Implementation of the American Recoveryand Reinvestment Act
A local government perspective
Jerry E. Durham, CPA, CGFM, CFE
2
Implementation of ARRAin Tennessee
4
Implementation of ARRAin Tennessee
County Audit Response to ARRA:Additional Audit/Review Procedures:
Completing a Questionnaire for all ARRA grants.Performing real-time audit procedures (commando
raids).Put governments on notice that we are looking.Determine the ability to report for direct grants.
Established New Investigative TeamComposed of four investigatorsHeaded by Kevin Huffman, Investigative Coordinator
5
Implementation of ARRAin Tennessee
County Audit Response to ARRA:Results of Real-time ARRA grant reviews:
Forty-six grants amounting to $15,389,964 in 11 Counties.Four grants did not have separate accounting records.Segregation of Duties controls were inadequate for 13
grants.Risk Assessments had not been performed for 13 grants.Action Plans had not been prepared for nine grants.Section 1512 reports had not been filed for two direct
grants.
6
Implementation of ARRAin Tennessee
7
Implementation of ARRA
State –Prime
RecipientSubrecipient
or Vendor
Subrecipient or Vendor
Local Govnt. -
Prime or Sub-
recipient
Federal
8
Implementation of ARRA
County or City
• Funds• Budgets• Types of Funds• Departments
Compon-ent Units
• Schools• E-911
Other Agencies
• Development Districts
• Human Resource Agencies
• State Agencies
9
Implementation of ARRA
TARP ARRA
10
Implementation of ARRA
Before - Non-ARRA Grant After - ARRA grant
• Title 1 Grant • Amount = $500,000• Certain Allowable Costs• Old CFDA Number• Standard Risk Assessment
to determine high risk programs.
• Normal Reporting
• Title 1 ARRA Grant• Amount = $500,000• Same Allowable Costs• New CFDA Number• Defined by OMB as High
Risk
• Normal reporting plus new reporting to TRAM Track and/or Federalreporting.gov
11
Implementation of ARRA
Before - Non-ARRA Grant After - ARRA grant
• Title 1 Grant (cont’d) • Amount = $500,000• Not a cluster program• A-133 Internal Control
requirements
– N/A– N/A
• Ability to identify grants
• Title 1 ARRA (cont’d)• Amount = $500,000• New Cluster Program• A-133 Internal Control
Requirements plus TRAM requirements+?– Risk Assessment– Action Plan
• Separate Accounting
12
Implementation of ARRA
Before - Non-ARRA Grant Before - ARRA grant
• Title 1 Grant (cont’d)• Amount = $500,000• N/A• Compliance Req.
• N/A
• What if this amount was $1,500,000?
• Title 1 ARRA (cont’d)• Amount = $500,000• Track Jobs
Created/Retained• More Compliance Req.
• Subject to IGs Audit
13
Implementation of ARRA
Status Report:For June 30, 2009, very few grants were actually
received (39 Audits = 8 grants for $4,265,852). Most ARRA grants will be received for FYE June
30, 2010.Jobs created to date are relatively few (TN. First
Report, 9/30/09 for Grants = 8754.)OIGs are coming. (DOE, Justice, USDA)
14
Implementation of ARRA
What this means to You - General: Laser beam focused on auditors and governments. Single Audits performed in the same way generally. Recipients Signed a contract to follow TRAM Directives. Recipients Signed a contract to follow ARRA. (Standard
Terms and Conditions for ARRA Grants). (e.g. Should contain requirement to report Fraud, Waste, and
Abuse to appropriate IG - M-09-10 & M-09-15)
15
Implementation of ARRA
What this means to You: Compliance Supplement Addendum #1
Effective for Single Audits performed on or after June 30, 2009.
Cross-cutting requirements:Cannot use ARRA funds for Casino, Gambling Establishment,
Aquarium, Zoo, Golf Course, or swimming pool.Davis Bacon Act Applies.Buy American provision for Public Building Projects. Identify to first-tier subrecipients requirements to register with
CCR including obtaining a DUNS number.
