II BILL OF QUANTITIES / SCHEDULE OF RATES

Page 2: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys

RENJA PRIMARY SCHOOL

Page 3: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys

BILL 1: CONSTRUCTION OF 50 M3 FERRO-CEMENT TANK - 1 NO.

AS PER DRAWING NO. UN-HABITAT-RAIN-2014- FERRO -CEMENT TANK

Item Description Unit Quantity Unit price Ksh.

Total Amount Ksh.

1 Site preparation, trimming and Excavation of tank foundation to remove black cotton/ top soil upto 300 mm

m3 9.0

2 Hardcore filling - well rammed and compacted -300 mm thick m3 9.0

Slab reinforcement

3 Weld mesh- BRC 104 pcs 12

4 Y 10 bars - column pcs 1.0

5 Starter bars for the walls - Y 8 pcs 4

6 Chicken mesh- starter rolls 1.0

Floor concrete

7 Casing of floor slab 100 mm -1.2.4 ratio m3 3

Walls

Reinforcement

8 Y 8 bars pcs 25

9 Chicken mesh- walls rolls 5

Mortar

10 Cast layers of mortar in walls upto 75mm thickness, mix 1:3 with water proof cement

m2 195

Roof

Reinforcement

11 Y 8 bars pcs 38

12 Chicken mesh rolls 3

Mortar

13 Cast layers of mortar in walls upto 60 mm thickness, mix 1:3 with water proof cement

m2 54.0

Page 4: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys

Item

Description Unit Quantity Unit price Ksh.

Total Amount Ksh.

Formwork

14 Plywood pcs 19

15 Props pcs 40

16 Timber -3 x 2 ft 200

Nails

17 Assorted Kg 10

Fittings

18 GI pipe 11/2" ( 38 mm) pcs 2

19 Elbow 11/2" pcs 12

20 Elbow (¾") pcs 4

21 Socket 11/2" pcs 4

22 ¾" GI pipe (Class B) pcs 2

23 Mosquito screen pcs 2

24 Plug (11/2") pcs 2

25 ¾" nipple pcs 4

26 Thread tape pcs 8

27 ¾" tap (Pegler) pcs 2

Gutters

28 Fix at least 30 m of gutters, connected to the tank through a 3”

medium duty uPVC pipe sum 1

Total amount materials and labour

Add 5% contigiency

Total amount

Page 5: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys

BILL 2: CONSTRUCTION OF 4 DOORS VIP LATRINE- SANPLAT TYPE- 1 NO.

AS PER DRAWING NO. UN-HABITAT-RAIN-2014-VIP LATRINE BOYS WITH URINAL

Item Description Unit Quantity Unit price Kshs.

Total Amount Kshs.

Excavation

1 Site preparation, trimming and Excavation Soil trimming up to 600 mm depth

m3 16

2 Excavation of 4 pits each measuring 1m diameter and depth not less than 15m

m3 48

Lining of the walls

3 Casting of trapezoidal cement blocks measuring 355 mm x 200 mm x 75mm, with cement/sand 1:7,

m3 4000

4 Y 10 bars -foundation - strip foundation pcs 5

5 Foundation walls - stones/blocks 600 mm m2 16

6 Hardcore filling - 600 mm m3 8

Slab reinforcement

7 Y 10 bars- for squat blocks pcs 2

8 Weld mesh - slab pcs 3.6

Floor concrete

9 Casing of floor slab 100 mm -1.2.4 ratio ( squat blocks separate as per the drawing and removable)

m3 2

Walls

10 Brick walls as per the drawing m2 49

11 Wall pass kg 25

Lintel

13 Reinforcement - 4 Y8 +links pcs 3

14 Lintel concrete m3 0.2

Page 6: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys

Item Description Unit Quantity Unit price Kshs.

Total Amount Kshs.

