IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area...

16
IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area Transit Authority IFB-FQ15096/ER SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Pre-Bid Conference Invitation For Bid (IFB)/Contract Number – FQ15096 March 25, 2015 10:00am-12:00pm EST The West Falls Church Yard Annex Building, 7251 Idylwood Rd, Falls Church, VA 22043

Transcript of IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area...

Page 1: IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area Transit Authority IFB-FQ15096/ER SUPPLY, DELIVERY, AND.

IFB FQ15096

SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS

Washington Metropolitan Area Transit Authority

IFB-FQ15096/ERSUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE

JACKS Pre-Bid Conference

Invitation For Bid (IFB)/Contract Number – FQ15096March 25, 2015 10:00am-12:00pm EST

The West Falls Church Yard Annex Building, 7251 Idylwood Rd, Falls Church, VA 22043

Page 2: IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area Transit Authority IFB-FQ15096/ER SUPPLY, DELIVERY, AND.

Opening Remarks Silence all Cell phones and pagers

No Recording This presentation and attendee list will be provided on WMATA.com website

Safety Tip: Safety Tip: “Safety Harnesses – Tie “Safety Harnesses – Tie or Die; Take the right or Die; Take the right

precautions precautions to prevent falls”to prevent falls”

Washington Metropolitan Area Transit Authority

IFB-FQ15096SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE

JACKS

Page 3: IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area Transit Authority IFB-FQ15096/ER SUPPLY, DELIVERY, AND.

Errol Roper, Contract Administrator, PRMT Raul Cintron, P.E. Project Manager, Dulles Bob Ernst, Superintendent, TIES/CMNT Alan Johnson, Asst. General Superintendent,

TIES/CMNT Gregory Collns, PLNT Ernest Hunter, DBE Compliance Specialist, PRMT Jim Hamilton, Insurance Manager, RISK Carmen Pelham, Insurance Analyst, RISK

Washington Metropolitan Area Transit Authority

IFB-FQ15096SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE

JACKS

Introduction of WMATA Personnel

Page 4: IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area Transit Authority IFB-FQ15096/ER SUPPLY, DELIVERY, AND.

PURPOSE

Washington Metropolitan Area Transit Authority

IFB-FQ15096/ERSUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE

JACKS

To promote a common understanding of:

IFB – SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS

• Authority’s requirements

• Solicitation Instructions

To provide answers to questions regarding the IFB

Networking opportunity

Page 5: IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area Transit Authority IFB-FQ15096/ER SUPPLY, DELIVERY, AND.

After today’s conference, if you have additional questions, they must be received via electronic mail by the Contracting Officer. Email your questions to Errol Roper at [email protected] by Tuesday, March 31, 2015, NLT 4:00pm.

Washington Metropolitan Area Transit Authority

IFB-FQ15096SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE

JACKS PURPOSE

Page 6: IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area Transit Authority IFB-FQ15096/ER SUPPLY, DELIVERY, AND.

The Pre-Bid Conference is for information purposes only. It may answer some Offeror questions. Statements or representations made during the Conference are not legally binding. Changes resulting from this Conference or the site visits are official only if issued through an Amendment to the Invitation For Bid (IFB).

Disclaimer Regarding Changes Disclaimer Regarding Changes to the Solicitationto the Solicitation

Washington Metropolitan Area Transit Authority

IFB-FQ15096/ERSUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE

JACKS

Page 7: IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area Transit Authority IFB-FQ15096/ER SUPPLY, DELIVERY, AND.

All Contractors must register with WMATA at www.wmata.com “New Vendor Registration”.

WMATA solicitations are publicized at www.wmata.com

Washington Metropolitan Area Transit Authority

IFB-FQ15096/ERSUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE

JACKS

Page 8: IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area Transit Authority IFB-FQ15096/ER SUPPLY, DELIVERY, AND.

Bid Form Unit Price Schedule Bid Guarantee – 5% of the Offered Price Representations and Certifications Appendix B DBE Forms

One (1) hard copy

BIDDING MATERIALBIDDING MATERIAL

Washington Metropolitan Area Transit Authority

IFB-FQ15096/ERSUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE

JACKS

Page 9: IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area Transit Authority IFB-FQ15096/ER SUPPLY, DELIVERY, AND.

