IM NE PR W O 2630 VE M EN M TS AR U KE T RE A N DY DE R ... · • 2,000 Amps @277/480v • Clear...

7
±61,723 SF FREE STANDING CLASS A OFFICE/R&D BUILDING ORCHARD PARKWAY 2630 “NEW MARKET READY IMPROVEMENTS UNDERWAY”

Transcript of IM NE PR W O 2630 VE M EN M TS AR U KE T RE A N DY DE R ... · • 2,000 Amps @277/480v • Clear...

Page 1: IM NE PR W O 2630 VE M EN M TS AR U KE T RE A N DY DE R ... · • 2,000 Amps @277/480v • Clear Height 15 ... 2630. Orchard Parkway ENTRANCE ENTRANCE Trimble Road ENTRANCE SITE/LOCATION

±61,723 SF FREE STANDINGCLASS A OFFICE/R&D BUILDING

ORCHARDPARKWAY

2630“NEW MARKET READY

IMPROVEMENTS UNDERWAY”

Page 2: IM NE PR W O 2630 VE M EN M TS AR U KE T RE A N DY DE R ... · • 2,000 Amps @277/480v • Clear Height 15 ... 2630. Orchard Parkway ENTRANCE ENTRANCE Trimble Road ENTRANCE SITE/LOCATION

PROPERTY HIGHLIGHTS• ± 61,723 SF – Class A Office/R&D• Standalone Identity• New Fitness Area• New Break Room• New Building Renovation designed by Studio G• Dramatic new 2 story lobby• New restroom cores with showers• Grade / Dock Level Loading• Expansive outdoor collaboration area with

BBQ’s, Bocce Court, Water Features, Seating and Amphitheater

• New HVAC: 5 Trane units totaling 160 Tons• 2,000 Amps @277/480v• Clear Height 15’• Column Spacing: 24’x38’• Elevator• Parking: 3.25/1,000 SF• New Drop Ceiling in 2nd Floor & Portion of 1st Floor• 2nd Floor Balconies• Monument Signage• Light Rail Station nearby• Retail Amenities nearby• Easy access to Highways 101, 237, 880 & SJ

International Airport• Credit Sublandlord• Flexible Sublease of 3-8 years• Available Now

ORCHARDPARKWAY

2630

Page 3: IM NE PR W O 2630 VE M EN M TS AR U KE T RE A N DY DE R ... · • 2,000 Amps @277/480v • Clear Height 15 ... 2630. Orchard Parkway ENTRANCE ENTRANCE Trimble Road ENTRANCE SITE/LOCATION

Orchard Parkway

ENTRANCE

ENTRANCE

Trimble Road

ENTRANCE

SITE/LOCATION MAP

2630ORCHARDPARKWAY

55 TRIMBLE

±94,515 SF

LEASED

2610 ORCHARD ±59,797 SF

LEASED

2630 ORCHARD ±61,723 SF

AVAILABLE

SITE

Page 4: IM NE PR W O 2630 VE M EN M TS AR U KE T RE A N DY DE R ... · • 2,000 Amps @277/480v • Clear Height 15 ... 2630. Orchard Parkway ENTRANCE ENTRANCE Trimble Road ENTRANCE SITE/LOCATION

FLOOR PLANS1ST FLOOR ±39,518 SF 2ND FLOOR ±22,205 SF

2630ORCHARDPARKWAY

2630

55

2610

UP

UP UPFEC

FEC

FEC

FEC

FEC

FEC

(E) LOBBY101

(E) MEN'S103

(E) WOMEN'S104

(E) JAN105

(E) MECHEQUIP107

(E) ELECT108

(E) ELECT109

(E) ELECT110

(E) CONF102

OPEN TO ABOVE

DW

M'S LCKR127

2324 SF

FITNESS120

tv

978 SF

BREAK119

M SHWR126

M'S125

W'S LCKR129

W'S128W SHWR

130

VEST124

EQUIP STOR121

(E) ELEV114

(E) STAIR #A1.2115

(E) SFR111

HALLWAY122

(E) STAIR #A1.3116

OPEN OFFICE106

(E) STAIR #A1.1117

3/32" = 1'-0"1 1st FLOOR - OVERALL

.Orchard trimble

UP

UP UP

LOBBY

POTENTIALDH’s

POTENTIALGLD

GLD

GLDSHOWERS

BUILDING HIGHLIGHTS• 3 STORIES

• LOADING: (3) Grade Level Doors (One Glassed-In); (2) Glassed-In Dock Doors

• POWER: 2,000 Amps @ 277/480V

• ROOFTOP HVAC: (2) 35-Ton Units; (16) 4.0- to12.5-Ton Units

• FLOOR-TO-FLOOR HEIGHTS: 15’

