    1/8

    Developing an Employee Activity Monitoring System for SIMSR Library

    Industrial Engineering Project Page 1

    Developing an Employee Activity Monitoring System for

    SIMSR Library

    Industrial Engineering Project

    Submitted by

    Name Course and Roll No

    Rintu George Abraham PGDM001

    Kopal Agrawal PGDM - 003

    Tara Redkar MMS - 039

    Vivek Patel MMS - 035

    Under the guidance of

    Prof. Pramod Shetty

    KJ Somaiya Institute of Management Studies and Research, Mumbai

    December, 2013

  • 8/13/2019 IE Kopal

    2/8

    Developing an Employee Activity Monitoring System for SIMSR Library

    Industrial Engineering Project Page 2

    Introduction:

    SIMSR Library is operated by seven employees under the care of Librarian Mr. Rajesh Memane. Every

    employee has his designated responsibilities to fulfil for the smooth execution of library processes. Themajor library processes followed in the library by the employees are classified as follows:

    PROCESSES ACTIVITIES

    PURCHASING Request From Faculty, Staff & Students

    Quotation

    Purchase Order

    Classification

    On Approval Selection

    Reminder For Non-Avail

    Data EntryApproval From Library Committee

    Price Verification

    Verification For Availability

    PROCESSING Bill Entry In Bill Register

    Bill Approval From Registrar

    Book Card Writing

    Barcode Label Print & Paste

    Putting Book Accession No.

    CIRCULATION Fine Collection

    Circulation Of Books

    MAINTENANCE Informing New Arrival To Students And Faculty

    Training Schedule

    Sending Reminder Letters

    Renewal Of Students Course-wise

    Books Distribution Of Book Bank

    Updating CD Register

    Shelf Rectification

    Checking Student Demand Slip

    Taking Torn Books For BindingShelving Books On Racks

    Writing Book Card, Pasting Barcode

    Open & Close Library

    Newspaper Entry And Arrangement Of Shelf

    Maintaining Silence In Library

    Stock Checking

    REPORTS Print Accession Register

    Budget Spend Report Of Books And Journals

    List Of Books, Journals

    Students & Faculty Overdue Report

    Books Circulation Report

  • 8/13/2019 IE Kopal

    3/8

    Developing an Employee Activity Monitoring System for SIMSR Library

    Industrial Engineering Project Page 3

    The issue to be addressed in the library by us was to create a basic monitoring system to track the work

    done by each employee in library so as to facilitate their performance measuring process.

    The responsibilities of each of these employees in the above mentioned processes, along with the time

    required to execute them are marked as under:

    LIBRARIAN: Rajesh Memane

    PROCESSES ACTIVITIES FREQUENCY TIME

    PURCHASING

    Request From Faculty, Staff & Students Daily .5 HRS

    Quotation Twice A Week 1 DAY

    Purchase Order Twice A Week 1 DAY

    Classification Twice A Week 2 MINS

    PROCESSING Bill Entry In Bill Register Daily 5 MINS

    MAINTENANCE

    Informing New Arrival To Students And

    Faculty Once A Month 1 DAY

    Training Schedule Twice A Month 3 HOURS

    Stock Checking Once A Year 4 DAYS

    REPORTS

    Print Accession Register Once A Week 2 HOURS

    Budget Spend Report Of Books And Journals Once A Month 3 HOURS

    List Of Books, Journals Once A Month 3 HOURS

    SUPERINTENDENT: N.B. Sable

    PROCESSES ACTIVITIES FREQUENCY TIME

    MAINTENANCE

    Sending Reminder Letters Once A Month 1 DAY

    Renewal Of Students Coursewise Once A Year 2 DAYS

    Books Distribution Of Book Bank 3 Times A Year 0.5 DAY

    Updating CD Register Once A Week 2 HOURS

    Stock Checking Once A Year 4 DAYS

    REPORTS Students & Faculty Overdue Report Once A Month 1 DAY

    HEAD CLERK: S.S. Chavan

    PROCESSES ACTIVITIES FREQUENCY TIME

    PURCHASINGOn Approval Selection Once In A Week 0.5 DAY

    Data Entry Daily 3 MINUTES

    Reminder For Non-Avail Twice A Week 1 DAY

    PROCESSING Bill Approval From Registrar Twice A Week 1 DAY

    CIRCULATION Circulation Of Books Daily 1 MIN/BOOK

    Fine Collection Daily 1 MIN/FINE

    MAINTENANCE Shelf Rectification Once In A Week 4 HOURS

    Stock Checking Once A Year 4 DAYS

  • 8/13/2019 IE Kopal

    4/8

    Developing an Employee Activity Monitoring System for SIMSR Library

    Industrial Engineering Project Page 4

    CLERK 1: B.N. Tiwari

    PROCESSES ACTIVITIES FREQUENCY TIME

    PROCESSING Book Card Writing Daily 1.2 MIN/BOOK

    MAINTENANCEChecking Student Demand Slip Daily 10 MIN

    Shelving Books On Racks Daily 1 HOURWriting Book Card, Pasting Barcode Daily 3 HOURS

    Taking Torn Books For Binding Once In Qtr 2 DAYS

    Stock Checking Once A Year 4 DAYS

    CLERK 2: S.N. Shukla

    PROCESSES ACTIVITIES FREQUENCY TIME

    PURCHASING Price Verification As Per Request 3 MINS/BOOK

    Verification For Availability As Per Request 1.2 MIN/BOOK

    Approval From Library Committee Twice A Week 1 DAY

    MAINTENANCE Shelving Books On Racks Daily 1 HOUR

    Writing Book Card, Pasting Barcode Daily 3 HOURS

    Stock Checking Once A Year 4 DAYS

    REPORTS Books Circulation Report Once A Month 1 HOUR

    ATTENDANTS: Jagbir Walmiki and Budhram

    PROCESSES ACTIVITIES FREQUENCY TIME

    PROCESSING Putting Book Accession No. Twice A Week 1.2 MIN/BOOK

    MAINTENANCE

    Barcode Label Print & Paste Daily 1.2 MIN/LABELOpen & Close Library Daily 0.5 HOURS

    Newspaper Entry And Arrangement Of

    Shelf Daily 0.5 HOURS

    Maintaining Silence In Library Daily .5 HOUR

    Stock Checking Once A Year 4 DAYS

    Problem Statement:

    As informed by the librarian to us, presently there exists no system to track the activities done by the

    employees in library and hence it is difficult for him to estimate if a certain employee has performed

    his/her assigned responsibility or not and has he/she done it within the stipulated time or not. This poses

    a hindrance for him to measure the productivity of the employees and evaluate their performance at

    work. Hence, the librarian needed a basic system which can be used to track every employees activities

    and ensure that all activities are being done by the assigned employees within projected timelines.

    Study & Analysis Done:

    For the purpose of setting an activity monitoring system, we first evaluated the work done to be done by

    the employees every day against the time available for them to carry out those activities in each of the

    library processes.

  • 8/13/2019 IE Kopal

    5/8

    Developing an Employee Activity Monitoring System for SIMSR Library

    Industrial Engineering Project Page 5

    The library operates in two shifts with the following work timings:

    LIBRARY TIMINGS

    Mon-Sat First Shift:

    Second Shift:

    8:30 AM-4:10 PM

    2:20 PM-10:00 PM

    Sunday 10:00 AM-5:00 PMLunch Time 1:30 PM-2:00 PM

    Therefore, on the basis of individual employee working hours we calculated the effective working hours

    available for them to work as described in the below table:

    STAFF WORK TIMINGS

    EFFECTIVE HOURS

    AVAILABLETotal Hours

    Available/Mont

    hStaff

    Member

    Work Timings

    (MON-SAT)

    Working

    Hours

    Effective

    hours/Day

    *

    Work Timings

    SUNDAY

    Working

    Hours

    Effectiv

    e hours

    on

    Sunday

    1st

    /3rd

    WEEK

    2nd

    /4th

    WEEK

    Librarian10:00 AM-5:40

    PM

    7 HRS 40

    MIN 6.25 OFF - - 31.25 37.5 137.5

    Head Clerk10:00 AM-5:40

    PM

    7 HRS 40

    MIN 6.25 OFF - - 37.5 31.25 137.5

    Superintendent 10:00 AM-5:40

    PM

    7 HRS 40

    MIN 6.25 OFF - - 37.5 31.25 137.5

    Clerk 12:20 PM-10:00

    PM

    7 HRS 40

    MIN 6.2510:00 AM-5:30

    PM

    7 HRS 30

    MIN 6.15 37.4 37.5 149.8

    Clerk 2 1:20 PM-9:00 PM7 HRS 40

    MIN 6.2510:00 AM-5:30

    PM

    7 HRS 30

    MIN 6.15 37.4 37.5 149.8

    Attendant 11:50 PM-10:00

    PM

    8 HRS 10

    MIN 6.759:50 AM-5:30

    PM

    7 HRS 40

    MIN 6.25 40.5 40 161

    Attendant 28:30 AM-4:40

    PM

    8 HRS 10

    MIN 6.759:50 AM-5:30

    PM

    7 HRS 40

    MIN 6.25 40.5 40 161

    Total Working Hours Available/Day 44.75 Total Working Hours Available/Month 1034.1

