  • BIDS STC-7271 Cheyenne overpass PH 1A Pocatello bridge, Pocatello:

    Bids are due by 2 p.m. 3.5.13 to the Idaho Transportation Department. For the work of building a new roadway from Bannock Highway to S. 5th, construction includes earthwork, grading, drainage, base material, signalization, illumination, traffic control and storm water pollution prevention.

    General road maintenance Floodwood area, Saint Maries: Bids due by 3 p.m. 2.22.13 to the Idaho Department of Lands. Request for proposals will be received by the Idaho Department of Lands to solicit proposals from qualified firms to provide long term road maintenance work for the Idaho Department of Lands St. Joe area. The selected contractor will complete annually scheduled road maintenance work and be available to complete road maintenance tasks as needed on the area. The contract will be renewable for up to five years.

    General road maintenance Pend Oreille area, Sandpoint: Bids due by 3 p.m. 2.22.13 to the Idaho Department of Lands. Request for proposals will be received by the Idaho Department of Lands to solicit proposals from qualified firms to provide long term road maintenance work the Idaho Department of Lands Pend Oreille Area. The selected contractor will complete annually scheduled road maintenance work and be available to complete road maintenance tasks as needed on the area. The contract will be renewable for up to five years.

    General road maintenance Priest Lake Area, Coolin: Bids due by 3 p.m. 2.22.13 to the Idaho Department of Lands. Request for proposals will be received by the Idaho Department of Lands to solicit proposals from qualified firms to provide long term road maintenance work for the Idaho Department of Lands Priest Lake area. The selected contractor will complete annually scheduled road maintenance work and be available to complete road maintenance tasks as needed on the area. The contract will be renewable for up to five years.

    General road maintenance St. Joe area, Saint Maries: Bids due by 3 p.m. 2.22.13 to the Idaho Department of Lands. Request for proposals will be received by the Idaho Department of Lands to solicit proposals from qualified firms to provide long term road maintenance work for the Idaho Department of Lands St. Joe area. The selected contractor will complete annually scheduled road maintenance work and be available to complete road maintenance tasks as needed on the area. The contract will be renewable for up to five years.

    Technical careers HS Office & Classroom bldg, Idaho Falls: Bids due by 3 p.m. 2.21.13 to the School District No. 93. Project is the construction of a new Technical Careers High School new office & classroom building. Work includes site work, concrete, metals, rough carpentry, thermal & moisture protection, openings, finishes, specialties, equipment, mechanical, and electrical.

    Sh-16 INT Sh-44 US-20 and local roads, Ada County: Bids due by 2 p.m. 3.5.13 to the Idaho Transportation Department. For the work of reconstructing the intersection of SH-16 and SH-44 and SH-16 and US-20/26 and the construction of the new local roads, MP 97.900 to MP 100.000

    General road maintenance Ponderosa area, Deary: Bids due by 3 p.m. 2.22.13 to the Idaho Department of Lands. Request for proposals will be received by the Idaho Department of Lands to solicit proposals from qualified firms to provide long term road maintenance work for the Idaho Department of Lands Ponderosa area. The selected contractor will complete annually scheduled road maintenance work and be available to complete road maintenance tasks as needed on the area. The contract will be renewable for up to five years.

    Desert Sage Health Center addition and remodel, Mountain Home: 2 p.m. 3.7.13 to the Owner. Description of the work can be summarized as the construction of an approximate 406 Sf. addition to the northwest corner, an approximate 2,128 Sf. Addition to the southeast corner and an approximate 1,667 Sf. Interior remodel of the Desert Sage Health Center. The remodel includes demolition, removal and relocation of designated walls, doors/frames, casework and interior finishes. The addition to the southeast includes four new owner supplied/installed dental operators, conference room, four offices and a storage space (future office). The addition to the northwest includes two exam rooms, a dirty linen storage and one sample drug storage room. The additions will include new HVAC units, plumbing, fire protection.

    Library Square sewer re-route, Nampa: Bids due by 2 p.m. 3.13.13 to the City of Nampa. Contractor shall complete all work as specified or indicated in the contract documents. The work is generally described as Library Square sewer re-route.

    Edgemont Elementary – New School, Idaho Falls: Bids due by 2 p.m. 3.13.13 to the Bateman Hall. The Edgemont Elementary School project consists of the following work: construction of a new elementary school with associated site improvements. The new school will be constructed on the existing Edgemont School site. The existing Edgemont School is to remain operational with minimal impact during construction. Demolition of the existing Edgemont School is included.

