Illustrated Product Catalogue Major Projects
Transcript of Illustrated Product Catalogue Major Projects
-
7/29/2019 Illustrated Product Catalogue Major Projects
1/26
ILLUSTRATED PRODUCT CATALOGUEMAJOR PROJECTS
-
-
7/29/2019 Illustrated Product Catalogue Major Projects
2/26
CLIENT ELF ANTARLOCATION Donges, FranceYEAR OF DELIVERY - 1992
COPE : Supply of 1 catalytic reformer and 1 Hot oil heater
-
7/29/2019 Illustrated Product Catalogue Major Projects
3/26
CLIENT - PetrokemyaLOCATION Al Jubail, Saudi ArabiaYEAR OF DELIVERY - 1993
COPE : Design and supply of 10 milliseconds cracking furnaces in 5 modules, prefabricated in Belgium and
hipped to Saudi Arabia. The 5 modules of 2 heaters each were entirely prefabricated, equipped and tested in
urope with all the auxiliaries equipment, instruments, piping and wiring, including lighting fixtures. To be
hipped, each module was rolled from the yard to the deck of the semi-submersible heavy lift vessel with 4
ailers each with 80 hydraulic heights controlled and steerable double-wheels. Technology M.W. Kellogg.
-
7/29/2019 Illustrated Product Catalogue Major Projects
4/26
CLIENT Mitteldeutsche Erdoel RefLOCATION Leuna, GermanyYEAR OF DELIVERY - 1994
COPE : Leuna 2000 Project. Engineering and fabrication of 6 Heaters : 1 Column Feed Heater, 1 Reactor
harge Heater, 3 Hydrotreaters, 1 Catalytic Reformer, technology Lurgi.
-
7/29/2019 Illustrated Product Catalogue Major Projects
5/26
CLIENT IBN HayyanLOCATION Al Jubail, Saudi ArabiaYEAR OF DELIVERY - 1994
COPE : Supply of 1 modularised EDC cracking furnace.
-
7/29/2019 Illustrated Product Catalogue Major Projects
6/26
CLIENT Reliance Industries LimitedLOCATION Jamnagar, IndiaYEAR OF DELIVERY - 1996
COPE : Reliance 1 Project. Design and supply of 12 heaters : 4 Hydrodesulfurisation Heaters, 2 Vacuum
stillation Heaters, 4 Atmospheric Distillation Heaters and 2 Reactor Charge Heaters.
-
7/29/2019 Illustrated Product Catalogue Major Projects
7/26
CLIENT Rafineria GdanskaLOCATION Gdansk, PolandYEAR OF DELIVERY - 1996
COPE : Replacement of a Vacuum Distillation Heater in 7 days.
tage 1 : Removal of the old heater from foundations.
tage 2 : The new heater built on temporary foundations is being rolled on position by mean of trolleys
ushed on the rails by hydraulic jacks.
tage 3 : Placement of the new heater on the existing foundations.
-
7/29/2019 Illustrated Product Catalogue Major Projects
8/26
CLIENT HadeedLOCATION Al Jubail, Saudi ArabiaYEAR OF DELIVERY - 1996
COPE : Installation of a fully modularised Process Gas Heater to be installed at 40 meters elevation on the
op of reactor structure.
-
7/29/2019 Illustrated Product Catalogue Major Projects
9/26
CLIENT UEI PosvenLOCATION Puerto Ordaz, VenezuelaYEAR OF DELIVERY - 1997
COPE : Supply of 2 gas heater, technology HYL.
-
7/29/2019 Illustrated Product Catalogue Major Projects
10/26
CLIENT Fina Antwerp OlefinsLOCATION Antwerp, BelgiumYEAR OF DELIVERY - 2001
COPE: FAO Project, supply of 1 Naphta Ethane Cracking Furnace. Recognition of Excellence in Quality and
afety, ExxonMobil technology.
-
7/29/2019 Illustrated Product Catalogue Major Projects
11/26
CLIENT SincorLOCATION Jos, VenezuelaYEAR OF DELIVERY - 2001
COPE : Design, full modularisation and sea transportation of 8 Heaters : 2 Cracking Heaters, 1 Reactor Charge
eater, 1 Hydrotreater, 2 Vacuum Distillation Heaters, 2 Atmospheric Distillation Heaters.
-
7/29/2019 Illustrated Product Catalogue Major Projects
12/26
CLIENT Holborn EuropaLOCATION Holborn, GermanyYEAR OF DELIVERY - 2000
COPE : Supply of 1 Steam Reformer (Haldor Topsoe Technology) and 1 hydrodesulfurisation heater.
