iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi...
Transcript of iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi...
![Page 1: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/1.jpg)
December 7, 2015Michigan Technological University
iDesign 2015: Water Supply in Quebrada Pinzón
![Page 2: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/2.jpg)
Meet the Team
Team Members
Roshni Sachar (Chief Editor)
Jeremy Mack (Chief Surveyor)
Surbhi Thakur (Chief Administrator)
Nicholas Wienold (Project Manager)
![Page 3: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/3.jpg)
Presentation OutlineProject Site BackgroundTeam ExperiencesCommunity LayoutExisting Water InfrastructureProject Site: Las DeliciasData CollectionDesign Alternatives 1 & 2Alternative AnalysisQD’s RecommendationConclusionQ & A
![Page 4: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/4.jpg)
Background: Quebrada PinzónProvince: Bocas del Toro
Census Information:◦ 37 houses◦ 220 inhabitants◦ Monthly income average: 144 balboas◦ 36% is illiterate◦ 6th grade education on average
1 hour dirt road hike
Main income source: Cacao and Banana farming
![Page 5: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/5.jpg)
Historical and Cultural Dynamics
Selected as a BioComunidad Project Site◦ Many recent improvements to community facilities
and infrastructure
Current Peace Corps Volunteer◦ Briana Arnold
Family units are stronger than organized committees
![Page 6: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/6.jpg)
Team Experiences
![Page 7: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/7.jpg)
Project Site: Las DeliciasObjective
To provide Las Delicias with basic water infrastructure and an uninterrupted water
supply for storage, drinking, and sanitation purposes.
![Page 8: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/8.jpg)
Community Layout
![Page 9: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/9.jpg)
Las Delicias: Data Collection Rain catchment area measurements Two sets of water quality tests Assessment of existing systems River slope and velocity measurements Surveyed elevations within Las Delicias
![Page 10: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/10.jpg)
Las Delicias: Survey Line
A. Structure A (Church) B. Structure B (Family Home)C. Structure C (Family Home)D. Proposed Tank Location
40
45
50
55
60
65
70
75
0 100 200 300 400 500 600 700 800
Curr
ent E
leva
tion
(Met
ers)
Horizontal Distance along Survery Line (Meters)
![Page 11: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/11.jpg)
Design Alternatives
1. River Pump System
2. Individual Rainwater Harvesting Systems
![Page 12: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/12.jpg)
Alternative One
River Pump System
![Page 13: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/13.jpg)
Layout of River Pump System
![Page 14: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/14.jpg)
Alternative One: River Pump SystemHydraulic Ram Pump system
Harvesting the power and size of the rivers energy and general typography
No external power necessary
Environmentally friendly
![Page 15: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/15.jpg)
System Modeling EPANET 2.0 was used to analyze pressures and flow rates within the system
Two different water demand patterns were modeled for weekdays and weekends
![Page 16: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/16.jpg)
Alternative Two
Rainwater Harvesting Systems
![Page 17: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/17.jpg)
Alternative Two: Rainwater Harvesting Systems
Rainfall Data for the nearby city
of Changuinola (2000-2012)
Long term variability analysis
with historical data (1960-1972)
Reliability and Storage analysis
![Page 18: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/18.jpg)
Alternative Two: System Components
Catchment area: Rooftops of Structures A, B,and C
PVC (Polyvinyl Chloride) gutters
Filtration: Mesh filters and first flush system
Disinfection: In-line chlorinators
Plastic storage tanks
MINSA’s In Line Chlorinator [1]
![Page 19: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/19.jpg)
Mesh Filter
[2]
![Page 20: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/20.jpg)
First Flush System
[3]
![Page 21: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/21.jpg)
3D Model: Catchment System
![Page 22: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/22.jpg)
3D Model: Filtration and Disinfection
A. Mesh Filter
B. First Flush System
C. In line chlorinator
A CB
![Page 23: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/23.jpg)
3D Model
![Page 24: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/24.jpg)
Alternatives Analysis: Design Constraints
Social
Responsibility within the community Routine maintenance Interest within the community
Technical
Feasibility Constructability Cost
![Page 25: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/25.jpg)
Failure Modes and Effects Analysis All possible failure modes are given a probability of occurrence and severity rating
Risk Priority Number (RPN) is calculated as the product of the two ratings
Alternative with lower RPN average is recommended
Probability of Occurrence of a Failure Mode
Ranking
Highly Unlikely 1-2Unlikely 3-4Neutral 5-6Likely 7-8Highly Likely 9-10
Severity of a Failure Mode Ranking
Very less significant 1
Somewhat significant 2
Significant 3
Harms human health 4
![Page 26: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/26.jpg)
Failure Modes and Effects Analysis Alternative One : Ram Pump Design
High risk failure modeso Check valve malfunction
o Clogging of the pump
o Loose pipes
o Dislodging of the pipe network
Risk Priority Number Average = 8
![Page 27: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/27.jpg)
Failure Modes and Effects Analysis Alternative Two: Rainwater Harvesting Systems
High risk failure modeso Clogging of gutters
o Leakage
o Chlorination malfunction and improper mixing
o First Flush malfunction
o Particle build up in the bottom of storage tank
Risk Priority Number Average = 6
![Page 28: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/28.jpg)
QD’s Recommendation Alternative Two: Individual Rainwater Harvesting Systems for all structures in Las Delicias
Constraint Alternative One Alternative Two
Feasibility and Constructability Feasible but harder to construct
Feasible and easy to construct
Cost 3300 USD 800 USD (Structure A)600 USD (Structure B)
Ownership of the system Joint Individual
Probability of system failure RPN average = 8 RPN average = 6
Ease of repair and maintenance High technical skill required
Technical skill not required
Water Quality Fit for non-potable uses only
Fit for potable and non potable uses
![Page 29: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/29.jpg)
SummaryProject Site: Las Delicias in Quebrada Pinzón, Bocas del Toro, Panama
Alternative I: River Pump Design
Alternative II: Rainwater Harvesting Systems
Selection Criteria: Design Constraints and failure modes analysis results
Final Recommendation: Alternative Two
![Page 30: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/30.jpg)
References[1] http://usfmi.weebly.com/uploads/5/3/9/2/5392099/users_manual_for_minsa_in-line_chlorinator.pdf
[2] http://www.aquabarrel.com/
[3] http://www.aquabarrel.com/product_downspout_filters_first_flush_inline.php
![Page 31: iDesign 2015: Water Supply in Quebrada Pinzóndwatkins/idesign09/2015/QD_Powerpoint.pdf · Surbhi Thakur (Chief Administrator) Nicholas Wienold (Project Manager) Presentation Outline](https://reader033.fdocuments.us/reader033/viewer/2022050411/5f887691f9efcc244e23b18b/html5/thumbnails/31.jpg)
Thank you!
Questions?