ClusterAcceptance Test Report
Submission Date : 27-Mar-2011Circle Name : HaryanaCluster : CharkhidadriRNC Name : 1103MSC Name :
Total Site Number : 8Total Sites Tested : 6
Signature
3G Cluster Optimization Report
Circle : Haryana
Cluster :1 Charkhidadri
NSN Circle Representative Idea Circle Representative
NameDate
Content
1. EXECUTIVE SUMMARY.......................................................................................................................32. NETWORK OPTIMIZATION ACTIVITIES............................................................................................43. TEST SETUP........................................................................................................................................5
3.1. MOBILITY TESTS AT CLUSTER LEVEL...................................................................................53.2. STATIONARY TESTS IN SELECTED LOCATION.....................................................................6
4. UMTS KPI SUMMARY – DRIVE TEST.................................................................................................85. DRIVE ROUTE......................................................................................................................................96. ON-AIR STATUS OF CLUSTER........................................................................................................107. RF INDICATORS - DISTRIBUTION PLOTS (CLUSTER LEVEL)......................................................11
7.1. BEST SERVER [SCANNER].....................................................................................................117.2. RSCP [SCANNER]....................................................................................................................127.3. EC/IO [SCANNER].....................................................................................................................137.4. CS BLER....................................................................................................................................147.5. CS DROPPED CALL.................................................................................................................157.6. IRAT LOCATIONS.....................................................................................................................167.7. PS PDP CONTEXT ACTIVATION.............................................................................................177.8. UE TX POWER..........................................................................................................................187.9. CQI PLOT...................................................................................................................................197.10. HSDPA THROUGHPUT.............................................................................................................20
8. STATIONARY TEST LOCATION.......................................................................................................218.1. CS STATIONARY KPI TABLE..................................................................................................228.2. PS STATIONARY KPI’S TABLE...............................................................................................22
9. Deliverables & Supporting Documents................................................................................................24
Page 2 of 21
3G Cluster Optimization Report
Circle : Haryana
Cluster :1 Charkhidadri
1. Executive Summary
CLUSTER 01SITE STATUS
Total Sites 8Sites ON-AIR 6
Percentage of Sites ON-AIR 75Sites included in Drive Test 8
Sites DOWN during Drive Test 0Sites DOWN due to HW Issues 0
Sites with Any Service Affecting Alarm 2Sites not Integrated
Site ID
Longitude Latitude On Air
37 76.2631 28.5942 NOT On Air
1335 76.28193 28.6148 NOT On Air
3751 76.2828 28.5954 On Air3789 76.2715 28.5868 On Air3796 76.2754 28.6026 On Air5725 76.2716 28.5962 On Air5726 76.281 28.6089 On Air5794 76.2727 28.5922 On Air
2. Network Optimization Activities
The following activities have been taken during the network optimization of mentioned area:
• Physical Verification of Sites for any discrepancies in implementation versus planning data.
• Parameter consistency checks and implementation of Change Requests if required.
• Detailed drive tests for various service types to verify the network performance in terms of received signal level, call quality, call setup, handovers (Intra-Frequency & IRAT), and call drops.Refer to drive plots and statistics.
• Coverage optimization by means of physical changes at site. Page 3 of 21
3G Cluster Optimization Report
Circle : Haryana
Cluster :1 Charkhidadri
• Neighbor Relations – Added & Deleted during optimization (IRAT & INTRA)
• Pilot Pollution optimization by means of physical changes at site.