-
7/29/2019 Illustrated Product Catalogue Major Projects
13/26
CLIENT Air LiquideLOCATION Antwerp, BelgiumYEAR OF DELIVERY -2001
COPE : upiter Project, supply of 1 232 tubes Steam Reformer, Haldor Topsoe technology.
-
7/29/2019 Illustrated Product Catalogue Major Projects
14/26
CLIENT SasolLOCATION Sasolsburg, South AfricaYEAR OF DELIVERY -2002
COPE : Supply of 2 steam superheaters.
-
7/29/2019 Illustrated Product Catalogue Major Projects
15/26
CLIENT ExxonMobil ChemicalLOCATION Jurong Island, SingaporeYEAR OF DELIVERY - 2006
COPE : LSTK project. Design and fabrication of the 9th furnace of the Singapore Olefins Plant : 1 steam
racking furnace, Exxon Technology.
-
7/29/2019 Illustrated Product Catalogue Major Projects
16/26
CLIENT Chandra Asri Petrochemical CenterLOCATION West Java, IndonesiaYEAR OF DELIVERY - 2007
COPE : Furnace expansion project. Supply and erection of 1 Steam Cracker, KBR technology.
-
7/29/2019 Illustrated Product Catalogue Major Projects
17/26
CLIENT Reliance Industries LimitedLOCATION Jamnagar, IndiaYEAR OF DELIVERY - 2008
COPE: Reliance II Project. Design and supply of 28 modularised furnaces : 3 Steam Superheaters, 2 Vacuum
istillation Heaters, 1 Reboiler, 11 Reactor Charge Heaters, 1 Catalytic Reformer, 4 Atsmospheric Distilation
eaters, 2 Hot Oil Heaters, 6 Hydrotreaters, 1 Delayed Coker.
-
7/29/2019 Illustrated Product Catalogue Major Projects
18/26
CLIENT Total PetrochemicalsLOCATION Gonfreville, FranceYEAR OF DELIVERY - 2007
COPE : Supply of 1 modularised Steam Superheater.
refabrication in Thessaloniki, Greece and sea transportation to Gonfreville, France.
-
7/29/2019 Illustrated Product Catalogue Major Projects
19/26
CLIENT Oman AromaticsLOCATION Sohar, Sultanate of OmanYEAR OF DELIVERY - 2008
COPE : Design and supply of 15 aromatic heaters : 8 Reboilers, 6 Reactor Charge Heaters and 1 Catalytic
eformer.
-
7/29/2019 Illustrated Product Catalogue Major Projects
20/26
CLIENT P.I.C.LOCATION Shuaiba, KuwaitYEAR OF DELIVERY - 2009
COPE : Aromatic Complex project. Design and supply of 4 Reboilers and 2 Reactor Charge Heaters, UOP
echnology.
-
7/29/2019 Illustrated Product Catalogue Major Projects
21/26
CLIENT KinefLOCATION Kirishi, RussiaYEAR OF DELIVERY - 2007
COPE : Supply of 1 Visbreaker and 2 Vacuum Distillation Heaters in 2004.
rection of the Heaters on the Kirishi Site in 2007.
-
7/29/2019 Illustrated Product Catalogue Major Projects
22/26
CLIENT ExxonMobil ChemicalLOCATION Jurong Island, SingaporeYEAR OF DELIVERY 2010
COPE : Supply of 7 cracking furnaces, fulkly modularised in Thailand, and shipped to Singapore, Exxon
echnology.
-
7/29/2019 Illustrated Product Catalogue Major Projects
23/26
CLIENT Total PetrochemicalsLOCATION Immingham, United KingdomYEAR OF DELIVERY - 2007
COPE : Supply of 1 64 tubes Steam Reformer, Jacobs technology.
-
7/29/2019 Illustrated Product Catalogue Major Projects
24/26
CLIENT Total PetrochemicalsLOCATION Gonfreville, FranceYEAR OF DELIVERY - 2011
COPE : UGO 2011 project : supply of 2 Steam Cracking furnaces, Shaw technology.
-
7/29/2019 Illustrated Product Catalogue Major Projects
25/26
CLIENT Hellenic PetroleumLOCATION Elefsis Refinery, GreeceYEAR OF DELIVERY - 2010
COPE : Supply of 1 Steam Methane Reformer, Haldor Topsoe technology and 2 hydrocrackers.
-
7/29/2019 Illustrated Product Catalogue Major Projects
26/26
CLIENT NIS GazpromneftLOCATION Pancevo Refinery, SerbiaYEAR OF DELIVERY - 2012