IEC - Engineering Projects Group & Business Development
-
Upload
jonathan-petit -
Category
Documents
-
view
36 -
download
3
Transcript of IEC - Engineering Projects Group & Business Development
ISRAEL ELECTRIC CORPORATIONISRAEL ELECTRIC CORPORATION
ENGINEERING PROJECTS GROUP ENGINEERING PROJECTS GROUP & BUSINESS DEVELOPMENT& BUSINESS DEVELOPMENT
• State owned utility, established 1923
• Annual turnover (2014): 7 Billion $
• Customers: 2.59 Million
• Employees: 13,000
• Installed Capacity: 13,617 MW
• Length of power grid: 58,000 km
• Generation: 63 Units, 17 Sites
• 151 switching stations and sub-stations
• Development of Gas Distribution System
• Telecommunications
IEC ProfileIEC Profile
2
IEC Organization StructureIEC Organization Structure
CEOCEO
Power&
Energy
Engineering
Projects&
Business Develop
ment
Engineering
Division
Construction
Division
Business Develop
ment
Information
& Communi
cationCustome
rs
Organization,
Logistics,
Security&
Emergency
Finance&
Economics
Senior Senior VPVP
Senior Senior VPVP
Senior Senior VPVP
Senior Senior VPVP
Senior Senior VPVP
Senior Senior VPVP
PMO
EPC Services for Power EPC Services for Power StationsStations
COMBINED COMBINED CYCLECYCLE
COGENERATION COGENERATION PLANTPLANT
COAL FIREDCOAL FIREDPLANTPLANT
EMISSION EMISSION REDUCTIONREDUCTION
REPOWERINGREPOWERING SWITCHING & SWITCHING & SUBSTATION SUBSTATION
(GIS & AIS)(GIS & AIS)
PV SOLARPV SOLAR HYDROELECTRIC HYDROELECTRIC POWERPOWER
• Over 50 years of proven experience
• Full Domestic & Overseas Design capability
• Comprehensive Integration of engineering
disciplines in-house:
• Project Management
• Process
• Mechanical
• Electrical and Control
• Civil
• Inter-Disciplinary Optimization to minimize overall project cost.
• Implementing Custom Creative Design to meet engineering challenges and costs.
• Proven ability of design under uncertainty,
minimal data and time constraints.
Engineering Engineering DivisionDivision
• Full Domestic & Partial Overseas Construction Capability
• Multi-disciplinary approach:•Project Management •Mechanical•Electrical and Control•Civil
• Multi-lingual
• Highly qualified and experienced professionals from around the globe.
• High level of responsibility and motivation
Construction Construction DivisionDivision
Project Lifecycle - Division Project Lifecycle - Division Activities (EPC)Activities (EPC)
Techno-EconomicalEvaluations
• IEC’s coal fired P.S. have the highest availability factors in the world, above 92%.
• Optimization of land use: IEC’s compact configuration FGD system in 2 x 575MW coal fired P.S. units is one of a kind and leads to 30% less required land area.
• In-house coal import company & expert system for coal purchasing, providing major savings of O&M costs.
• Maximizing efficiency & power generation through optimization and creative systems solutions.
IEC - Unique IEC - Unique StrengthsStrengths
• Integrating control systems & data processing.
• Vast experience in optimization of water & waste use and re-use.
• Extensive knowledge in all types of cooling systems.
• State of the art emissions reduction measures: FGD, SCR, LNB, Particulates & monitoring.
• Coal & bulk handling systems optimal design.
IEC - Unique IEC - Unique StrengthsStrengths
Generic design
Creative solutions to commence design before contract signing:
• Project Layout & General Arrangement
• Project Licensing & Permits
• Project Engineering & Procurement.
• Wide equipment database to pre-design a generic layout.
Pre designed 2x630 MW supercritical coal fired P.S.
IEC - Unique IEC - Unique StrengthsStrengths
Design & Construction Design & Construction ServicesServices
Generation Projects:
• Power Stations
• Combined cycles
• Hydro, Solar & Wind power generation
• Renovations and improvements of power stations
• Gas conversion
• Emission Reduction Systems (FGD, SCR, PM)
Transformation & Transmission Projects:
• Switching & Substations Construction
• Sub stations Construction
• Extension & refurbishing of existing stations
Additional Civil Works:
• Office buildings
• Logistic centers
• Buildings maintenance
Project Management:
• Full Project management
• Site management
Tenders Management:
• Bids and tenders coordination & management
Additional Additional CapabilitiesCapabilities
Additional Additional CapabilitiesCapabilities
Gas Turbine Maintenance
• Overhauls on general electric gas turbines frame 9F: HGPI, CI, MAJOR.
• Overhauls on Siemens gas turbines frame 9F: HGPI, CI, MAJOR.
