HUAWEI TECHNOLOGIES CO., LTD. Page 1
2G & 3G SWAP Project 2010
Hardware Installation
HUAWEI TECHNOLOGIES CO., LTD.
www.huawei.com
Prepared by: Yanuar Wahyudi
HUAWEI TECHNOLOGIES CO., LTD. Page 2
INSTALLATION PREPARATION
Checking Material
HUAWEI TECHNOLOGIES CO., LTD. Page 3
Tools Preparation
HUAWEI TECHNOLOGIES CO., LTD. Page 4
Installation Cabinet
HUAWEI TECHNOLOGIES CO., LTD. Page 5
Indoor Overview Cabinet should be shown all part of BTS outside and inside the cabinet
INDOOR BTS CABINET
DCDU
DCDU
HUAWEI TECHNOLOGIES CO., LTD. Page 6
Jumper Routing
HUAWEI TECHNOLOGIES CO., LTD. Page 7
Overview BBU Module and Labels, must be attached regarding standardization
BBU Module 3G System BBU Module 2G System
HUAWEI TECHNOLOGIES CO., LTD. Page 8
Grounding connection (must be lugged with heat shrink and connected firmly)
Overview DCDU Module – PDU and Labels.(all connection must be lugged with heat shrink cover and connected firmly)
Power Cable
HUAWEI TECHNOLOGIES CO., LTD. Page 9
Cable power and E1 distribution (power and E1 cableshould be installed separated each other, and laying upper the BTS without covering the radiation ventilation)
HUAWEI TECHNOLOGIES CO., LTD. Page 10
Routing jumper cable on the wall. Power cable and E1 using cable duct on both side.
HUAWEI TECHNOLOGIES CO., LTD. Page 11
(All cable jumper – feeder Connected firmly,with coloring label,)
Labeling Jumper Indoor DCS1800 Labeling Jumper Indoor GSM900
Label Existing
HUAWEI TECHNOLOGIES CO., LTD. Page 12
OUTDOOR BTS CABINET
HUAWEI TECHNOLOGIES CO., LTD. Page 13
1 2
3 4
CABINET FIXATION
HUAWEI TECHNOLOGIES CO., LTD. Page 14
APM Rack
DCDU module for power resource to all module in BTSAnd BBU for 2G and 3G
GTMU ModuleAnd EMUA Module (below)
UELP and DCDU
HUAWEI TECHNOLOGIES CO., LTD. Page 15
Inlet outlet cable hole on APM cabinet is for the entering or leaving cable purpose. RED mark is for inlet and outlet cable from outside cabinet such as E1 from XL DDF or cable power from XL rectifier.Blue mark is for internal cable
HUAWEI TECHNOLOGIES CO., LTD. Page 16
RFU BOARD : For 2G GRFU and For 3G WRFU
HUAWEI TECHNOLOGIES CO., LTD. Page 17
Grounding cable connection for BTS 3900A WCDMA must be connected as standard. Grounding cable is for BTS door,grounding for module, grounding for connected 2 cabinets and all connected to BTS grounding bar. PGND cable will connected BTS grounding bar to external grounding bar.
HUAWEI TECHNOLOGIES CO., LTD. Page 18
Connection jumper on tower with feeder existing and connection jumper cable with antenna must refers same standard as connection feeder with jumper at BTS.
Cable that distributed outside or entering BTS cabinet from outside must be connected with protecting tube. Inlet outlet hole at BTS must be blocked after cable/protecting tube
HUAWEI TECHNOLOGIES CO., LTD. Page 19
2 cm from connector
1 cm distance
ANT_TX/RXA
2 cm from connector
1 cm distance
ANT_RXB
ANT_TX/RXA
ANT_RXB
BTS 900MAdd one white ring near connector for 3G System
BTS 1800M (DCS 1)Add one white ring near connector for DCS 2
LABEL COLOR for JUMPER AND FEEDER CABLE
HUAWEI TECHNOLOGIES CO., LTD. Page 20
AFTER INSTALLATION
TEST CALL and DRIVE TESTRE-CHECK HARDWARE INSTALLATION
HUAWEI TECHNOLOGIES CO., LTD. Page 21