• CLEAR HEIGHTS W/ DROP CEILING: 10’ to 12’

• FLOOR LOADS: DL - 76/sf (Including 20 Partition Loads; LL - 80/sf)

• COLUMN SPACING: 24’ x 38’

• ELEVATOR: Single 2,500 lb Capacity Hydraulic

55

26102630

2630 ORCHARD PARKWAY • ±64,433 SFAS BUILT FLOOR PLANS

2ND FLOOR ±22,205 SF

1ST FLOOR ±42,128 SF

CONF

Orchard

OPEN CEILING15’ CLR HEIGHT

GL DH DH

DROP CEILING DROP CEILING

DROP CEILING

BREAKROOM

ROLL UP DOORTO PATIO AREA

FITNESSCENTER

Page 5: IM NE PR W O 2630 VE M EN M TS AR U KE T RE A N DY DE R ... · • 2,000 Amps @277/480v • Clear Height 15 ... 2630. Orchard Parkway ENTRANCE ENTRANCE Trimble Road ENTRANCE SITE/LOCATION

Orchard trimble

Bocce Court

Bike Parking

OUTDOOR AMENITY MAP

Outdoor Kitchen with BBQ

Bike Lockers

Concrete Seat Walls with Lights for Bocce Spectators

Built In Gas Fire Pit andFlexible Lounge Seating

Dining Area

Fountain

Seating Area

Metal Shade Arbor with Presentation Screen

Amphitheatre

2610 ORCHARD PARKWAY

2630 ORCHARD PARKWAY

55 WEST TRIMBLE

OUTDOOR AMENITY MAP

Page 6: IM NE PR W O 2630 VE M EN M TS AR U KE T RE A N DY DE R ... · • 2,000 Amps @277/480v • Clear Height 15 ... 2630. Orchard Parkway ENTRANCE ENTRANCE Trimble Road ENTRANCE SITE/LOCATION

Orchard trimble

Brokaw Road

Trimble R

oadZanker Road

101

North First Street

Bagel Street CafeSenor Jalapeno Taqueria

That’s a WrapDD’s CafeStar Cafe

Cutting Board Deli

101

BB’s Small World CafeHomewood Suites

Honba Sushi Thai Orchid

Ume Chinese Food Sangram Indian Cuisine

Olive’s Greek & Middle Eastern Cafe

Rivermark

Plaza

CrescentVillage

Levi’s Stadium

RivePlaP za

Montague Expressway

Bonavertura Station

Tasman Station

River Oaks Station

GreatAmericaStation

Lick MillStation

ChampionStation

BaypointeStation Cisco Way

Station

MontagueStation

Component Station

KarinaStation

Metro/Airport Station

Shagun Indian Active Sports Club

Ume Chinese Food

1,740 Luxury ApartmentsTennis Courts

Basketball CourtWalking Trails

1

dd

River Oaks Village

880

DISTANCES Light Rail (±8 minute Walk to Component Station)

AMENITIES MAP

San Jose, CaliforniaOrchard trimble

OUTDOOR AMENITY MAP

ORCHARD TRIMBLE San Jose, CA

Page 7: IM NE PR W O 2630 VE M EN M TS AR U KE T RE A N DY DE R ... · • 2,000 Amps @277/480v • Clear Height 15 ... 2630. Orchard Parkway ENTRANCE ENTRANCE Trimble Road ENTRANCE SITE/LOCATION

CBRE | Silicon Valley 225 West Santa Clara St

12th Floor San Jose, CA

+1 408 453 7400

MICHAEL E. FILICE Lic. 01109988

+1 408 453 7445 [email protected]

AUDREY MILO Lic. 01869379

+1 408 467 7550 [email protected]

For more information contact:

© 2017 CBRE, Inc. The information contained in this document has been obtained from sources believed reliable. While CBRE, Inc. does not doubt its accuracy, CBRE, Inc. has not verified it and makes no guarantee, warranty or representation about it. It is your responsibility to independently confirm its accuracy and completeness. Any projections, opinions, assumptions or estimates used are for example only and do not represent the current or future performance of the property. The value of this transaction to you depends on tax and other factors which should be evaluated by your tax, financial and legal advisors. You and your advisors should conduct a careful, independent investigation of the property to determine to your satisfaction the suitability of the property for your needs. Team-Marketing:2630 Orchard Parkway:2630OrchardParkway_Brochure_v03.indd | July 13, 2017

CBRE and the CBRE logo are service marks of CBRE, Inc. and/or its affiliated or related companies in the United States and other countries. All other marks displayed on this document are the property of their respective owners.

2630ORCHARDPARKWAY