15 Timber formwork - 8x1 ft 36

16 Timber formwork - 3x2 ft 50

17 Round poles pcs 3

Roofing

18 Nails 4" kg 2

19 Nails 3" kg 2

20 Nails 2" kg 2

21 Roofing nails kg 1

22 Timber 8"x1" ft 50

23 Timber 3"x2" ft 50

24 Timber 2"x2" ft 80

25 Install Galvanized Iron sheet (30 gauge)- 2.5 m pcs 7

26 Fix roof as per dimension sum 1

Doors

27 Butt joint timber doors ( 1900 x 850) with hinges, locks both inside and outside

No 4

Paints and finishes

Plaster

28 2 layers of plaster ( 15mm )on all walls m2 90

29 Floor screed m2 16

30 Undercoat paint ltrs 4

31 Emulsion paint - 4l - external tin 2

32 Gloss paint - 4l - internal - wet areas tin 2

33 White tiles- urinal wall up to 1.2 m cuttons 3

Page 7: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys

Item Description Unit Quantity Unit price Kshs.

Total Amount Kshs.

Plumbing

34 Install 4" Vent pipe (10 ft) + vent cover+ screen pcs 4

35 Install uPVC 6" waste pipe - urinal No 1

36 2" - waste pipe uPVC - urinal drain to soak pit No 2

Total amount materials and labour

Add 5% contingency

Total amount

Page 8: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys

BILL 3: CONSTRUCTION OF 4 DOORS VIP LATRINE- SANPLAT TYPE- 2

AS PER DRAWING NO. UN-HABITAT-RAIN-2014-VIP LATRINE IRLS WITHOUT URINAL

Item Description Unit Quantity Unit price Kshs.

Total Amount Kshs.

Excavation

1 Site preparation, trimming and Excavation Soil trimming up to 600 mm depth

m3 16

2 Excavation of 4 pits each measuring 1m diameter and depth not less than 5m

m3 48

Lining of the walls

3 Casting of trapezoidal cement blocks measuring 355 mm x 200 mm x 75mm, with cement/sand 1:7,

m3 4000

4 Y 10 bars -foundation - strip foundation pcs 5

5 Foundation walls - stones/blocks 600 mm m2 16

6 Hardcore filling - 600 mm m3 8

Slab reinforcement

7 Y 10 bars- for squat blocks pcs 2

8 Weld mesh - slab pcs 4

Floor concrete

9 Casing of floor slab 100 mm -1.2.4 ratio ( squat blocks separate as per the drawing and removable)

m3 2

Walls

10 Brick walls as per the drawing m2 49

11 Wall pass kg 25

Lintel

13 Reinforcement - 4 Y8 +links pcs 3

14 Lintel concrete m3 0.2

15 Timber formwork - 8x1 ft 36

Page 9: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys

Item Description Unit Quantity Unit price Kshs.

Total Amount Kshs.

16 Timber formwork - 3x2 ft 50

17 Round poles pcs 3

Roofing

18 Nails 4" kg 2

19 Nails 3" kg 2

20 Nails 2" kg 2

21 Roofing nails kg 1

22 Timber 8"x1" ft 50

23 Timber 3"x2" ft 50

24 Timber 2"x2" ft 80

25 Install Galvanized Iron sheet (30 gauge)- 2.5 m pcs 7

26 Fix roof as per dimensions and details sum 1

Doors

27 Butt joint timber doors ( 1900 x 850) with hinges, locks both inside and outside

No 4

Paints and finishes

Plaster

28 2 layers of plaster on all walls m2 90

29 Floor screed m2 16

30 Undercoat paint ltrs 4

31 Emulsion paint - 4l - external tin 2

32 Gloss paint - 4l - internal - wet areas tin 2

Plumbing

33 Install 4" Vent pipe (10 ft) + vent cover+ screen pcs 4

Total amount materials and labour

Add 5% contingency

Total amount

Page 10: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys

BILL 4: SUPPLY OF HAND WASHING FACILITIES

Item Description Unit Quantity Unit price Kshs.

Total Amount Kshs.

