3
e. Spraying varnish on the board. f. Padding of the notice board with foam and the landing (velvet cloth) g. Fixing of glass doors and mounting them with the help of the hinges 3.4 COST EVALUATION/BEME Using the market survey analysis, the following information below were obtained and evaluated using the bill of engineering measurement and evaluation, (BEME) S/No Description Quantity Unit Price Amount (N) 1 72 inch x 36 inches wood 4 300 1200 2 72 inch x 36 inches plywood 1 700 700 3 Wooden frame 4 500 2000 4 72 x 36 velvet cloth 1 4000 4000 5 Glue big size 2 400 800 20

description

tab

Transcript of Ihechi Table

Page 1: Ihechi Table

e. Spraying varnish on the board.

f. Padding of the notice board with foam and the landing

(velvet cloth)

g. Fixing of glass doors and mounting them with the help

of the hinges

3.4 COST EVALUATION/BEME

Using the market survey analysis, the following information

below were obtained and evaluated using the bill of engineering

measurement and evaluation, (BEME)

S/No Description Quantity Unit

Price

Amount

(N)

1 72 inch x 36 inches

wood

4 300 1200

2 72 inch x 36 inches

plywood

1 700 700

3 Wooden frame 4 500 2000

4 72 x 36 velvet cloth 1 4000 4000

5 Glue big size 2 400 800

20

Page 2: Ihechi Table

6 Scrapper 1 200 200

7 1 and 2 inches nails 1 300 300

8 Pins 1 700 700

9 Hinges 6 50 300

10 Drawer keys 3 200 600

11 Transparent glass 3 400 1200

12 Hacksaw 1 500 500

13 Hammer 1 400 400

14 Sand Paper 1 300 300

15 Scissors 1 1000 1000

16 Bench Vice 1 3200 3200

17 Chisel 1 300 300

18 Glass cutter 1 1500 1500

19 Sarch clamp 1 3500 3500

20 Pencil 3 20 60

21 Tape 1 200 200

22 Wood varnish 1 1200 1200

23 Brush 1 100 100

21

Page 3: Ihechi Table

24 Sprayer 1 1000 1000

25 Foam 72 x 36 inches 1 800 800

26 Handle 6 150 900

27 Jack plain 1 3500 3500

22