The outside of the envelope shall show: The outside of the envelope shall show:

- THE AMENDMENTS RECEIVED (lower left hand corner). Failure to acknowledge all amendments may cause the Bid to be considered not responsive.

- HOUR and DATE specified in the IFB for receipt, the IFB number, and the full legal name and address of the Bidder on the face of the envelope

BIDDING MATERIALBIDDING MATERIAL

Washington Metropolitan Area Transit Authority

IFB-FQ15096SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE

JACKS

Page 10: IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area Transit Authority IFB-FQ15096/ER SUPPLY, DELIVERY, AND.

Proposals may be received prior to, but no later than Proposals may be received prior to, but no later than 2:00 PM, April 8, 20152:00 PM, April 8, 2015

BASIS FOR AWARD: The Authority will award a contract to the lowest responsive and responsible bidder whose bid conforms to this Invitation for Bids.

BIDDING MATERIALBIDDING MATERIAL

Washington Metropolitan Area Transit Authority

IFB-FQ15096/ERSUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE

JACKS

Page 11: IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area Transit Authority IFB-FQ15096/ER SUPPLY, DELIVERY, AND.

AWARDAWARD

Apparent Low Bidder submits Pre-Award Information within 5 days after Bid Opening

WMATA will have 90 calendar days to

award the Contract

Washington Metropolitan Area Transit Authority

IFB-FQ15096/ERSUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE

JACKS

Page 12: IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area Transit Authority IFB-FQ15096/ER SUPPLY, DELIVERY, AND.

SCHEDULE EVENT DATE

IFB Release March 13, 2015Pre-Bid Conference March 25, 2015Deadline for Proposer Questions March 31, 2015Bid Opening April 8, 2015Award Date (estimated) June 8, 2015Notice to Proceed (NTP) (estimated) June 18, 2015

Dates Subject to Change

Washington Metropolitan Area Transit Authority

IFB-FQ15096/ERSUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE

JACKS

Page 13: IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area Transit Authority IFB-FQ15096/ER SUPPLY, DELIVERY, AND.

Washington Metropolitan Area Transit Authority

IFB-FQ15096/ERSUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE

JACKS

DBE Compliance, Appendix “B”

Page 14: IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area Transit Authority IFB-FQ15096/ER SUPPLY, DELIVERY, AND.

Disadvantaged Business EnterprisesDisadvantaged Business Enterprises

Disadvantaged Business Enterprise (DBE) 3%. Disadvantaged Business Enterprise (DBE) 3%. $500,000 or more for a construction contract. Submit complete schedule of DBE participation and Letters of Intent. All DBEs must have current WMATA DBE certifications.

It is the policy of WMATA, the Federal Transit Administration (FTA) and the U.S. Department of Transportation (US DOT) that Disadvantaged Business Enterprises (DBE’s) shall have an equal opportunity to receive and participate in performing federally -assisted contracts, including contractors and subcontractors at any tier.

Washington Metropolitan Area Transit Authority

IFB-FQ15096/ERSUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE

JACKS

Page 15: IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area Transit Authority IFB-FQ15096/ER SUPPLY, DELIVERY, AND.

SUMMARY OF SUBMITTALS

With the Bid/Proposal

1. Completed “Schedule of DBE Participation” (Attachment B-1) with currentcertification letters attached for each listed DBE.2. Executed “Letters of Intent to Perform as a Subcontractor/Joint Venture”(Attachment B-2).3. Justification for grant of relief (waiver of DBE goal), if applicable. Includecompleted “DBE Unavailability Certifications” (Attachment B-3) as appropriate.

Washington Metropolitan Area Transit Authority

IFB-FQ15096/ERSUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE

JACKS

Page 16: IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area Transit Authority IFB-FQ15096/ER SUPPLY, DELIVERY, AND.

Washington Metropolitan Area Transit Authority

IFB-FQ15096/ERSUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE

JACKS

QUESTIONS?