemented by the Municipal Assembly as well as the various implementing departments
and funding Agencies.
• The Municipal Assembly should ensure that coordination between planning and other
departments should be improved
• The Municipal Assembly should provide adequate logistical support especially office
equipment, vehicles and motor bikes among others to various departments.
• The release of funds for the implementation of programmes and projects should be on
time and be adequate
• The Municipal Assembly and decentralized departments should make conscious
efforts to improve the implementation process
• The MPCU should be strengthened to work as a special implementation management
structure to ensure that plans are properly implemented.
31
TABLE 3.1: ANNUAL PROGRESS REPORT (PROJECTS & PROGRAMMES) FOR ON-GOING PROJECTS FOR 2014
S/N Description of Project Location Contractor Contract
Sum
Date of
Award
Expected
Completio
n Date
Source of
Funding
Expenditur
e to Date
GH¢
General Remark
% of
Work
Done
Level of
Completion
1. Construction of
community clinic and 3
bedroom nurses
quarters at Adentan
Adenta Messrs
AkuyaLtd
110,000.00
16/11/09
6 Months
DACF
80%
Outstanding
works to be re-
awarded
2. Extension works to
Existing CHIP Compound
at Adjiringanor
Adjiringanor Messrs MBJ
CO.Ltd
12,896.17
-
3 Months
IGF
12,892.17
100%
works
completed
3. Continuation And
Completion Of Otano
Presby School
Otano Messrs Best
Results. G.
Ltd. 35,850.60 _ _
DACF
26,674.60 95%
Work
Practically
Completed
4. Construction of 3 storey,
18 unit classroom at
Adentan Community
School (Phase 1- Const.
of
6-unit classroom with
ancillary facility.
Adenta Messrs Zakat
Const. Ltd
284,576.70
21/01/11
One year
GETFund
_
60%
Substructure
100%
completed. 1st
Floor Slab
Constructed.
S/N Description of Project Location Contractor Contract
Sum
Date of
Award
Expected
Completio
n Date
Source of
Funding
Expenditur
e to Date
GH¢
General Remark
% of
Work
Done
Level of
Completion
5. Construction of 3-storey
18-unit classroom block
at Adentan Comm.
Adenta Messrs Hanza
Ltd.
282,417.69
One year GETFund _
25%
Substructure
works under
construction
32
6. Construction of 2 storey,
12 unit classroom at
Adjiriganor Primary
SchooI
Adjiriganor Messrs Ralph-
J Global
Ventures Ltd
_
21/01/11
One year
GETFund
_
92%
Major works
completed.
Outstanding
works
remaining are
painting and
fixing of
windows.
7. Construction of 3 Storey,
9 unit classroom at
Adjiriganor Primary
School (Phase 1- Const.
of 6-unit block)
Adjiriganor Messrs Sando
Const. Ltd
199,000.14
- One year GETFund _
50%
Lentil level
ongoing
8. Construction of 5 unit
office accommodation
Ogbojo Messrs
Messrs
Rizcom Ltd
64,000.00 7/06/13 4 months IGF _ 100% Completed
9. Mechanisation of 2No
Borehole at the 3
Community Clinics
Amanfrom
Amrahia
Frafraha
Messrs
Mdumolca
Hydrogeologi
cal Services
Ltd
48,759.79 21/09/13 3 Months IGF _ 100% Completed
10. Construction of 2 storey,
12 unit classroom at
Ogbojo(Phase 1- Const.
of 6-unit block with
ancillary facilities)
Ogbojo Messrs
Jadafco Ltd
284,516.21
21/01/11
One year
GETFund
_
80%
Substructure
walling under
Construction.
Major Concrete
works done
11. Construction of 2
storeys, 12 unit
classroom at Sraha.
PHASE 1
Sraha Messrs
Rizcom
Investment
Ltd.
404,000.00
_
One year
GETFund
_
90%
Finishing works
under way
S/N Description of Project Location Contractor Contract Date of Expected Source of Expenditur General Remark
33
Sum Award Completio
n Date
Funding e to Date
GH¢
% of
Work
Done
Level of
Completion
12. Extension of Electricity to
3 no. Selected Schools
Ogbojo,Amrahia
Ogbojo,
Amrahia
Messrs Big
Boss
Electricals
29,960.40
01/10/12
01/04/13
IGF
28,462.38
100%
completed
13. Construction of Corn
Millers Shops,Ogbojo
Market Lot 1
Ogbojo Messrs Afojin
Ltd
49,231.61 7/06/13 4 months IGF 19,361.70 72% Roofing
ongoing
14. Construction of Corn
Millers Shops,Ogbojo
Market Lot 2
Ogbojo Messrs
Danbort
Company ltd
49,933.23 7/06/13 4 months IGF 36,601.33 72% Roofing
ongoing
15. Construction of Corn
Millers Shops,Ogbojo
Market Lot 3
Ogbojo Messrs Grans
Investment
Ltd
48,504.97 7/06/13 4 months IGF 23,313.96 72% Roofing
ongoing
16. Construction of borehole
at Sraha AdMA School
Sraha Messrs
Mdumolca
Hydrogeologi
cal Services
Ltd
_ _ 3 months Community
Water and
Sanitation
Authority
_
70% On-going
17. Mechanisation of 2No
Borehole at Fire Service
&Commandos
Fire Service
Commandos
Messrs
Mdumolca
Hydrogeologi
cal Services
Ltd
48,759.79 21/09/13 3 Months IGF 23,411.38 80% 1. Project at
Commandos
completed and
handed over.
2.Project at Fire
Service to be
relocated
18.
S/N Description of Project Location Contractor Contract Date of Expected Source of Expenditur General Remark
34
Sum Award Completio
n Date
Funding e to Date
GH¢
% of
Work
Done
Level of
Completion
19. Procure and install
250No. Streetlight(Lot1)
Municipal
wide
Delovely
Co.Ltd 152,000.00 - 3 months IGF/DACF/DDF 152,000.00 80% On-going
20. Procure and install
250No. Streetlight(Lot1)
Municipal
wide
Delovely
Co.Ltd 152,000.00 - 3 months IGF/DACF/DDF 152,000.00 80% On-going
21. Installation Of Street
Signage’s
Adenta Duratech
Signs 46,759.71 - 3 months DDF 46,759.71 100% Completed
22. Construction of borehole
at Adjiriganor School
Adjiriganor
Messrs
Mdumolca
Hydrogeologi
cal Services
Ltd
_ _
01/04/13
Community
Water and
Sanitation
Authority
_ 70% On-going
23. Construction of borehole
at St. Francis Catholic
School
Ashalle
Botwe
Messrs
Mdumolca
Hydrogeologi
cal Services
Ltd
_ _ 4 months Community
Water and
Sanitation
Authority
_ 70% On-going
24. Construction of borehole
at Sowah Din School
Ashalle
Botwe
Messrs
Mdumolca
Hydrogeologi
cal Services
Ltd
_ _ 4 months Community
Water and
Sanitation
Authority
- 70% On-going
35