1 Supply 4 No. plastic hand washing basins - 60 litres fixed with GI taps -1/4" type Pegler and a fabricated steel stand

pcs 4

Total amount

SUMMARY- RENJA PRIMARY SCHOOL AMOUNT KSH

1 Bill 1: Construction of 50 m3 Ferro Cement Tank - 1 No.

2 Bill 2: Construction of 4 doors VIP latrine- SANPLAT TYPE- 1 No.

3 Bill 3: Construction of 4 doors VIP latrine- SANPLAT TYPE- 2

4 Bill 4: Supply of hand washing facilities

Project total

Page 11: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys

MATETE PRIMARY SCHOOL

Page 12: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys

BILL 1: CONSTRUCTION OF 50 M3 FERRO CEMENT TANK - 1 NO.

As per Drawing No. UN-HABITAT-RAIN-2014- FERRO -CEMENT TANK

Item Description Unit Quantity Unit price Kshs.

Total Amount Kshs.

1 Site preparation, trimming and Excavation of tank foundation to remove black cotton/ top soil up to 300 mm

m3 9

2 Hardcore filling - well rammed and compacted -300 mm thick

m3 9

Slab reinforcement

3 Weld mesh- BRC 104 pcs 12

4 Y 10 bars - column pcs 1

5 Starter bars for the walls - Y 8 pcs 4

6 Chicken mesh- starter rolls 1

Floor concrete

7 Casing of floor slab 100 mm -1.2.4 ratio m3 3

Walls

Reinforcement

8 Y 8 bars pcs 25

9 Chicken mesh- walls rolls 5

Mortar

10 Cast layers of mortar in walls up to 75mm thickness, mix 1:3 with water proof cement

m2 195

Roof

Reinforcement

11 Y 8 bars pcs 37

12 Chicken mesh rolls 3

Mortar

13 Cast layers of mortar in walls up to 60 mm thickness, mix 1:3 with water proof cement

m2 54

Formwork

14 Plywood pcs 19

15 Props pcs 40

16 Timber -3 x 2 ft 200

Page 13: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys

Item Description Unit Quantity Unit price Kshs.

Total Amount Kshs.

Nails

17 Assorted Kg 10

Fittings

18 GI pipe 11/2" ( 38 mm) pcs 2

19 Elbow 11/2" pcs 12

20 Elbow (¾") pcs 4

21 Socket 11/2" pcs 4

22 ¾" GI pipe (Class B) pcs 2

23 Mosquito screen pcs 2

24 Plug (11/2") pcs 2

25 ¾" nipple pcs 4

26 Thread tape pcs 8

27 ¾" tap (Pegler) pcs 2

Gutters

28 Fix at least 30 m of gutters, connected to the tank through a 3” medium duty uPVC pipe

sum

1

Total amount materials and labour

Add 5% contingency

Total amount

Page 14: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys

BILL 2: CONSTRUCTION OF 4 DOORS VIP LATRINE

AS PER DRAWING NO. UN-HABITAT-RAIN-2014-VIP LATRINE BOYS WITH URINAL

Item Description Unit Quantity Unit price Kshs.

Total Amount Kshs.

Excavation

1 Site preparation, trimming and Excavation Soil trimming up to 600 mm depth

m3 16

2 Excavation of pit as per dimension up to 5m min

m3 80

Foundation walls

3 Y 10 bars -foundation - strip foundation pcs 5

4 Foundation walls - stones/blocks 600 mm depth

m2 16

5 Hardcore filling - 600 mm m3 8

Slab reinforcement

6 Y 10 bars pcs 5

7 Weld mesh - slab pcs 5

Floor concrete

8 Casing of floor slab 100 mm -1.2.4 ratio( squat blocks separate as per the drawing and removable)

m3 2

Walls

10 Brick walls as per the drawing m2 50

11 Wall pass kg 25

Lintel

13 Reinforcement - 4 Y8 +links pcs 3

14 Lintel concrete m3 0.2

15 Timber formwork - 8x1 ft 36

16 Timber formwork - 3x2 ft 50

17 Round poles pcs 3

Roofing

18 Nails 4" kg 2

19 Nails 3" kg 2

20 Nails 2" kg 2

21 Roofing nails kg 1

22 Timber 8"x1" ft 50

Item Description Unit Quantity Unit price Total

Page 15: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys

Kshs. Amount Kshs.