Page 4 of 21
3G Cluster Optimization Report
Circle : Haryana
Cluster :1 Charkhidadri
3. Test Setup
3.1. Mobility Tests at Cluster Level
Test Configuration - Mobility
Device Type of Call Mode Type Duration CommentsMS 1 Scanner UMTS Mobility Scanning UMTS
UE 1 HSDPA 3G Locked Mobility 200 MB file to be Downloaded from FTP server for HSDPA
UE 2 R99 Dual Mobility 20 MB file to be Downloaded from FTP server for Rel 99 PS
UE 3 Voice Call 3G Locked Mobility 90 Sec Call/10Sec idle between calls to allow reselection
UE 4 Voice Call Dual Mobility 90 Sec Call/30Sec idle between calls to allow reselection
XCAL Kit equipment configuration:
Device ID
Model Phone Number SIM Card Id IMSI Test
UE1 Samsung5350 9812434146 HSDPA 3G Locked
UE2 Samsung5350 9812556540 R99 Dual Mode
UE3 Samsung5350 9812556552 Voice Call
Page 5 of 21
TESTS Scanner UE1 UE2 UE3 UE41. RF Indicators a. Best Server X b. RSCP X c. EcIo X 2. Voice AMR CSSR X3. Voice Call Setup Duration UE to Core X4. Voice Call Setup Duration UE to UE X5. Voice Dropped Call X6. Voice BLER X5. Data Attach (PS) X 6. PDP Context Activation X7. PS Bearer Setup X8. PS 3G -> 2G Cell Change Interruption Time
X
9. Intersystem Handover X
3G Cluster Optimization Report
Circle : Haryana
Cluster :1 Charkhidadri
DUAL Mode
UE4 Samsung5350 9812553565 Voice Call 3G Locked
Scanner MS1
PCTL-EXIDLE
Type of Calls:Mobility Test: MS1 Scanner
UMTS Scanner would be used continuously to monitor RF condition for CPICH RSCP, CPICH Ec/No, Scrambling Code, etc.
Mobility Test: UE1 HSDPAFor data collection of HSDPA data call UE1 mobile will be used to down load (FTP) heavy file of data from FTP Server. This UE will be locked to 3G.
Mobility Test: UE2 PS CallFor data collection of PS R99 data call UE2 mobile will be used to down load (FTP) 20 MBytes of data from FTP Server. This is will be in dual mode.
Mobility Test: UE3 Voice CallThe duration of the calls on UE 4 will be ninety (90) seconds and the idle period between two calls will be 30 seconds to allow reselection.
Mobility Test: UE4 Voice CallThe duration of the calls on UE 3 will be ninety (90) seconds and the idle period between two calls will be 10 seconds to allow reselection.
3.2. Stationary Tests in Selected Location
Test Configuration - Mobility
Device Type of Call Mode Type Duration Comments
UE 5 HSDPA 3G Locked Stationary200 MB file to be
Downloaded from FTP server for HSDPA
Test at Predefined Locations
UE 6 Video Originating Call 3G Locked Stationary Test at Predefined Locations
UE 7 Video Terminating Call 3G Locked Stationary Test at Predefined Locations
UE 8 Voice Call to PSTN 3G Locked Stationary Test at Predefined Locations
Page 6 of 21
3G Cluster Optimization Report
Circle : Haryana
Cluster :1 Charkhidadri
Stationary Test: UE6 & UE7 Video CallStationary Test at pre-defined locations. UE6 mobile will be used to make video call to UE7.
Stationary Test: UE5 HSDPA PS CallFor data collection of data call UE5 mobile will be used to down load (FTP) 5 MBytes of data from FTP Server. Stationary Test at pre-defined locations.
Stationary Test: UE8The duration of the calls on UE 8 will be ninety (90) seconds. Also this UE would be used to collect R99 Throughput as a part of stationary KPI’s.
