Datuk Ir. Elias Ismail Senior General Manager Technology Development Sector Construction Industry Development Board (CIDB) IBS CONFERENCE 26 th March 2019 IBS SCORING IN MALAYSIA : HOW CAN CIDB AND INDUSTRY PLAYERS WORK HAND IN HAND TO PROMOTE USAGE OF IBS? 1

Transcript of IBS SCORING IN MALAYSIA -...

Page 1: IBS SCORING IN MALAYSIA - rehdainstitute.comrehdainstitute.com/wp-content/uploads/2019/03/1.-Datuk-Ir.-Elias-Ismail.pdf · IBS CONFERENCE 26th March 2019 IBS SCORING IN MALAYSIA :

Datuk Ir. Elias IsmailSenior General Manager

Technology Development Sector

Construction Industry Development Board (CIDB)

IBS CONFERENCE

26th March 2019

IBS SCORING IN MALAYSIA :

HOW CAN CIDB AND

INDUSTRY PLAYERS WORK

HAND IN HAND TO

PROMOTE USAGE OF IBS?

1

Page 2: IBS SCORING IN MALAYSIA - rehdainstitute.comrehdainstitute.com/wp-content/uploads/2019/03/1.-Datuk-Ir.-Elias-Ismail.pdf · IBS CONFERENCE 26th March 2019 IBS SCORING IN MALAYSIA :

CONTENTS

1

2

3

ABOUT IBS

IBS ECOSYSTEM4

HOW CAN WE WORK HAND IN

HAND TO PROMOTE IBS

IBS SCORE

5 IBS DATA & STATISTIC

6 CONCLUSION

2

Page 3: IBS SCORING IN MALAYSIA - rehdainstitute.comrehdainstitute.com/wp-content/uploads/2019/03/1.-Datuk-Ir.-Elias-Ismail.pdf · IBS CONFERENCE 26th March 2019 IBS SCORING IN MALAYSIA :

ABOUT IBS

3

Page 4: IBS SCORING IN MALAYSIA - rehdainstitute.comrehdainstitute.com/wp-content/uploads/2019/03/1.-Datuk-Ir.-Elias-Ismail.pdf · IBS CONFERENCE 26th March 2019 IBS SCORING IN MALAYSIA :

Industrialised Building System or IBS” means

the technique of construction whereby

components are manufactured in a

controlled environment, either at site or off-

site and subsequently transported,

positioned and assembled into

construction worksACT 520

ABOUT IBS

Design

Production

Delivery

Form a Completed Unit

Installation 4

Page 5: IBS SCORING IN MALAYSIA - rehdainstitute.comrehdainstitute.com/wp-content/uploads/2019/03/1.-Datuk-Ir.-Elias-Ismail.pdf · IBS CONFERENCE 26th March 2019 IBS SCORING IN MALAYSIA :

Precast Concrete Metal Framing Block Work

Timber Framing InnovativeReusable Formwork

1 2 3

4 5 6

ABOUT IBS – TYPES OF IBS SYSTEMS AND COMPONENTS

5

Page 6: IBS SCORING IN MALAYSIA - rehdainstitute.comrehdainstitute.com/wp-content/uploads/2019/03/1.-Datuk-Ir.-Elias-Ismail.pdf · IBS CONFERENCE 26th March 2019 IBS SCORING IN MALAYSIA :

GOVERNMENT

SECTOR

-Surat Pekeliling

Perbendaharaan

Bil. 7 tahun 2008

Projek kerajaan yang bernilai RM10 Juta dan keatas wajib mencapaiminimum 70 IBS Skor sejakdari 2008

PRIVATE

SECTOR

Pekeliling KSU

Kementerian KPKT

Bil. 1 Tahun 2017

-Bertarikh 10

Januari 2018

ABOUT IBS - IBS POLICYX

Projek swasta yang bernilaiRM50 Juta dan ke ataswajib mencapai minimum 50 IBS Skor