23 Timber 3"x2" ft 50

24 Timber 2"x2" ft 80

25 Install Galvanized Iron sheet (30 gauge)- 2.5 m

pcs 7

26 Fix roof as per dimension sum 1

Doors

27 Butt joint timber doors ( 1900 x 850) with hinges, locks both inside and outside

No 4

Paints and finishes

Plaster

28 2 layers of plaster on all walls m2 90

29 Floor screed m2 16

30 Undercoat paint ltrs 4

31 Emulsion paint - 4l - external tin 2

32 Gloss paint - 4l - internal - wet areas tin 2

33 White tiles- urinal wall up to 1.2 m cuttons 3

Plumbing

34 Install 4" Vent pipe (10 ft) + vent cover+ screen

pcs 4

35 Install uPVC 6" waste pipe - urinal No 1

36 2" - waste pipe uPVC - urinal drain to soak pit No 2

Total amount materials and labour

Add 5% contingency

Total amount

Page 16: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys

BILL 3: CONSTRUCTION OF 4 DOORS VIP LATRINE

AS PER DRAWING NO. UN-HABITAT-RAIN-2014-VIP LATRINE GIRLS WITHOUT URINAL

Item Description Unit Quantity Unit price Kshs.

Total Amount Kshs.

Excavation

1 Site preparation, trimming and Excavation Soil trimming up to 600 mm depth

m3 16

2 Excavation of pit as per dimension up to 5m min

m3 80

Foundation walls - stones

3 Y 10 bars -foundation - strip foundation pcs 5

4 Foundation walls - stones/blocks 600 mm m2 16

5 Hardcore filling - 600 mm m3 8

Slab reinforcement

6 Y 10 bars pcs 5

7 Weld mesh - slab pcs 5

Floor concrete

8 Casing of floor slab 100 mm -1.2.4 ratio ( squat blocks separate as per the drawing and removable)

m3 2

Walls

10 Brick walls as per the drawing m2 50

11 Wall pass kg 25

Lintel

13 Reinforcement - 4 Y8 +links pcs 3

14 Lintel concrete m3 0.2

15 Timber formwork - 8x1 ft 36

16 Timber formwork - 3x2 ft 50

17 Round poles pcs 3

Roofing

18 Nails 4" kg 2

19 Nails 3" kg 2

20 Nails 2" kg 2

21 Roofing nails kg 1

22 Timber 8"x1" ft 50

Page 17: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys

Item Description Unit Quantity Unit price Kshs.

Total Amount Kshs.

23 Timber 3"x2" ft 50

24 Timber 2"x2" ft 80

25 Install Galvanized Iron sheet (30 gauge)- 2.5 m

pcs 7

26 Fix roof as per dimension sum 1

Doors

27 Butt joint timber doors ( 1900 x 850) with hinges, locks both inside and outside

No 4

Paints and finishes

Plaster

28 2 layers of plaster on all walls m2 90

29 Floor screed m2 16

30 Undercoat paint ltrs 4

31 Emulsion paint - 4l - external tin 2

32 Gloss paint - 4l - internal - wet areas tin 2

Plumbing

33 Install 4" Vent pipe (10 ft) + vent cover+ screen

pcs 4

Total amount materials and labour

Add 5% contingency

Total amount

Page 18: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys

BILL 4: SUPPLY OF HAND WASHING FACILITIES

Item Description Unit Quantity Unit price Kshs.

Total Amount Kshs.

1 Supply 4 No. plastic hand washing basins - 60 litres fixed with GI taps -1/4" type Pegler and a fabricated steel stand

pcs 4

Total amount

SUMMARY AMOUNT KSH

Bill 1: Construction of 50 m3 Ferro Cement Tank - 1 No.

Bill 2: Construction of 4 doors VIP latrine- SANPLAT TYPE- 1 No.

Bill 3: Construction of 4 doors VIP latrine- SANPLAT TYPE- 1 No.

Bill 4: Supply of hand washing facilities

Project total