Page 7 of 21
TESTS UE5 UE6 UE7 UE8Video Call Setup Success Rate X X Video Call Setup Duration - Total X X Video Dropped call rate X X Video BLER (DL) X X Ping RTT (Nearest IP after GGSN) X Avg. FTP DL Throughput (Kbps) for R99 X Avg FTP DL Throughput (Kbps) - HSDPA X Voice Call Setup Duration UE to PSTN X
3G Cluster Optimization Report
Circle : Haryana
Cluster :1 Charkhidadri
4. UMTS KPI Summary – Drive Test
Information Element Unit Target ValueActual value
Comments
Mobility Test KPI
RSCP %95% of Samples >=-
95dBm 100
Ec/Io %95% of Samples >=-
14dBm 100 Voice Call Setup Success Rate % >=95% 100 Voice Call Setup Duration-UE to Core network sec <=4sec .378 Voice Call Setup Duration-UE to UE sec <=6sec 3.54 Voice Dropped call rate % <3% 0 BLER % <3.5% 0.053
InterSystemHO Success Rate, UMTS->GSM Success Rate % >=92% 100
Data Attach Success Rate (PS) % >=98% 100 PDP context activation Success Rate(PS) % >=99% 100 PS Bearer Setup Success Rate % >=98% 100
Packet Switch 3G->2G Cell Change Interruption Time sec <=15sec 12.987
Stationary Test KPIVoice Call Setup Duration-UE to PSTN sec <=9sec Video Call Setup Duration sec >=9sec Video Call Setup Success Rate % >=95% Video Dropped call rate % <3% Video Call BLER(DL) % <5% Avg FTP DL Throughput (kbps) - HSDPA Kbps >=500Kbps Avg FTP DL Throughput (kbps) - PS(R99) Kbps >=150Kbps
Ping sec <=15sec
Page 8 of 21
3G Cluster Optimization Report
Circle : Haryana
Cluster :1 Charkhidadri
5. Drive Route
Page 9 of 21
3G Cluster Optimization Report
Circle : Haryana
Cluster :1 Charkhidadri
6. On-Air status of Cluster
NOTE: Sites not on air or with alarms being reflecting with RED Colour
Page 10 of 21
3G Cluster Optimization Report
Circle : Haryana
Cluster :1 Charkhidadri
7. RF Indicators - Distribution Plots (Cluster Level)
7.1. Best Server [Scanner]
Page 11 of 21
3G Cluster Optimization Report
Circle : Haryana
Cluster :1 Charkhidadri
7.2. RSCP [Scanner]
Comments on bad coverage areas:
Page 12 of 21
3G Cluster Optimization Report
Circle : Haryana
Cluster :1 Charkhidadri
7.3. Ec/Io [Scanner]
Comments on high interference areas:
Page 13 of 21
3G Cluster Optimization Report
Circle : Haryana
Cluster :1 Charkhidadri
7.4. CS BLER
Comments:
Page 14 of 21
3G Cluster Optimization Report
Circle : Haryana
Cluster :1 Charkhidadri
7.5. CS Dropped Call
No Dropped CallComments:
Page 15 of 21
3G Cluster Optimization Report
Circle : Haryana
Cluster :1 Charkhidadri
7.6. IRAT LOCATIONS
Comments:
Page 16 of 21
3G Cluster Optimization Report
Circle : Haryana
Cluster :1 Charkhidadri
7.7. PS PDP Context activation
NOTE: PDP Context Activation Failures Events will be shown in the plot
Comments:
Page 17 of 21
3G Cluster Optimization Report
Circle : Haryana
Cluster :1 Charkhidadri
7.8. UE Tx Power
Page 18 of 21
3G Cluster Optimization Report
Circle : Haryana
Cluster :1 Charkhidadri
7.9. CQI Plot
Page 19 of 21
3G Cluster Optimization Report
Circle : Haryana
Cluster :1 Charkhidadri
7.10. HSDPA Throughput
Page 20 of 21
3G Cluster Optimization Report
Circle : Haryana
Cluster :1 Charkhidadri
8. Deliverables & Supporting Documents
The following supporting documents will be attached to this Cluster Optimization Report according to agreed format and content:
Idea 3G Master Database [RF Engineering Site Database]o Latest updated versiono File Name Convention:
Log Files o Drive Test Log Fileso File Name Convention:
Drive Test Example:
Page 21 of 21