Illustrative Extended Build-Out Scenario: Stage 1 Arena ... · Platform Partially Complete Over...
Transcript of Illustrative Extended Build-Out Scenario: Stage 1 Arena ... · Platform Partially Complete Over...
![Page 1: Illustrative Extended Build-Out Scenario: Stage 1 Arena ... · Platform Partially Complete Over Block 1120 BuilDing with Below-graDe Parking comPlete BuilDing with Below-graDe Parking](https://reader034.fdocuments.us/reader034/viewer/2022050717/5e157433870bd033f23cb93b/html5/thumbnails/1.jpg)
Figure 9
12.12.10
Illustrative Extended Build-Out Scenario:Stage 1
Arena Opening
SOUR
CE: S
tant
ec 1
2/20
10
ConstruCtionoFFiCE
ConstruCtionstaging
Surface Parkingwith nYPD Parking
![Page 2: Illustrative Extended Build-Out Scenario: Stage 1 Arena ... · Platform Partially Complete Over Block 1120 BuilDing with Below-graDe Parking comPlete BuilDing with Below-graDe Parking](https://reader034.fdocuments.us/reader034/viewer/2022050717/5e157433870bd033f23cb93b/html5/thumbnails/2.jpg)
Figure 10
12.12.10
Illustrative Extended Build-Out Scenario:Stage 2
LIRR Permanent Yard Complete
BuilDing with Below-graDe Parking comPlete
ConstruCtionstaging
Surface Parkingwith nYPD Parking
SOUR
CE: S
tant
ec 1
2/20
10
![Page 3: Illustrative Extended Build-Out Scenario: Stage 1 Arena ... · Platform Partially Complete Over Block 1120 BuilDing with Below-graDe Parking comPlete BuilDing with Below-graDe Parking](https://reader034.fdocuments.us/reader034/viewer/2022050717/5e157433870bd033f23cb93b/html5/thumbnails/3.jpg)
Figure 11
12.12.10
Extended Build-Out Scenario:Stage 3
Platform Partially Complete Over Block 1120
BuilDing with Below-graDe Parking comPlete
BuilDing with Below-graDe Parking comPletewith nYPD Parking
POSSIBLECOnStruCtIOn
StagIng
SOUR
CE: S
tant
ec 1
2/20
10
Surface Parkingwith nYPD Parking
![Page 4: Illustrative Extended Build-Out Scenario: Stage 1 Arena ... · Platform Partially Complete Over Block 1120 BuilDing with Below-graDe Parking comPlete BuilDing with Below-graDe Parking](https://reader034.fdocuments.us/reader034/viewer/2022050717/5e157433870bd033f23cb93b/html5/thumbnails/4.jpg)
Figure 12
12.12.10
Illustrative Extended Build-Out Scenario:Stage 4
Platform Complete Over Block 1120
BuilDing with Below-graDe Parking comPletewith nYPD Parking
BuilDing with Below-graDe Parking
comPlete with nYPD Parking
PossiBLEConstruCtion
staging
SOUR
CE: S
tant
ec 1
2/20
10
BuilDing with Below-graDe Parking comPlete
![Page 5: Illustrative Extended Build-Out Scenario: Stage 1 Arena ... · Platform Partially Complete Over Block 1120 BuilDing with Below-graDe Parking comPlete BuilDing with Below-graDe Parking](https://reader034.fdocuments.us/reader034/viewer/2022050717/5e157433870bd033f23cb93b/html5/thumbnails/5.jpg)
Figure 13
12.12.10
Illustrative Extended Build-Out Scenario:Stage 5
Platform Partially Complete Over Block 1121
BuilDing with Below-graDe Parking comPletewith nYPD Parking
BuilDing with Below-graDe Parking
comPlete with nYPD ParkingSurfaceParking
POSSIBLECOnStruCtIOn
StagIng
SOUR
CE: S
tant
ec 1
2/20
10
BuilDing with Below-graDe Parking comPlete
![Page 6: Illustrative Extended Build-Out Scenario: Stage 1 Arena ... · Platform Partially Complete Over Block 1120 BuilDing with Below-graDe Parking comPlete BuilDing with Below-graDe Parking](https://reader034.fdocuments.us/reader034/viewer/2022050717/5e157433870bd033f23cb93b/html5/thumbnails/6.jpg)
Figure 14
12.12.10
Illustrative Extended Build-Out Scenario:Stage 6
Platform Complete Over Block 1121
BuilDing with Below-graDe Parking
comPlete with nYPD Parking