6

Page 7: IBS SCORING IN MALAYSIA - rehdainstitute.comrehdainstitute.com/wp-content/uploads/2019/03/1.-Datuk-Ir.-Elias-Ismail.pdf · IBS CONFERENCE 26th March 2019 IBS SCORING IN MALAYSIA :

IBS SCORE

7

Page 8: IBS SCORING IN MALAYSIA - rehdainstitute.comrehdainstitute.com/wp-content/uploads/2019/03/1.-Datuk-Ir.-Elias-Ismail.pdf · IBS CONFERENCE 26th March 2019 IBS SCORING IN MALAYSIA :

8

MC on MS 1064

PART 3 : OTHER SIMPLIFIED CONSTRUCTION – 30 SCORE

Repetitiveness

PART 1 : STRUCTURE SYSTEM – 50 SCORE

Roof Structure

Column

Floor Structure

Wall/Panel

PART 2 : WALL SYSTEM – 20 SCORE

Productivity

Beam

IBS SCORE CALCULATIONX

8

Page 9: IBS SCORING IN MALAYSIA - rehdainstitute.comrehdainstitute.com/wp-content/uploads/2019/03/1.-Datuk-Ir.-Elias-Ismail.pdf · IBS CONFERENCE 26th March 2019 IBS SCORING IN MALAYSIA :

HOW CAN WE WORK HAND IN

HAND TO PROMOTE IBS

9

Page 10: IBS SCORING IN MALAYSIA - rehdainstitute.comrehdainstitute.com/wp-content/uploads/2019/03/1.-Datuk-Ir.-Elias-Ismail.pdf · IBS CONFERENCE 26th March 2019 IBS SCORING IN MALAYSIA :

OLIGOPOLY

Market Share by small no. of players and control market

Low delivery of the targeted affordable housing

DELIVERY

QUALITY

Quality in manufacturing and installation process of IBS components

R&D

Poor commercialization for local R&D Products

SME

No real development from new IBS SME company

IBS ISSUES ON THE GROUND

TECHNOLOGY

Low usage of new technology and innovation in the IBS

CONVENTIONAL METHOD

High dependency on conventional method

10

Page 11: IBS SCORING IN MALAYSIA - rehdainstitute.comrehdainstitute.com/wp-content/uploads/2019/03/1.-Datuk-Ir.-Elias-Ismail.pdf · IBS CONFERENCE 26th March 2019 IBS SCORING IN MALAYSIA :

X HOW CAN WE WORK HAND IN HAND TO PROMOTE IBS

11

Page 12: IBS SCORING IN MALAYSIA - rehdainstitute.comrehdainstitute.com/wp-content/uploads/2019/03/1.-Datuk-Ir.-Elias-Ismail.pdf · IBS CONFERENCE 26th March 2019 IBS SCORING IN MALAYSIA :

CIDB HAND IN HAND TO PROMOTE IBSX

12

Page 13: IBS SCORING IN MALAYSIA - rehdainstitute.comrehdainstitute.com/wp-content/uploads/2019/03/1.-Datuk-Ir.-Elias-Ismail.pdf · IBS CONFERENCE 26th March 2019 IBS SCORING IN MALAYSIA :

IBS ECOSYSTEM

12

Page 14: IBS SCORING IN MALAYSIA - rehdainstitute.comrehdainstitute.com/wp-content/uploads/2019/03/1.-Datuk-Ir.-Elias-Ismail.pdf · IBS CONFERENCE 26th March 2019 IBS SCORING IN MALAYSIA :

17

IBS ECOSYSTEM

13

X

Page 15: IBS SCORING IN MALAYSIA - rehdainstitute.comrehdainstitute.com/wp-content/uploads/2019/03/1.-Datuk-Ir.-Elias-Ismail.pdf · IBS CONFERENCE 26th March 2019 IBS SCORING IN MALAYSIA :

