Imagine! Dixon Street Office Remodel Progress 4/3/2015

43

Transcript of Imagine! Dixon Street Office Remodel Progress 4/3/2015

Imagine! Dixon

Street Office

Remodel Progress

Before Remodel 2/13/2015

Before Remodel 2/13/2015

Before Remodel 2/13/2015

Before Remodel 2/13/2015

2/20/2015

Staff, Equipment Moved Out

2/20/2015

Staff, Equipment Moved Out

2/20/2015

Staff, Equipment Moved Out

2/20/2015

Staff, Equipment Moved Out

2/27/2015

Furniture Is (Mostly) Gone

2/27/2015

Furniture Is (Mostly) Gone

2/27/2015

Temporary walls installed to block off areas so staff in a few

departments (HR, Finance, Administration) may continue to work in

limited areas

3/6/2015

Demolition Is Underway

3/6/2015

Don’t worry – we saved all the pictures of the monthly recipients of

Imagine!’s Excellence in Customer Service Award

3/6/2015

For those hearty souls still working at Dixon,

bathroom availability is at a premium

3/13/2015

First floor break area

3/13/2015

1st

floor looking southeast, former IBHS and EI

support offices

3/13/2015

2nd

floor looking South and West on Case

Management wing

3/13/2015

2nd

floor Case Management wing

3/13/2015

1st

floor looking through O’Shea Room

3/13/2015

1st

floor looking South and West through O’Shea

Room

3/13/2015

Two new ten person conference rooms framed

(near former IBHS space), new

office for HR Director

3/20/2015

1st

floor meeting room,

adjacent to Human Resources

3/20/2015

Reception area

3/20/2015

First floor hallway looking into patio and break area

3/20/2015

First floor large meeting room West wing

3/20/2015

First floor large meeting room West wing

3/20/2015

First floor small meeting room West wing

3/20/2015

First floor office West wing (old FSSP area)

3/20/2015

First floor old FSSP area, looking East

3/20/2015

Women’s second floor bathroom

3/20/2015

First floor IBHS office

3/20/2015

First floor South Wing meeting room

3/27/2015

New meeting room adjacent to IBHS

3/27/2015

IBHS on right side of hall. Meeting rooms on left.

3/27/2015

Meeting room adjacent to HR on left. Meeting room

across from IBHS on right.

3/27/2015

HR Director’s Office

3/27/2015

Door from HR Director’s office to HR office

3/27/2015

New meeting room adjacent to work stations, 1st

floor, Southeast wing

3/27/2015

Two offices, 1st floor, Southeast wing

3/27/2015

IBHS office and treatment room

4/3/2015

This week walls started to go up, like the walls for

this small meeting room in South wing first floor.