IEC Installed EPC PS in Israel - 2015IEC Installed EPC PS in Israel - 2015
Coal-fired4,840 MW
Oil / NG-fired1,622 MW
Combined Cycle6,651 MW
Jet / Industrial GT504 MW
Flue Gas Desulphurization (FGD)
Total Installed PowerTotal Installed Power::13,61713,617 MWMW
Total Installed PowerTotal Installed Power::13,61713,617 MWMW
Switching and SubstationsSwitching and Substations
Switching and Substations:•10x 400/161/24KV (GIS & AIS) Switching Stations•34x Indoor (GIS) 161/36-16KV Substations•72x Outdoor (AIS) 161/36-16KV Substations•17x Temporary 161/36-24KV Substations•18x Mobile 161/36-24KV Substations
MVA 10,150Switching Stations of 400kV 10
MVA 10,150Switching Stations of 400kV 10
MVA 16,940Over at 141 Substation Sites
MVA16,940 Over at 141 Substation Sites
The Electricity ChainThe Electricity Chain
63 Generation units in 17
power stations
10 Switching stations
400/161 KV )5,338 km(
Generation Transmission
HV &LV lines ~)48,000 km(
2.6M customers
Distribution
141 substations161 KV
)4,550 km(
super-high voltage
customers
super-high voltage
customers
high-voltage customers
high-voltage customers
17
MEDUPI & KUSILE,MEDUPI & KUSILE,South AfricaSouth Africa12 x794MW Coal FiredClient:Alstom (France) for EskomCommissioning: 20122012Scope: Complete Detailed Design•Turbine building •ACC General Arrangement• Civil guide• Piping & supports detailed design• Instruments & cables
ALIVERI,ALIVERI, GreeceGreece420MW Combined CycleClient: Metka S.A. for Public Power Company of GreeceCommissioning: 20112011Scope: Design of technical specifications, process, mechanical, electrical & Control, and civil for main power island.
LALITPUR,LALITPUR,IndiaIndia3x660MW Coal FiredClient: Bajaj Infrastructure Development Company ltd. Commissioning: 20162016Scope: Consulting & Integration Services for design, construction & start-up
LEBRIJA,LEBRIJA,SpainSpain3x50MW Solar ThermalClient: Siemens CSPCommissioning: 20112011Scope: Consulting & Integration services for complete design of power island.
PAPUA NEW GUINEA,PAPUA NEW GUINEA, OceaniaOceania2 x 25MW Gas TurbineClient: LR Group ltd.Commissioning: 20152015Scope: Owners Engineering
ALTO CHINGO & WAKO-ALTO CHINGO & WAKO-KUNGO, AngolaKUNGO, AngolaTransmission lines and substations Client: Mitrelli Group (Angola) for Empresa Nacional De ElectricidadeCommissioning: 20162016Scope: Owners Engineer services for the Design and construction of 14 220/60/30KV substations and lines.
MEDUPI & KUSILEMEDUPI & KUSILE,,South AfricaSouth Africa
Alivery, GreeceAlivery, Greece
LALITPUR, LALITPUR, IndiaIndia
Lebrija, Lebrija, SPAINSPAIN
PAPUA NEW GUINEAPAPUA NEW GUINEA , ,OceaniaOceania
Major Overseas Projects Major Overseas Projects ReferenceReference
17
ALTO CHINGO & ALTO CHINGO & WAKO-KUNGO, AngolaWAKO-KUNGO, Angola
Medupi & Kusile,Medupi & Kusile,SOUTH AFRICASOUTH AFRICA
Alivery,Alivery,GREECEGREECE
Lalitpur,Lalitpur,INDIAINDIA
Lebrija,Lebrija,SPAINSPAIN
Papua New Guinea,Papua New Guinea,OCEANIAOCEANIA
Alto Chingo &Alto Chingo & Wako Kungo, ANGOLAWako Kungo, ANGOLA
18
NigeriaNigeria
KazakhstanKazakhstan
NetherlandNetherland
Nigeria
Rehabilitation of NEPA P.S.Client: Nairda ltd.Commissioning: 2005Scope: Consulter at rehabilitation works
Kazakhstan
250MW Combined cycleClient: Bateman (Israel) AgipCommissioning: 2005Scope: Design review, process optimization
ESSENT, Netherlands
Revamp of Amercentrale 7Client: KH EngineeringCommissioning: 2005Scope: Consultancy & conceptual design for the pre-project stage
Rwanda
Generation & TransmissionClient: Government of RwandaCommissioning: 2002Scope: Master plan for planning the generation & transmission system
Germany
FGDClient: Lurgi Lentjes BischoffCommissioning: 2001Scope: Integrated structure concept
Jamaica
3 x 125MW Coal fired P.S.Client: Jamaica Public Service co. ltd.Commissioning: 2000Scope: Consultancy services
Additional Overseas Projects Additional Overseas Projects ReferenceReference
GermanyGermany
RwandaRwanda
JamaicaJamaica
NIGERIANIGERIA KAZAKHSTANKAZAKHSTAN NETHERLAND, EssentNETHERLAND, Essent RWANDARWANDA GERMANYGERMANY JAMAICAJAMAICA
18
19
Additional Projects Additional Projects ReferenceReference
LocationProjectClientScopeCommissioning
Year
IsraelHRB conversion to
NG firingAmerican/Israel paper industry
RFI, specifications, proposals evaluation2005
IsraelOil to NG retrofitDead sea industriesEntire scope of design2007
Israel400 kV GIS
switching station for Haruvit P.S.
Alstom GridElectrical engineering for 400 kV GIS Switchgear & control building
2014
Israel161/24 kV 50MVAArava PowerKetora substation - Full EPC2014
Israel161/24 kV 2x33MVAEnergixgroupNeot-Hovav substation - Engineering and Construction2014
Our Partners – We Know them….. They Our Partners – We Know them….. They Know usKnow us
ACCACC
DeaeratorDeaerator
Additional Additional ServicesServices
Distribution & Supply Infrastructure: High, Medium & Distribution & Supply Infrastructure: High, Medium & Low voltage network, smart grid mechanism, intelligent Low voltage network, smart grid mechanism, intelligent and prepaid metering system, technical & non technical and prepaid metering system, technical & non technical losses solutionslosses solutions
TelecommunicationTelecommunication
Refurbishment of Refurbishment of Turbo generatorsTurbo generators
Training ServicesTraining Services
Gas ConversionGas Conversion
CyberGymCyberGym
Energy EfficiencyEnergy Efficiency
“We bring Innovation, Modernization and Proven
Experience combined with high level of Professionalism to the
Power Industry”