IBS DATA & STATISTIC

14

Page 16: IBS SCORING IN MALAYSIA - rehdainstitute.comrehdainstitute.com/wp-content/uploads/2019/03/1.-Datuk-Ir.-Elias-Ismail.pdf · IBS CONFERENCE 26th March 2019 IBS SCORING IN MALAYSIA :

DESCRIPTIONB01 B02 B19 B22 B23

JUMLAHBumi Non Bumi Bumi Non Bumi Bumi Non Bumi Bumi Non Bumi Bumi Non Bumi

JOHOR 80 13 584 81 14 1 23 2 12 3 813

KEDAH 82 5 399 23 0 0 6 0 0 1 516

KELANTAN 142 0 433 7 4 0 10 0 6 0 602

MELAKA 48 1 168 22 29 1 34 1 0 0 304

NEGERI SEMBILAN 172 5 257 24 1 0 3 0 2 0 464

PAHANG 57 5 507 24 4 1 22 1 4 0 625

PERAK 47 6 271 39 4 1 61 1 15 1 446

PERLIS 8 0 162 1 1 0 8 0 2 0 182

PULAU PINANG 37 6 499 69 0 2 1 1 3 0 618

SABAH 39 15 253 58 5 1 10 1 4 0 386

SARAWAK 158 74 307 99 5 4 25 8 9 1 690

SELANGOR 202 54 1197 194 19 21 91 17 21 4 1820

TERENGGANU 19 2 465 12 5 1 6 0 11 0 521

WILAYAH PERSEKUTUAN KUALA LUMPUR 112 32 671 204 16 10 37 5 5 0 1092

WILAYAH PERSEKUTUAN LABUAN 3 0 4 0 1 0 1 0 1 0 10

WILAYAH PERSEKUTUAN PUTRAJAYA 3 1 3 1 0 0 0 0 0 0 8

JUMLAH 1209 219 6180 858 108 43 338 37 95 10 9097

KONTRAKTOR IBS

BUMI 7930

NON BUMI 1167

JUMLAH 9097NOTE:B01-SISTEM KONKRIT PRATUANG B02-SISTEM KERANGKA KELULI B19-SISTEM ACUAN B22-SISTEM BLOK B23-SISTEM KERANGKA KAYU

STATSTICS OF IBS CONTRACTORS REGISTERED WITH CIDB

(UNTIL DECEMBER 2018)X

15

Page 17: IBS SCORING IN MALAYSIA - rehdainstitute.comrehdainstitute.com/wp-content/uploads/2019/03/1.-Datuk-Ir.-Elias-Ismail.pdf · IBS CONFERENCE 26th March 2019 IBS SCORING IN MALAYSIA :

SENARAI PEMBEKAL KOMPONEN IBS SEHINGGA DISEMBER 2018

NEGERI

Precast Concrete System (Sistem Konkrit Pratuang)

Reusable Formwork System (Sistem Acuan Berulang)

Metal Framing System (Sistem Kerangka Logam)

Timber Framing System (Sistem Kerangka Kayu)

Blockwork System (Sistem Blok)

Innovative System (Sistem Inovatif)