    *The effective hours available was estimated in the above table for every employee is done taking certain

    allowances as described below:

    Effective Hours Available/Day Calculation:

    Allowances:10 Mins Late Arrival, 10 Mins Early Dept, 5 Mins Early Lunch, 5mins Late Lunch, 10 Mins For Late/Early Tea, 30 Mins Lunch,

    15 Mins Tea

    460-85=375 MINS=6.25 HOURS

    Now, we found out the time required by the activities done by the employees in various processes:

    ACTIVITIES RESPONSIBILITY FREQUENCY TIME

    TIME (in

    hrs)

    TOTAL

    TIME/DAY (in

    hrs)

    TOTAL

    TIME/WEE

    K (in hrs)

    TOTAL

    TIME/MONTH

    (in hrs)

    Request From Faculty,

    Staff & Students Librarian DAILY .5 HRS 0.5 0.5 3 11.55

    Data Entry

    Head Clerk &

    Clerk 2 DAILY 3 MINS/BOOK 0.05 5 30 115.54

    Price Verification Clerk 2

    AS PER

    REQUEST 3 MINS/BOOK 0.05 0.5 3 11.55

    Verification For

    Availability Clerk 2

    AS PER

    REQUEST 1.2 MIN/BOOK 0.02 0.2 1.2 4.62

    Bill Entry In Bill

    Register Librarian DAILY 5 MINS/BILL 0.0833 8.33 50 192.57

    Book Card Writing Clerk 1 DAILY 1.2 MIN/BOOK 0.02 2 12 46.22

  • 8/13/2019 IE Kopal

    6/8

    Developing an Employee Activity Monitoring System for SIMSR Library

    Industrial Engineering Project Page 6

    Barcode Label Print &

    Paste Attendant 2 DAILY 1.2 MIN/LABEL 0.02 2 12 46.22

    Fine Collection Head Clerk DAILY 1 MIN/BOOK 0.0167 0.17 1 3.85

    Circulation Of Books Head Clerk DAILY 1 MIN/BOOK 0.0167 1.67 10 38.51

    Checking Student

    Demand Slip Clerk 1 DAILY 10 MIN 0.1667 0.17 1 3.85

    Shelving Books OnRacks Clerk 1 And 2 DAILY 1 HOUR 1 1 6 23.11

    Writing Book Card,

    Pasting Barcode Clerk 1 And 2 DAILY 3 HOURS 3 3 18 69.33

    Open & Close Library Attendant 1 & 2 DAILY 0.5 HOURS 0.5 0.5 3 11.55

    Newspaper Entry And

    Arrangement Of Shelf Attendant 2 DAILY 0.5 HOURS 0.5 0.5 3 11.55

    Maintaining Silence In

    Library Attendant 1 & 2 DAILY .5 HOUR 0.5 0.5 3 11.55

    Total Time Required for Daily Activities 26.03 156.20 601.59

    Quotation Librarian TWICE A WEEK 1 DAY

    6.5 13.0 52

    Purchase Order Librarian TWICE A WEEK 1 DAY6.5 13.0 52

    Classification Librarian TWICE A WEEK 2 MINS/BOOK

    3.33 6.67 26.67

    Reminder For Non-

    Avail Head Clerk TWICE A WEEK 1 DAY

    6.5 13.0 52

    Approval From Library

    Comm Clerk 2 TWICE A WEEK 1 DAY

    6.5 13.0 52

    Bill Approval From

    Registrar Head Clerk TWICE A WEEK 1 DAY

    6.5 13.0 52

    Putting Book

    Accession No. Attendant 2 TWICE A WEEK 1.2 MIN/BOOK

    2 4 16

    Total Time Required for Twice a Week Activities

    75.67 302.67

    On Approval Selection Head Clerk ONCE A WEEK 0.5 DAY

    3.25 3.25 13

    Updating Cd Register Superitendant ONCE A WEEK 2 HOURS

    2 2 8

    Shelf Rectification Head Clerk ONCE A WEEK 4 HOURS

    4 4 16

    Print Accession

    Register Librarian ONCE A WEEK 2 HOURS

    2 2 8

    Total Time Required for Once a Week Activities

    11.25 45

    Total Time Required for Weekly Activities

    243.12 949.255

    Training Schedule Librarian

    TWICE A

    MONTH 3 HOURS

    6 6

    Informing New Arrival

    To Students And

    Faculty Librarian

    ONCE A

    MONTH 1 DAY

    6.5 7

    Sending Reminder

    Letters Superintendent

    ONCE A

    MONTH 1 DAY

    6.5 7

    Budget Spend Report

    Of Books And Journals Librarian

    ONCE A

    MONTH 3 HOURS

    3 3

    List Of Books, Journals Librarian ONCE AMONTH 3 HOURS

    3 3

  • 8/13/2019 IE Kopal

    7/8

