ImagePASS-S2 Installation Procedure

10
image PASS-S2 Installation Procedure Network Multi-PDL Printer Unit-S2 Installation Procedure PUB No.FT1-0065-000 PRINTED IN JAPAN, CHINA OR U.S.A. Follow the instructions herein when installing the equipment to its host machine. E N G L I S H

description

ImagePASS-S2 Installation Procedure

Transcript of ImagePASS-S2 Installation Procedure

Page 1: ImagePASS-S2 Installation Procedure

image PASS-S2 Installation Procedure

Network Multi-PDL Printer Unit-S2Installation Procedure

PUB No.FT1-0065-000 PRINTED IN JAPAN, CHINA OR U.S.A.

Follow the instructions herein when installing the equipment to its host machine. E N G L I S H

日 本 語

dave
Page 2: ImagePASS-S2 Installation Procedure

2

1.1 Checking components

1.1.1 Checking the Contents

F-1-1

[1] PS print server, PS-S2 1 unit [2] Power cable 1 pc

[3] Media pack 1 set [4] Ethernet crossover cable(length of 3m, Identified by the "Crossover" label)

1 pc

[5] Communication cable 1 pc [6] Interface board 1 pc

[7] PCI bus expansion unit 1 pc [8] Connector board support (for iR5075/5065/5055 series)

1 pc

[9] Screw (Bind; M3X6) 2 pc [10] Network cable (3m) 1 pc

[1] [2] [3] [4] [5]

[6] [7] [8] [9] [10]

Page 3: ImagePASS-S2 Installation Procedure

3

1.2 Installation procedure

1.2.1 Initialization ofPrinter Setting (Whenthe host machine hasbeen already used)

When the host machine has been already used, initial-ize the printer setting by specifying "Yes" to the set-

ting of > Printer Settings > Utility > Reset Printer.When the host machine and this equipment are in-stalled at the same time, initialization is not necessary.

1.2.2 Preparation beforeConnection

Secure a space to install this equipment as shown inthe figure below.It is necessary to secure a space of 200mm or morefrom the wall to the back and side of the equipment.

F-1-2

1.2.3 Turning Off the HostMachine

1.2.4 Attaching the Inter-face Board

<iR7105/7095/7086 Series>1) Remove the main controller cover [1].

- 10 screws [2]

F-1-3

Back panel

Side panel

200mm

200mmPrint server

Front

Turning Off the Main Power SwitchBe sure to follow the correct procedure when turning off the main power. For instructions, see the Service Manual.

Go to Step 6) when the PCI bus expansion unit has been already attached.

[2]

[1]

[2]

[2]

[2]

Page 4: ImagePASS-S2 Installation Procedure

4

2) Remove the reader power cable [1].

F-1-4

3) Open the wire saddle [1].

F-1-5

4) Remove the rear cover [1].- 8 screws [2]

F-1-6

5) Attach the PCI bus expansion unit [1].- 2 screws (Bind; M3X6) [2]

F-1-7

6) Remove the face cover plate [1]. (The removedplate is not used after this step.)- 2 screws [2]

F-1-8

[1]

[1]

[2]

[2]

[2]

[1]

Be sure to hold the frame of the PCI bus expansion unit during work.

[1] [2]

[2]

[1]

[2]

Page 5: ImagePASS-S2 Installation Procedure

5

7) Connect the interface board [1] to the connector [2]J9004 located on the lower side of the PCI bus ex-pansion unit.

8) Fix the interface board [1] in place by the 2 screws[2] removed in the step 6).- 2 screws [2]

F-1-9

9) Attach the removed parts.- Rear cover (when it was removed)- Main controller cover

10) Connect the reader power cable.11) Close the reader communication cable with the

wire saddle.

<iR5075/5065/5055 Series>1) Open the cable clamp [1] and remove the reader

communication cable [2].

F-1-10

2) Remove the upper rear cover [1].- 6 screws [2]

F-1-11

J9004 connector is located on the lower side of the PCI bus expansion unit.Connecting the board to other part causes damage to the host machine.

[1] [1]

[1]

[2] J9004

[2]

[1]

[1] [2]

[1]

[2]

[2]

Page 6: ImagePASS-S2 Installation Procedure

6

3) Remove the main controller box cover [1].- 4 screws [2]

F-1-12

4) Remove the connector board support [2] from thePCI bus expansion unit [1]. (Be sure a user storesaway the removed connector board support.)- 4 screws [3]

F-1-13

5) Attach the connector board support [2] to the riserboard [1].- 4 screws [3]

F-1-14

[1]

[2]

[1]

[2]

[3] [3]

Points to note when attaching the boardA different type of connector board support is used depending on the product.iR7105/7095/7086 Series: A iR5075/5065/5055 Series: B

A

B

[1][3] [3]

[2]

Page 7: ImagePASS-S2 Installation Procedure

7

6) Attach the PCI bus expansion unit [1].- 2 screws (Bind; M3X6) [2]

F-1-15

7) Remove the face cover plate [1]. (The removedplate is not used after this step.)- 2 screws [2]

F-1-16

8) Connect the interface board [1] to the connector [2]J9004 located on the upper side of the PCI bus ex-pansion unit.

