Adaptive Reuse of Historic Structures: Transforming Assetsto Support Your Mission
architecture
planning
interior design
For more information visit: www.ikminc.comConnect with us:
![Page 2: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/2.jpg)
THE GROVE CITY COLLEGE CARNEGIE ALUMNI CENTER
A Case Study
![Page 3: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/3.jpg)
Presenters
• John Schrott, AIA IKM Incorporated Architects
• Michael McDonnell, AIA IKM Incorporated Architects
• Thomas Gregg Grove City College, Vice President Operations
![Page 4: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/4.jpg)
Presentation Objectives
• Explore the significance of historic buildings to a campus
• Explore some typical challenges/opportunities facing reusing or upgrading an historic building
• Explore a process of transformation• Explore the outcomes of the process
![Page 5: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/5.jpg)
THE HISTORICAL PERSPECTIVE
![Page 6: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/6.jpg)
1912 Library
![Page 7: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/7.jpg)
Prominent lower campus location
• Corner of Main & Broad Streets• Oldest publicly used building on campus
![Page 8: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/8.jpg)
Carnegie Library
• Recreation – lower level
• Library – main level
• Auditorium – sloped floor & stage – upper level
![Page 9: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/9.jpg)
1930s – Upper Campus Starts to Develop
![Page 10: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/10.jpg)
Focal Point of Lower Campus
![Page 11: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/11.jpg)
Focal Point of Lower Campus
![Page 12: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/12.jpg)
Focal Point of Lower Campus
![Page 13: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/13.jpg)
Campus migrates east – Building Use Changes
• 1950s – Library moves: building becomes Carnegie Music Hall
• 1970s – Music moves: building becomes AFROTC home until late 1980s
• Early 1990s – Alumni & Career Services office move in
• Late 1990s – Institutional Advancement offices expand
![Page 14: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/14.jpg)
Building Use Evolves
![Page 15: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/15.jpg)
Carnegie Building 1990s
![Page 16: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/16.jpg)
Grove City College Lower Campus - Today
![Page 17: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/17.jpg)
• Appropriate venue for alumni needed• Alumni & Institutional Advancement Offices
identify with location plus no other space available for relocation
• Need to address building accessibility & restroom capacity problems
Lower Campus Vacated – Opportunities for Site Development Exist
![Page 18: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/18.jpg)
Project Goals and Objectives
• Create a better ‘front door’ to the campus
• Strengthen the connection between Alumni and Campus
• Next step in revitalizing the lower campus creating a focal point
• Improve the work environment for all users
![Page 19: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/19.jpg)
CHALLENGES/OPPORTUNITIES
![Page 20: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/20.jpg)
Egress /Code Issues
![Page 21: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/21.jpg)
Accessibility
![Page 22: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/22.jpg)
Building envelop
![Page 23: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/23.jpg)
Work Environment
![Page 24: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/24.jpg)
Abandoned/Deteriorating Areas
![Page 25: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/25.jpg)
HVAC
![Page 26: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/26.jpg)
Plumbing/ Fire Protection
![Page 27: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/27.jpg)
Electrical – Lighting/Power/Data
![Page 28: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/28.jpg)
PROCESS – CONCEPT
![Page 29: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/29.jpg)
Consensus Building
• Grove City College initial project direction with Goals and Objectives
• Stakeholder meetings to explore opportunities• Smaller Focus Groups/Charettes to develop
concepts/refine options• Reconvene for validation by Administration
Core Team
![Page 30: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/30.jpg)
Program Development
![Page 31: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/31.jpg)
Conceptual Design
• Iterative/Interactive process• Stakeholder engagement• Program Monitor• Administrative Core Team Validation• Cost Estimate• Value Engineering Process
![Page 32: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/32.jpg)
Conceptual Design
![Page 33: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/33.jpg)
Conceptual Design
![Page 34: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/34.jpg)
Conceptual Design
![Page 35: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/35.jpg)
Conceptual Design
![Page 36: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/36.jpg)
Conceptual Design
![Page 37: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/37.jpg)
Conceptual Design
![Page 38: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/38.jpg)
Conceptual Design
![Page 39: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/39.jpg)
PROCESS – FUNDRAISING PERIOD
![Page 40: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/40.jpg)
• Need to complete fundraising for Change and Commitment Campaign
• Original program called for $8-$10 million building– Campaign & alumni do not support this amount– Scope & resultant cost reductions needed– Work with IKM & Construction Manager (Tedco) to
achieve reductions– Final Project Cost $7.3 million