    Screenings Room reconstruction, Nampa: Bids due by 2 p.m. 3.11.13 to the City of Nampa. The work of project is defined by the contract documents and consists of the following; reconstruction of the existing screening room building including a new controls room. The existing screening room building is a pre- engineered metal building to be removed by the City of Nampa. The proposed screenings room building will be constructed with CMU walls and metal roof system protection with an epoxy paint finish at all interior metal finishes.

    Twin Falls High School lobby remodel, Twin Falls: Bids due by 3 p.m. 2.28.13 to the Twin Falls School District. This project consists of remodeling the lobby area.

    Gate City Elementary HVAC renovations, Pocatello: Bids due by 10 a.m. 3.7.13 to School District #25. Project includes, but is not limited to: replacement of the existing HVAC systems, new electrical, motor control center, and cutting and patching required for the replacement work.

    RFQ camera and alarm assessment, Boise: Bids due by 5 p.m. 3.18.13 to the Boise State University. Project will assess the current camera and alarm systems campus-wide and will provide a written report detailing the current deficiencies and prioritized recommendations for expansion improvements/upgrades. The report shall include associated costs that can be implemented in a phased approach paying attention to cost effectiveness and reasonably appropriate methodologies. This assessment will also include recommendations for an integrated camera and burglar alarm system as well as a central source for camera and alarm maintenance

    State Highway 48/3800 East intersection, Jefferson County: Bids due by 2 p.m. 2.21.13 to Jefferson Joint School Dist, #251. Project consists of the contractor furnishing all labor, tools, materials, and equipment necessary for reconstructing SH-48 MP 13.177 to MP13.366, State Highway 48/3800 East intersection, Jefferson County Idaho. Project also includes construction of a new traffic signal at the intersection and other related items specified.

    Rigby High School north sports fields, Rigby: Bids due 2 p.m. 2.26.13 to the Jefferson Joint School Dist. #251.The project

    consists of the contractor furnishing all labor, tools, materials and equipment necessary for the rough and final grading of the 15 acre north sports fields, and installing all underground irrigation piping, valves, irrigation appurtenances, power and communication conduit and other items specified.

    CWI art and tutoring remodel, Nampa: Bids due by 3:30 p.m. 3.6.13 to the owner. The contractor shall execute the work described in the contract documents, except as a specifically indicated in the contract documents to be the responsibility of others.

    2013 Aggregate crushing project, Malta: Bids due by 2 p.m. 2.28.13 to the owner. The project involves crushing approximately 16,000 tons of ½ inch crushed aggregate type II, in stockpile, and 3,000 tons of class 3 cover coat material, delivered to the bridge pit, south of Malta along Old Highway 81 South Rd.

    Roadway rehabilitation project, Wilder: Bids due by 2 p.m. 3.1.13 to the owner. The project consists of recycled asphalt base stabilization processing approx. 3.25 miles of roadway with an average width of 24-feet followed by an application of penetration asphalt at locations specifically described below: Mathews Road – 0.5 miles of recycled asphalt base stabilization prior to application of penetration asphalt shot. Application of approximately 15 tons of penetration asphalt. Hoskins Road – 2.5 miles of recycled asphalt base stabilization prior to application of penetration asphalt shot. Application of approximately 75 tons of penetration asphalt. Van Slyke Road – 0.25 miles of recycled asphalt base stabilization prior to application of penetration asphalt shot. Golden Gate Highway District intends to perform roadway grading subsequent to the RABS process to facilitate proper roadway drainage. Upon completion of the Golden Gate Highway District base work the application of approximately 8 tons penetration asphalt.

    Red Lobster #847, Lewiston: Bids due by 5 p.m. 3.1.13 to CSDI Construction Inc. The scope of work includes a restaurant remodel of the 4,152 square foot Red Lobster in Lewiston ID. Exterior work includes; concrete placement, concrete curbing, asphalt patch, asphalt slurry seal, stripping, signage, flag pole install, stone veneer, awning replacement, siding standing seam metal roofing and painting. Interior work includes; demolition, stone veneer, finish carpentry, millwork, drywall, tile, carpet, acoustical ceilings, painting, wood st