16
Implementation of ARRA
What this means to You: Compliance Supplement Addendum #1 (cont’d)
Cross-cutting requirements (cont’d):Special Tests and Provisions:
Separate accountability in accounting records.Separate Identification and presentation of ARRA grants
on SEFA and Data Collection Form.Communication to subrecipients of ARRA award
information including Federal Award Number, CFDA number, amount of ARRA funds, and separate identification requirements on SEFA and Data Collection Form.
17
Implementation of ARRA
What this means to You: Compliance Supplement Addendum #1 (cont’d)
New Reporting to Federalreporting.gov.Major Program Determination:
Methodology used to identify A & B programs is unchanged.Any federal award that exceeds the Type A threshold and
contains “any” amount of ARRA expenditures is automatically a high-risk Type A program.
Any cluster exceeding the Type A threshold that includes an ARRA program is considered a “new” program and would automatically be a high-risk Type A program.
18
Implementation of ARRA
What this means to You: Compliance Supplement Addendum #1 (cont’d)
Changes have been made to program-specific requirements.
OMB anticipates additional amendments to compliance supplement. They will be effective for various dates.
In the future, extensions of time to submit the Single Audit will be difficult, if not impossible, to get approved.
In the future, submission deadline will be less that nine mos.
19
Implementation of ARRA
What this means to You: Compliance Supplement Addendum #1 (cont’d)
Monitoring SubrecipientsWhitehouse.gov/omb/
circulars_a133_compliance_09toc
20
Implementation of ARRA
What this means to You:ARRA Reporting Requirements:
M-09-21guidance (whitehouse.gov/omb/recovery_default):Report no later than 10th day after the end of each calendar
quarter beginning on September 30, 2009. Prime recipients may delegate reporting responsibilities. Subrecipients are non-federal entities that are awarded funding
through a legal instrument of the prime recipient. Terms and conditions of the Federal award are carried forward to the subrecipient. A vendor is not a subrecipient.
Prime recipient must report the identity of any vendor that receives payments of over $25,000.
Subrecipients may be required by the prime recipient to report certain data elements.
21
Implementation of ARRA
What this means to You:ARRA Reporting Requirements (cont’d):
M-09-21 guidance (cont’d):Reporting will begin the quarter in which an award is made.Reporting is on a cumulative basis (except jobs).Ramifications of non-compliance with reporting requirements.
Flagged as non-compliant.Withholding funds.Termination.Suspension and debarment.
How to report payments.Key activities and time frames.
22
Implementation of ARRA
What this means to You:ARRA Reporting Requirements (cont’d):
M-09-21 guidance (cont’d):Key Activities and Time Frames (Original)
Days 1-10.Days 11-21Days 22-29Day 30
Extensions for Late Filing?
23
In-bound Recipient Reporting (FederalReporting.gov) Timeline and Activities
Next quarterly reporting
cycle begins- updates reflected
cumulatively
Agency, Prime and Sub
Recipient Registration
1 – 15 days after end of Quarter
16 – 22 days after end of Quarter
23 – 29 days after end of Quarter
30 days after end
of QuarterPrime
Recipients & Subs Enter Draft
Reporting Data
Initial Submission
1
2
10 days after end
of Quarter
Prime Recipients
Review Data Submitted By Sub(s)
3
Prime Recipients & Subs Make Corrections
4
Agency Review of
Data Submitted
Recipient Reports
Published on
Recovery.gov
Prime Recipients & Subs Make Corrections
5 7
6
Agency “View Only” Agency Comment Period
Continuous
9
8
33 -90 days after end of
Quarter
Recipient Report Adjustments Possible
Report Status: Draft Initial Submission
Final Submission Published
24
25
Implementation of ARRA
What this means to You:ARRA Reporting Requirements (cont’d):
M-09-21 guidance (cont’d):Illustration – Federal agency awards $1,000,000 ARRA
grant to University A. A spends $200,000 to purchase equipment from XYZ Corp. A sub-awards the $500,000 to University B. B spends $50,000 to purchase equipment from 123 Corp.
