    ILLUSTRATED PRODUCT CATALOGUEMAJOR PROJECTS

    -

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    2/26

    CLIENT ELF ANTARLOCATION Donges, FranceYEAR OF DELIVERY - 1992

    COPE : Supply of 1 catalytic reformer and 1 Hot oil heater

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    3/26

    CLIENT - PetrokemyaLOCATION Al Jubail, Saudi ArabiaYEAR OF DELIVERY - 1993

    COPE : Design and supply of 10 milliseconds cracking furnaces in 5 modules, prefabricated in Belgium and

    hipped to Saudi Arabia. The 5 modules of 2 heaters each were entirely prefabricated, equipped and tested in

    urope with all the auxiliaries equipment, instruments, piping and wiring, including lighting fixtures. To be

    hipped, each module was rolled from the yard to the deck of the semi-submersible heavy lift vessel with 4

    ailers each with 80 hydraulic heights controlled and steerable double-wheels. Technology M.W. Kellogg.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    4/26

    CLIENT Mitteldeutsche Erdoel RefLOCATION Leuna, GermanyYEAR OF DELIVERY - 1994

    COPE : Leuna 2000 Project. Engineering and fabrication of 6 Heaters : 1 Column Feed Heater, 1 Reactor

    harge Heater, 3 Hydrotreaters, 1 Catalytic Reformer, technology Lurgi.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    5/26

    CLIENT IBN HayyanLOCATION Al Jubail, Saudi ArabiaYEAR OF DELIVERY - 1994

    COPE : Supply of 1 modularised EDC cracking furnace.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    6/26

    CLIENT Reliance Industries LimitedLOCATION Jamnagar, IndiaYEAR OF DELIVERY - 1996

    COPE : Reliance 1 Project. Design and supply of 12 heaters : 4 Hydrodesulfurisation Heaters, 2 Vacuum

    stillation Heaters, 4 Atmospheric Distillation Heaters and 2 Reactor Charge Heaters.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    7/26

    CLIENT Rafineria GdanskaLOCATION Gdansk, PolandYEAR OF DELIVERY - 1996

    COPE : Replacement of a Vacuum Distillation Heater in 7 days.

    tage 1 : Removal of the old heater from foundations.

    tage 2 : The new heater built on temporary foundations is being rolled on position by mean of trolleys

    ushed on the rails by hydraulic jacks.

    tage 3 : Placement of the new heater on the existing foundations.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    8/26

    CLIENT HadeedLOCATION Al Jubail, Saudi ArabiaYEAR OF DELIVERY - 1996

    COPE : Installation of a fully modularised Process Gas Heater to be installed at 40 meters elevation on the

    op of reactor structure.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    9/26

    CLIENT UEI PosvenLOCATION Puerto Ordaz, VenezuelaYEAR OF DELIVERY - 1997

    COPE : Supply of 2 gas heater, technology HYL.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    10/26

    CLIENT Fina Antwerp OlefinsLOCATION Antwerp, BelgiumYEAR OF DELIVERY - 2001

    COPE: FAO Project, supply of 1 Naphta Ethane Cracking Furnace. Recognition of Excellence in Quality and

    afety, ExxonMobil technology.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    11/26

    CLIENT SincorLOCATION Jos, VenezuelaYEAR OF DELIVERY - 2001

    COPE : Design, full modularisation and sea transportation of 8 Heaters : 2 Cracking Heaters, 1 Reactor Charge

    eater, 1 Hydrotreater, 2 Vacuum Distillation Heaters, 2 Atmospheric Distillation Heaters.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    12/26

    CLIENT Holborn EuropaLOCATION Holborn, GermanyYEAR OF DELIVERY - 2000

    COPE : Supply of 1 Steam Reformer (Haldor Topsoe Technology) and 1 hydrodesulfurisation heater.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    13/26

    CLIENT Air LiquideLOCATION Antwerp, BelgiumYEAR OF DELIVERY -2001

    COPE : upiter Project, supply of 1 232 tubes Steam Reformer, Haldor Topsoe technology.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    14/26

    CLIENT SasolLOCATION Sasolsburg, South AfricaYEAR OF DELIVERY -2002

    COPE : Supply of 2 steam superheaters.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    15/26

    CLIENT ExxonMobil ChemicalLOCATION Jurong Island, SingaporeYEAR OF DELIVERY - 2006

    COPE : LSTK project. Design and fabrication of the 9th furnace of the Singapore Olefins Plant : 1 steam

    racking furnace, Exxon Technology.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    16/26

    CLIENT Chandra Asri Petrochemical CenterLOCATION West Java, IndonesiaYEAR OF DELIVERY - 2007

    COPE : Furnace expansion project. Supply and erection of 1 Steam Cracker, KBR technology.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    17/26

    CLIENT Reliance Industries LimitedLOCATION Jamnagar, IndiaYEAR OF DELIVERY - 2008

    COPE: Reliance II Project. Design and supply of 28 modularised furnaces : 3 Steam Superheaters, 2 Vacuum

    istillation Heaters, 1 Reboiler, 11 Reactor Charge Heaters, 1 Catalytic Reformer, 4 Atsmospheric Distilation

    eaters, 2 Hot Oil Heaters, 6 Hydrotreaters, 1 Delayed Coker.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    18/26

    CLIENT Total PetrochemicalsLOCATION Gonfreville, FranceYEAR OF DELIVERY - 2007

    COPE : Supply of 1 modularised Steam Superheater.

    refabrication in Thessaloniki, Greece and sea transportation to Gonfreville, France.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    19/26

    CLIENT Oman AromaticsLOCATION Sohar, Sultanate of OmanYEAR OF DELIVERY - 2008

    COPE : Design and supply of 15 aromatic heaters : 8 Reboilers, 6 Reactor Charge Heaters and 1 Catalytic

    eformer.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    20/26

    CLIENT P.I.C.LOCATION Shuaiba, KuwaitYEAR OF DELIVERY - 2009

    COPE : Aromatic Complex project. Design and supply of 4 Reboilers and 2 Reactor Charge Heaters, UOP

    echnology.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    21/26

    CLIENT KinefLOCATION Kirishi, RussiaYEAR OF DELIVERY - 2007

    COPE : Supply of 1 Visbreaker and 2 Vacuum Distillation Heaters in 2004.

    rection of the Heaters on the Kirishi Site in 2007.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    22/26

    CLIENT ExxonMobil ChemicalLOCATION Jurong Island, SingaporeYEAR OF DELIVERY 2010

    COPE : Supply of 7 cracking furnaces, fulkly modularised in Thailand, and shipped to Singapore, Exxon

    echnology.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    23/26

    CLIENT Total PetrochemicalsLOCATION Immingham, United KingdomYEAR OF DELIVERY - 2007

    COPE : Supply of 1 64 tubes Steam Reformer, Jacobs technology.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    24/26

    CLIENT Total PetrochemicalsLOCATION Gonfreville, FranceYEAR OF DELIVERY - 2011

    COPE : UGO 2011 project : supply of 2 Steam Cracking furnaces, Shaw technology.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    25/26

    CLIENT Hellenic PetroleumLOCATION Elefsis Refinery, GreeceYEAR OF DELIVERY - 2010

    COPE : Supply of 1 Steam Methane Reformer, Haldor Topsoe technology and 2 hydrocrackers.

  • 7/29/2019 Illustrated Product Catalogue Major Projects

    26/26

    CLIENT NIS GazpromneftLOCATION Pancevo Refinery, SerbiaYEAR OF DELIVERY - 2012

    COPE : Supply of 1 complete steam reforming unit for Hydrogen production, Haldor Topsoe technology.