IET 120CONSTRUCTION PROJECTName:Shane Holbrook
Dwelling Number of Floors 1
Square Footage Square footage of each floor: 4500
sq feet
Square footage total: 4500
Building Materials Recycled Natural Cotton for insulation. Geothermal Heating and
Cooling system. Recycled content drywall. Ecofriendly paint. Water Filtration system, utilizing water usage from rainfall.
Water filtration. Catches rain water and filters it for consumption, therefore utilizing water already availible. Geothermal heating and cooling, using earth for climate control. Plants on roof, availble for food, oxygen.
I wanted to go completely green, even using a tornadic type vacuum system for the geothermal. Although the budget didn’t allow for it. The purpose of using the filtration system is to reduce our reliance. To be almost self sustainable. To utilize the earths heat, also cuts back on our impact on which we are using energy.
Building Materials A continuation of building materials Fireclay Tile Recycled Content Drywall Front Wood Door Interior insulated Door Garage Door Vinyl Windows 2X6 Studs Geothermal heating and cooling Recycled Natural Cotton Sink – Porcelain Countertops – Bamboo Range – Viking 60” gas Range double oven Refrigerator – Victory Ultra spec series
Oriented Strandboard (OSB) Interior/Exterior ecofriendly
paint Metal roofing Fiber cement board siding
5’X3’ (1/2”)
Floor Plan Layout I chose to make everyone their own
private quarters. The reason being is because everyone really needs their privacy. Communal bedrooms are fine, although this layout, although small, makes one feel more as if they are in their own community, as opposed to a camp or soldier barrack.
TimelineGantt Chart Version 1.7.3 0
Student GreenIET 120 Today's Date: Wednesday
(vertical red line)Project Lead: [42]
Start Date: Wednesday[42] First Day of Week (Mon=2): 2
WBS TasksTaskLead Start End D
urat
ion
(Day
s)
% C
ompl
ete
Wor
king
Day
s
Day
s C
ompl
ete
Day
s R
emai
ning
1 Task Category 1 [Name] 5/7/14 6/5/14 30 0% 22 0 301.1 buy materials 5/7/14 5/11/14 5 0% 3 0 51.2 contract w orkers 5/12/14 5/16/14 5 0% 5 0 5
1.2.1
Designate building
contract 5/17/14 5/21/14 5 0% 3 0 5
1.2.2
Delegate tasks and
rev iew 5/22/14 5/26/14 5 0% 3 0 5
1.3
Ex cav ate For
Geothermal Heating 5/27/14 5/31/14 5 0% 4 0 5
1.4
Lay begin placing
pipes for geothermal
heating w ater filtration 6/1/14 6/5/14 5 0% 4 0 52 Task Category 2 [Name] 6/5/14 7/4/14 30 25% 22 7 232.1 Lay foundation 6/5/14 6/9/14 5 25% 3 1 4
2.2
Begin lay ing stick
lay out (Frame) and
w ater pipes and
electricity 6/10/14 6/24/14 15 25% 11 3 122.3 Flooring 6/25/14 6/29/14 5 25% 3 1 42.4 Dry w all 6/30/14 7/4/14 5 25% 5 1 43 Task Category 3 [Name] 6/20/14 6/30/14 11 50% 7 5 63.1 Begin Lay ing Roof 6/20/14 6/25/14 6 50% 4 3 33.2 Begin Painting 6/20/14 6/25/14 6 50% 4 3 3
3.3
Construct Water
Filtration on roof 6/25/14 6/30/14 6 50% 4 3 33.4 Begin placing plants 6/25/14 6/30/14 6 50% 4 3 34 Task Category 4 [Name] 1/2/12 1/21/12 20 0% 15 0 204.1 1/2/12 1/6/12 5 0% 5 0 54.2 1/7/12 1/11/12 5 0% 3 0 54.3 Sub Task lev el 2 1/12/12 1/16/12 5 0% 3 0 54.4 Sub Task lev el 2 1/17/12 1/21/12 5 0% 4 0 5
TEMPLATE ROWS: Copy and insert the entire section, or just the specific sub tasks, depending on w hich level you w ant to use (formulas are different for different WBS levels)1 Task Category 1 1/5/09 1/5/09 1 0% 1 0 11.1 Sub Task lev el 2 1/5/09 1/5/09 1 0% 1 0 11.1.1 Lev el 3 Task 1/5/09 1/5/09 1 0% 1 0 11.1.1.1 Lev el 4 task 1/5/09 1/5/09 1 0% 1 0 1
08 -
Sep
- 14
23 -
Jun
- 14
22 -
Sep
- 14
15 -
Sep
- 14
01 -
Sep
- 14
04 -
Aug
- 14
11 -
Aug
- 14
18 -
Aug
- 14
25 -
Aug
- 14
5/7/2014Shane Holbrook
HELP
16 -
Jun
- 14
28 -
Jul -
14
30 -
Jun
- 14
07 -
Jul -
14
14 -
Jul -
14
21 -
Jul -
14
08 -
Dec
- 14
10 -
Nov
- 14
17 -
Nov
- 14
24 -
Nov
- 14
01 -
Dec
- 14
22 -
Dec
- 14
15 -
Dec
- 14
© 2006-2012 Vertex42 LLC
5/7/2014
02 -
Jun
- 14
09 -
Jun
- 14
05 -
May
- 14
12 -
May
- 14
19 -
May
- 14
26 -
May
- 14
03 -
Nov
- 14
06 -
Oct
- 14
13 -
Oct
- 14
20 -
Oct
- 14
27 -
Oct
- 14
29 -
Sep
- 14
HELP
- Modify the GREEN cells and the Tasks, and Task Lead columns. Some of the green cells contain formulas, but those formulas are just examples of ways to add automation and task dependency. You can enter values manually into the green cells, or use formu las.- The Start Date that you choose determines the first week in the gantt chart.- Change the first day of the week via cell K8
To unlock this spreadsheet, purchase Gantt Chart Template Pro: http://www.vertex42.com/ExcelTemplates/excel-gantt-chart.html
Conclusion It was fun designing the building. I
learned a lot about management of space, and of buildings in general.
I did learn some new things about buildings that I previously didn’t know. I learned about their structure, the processes involved and so fourth.