Aggregate payments less than $25,000.Sub-awards Payments to individualsPayments to vendors
26
Implementation of ARRA
What this means to You:ARRA Reporting Requirements (cont’d):
M-09-21 guidance (cont’d):Calculating the number of jobs.
Full-time equivalents basis.Collecting information from subrecipients and vendorsDirect jobs vs. Indirect jobs.New Guidance (M-10-08, 12/18/09)
Simplified calculation.Report Jobs for each quarter rather than cumulative.
27
Implementation of ARRA
What this means to You:Other OMB Guidance:
M-09-10 and 15 guidance.Standard terms and conditions.
28
Implementation of ARRA
What this means to You:OMB General:
Pilot Project (Internal Controls Reporting).AICPA Letter.Not responsible for auditing Job count.Build America and Cobra compliance not subject to
Single Audit.Capacity not subject to audit.No more extensions to complete Single Audits.Be sure private information is protected since on
website.
29
Implementation of ARRA
What this means to You:OMB General (cont’d):
Enter findings on Data Collection Form next year.Report as a cluster when grant is “expended”.M-10-05, 11/30/09.
Identifying and Reporting Noncompliance.M-10-08, 12/18/09.
Changes to job number calculations.Additional Guidance is coming.
30
Implementation of ARRA
What this means to You:GAO:
Fraud, Waste, and Abuse.First report on Compliance with Section 1512.
RATB:New reporting will be required of all grants in the
future.Late Filing Extensions. (9/30, and 12/31)
31
Implementation of ARRA
What this means to You:Inspector General Report (DOE):
Internal Controls.Capacity.Communication.Reports to Three Local Education Agencies
Correct Previous Dept. of Audit Findings
32
Implementation of ARRA
What to anticipate:We anticipate numerous findings related to the
TRAM Directives and reporting. These findings will be reported to the Federal Government to be posted on their website. Based on our experience, we do not expect wide-spread fraud.
Lessons from 9/11/2001 - Abuse. Vs. TARP/ARRA. We are now required to report abuse.
Prosecutions – President, RATB, Comptroller, DAs.
33
Implementation of ARRA
What to anticipate:Direct Grants reporting noncompliance.Subrecipient monitoring responsibilities
noncompliance.Fraud in contracts.
34
Implementation of ARRA
Transparency and Accountability Funding:Inspector Generals = $224,000,000.GAO = $25,000,000Recovery Act Transparency Board =
$84,000,000OMB = ??
Department of Audit = $0,000,000.
35
Implementation of ARRA
Ten Steps to ARRA Compliance:– The following websites are of importance with regard to
ARRA compliance: – http://www.recovery.gov/- Federal ARRA Information Website– https://www.federalreporting.gov – Website where all ARRA
grant revenues and expenditures are reported by grant recipients.– http://www.tnrecovery.gov/ - ARRA General Information
website for the State of Tennessee.– http://www.tn.gov/comptroller/ -Tennessee Comptroller’s
General Information and ARRA Website.
36
Implementation of ARRA
Recovery Act and Related Bonds:Build America Bonds.Recovery Zone Economic Development Bonds.Qualified School Construction Bonds.Qualified Energy Conservation Bonds.Qualified Zone Academy Bonds.Other Bonds.
37
Implementation of ARRA
How do we deal with ARRA?
38
Implementation of ARRA
How do we deal with ARRA?A simple solution.Responses to current internal control and
questioned cost findings.A place to start for Local Governments -
County/Municipal Audit ARRA websites.
39
ARRA Questions?www.tn.gov/comptroller
Jerry E. Durham, CPA, CGFM, CFE
Technical Manager Division of County
Audit 615.401.7951
The Opinions expressed during this presentation were my own. They do not necessarily represent the views of the Comptroller, his representatives, or the Department of Audit.