PossiBLEConstruCtion
staging
SOUR
CE: S
tant
ec 1
2/20
10 BuilDing with Below-graDe Parking comPletewith nYPD Parking
BuilDing with Below-graDe Parking comPlete
![Page 7: Illustrative Extended Build-Out Scenario: Stage 1 Arena ... · Platform Partially Complete Over Block 1120 BuilDing with Below-graDe Parking comPlete BuilDing with Below-graDe Parking](https://reader034.fdocuments.us/reader034/viewer/2022050717/5e157433870bd033f23cb93b/html5/thumbnails/7.jpg)
Figure 15
12.12.10
Illustrative Extended Build-Out Scenario:Stage 7
Final Build Out
BuilDing with Below-graDe Parking comPletewith nYPD Parking
BuilDing with Below-graDe Parking
comPlete with nYPD Parking
SOUR
CE: S
tant
ec 1
2/20
10
BuilDing with Below-graDe Parking comPlete
![Page 8: Illustrative Extended Build-Out Scenario: Stage 1 Arena ... · Platform Partially Complete Over Block 1120 BuilDing with Below-graDe Parking comPlete BuilDing with Below-graDe Parking](https://reader034.fdocuments.us/reader034/viewer/2022050717/5e157433870bd033f23cb93b/html5/thumbnails/8.jpg)
Figu
re 1
6
12.1
2.10
Illus
trat
ive
Inte
rim
Pub
lic P
laza
on
Build
ing
Site
1
![Page 9: Illustrative Extended Build-Out Scenario: Stage 1 Arena ... · Platform Partially Complete Over Block 1120 BuilDing with Below-graDe Parking comPlete BuilDing with Below-graDe Parking](https://reader034.fdocuments.us/reader034/viewer/2022050717/5e157433870bd033f23cb93b/html5/thumbnails/9.jpg)
Figure 17
12.12.10
Illustrative Interim Public Open Space on Building Site 3
![Page 10: Illustrative Extended Build-Out Scenario: Stage 1 Arena ... · Platform Partially Complete Over Block 1120 BuilDing with Below-graDe Parking comPlete BuilDing with Below-graDe Parking](https://reader034.fdocuments.us/reader034/viewer/2022050717/5e157433870bd033f23cb93b/html5/thumbnails/10.jpg)
Figure 18
12.12.10
Illustrative Layout ofTemporary Use on Block 1129 at Arena Opening
Landscaped FencingDirectional LightingParking Access/Egress
ConstruCtionoFFiCe
ConstruCtionstAGinG
![Page 11: Illustrative Extended Build-Out Scenario: Stage 1 Arena ... · Platform Partially Complete Over Block 1120 BuilDing with Below-graDe Parking comPlete BuilDing with Below-graDe Parking](https://reader034.fdocuments.us/reader034/viewer/2022050717/5e157433870bd033f23cb93b/html5/thumbnails/11.jpg)
Figu
re 1
9
12.1
2.10
Pede
stri
an P
ersp
ecti
ve o
f Bl
ock
1129
-Lo
okin
g N
orth
east
at
Dea
n St
reet
& C
arlt
on A
venu
e
![Page 12: Illustrative Extended Build-Out Scenario: Stage 1 Arena ... · Platform Partially Complete Over Block 1120 BuilDing with Below-graDe Parking comPlete BuilDing with Below-graDe Parking](https://reader034.fdocuments.us/reader034/viewer/2022050717/5e157433870bd033f23cb93b/html5/thumbnails/12.jpg)
4TH
AVE.
HANSON PL.
ATLANTIC AVE.CLERM
ONT AVE.
CARLTON AVE.
CUMBERLAND ST.
S. OXFORD ST.
S. PORTLAND AVE.
S. ELLIOTT PL.
FORT GREENE PL.
VANDERBILT AVE.
PACIFIC ST.
CAR
LTO
N A
VE.
VAN
DER
BILT
AVE
.
DEAN ST.
BERGEN ST.
ST. MARKS AVE.ST. MARKS PL.
5TH
AVE. FLATBUSH AVE.
6TH
AVE
.
1
18
11
9b9c
2
12
313
17
16
414
5
15
6
7
8
9
10
7a
10b10a
10c
10d
12.12.10
Construction Noise Receptor LocationsFigure 20
SCALE
0 200 FEET100
N
*
*
Atlantic Yards Arena andRedevelopment Project
TECHNICALMEMORANDUM
Office
Commercial/ Office
Institutional
Industrial
Parking
Open Space
Vacant Parcel
Vacant Building
Under Construction
* Developments expected to be completed by time of analysis (see Table 2-1)
Project Site Boundary
Noise Receptor Location
Residential
Residential(with Ground-Floor Retail)
Commercial
1This figure has been revised since the DEIS