Fundraising
![Page 41: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/41.jpg)
Fundraising
![Page 42: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/42.jpg)
Fundraising
![Page 43: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/43.jpg)
PROCESS – DESIGN TRANSFORMATION
![Page 44: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/44.jpg)
Design – Functional Program – Lower Level
![Page 45: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/45.jpg)
Design – Functional Program – Lower Level
![Page 46: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/46.jpg)
Design – Functional Program – Lower Level
![Page 47: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/47.jpg)
Design – Functional Program – Lower Level
![Page 48: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/48.jpg)
Design – Functional Program – Main Level
![Page 49: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/49.jpg)
Design – Functional Program – Main Level
![Page 50: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/50.jpg)
Design – Functional Program – Second Level
![Page 51: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/51.jpg)
Design – Functional Program – Second Level
![Page 52: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/52.jpg)
Design – Functional Program – Second Level
![Page 53: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/53.jpg)
Design – Functional Program – Exterior Space
![Page 54: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/54.jpg)
Design – Accessibility
![Page 55: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/55.jpg)
Design – Accessibility
![Page 56: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/56.jpg)
Design – Flexibility
![Page 57: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/57.jpg)
Design – Flexibility
![Page 58: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/58.jpg)
Design – Exterior Envelop
![Page 59: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/59.jpg)
• Bring systems up to code• Energy efficiency• Minimize impact to architecture• Provide sophisticated A/V• Support an efficient work environment
Design – MEP Imperatives
![Page 60: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/60.jpg)
Design – Building Appearance
![Page 61: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/61.jpg)
Design – Building Appearance
![Page 62: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/62.jpg)
Design Cost Controls
• Early Estimate• Value Modifications• CM analyses throughout design • Consistent teamwork to identify opportunities
![Page 63: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/63.jpg)
OUTCOME
![Page 64: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/64.jpg)
• New (34 ton) Air cooled chilled water generation
• New High Efficiency condensing boilers• New High Efficiency Hot water heaters• Architectural Wall Heaters• Quiet air distribution systems• Snow melt system
Final Product – MEP Infrastructure HVAC
![Page 65: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/65.jpg)
Outcome– MEP Infrastructure HVAC
![Page 66: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/66.jpg)
Outcome– MEP Infrastructure
![Page 67: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/67.jpg)
• New toilet rooms• Kitchen/Food preparation area• All new sprinkler system
Outcome – Plumbing/Fire Protection Infrastructure
![Page 68: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/68.jpg)
Outcome– Plumbing/Fire Protection Infrastructure
![Page 69: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/69.jpg)
Outcome – Electrical/Data
• New Electrical Service• Efficient lighting for offices• Specialty lights for Ballroom• New telephone system• Cable for Data/Voice and specialty requirements• Transformer and generator housed in adjacent
student housing and were sized to support Carnegie Renovation/Addition
![Page 70: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/70.jpg)
Outcome – Electrical/Data
![Page 71: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/71.jpg)
Outcome
![Page 72: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/72.jpg)
Outcome
![Page 73: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/73.jpg)
Outcome
![Page 74: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/74.jpg)
Outcome
![Page 75: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/75.jpg)
Outcome
![Page 76: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/76.jpg)
Outcome
![Page 77: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/77.jpg)
Outcome
![Page 78: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/78.jpg)
Outcome
![Page 79: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/79.jpg)
Outcome
![Page 80: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/80.jpg)
Outcome
![Page 81: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/81.jpg)
Outcome
![Page 82: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/82.jpg)
Outcome
![Page 83: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/83.jpg)
Outcome – Impact to GCC
• Wonderful venue at the front door to the community & campus
• Modern, professional office for Institutional Advancement– Fully functional building for hosting
campus & community events– Easy to access– Great for receptions – nice décor &
amenities– Comfortable HVAC system– Full multi-media presentation
capabilities
![Page 84: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/84.jpg)
Summary
• Historical Buildings are a valuable asset to any institution
• Transformation can be achieved through clear, direct goals and objectives
• Cost effective solutions are available• Adaptive Reuse can be a tool to leverage the
asset to new and better purpose.
![Page 85: IKM Architects: Case Study Higher Education Renovation-2012](https://reader031.fdocuments.us/reader031/viewer/2022012922/545152e3af7959af2f8b6ec3/html5/thumbnails/85.jpg)
QUESTIONS