ILO Meeting #26 Ongoing and forthcoming Procurement activities 29 th September 2014 - San Sebastian...
-
Upload
shanon-ross -
Category
Documents
-
view
217 -
download
4
Transcript of ILO Meeting #26 Ongoing and forthcoming Procurement activities 29 th September 2014 - San Sebastian...
ILO Meeting #26ILO Meeting #26
Ongoing and forthcomingOngoing and forthcomingProcurement activitiesProcurement activities
2929thth September 2014 - San Sebastian September 2014 - San Sebastian
F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 1
Reminder: MIG/BI GroupReminder: MIG/BI Group
F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 2
ANTENNAS & PLASMA ENGINEERING A. COURTIAL NEUTRAL BEAM SYSTEM & PS (T. Bonicelli) B.PERIER;M.DAVAL ION CYCLOTRON H&CD ANTENNA A. COURTIAL ELECTRON CYCLOTRON M.DAVAL
Diamond Disks A. COURTIAL MITICA Beam Source B.PERIER
EC UL Cooling Water Distribution System A. COURTIAL SF6 Plant B.PERIER
BUILDINGS (L.Schmieder) M.DAVAL Gyrotron Magnets M.DAVAL
TB13 Emergency Electrical System M.DAVAL AGPS-CS B.PERIER
CODAC (F. Sartori) A. COURTIAL PROJECT OFFICE (F. Casci) A. COURTIAL;M.DAVAL Framework contract ENGINEERING SERVICES A. COURTIAL PROJECT MANAGEMENT A. COURTIAL;M.DAVAL
CRYOPLANT & FUEL CYCLE (A. Teissier) M.DAVAL;B.PERIER Indexation M.DAVAL
REMS B.PERIER;M.DAVAL Export Control Service Provider M.DAVAL
PRE PRODUCTION CRYOPUMP B.PERIER REMOTE HANDLING (C.Damiani) B.PERIER TRITIUM M.DAVAL DIVERTOR RH B.PERIER
VACUUM PUMPIMG M.DAVAL CASK & PLUG B.PERIER
DIAGNOSTICS (G. Counsell) A. COURTIAL;M.DAVAL NB RH B.PERIER
RH CONNECTORS A. COURTIAL IN VESSEL VIEWING SYSTEM (IVVS) B.PERIER
COLLECTIVE THOMSON SCATTERING M.DAVAL TECHNICAL SUPPORT SERVICES (PY. A. COURTIAL;M.DAVAL FEEDTHROUGH M.DAVAL MATERIALS DEVELOPMENT M.DAVAL
IN-VESSEL (P.Lorenzetto) M.DAVAL Helium Test M.DAVAL
DIVERTOR IVT M.DAVAL Engineering Support A. COURTIAL
DIVERTOR CASSETTE BODY M.DAVAL VACUUM VESSEL (P.Jucker) B.PERIER MANIFOLD M.DAVAL TBD B.PERIER
MAGNETS (S. Bonito) B.PERIER BROADER APPROACH (P. Barabaschi) B.PERIER PF COILS IMPREGNATION and ADDITIONAL TOOLING B.PERIER TBD B.PERIER
PF COILS WINDING TOOLING B.PERIER
PF COILS Site & Infra B.PERIER
PF COILS Cold Test B.PERIER
PF COILS MANUFACTURING B.PERIER
MagnetsMagnets
(PF Coils)Awarded:•Winding tooling {OPE-463]: signed with Sea-Alp consortium on 8th of MayOn-going:•Impregnation & Additional tooling [OPE-559]Under evaluation:•Site & Infrastructure Management [OPE-568]Under preparation:•Manufacturing and cold test [OPE-570](CFT 11/2014)•Cold test engineering study and facility construction [OPE-585]-cf market survey
F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 3
In VesselIn Vessel
DivertorUnder evaluation: •OMF-567: 3rd Tungsten IVT prototype (deadline 17/06): start of the dialogue in September 2014 (target contract signature June 2015).•Cassette body assembly: market survey mid-2015. (target CFT Q1 2016)
First WallAwarded:• [OPE-443] full scale prototype.
F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 4
Remote HandlingRemote Handling
Awarded: Divertor RHS [OMF 340-1] to Assystem UK (rank 1)
On-going:
•Cask & Plug RHS [OMF-577] CFEI published 3rd June 2014. Deadline for requests
to participate: 4 July 2014. Invitation to dialogue: expected October 2014.
•In-Vessel Viewing System [OMF-383] on-going dialogue since mid July 2014. Final
invitation to submit tender: December 2014. Tender submission deadline: January
2015. Expected Award: July 2015.
Under evaluation:
•Neutral Beam RHS [OMF 340-3] Tender phase ongoing, deadline for submission
of tenders 16/06/2014. Expected Award: ExCo Jan. 2015.
F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 5
Cryoplant & Fuel cycleCryoplant & Fuel cycle
Tritium PlantUnder preparation:•Conceptual design for Hydrogen Isotope Separation System [ex-OPE-441]. Possible ITA signature with IO. Target CFT Q3 2015.
Vacuum pumpingAwarded: OPE-551: He gas transfer lines. Signed on 04/09/2014 with Criotec Impianti.
F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 6
ITER Cryopump component
TBM & Materials developmentTBM & Materials development
Ancillary system
F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 7
Technical SupportTechnical Support
F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 8
Planning and SchedulingPlanning and Scheduling
Under evaluation:
•[OMF 555]: FW for dual use export compliance services
•[OMF 556]: FW for Planning and scheduling
•[OMF 557]: FW for Quality Inspection
F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 9
Neutral Beam & EC Power SuppliesNeutral Beam & EC Power Supplies
F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 10
1 MW CW Gyrotron (140 GHz) W7-X
DiagnosticsDiagnostics
F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 11
Buildings (and site adaptation) 1/2Buildings (and site adaptation) 1/2
F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 12
Buildings (and site adaptation) 2/2Buildings (and site adaptation) 2/2
F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 13
Antennas & Plasma EngineeringAntennas & Plasma Engineering
EC launcher
Antennas
F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 14
F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 15
ILO Meeting #26 Market surveysILO Meeting #26 Market surveys
Market Surveys on-going
DIAGNOSTICS- bolometer sensor manufacturingMAGNETS- PF coils cold tests
Market Surveys to comeDIVERTOR – Cassette assembly, Q1 2015EC UL/CODAC – System and Instrumentation Engineering Support, Q3 2014
Info Days to come
10th June 2015: F4E Forum