IIESL & ICES Joint CPD Event
24th May 2009
ICES Membership ICES Membership forfor
IIESL MembersIIESL Members
ICES Membership ICES Membership forforIIESL MembersIIESL MembersDhammika T. Gamage NDT (Civil Eng.), ICIOB, ACIArb, AAIQS, MIIE(SL) I Eng., FACostE, FInstCES
Member of the Society of Construction Law – UAESecretary of the UAE Regional Committee of Institution of Civil Engineering SurveyorsCertified Examiner of Institution of Civil Engineering SurveyorsChairman – International Affiliations of the Institution of Incorporated Engineers, Sri Lanka – UAE BranchVice President, Contracts – Ilyas & Mustafa Galadari Group – Dubai, UAE
Institution of Civil Engineering Surveyors (ICES) Institution of Civil Engineering Surveyors (ICES) is the professional institution for surveyors and engineers who work in the civil engineering and geospatial industries
THE ICESTHE ICES
Established in 1969 as the Association of Surveyors in Civil Engineering and incorporated in 1972.
ICES wanted to encourage and regulate the professional aspirations ofquantity surveyors and land surveyors working within the civil engineeringsector and to increase the value of their services to the public.
These surveyors had developed a distinctive expertise and understanding ofthe special surveying requirements of the civil engineering industry which wasnot recognised at that time by any of the existing professional bodies. ICESrepresents individual surveyors and not businesses/corporate members.
History of ICES
Professional Organisations
ICES has developed unique and mutual agreements with the following:
• ICES is an associated body of the Institution of Civil Engineers (ICE).
• ICES is a full member of the UK Construction Industry Council (CIC).
• ICES is a member of the International Cost Engineers Association (ICEA).
• ICES is an active member of the International Federation of Surveyors (FIG).
• ICES also works with PI UKChina.
ICES supports the continuing professional development of surveyors studying or working within commercial management and geospatial engineering surveying. Members may specialise in one or more of the following:
ICES Membership
Commercial Management
-Quantity Surveying-Estimating-Cost Engineering-Project Management-Procurement Management-Construction Law
Geospatial Engineering
-Land and Engineering-Hydrographic-Photogrammetry and Remote Sensing-Geographic Information Systems
The Institution of Civil Engineering Surveyors
News
This Month the ICES UAE Region Celebrates
2 Years
This Year the ICES Celebrates 40 Years
NewsDear Member
Re: Royal Charter Petition
In December 2008, at the instruction of Council of Management, a petition was submitted to the Privy Council seeking Her Majesty’s pleasure in granting a Royal Charter to the Institution.
Last Friday, 20th March 2009, the following message was received from the clerk to the Privy Council:
At the Privy Council meeting on 18th March, Her Majesty approved an Order approving the draft ICES Charter and ordering the Lord Chancellor to pass it under the Great Seal.
Whilst there remain a number of steps before the sealed Charter is received by the Institution, which may take a number of months to complete, I have been advised that these are merely procedural and that the grant of the Charter is now confirmed.
It is therefore with great pleasure that I can advise that at the earliest juncture following the completion of the remaining process, the ICES will move to re-launching itself as:
The Chartered Institution of Civil Engineering Surveyors
Further details will be made available in due course.
Yours faithfully
Steve JacksonPresident, Institution of Civil Engineering Surveyors
News
ICES signs historic agreement with Sri LankaICES has agreed a memorandum of understanding with the Institution of Incorporated Engineers of Sri Lanka (IIESL). The MoU recognises the professionalism of members of both institutions and covers reciprocal membership arrangements. The agreement was signed in Dubai by ICES president Steve Jackson and IIESL president Tissa Senevirathna.
ICES President Steve Jackson signing historical agreement
with the Institution of Incorporated Engineers
of Sri Lanka in Dubai.
Tonight's discussionTonight's discussionThe way forward
Members of Institution of Incorporated EngineersSri Lanka
to become Members of The Institution of Civil Engineering Surveyors
Why should I belong to aWhy should I belong to a professional institution? professional institution?
Professional recognition
Designatory letters
Technical assistance
CPD events
Networking events
Getting involved
Benefits to MembersBenefits to Members
• ICES Journal Civil Engineering Surveyor
• E Newsletter• Regional and National
Events• Technical Advice
• Access to ICE Library• Discounts on SURCO
Training Courses and Bookshop
• Supplementary specialist literature
• Prizes and Awards
Membership GradesMembership Grades
• Student
• Affiliate
• Graduate
• Technical
• Member (Corporate)
• Fellow
Applying for MembershipApplying for Membership
For Technical and Corporate Members
• Application form with Sponsor’s signature(s)
• Detailed C.V
• Experience Report
• Signed off competencies
• Principal Sponsor’s Form (Corporate Membership)
The CompetenciesThe Competencies
• Competencies are statements that define what you should know and be able to do in order to become a Member.
• There are competencies for Technical and Corporate Membership.
• The competencies are broken down into specific ‘activities’.