JUMLAH KESELURUHANSETIAP NEGERI

PRECAST ONSITE PRECAST FORMWORK STEEL STRUCTURE METAL ROOF TRUSSES TIMBER FRAME BLOCK INOVATIVE

Pengeluar PengedarJUMLAH

Pengeluar PengedarJUMLAH

Pengeluar PengedarJUMLAH

Pengeluar PengedarJUMLAH

Pengeluar PengedarJUMLAH

Pengeluar PengedarJUMLAH

Pengeluar PengedarJUMLAH

Pengeluar PengedarJUMLAH

Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah

1 JOHOR 1 22 22 3 4 4 1 2 2 1 5 5 1 4 4 1 1 4 4 9 1 10 52

2 K.LUMPUR 0 1 2 2 0 1 1 1 1 1 0 0 1 2 3 7

3 KEDAH 3 4 4 0 1 1 2 2 2 1 1 0 1 1 1 1 2 2 12

4 KELANTAN 1 1 1 0 0 0 1 3 3 0 1 1 1 2 2 2 7

5 MELAKA 1 3 3 1 1 0 1 2 2 1 1 1 1 1 2 2 0 10

6 N. SEMBILAN 4 7 7 1 2 2 3 3 0 1 1 1 0 2 3 3 2 2 18

7 P.PINANG 2 2 0 1 1 1 1 1 2 2 0 1 1 0 7

8 PAHANG 1 2 2 1 1 1 0 0 1 2 2 0 1 3 3 0 8

9 PERAK 1 3 3 0 0 1 1 1 2 2 0 1 1 1 3 7 2 9 16

10 PERLIS 1 1 1 0 0 0 0 0 0 0 1

11 SABAH 2 7 7 0 0 4 4 3 3 0 2 4 1 5 3 1 4 23

12 SARAWAK 3 5 5 1 1 0 5 5 1 3 3 1 1 2 2 2 2 2 19

13 SELANGOR 5 18 18 2 7 7 1 21 7 28 3 10 10 1 7 7 0 4 10 1 11 6 22 3 9 31 112

14 TERENGGANU 2 2 2 1 1 0 0 2 2 2 2 2 2 1 1 1 0 8

Jumlah 25 77 0 0 77 8 19 0 0 19 2 28 0 8 36 6 30 0 1 31 11 32 0 0 32 2 5 0 0 5 15 33 0 2 35 12 50 3 15 65 300

Kategori Jumlah

PengeluarBumi 81

274Non Bumi 193

PengedarBumi 3

26Non Bumi 23

JUMLAH KESELURUHAN 300 300

IBS MANUFCTURER STATISTIC

(UNTIL DECEMBER 2018)

X

16

Page 18: IBS SCORING IN MALAYSIA - rehdainstitute.comrehdainstitute.com/wp-content/uploads/2019/03/1.-Datuk-Ir.-Elias-Ismail.pdf · IBS CONFERENCE 26th March 2019 IBS SCORING IN MALAYSIA :

19

23

52

8

8

7

12

1

10

112

16

7

18

7

300 PENGELUAR IBS

IBS MANUFCTURER STATISTIC

(UNTIL DECEMBER 2018)X

17

Page 19: IBS SCORING IN MALAYSIA - rehdainstitute.comrehdainstitute.com/wp-content/uploads/2019/03/1.-Datuk-Ir.-Elias-Ismail.pdf · IBS CONFERENCE 26th March 2019 IBS SCORING IN MALAYSIA :

IBS INSTALLER STATISTIC UNTIL DECEMBER 2018X

Page 20: IBS SCORING IN MALAYSIA - rehdainstitute.comrehdainstitute.com/wp-content/uploads/2019/03/1.-Datuk-Ir.-Elias-Ismail.pdf · IBS CONFERENCE 26th March 2019 IBS SCORING IN MALAYSIA :

IBS PROFESSIONAL STATISTIC

(UNTIL DECEMBER 2018)X

0

200

400

600

800

1000

1200

1400

1600

1800

2000

2016 2017 2018

JUMLAH PROFESIONAL IBS TERLATIH

JUMLAH PROFESIONAL IBS TERLATIH

356

1713

1984

19

Page 21: IBS SCORING IN MALAYSIA - rehdainstitute.comrehdainstitute.com/wp-content/uploads/2019/03/1.-Datuk-Ir.-Elias-Ismail.pdf · IBS CONFERENCE 26th March 2019 IBS SCORING IN MALAYSIA :

Currently, the industry is at medium level of prefabrication adoption but is heading into a more rapid implementation of IBS in future.

Advanced technology and modern methods of construction using prefabrication and offsite construction are needed to cope with current global construction industry.

CIDB and industry must work hand in hand to implementing IBS in the ground level to delivering efficient, sustainable and productive construction environment.

CONCLUSION

20