Be sure to hold the frame of the PCI bus expansion unit during work.

[1]

[2]

[1]

[2]

The J9004 connector is located on the upper side of the PCI bus expansion unit.Connecting the board to other part causes damage to the host machine.

[1] [2]

[1][1]

J9004

Page 8: ImagePASS-S2 Installation Procedure

8

9) Fix the interface board [1] in place by the 2 screws[2] removed in the step 7).- 2 screws [2]

F-1-17

10) Attach the removed parts.- Main controller box cover- Upper rear cover

11) Connect the reader communication cable.12) Pass the reader communication cable through the

wire saddle, and close the saddle.

1.2.5 Changing the HostMachine Interface Set-ting

1) Turn on the power of the host machine.2) Using service mode, make sure that the MN-CONT

version is later than the version shown below.COPIER > DISPLAY > VERSION > MN-CONTIf the version is lower than the one shown below,update the version using the service support tool.

3) Perform setting of service mode for each equip-ment.Enter the service mode.Specify "4" to the setting of COPIER > OPTION >INT-FACE > IMG-CONT.

4) Turn off the power of the host machine, followingthe description in the shut-down sequence screen.

1.2.6 Connecting to theHost Machine

1) Connect the ethernet crossover cable [2] to theRJ45 connector [1] located on the lower side of theback of the equipment, and connect the interface ca-ble [4] to the Interface board connector [3].

F-1-18

MEMO:iR7105/7095/7086 Series (MN-CONT): 40.xx or later

[2]

[1]

[1]

[3]

[4][2]

Page 9: ImagePASS-S2 Installation Procedure

9

2) Connect the ethernet crossover cable [1] and the In-terface cable [2] to the host machine. <iR7105/7095/7086 Series>

F-1-19

<iR5075/5065/5055 Series>

F-1-20

3) Connect the power cable to the equipment [1].

F-1-21

4) Insert the power cable into the wall socket.5) Turn on the power switch [1] of the equipment.

F-1-22

6) Insert the power cable on the host machine side tothe wall socket.

7) Turn on the main power switch.

<iR7105/7095/7086 Series>8) When the equipment is connected to the host ma-

chine for the first time, the message "Turn the mainpower switch OFF & ON again" is displayed. Fol-lowing the shutdown sequence, turn off and on thepower of the host machine.

1.2.7 To print a configura-tion page

Print out a settings page as follows to make sure thatall settings have correctly been made on the equip-ment and its host machine and that all connections arenormal:

TO PRINT A CONFIGURATION PAGE

1) Ensure that the host machine is on and warmed up.2) Ensure that the equipment is on.3) At the Idle screen, press the Menu button once.4) Press the line selection button to the right of Print

Pages, and then select Configuration page.The equipment sends the Configuration page to thehost machine and displays the RIP and Print statusscreens so you can monitor the job.

[2]

[1]

[2][1]

[1]

[1]

Page 10: ImagePASS-S2 Installation Procedure

10

1.2.8 Network connection

Network connection is the network administrator's re-sponsibility to configure Setup according to the net-work and user environment.1) Shut down the Unit before connecting it to any net-

work device.If the system has just finished processing, wait 10seconds after the system reaches the idle status be-fore powering off the equipment.

2) Connect the network cable to the network port (up-per RJ-45)[1] on the back of the equipment.

F-1-23

3) Power on the equipment.4) Advise the network administrator to configure Set-

up options.The network administrator is responsible to config-ure Setup according to the network and user envi-ronment.For Setup information, refer the network adminis-trator to Configuration and Setup on the User Doc-umentation CD.

5) After Setup options have been configured, verifythe network connection.The network administrator should perform any ad-ditional network setup, verify the network connec-tion, verify that the Unit appears in the list ofprinters, and print a few test documents from a net-worked computer that will use the Unit. (For moreinformation, see Configuration and Setup on theUser Documentation CD.)

The customer's network cable and the ethernet crossover cable included with the equipment look similar but are not interchangeable. Do not swap these cables. When connecting the cable to RJ-45 port, be sure to connect to the connect position.

[1]