Competency optimum standards 1Competency optimum standards 1
A Appreciation
• A general appreciation and awareness of the objective is required.
K Knowledge
• This standard requires knowledge and understanding of the objective.
Competency optimum standards 2Competency optimum standards 2
• E Experience To reach this standard the objective must
have been performed independently or under supervision. Experience of the relevant techniques and functions must be in addition to showing appreciation and knowledge.
• B Ability
To be able, without supervision, to perform relevant functions and will be able to supervise other less experienced staff.
Which set of competencies?Which set of competencies?
Technical Member or Corporate Member
Commercial Management and Geospatial Engineering
General and Specialist competencies
The SpecialismsThe Specialisms
• Quantity Surveying
• Estimating
• Cost Engineering
• Project Management
• Procurement management
• Construction Law
• Land and Engineering
• Hydrographic
• Photogrammetry and Remote Sensing
• GIS
Signed off competencies
Gen 04 COMPETENCIES AND RANGE OF ELEMENTS
Dealing with Change - Positive approach to the challenges of change for self, team and the business. Sees change as an opportunity. Manages self and helps others to become receptive and responsive to change.
Date of AssessmentCross
Reference OptimumActivity Details
Reference Standard A K E B
A E Positive attitude to change, sees potential of new ideas and situations
B E Readiness to accept new methods, identifies problems quickly and accurately
Preparing a Detailed C.V• Civil Engineering Contractors Ltd – 01/01/2006 to 19/11/2007• GSM-R & FTN Scheme, Intermediate Quantity Surveyor / Section Quantity
Surveyor• Conditions of Contract:• ICE 6th, including * Rail Special Conditions RT3 (Framework)• Value: £10.4m• Schedule of Rates• Method of Measurement:• None• Scope of Works• Fixed Telecom Network Cable installation (FTN), GSM-R base construction, telecom
mast’s installation• and REB installation along various routes. A price is agreed per route which is based
on a schedule of• rates as per the framework agreement. * Rail upon agreement of price issued what is
known as a• “Works Order Contract Agreement” (individual contract) for that particular route.
Preparing a Detailed C.V Contd.
• Main responsibilities:• The main duties for the post involved, pricing of the
Works using the schedule of rates (CM3/A) (scope• of works, survey and design including specifications
provided by the Client) negotiating and agreeing• this with the Client including any new rates (CM2/A),
specific to that particular scope of works, prior to• issue of the Works Order. Preparing subcontract
enquiries and subsequent contract documents for• approval by Senior QS, Checking subcontractor
applications for payment including the valuation of any• variations, preparing/reviewing payment certificates,
maintaining a register of alterations for each
Preparing a Detailed C.V Contd.
You should incorporate all work experience gained under the circumstances shown below ;
General Situations1.Planning 2.Resourcing 3.Execution 4.Monitoring (verification) 5. Rectification of any Defects. (repeat 1 to 4)6.Prevention of any adverse effects. 7.Conclusion 8.Evaluation of project stakeholders satisfaction.
Preparing a Detailed C.V Contd.
Critical Situations 1.Identification of the circumstance. 2.Our commission (how and why you are
involved). 3.Study of options available. 4.Justification of why a particular option
was selected and others rejected. 5.Implementation of selected option / action. 6.Evaluation of outcome / conclusion.
Corporate Review InterviewCorporate Review Interview
• The Corporate review interview is a formal interview and is a means for the Institution to effectively
• and fairly assess applications for the Corporate member grade. The Corporate review interview aims to
• provide the candidate with the opportunity to demonstrate knowledge, understanding, competence
• and experience in civil engineering surveying. The interview panel will, in turn, discuss with the
• candidate the information provided within the written application.
• The interview will last one hour.
Corporate Review Interview Corporate Review Interview Contd.Contd.
• Part One — The Presentation• All candidates are asked to prepare and give an informal 10-15
minute presentation about a particular• project (normally the project described in the experience report).
The presentation should be given• without the use of audiovisual aids.• Part Two — Presentation Review• The interview panel will ask questions about the content of the
presentation.• Part Three — Question and Answer Session• The interview panel will put forward a series of questions to the
candidate concerning the following• areas (emphasis is placed on the candidate’s professional
specialism):
Corporate Review Interview Corporate Review Interview Contd.Contd.
The Interview Panel
The interview panel will consist of two or three Institution Fellows and Corporate members. Panelistsundergo interview training. The performance of panels and standards expected from candidates areconstantly monitored by a team of moderators and the Institution’s chief executive. Panelists serve theInstitution on a voluntary basis.
Corporate Review Interview Corporate Review Interview Contd.Contd.
What Panel expect from you
• Be yourself
• Under construction
Company Approved Training SchemesCompany Approved Training Schemes
• Schemes are an agreement between the ICES and the company.
• Provides a coherent and well-structured programme of development.
• Mentoring and supervision of trainees built into the scheme to ensure optimum and cost effective training and development
• Rapid progression towards ICES Membership
Your MembershipYour Membership
Question and Answers…
We look forward to welcoming a new group of Chartered Civil Engineering Surveyors.