    Developing an Employee Activity Monitoring System for SIMSR Library

    Industrial Engineering Project Page 7

    Students & Faculty

    Overdue Report Superintendent

    ONCE A

    MONTH 1 DAY

    6.5 7

    Books Circulation

    Report Clerk 2

    ONCE A

    MONTH 1 HOUR

    1 1

    Total Time Required for Monthly Activities

    33

    TOTAL TIME REQUIRED FOR ALL THE ACTIVITIES IN A MONTH982

    From here we observe that there exists an allowance of 1034.1-982=52.1 Hours which is utilized for other annual

    maintenance activities as mentioned below:

    ACTIVITIES RESPONSIBILITY FREQUENCY TIME

    TIME (in

    hrs)

    Taking Torn Books For Binding Clerk 1 Once In Qtr 2 Days 13

    Books Distribution Of Book Bank Superintendent 3 Times A Year0.5 Day 3.25

    Renewal Of Students Course-wise Superintendent Once A Year 2 Days 13

    Stock Checking All Once A Year 3 Days 19.5

    In the above calculations following data has been considered, provisions of changing which, have been

    provided in the excel sheet:

    DATA

    1 Month (in Effective Days) 23

    1 Week (in Effective Days) 6

    1 Day (in Effective Hrs) 6.5

    No. of Books for data entry/Day 100

    No. of Requests for Price Verification/Day 10

    No. of Request for Availability Verification/Day 10

    No. of Bills to be entered/Day 100

    No. of Book Cards to be written/Day 100

    No. of Label to be pasted/Day 100

    No. of Students with Fine/Day 10

    No. of Books Returned or Withdrawn/Day 100

    No. of Books for Classification/frequency 100

    No. of Accession No. to be put/frequency 100

    So, on the basis of understanding derived from the above analysis done, we could determine the time that is

    required by any activity to be done and hence set the target for each activity. We prepared a simple excel sheet for

    librarian to monitor if the activities targeted for the day were done by the employees or not and at what rate they

    were actually done which he can later use for measuring the productivity of the employee and performance of the

    library functions.

  • 8/13/2019 IE Kopal

    8/8

    Developing an Employee Activity Monitoring System for SIMSR Library

    Industrial Engineering Project Page 8

    Other Recommendations:

    Apart from above activity, in the course of analysis it was observed that the work profiles of 2 Attendants are similar

    and exclusive from other employees but they are given off on same days i.e.; 2nd

    and 4th

    Saturdays and 1st

    and 3rd

    Sundays which signifies that the work assigned to them is being done by employees at clerk designation which

    should not be the case. Similarly, the 2 employees at clerk designations are also given off on same days i.e., 1st

    and

    3rd

    Saturday and 2nd

    and 4th

    Sunday and their work is done by Attendants on those days. In order to maintain

    discipline in the system, it is advisable that at any given day from Monday-Saturday along with one or more of the

    Senior Staff Members, a clerk and an attendant is on duty and on any given Sunday a clerk and an attendant is on

    duty.

    Therefore, we suggest that the days of leaves for attendants and clerks should be alternate and not simultaneous.

    Also, the lunch timings for all employees is common from 1:30 PM-2:00 PM which considering 10 Allowance ranges

    from 1:20 PM-2:10PM and no ATL activities can be performed during these hours. For the convenience of students

    and faculty, the lunch timings can be made staggered with Superintendent and morning shift Attendant taking lunch