20
© 2013 IBM Corporation IBM Asset Management Roadmap, New Capabilities Pete Karns, Director, Product Management & Strategy Asset Management & Smarter Infrastructure

Transcript of IBM Asset Management Pulse 2013 - Maximo...Maximo . Fix-pack 7.1.1.xx. Maximo Mobile 7.5.1 •...

© 2013 IBM Corporation

IBM Asset ManagementRoadmap, New Capabilities

Pete Karns,Director, Product Management & StrategyAsset Management & Smarter Infrastructure

© 2013 IBM Corporation2

Smarter Infrastructure relies on an Asset Management foundationIBM Asset Management

EnterpriseAssets

Operational Technology & Service Management

WorkplaceManagement

ANALYTICS

MO

BILITY

Facility & Space

Real Estate

Energy & Sustainability

Capital Projects

Work & Asset Management

Supply Chain

Health & Safety

Service Providers

Service Desk

IT Asset Management

Change Mgt

Compliance

Common Platform Services

Asset, Device, System Infrastructure Interaction

AUTOMATIONVISIBILITY CONTROL

Comm

erce

© 2013 IBM Corporation3

Asset Management roadmap

© 2013 IBM Corporation4

2012 Asset Management Roadmap

Address high-value customer requirements across multiple industries and markets with delivery of new solution for advanced Scheduling, Dispatch & Routing of work

• Enhance existing Maximo, TRIRIGA and ISM solutions

• Continued maintenance for multiple releases, delivering Fix-packs for R6.2.x, 7.1.x and 7.5.x

Q1 2012 Q32012

Maximo Fix-pack 7.1.1.11TRIRIGA Energy

Optimization -Rebranding

Q4 2012Q2 2012

Maximo Fix-pack 7.5.0.2

Maximo Adapter for SAP

Fix-pack 7.5.0.1

Service Mgmt

IT Asset Mgmt

Change Mgmt

Smart Cloud Control Desk 7.5

TRIRIGA 10.2- Additional

Languages

Maximo Scheduler 7.5.1.0

- Schedule Compliance

- Graphical Labor Assignments

- Dispatching- Additional

Resources- WO Actions

Fix-pack 7.5.0.3- Features:- Crews- Public Map API- Service Addresses

Advanced Scheduling

The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion. .

Maximo Service Provider

Fix-pack 7.5.1.1

Maximo for Utilities

Fix-pack 7.5.0.1

Maximo for Spatial

Fix-pack 7.5.0.1

TRIRIGA 10.3- Reservation

Mgmt- Sustainability

enhancements- Building

System Integrations

Maximo Fix-pack 6.2.9

Maximo Nuclear 7.5.1.0

• LCO Tracking• Duty Stations

© 2013 IBM Corporation5

2013 Asset Management Roadmap

Fix-Packs/Mod Release

Major Releases

New Products

Key

H1 2013 H2 2013

Maximo ACM/Transportation 7.5.x.x

• Aviation/Spec 2000• Flight Log Book• Progressive Inspections

Maximo Scheduler 7.5.x.0

- Automated Schedule Optimization

- Automated Route Optimization

TRIRIGA 10.x• Implementation

accelerators• Localization

enhancements• Lease

accounting enhancements

Maximo Fix-pack 7.5.0.x

Mobile Next• Mobile platform• Android support• Connected/Discon

nected• Maximo Work

Mgmt applications

Maximo Fix-pack

7.1.1.xx

Maximo Mobile 7.5.1

• Android support• RFID

Smart Cloud Control Desk 7.5.1

Maximo Fix-pack 7.5.0.4

Maximo Integration for TRIRIGA

• Facility Condition Assessment

• ISM Library download

Maximo Oil & Gas/HS&E 7.5.1

• Permit to Work• Audit and

Surveys

Trellis Real-time Infrastructure Optimization Data Center Infrastructure Mgt (DCIM)

Maximo Integration for TRIRIGA 1.1

• Space & Move Mgmt

• ISM Library download

TRIRIGA 10.3.x• Enhanced

browser support• Energy Star and

ESRI updates• Phase 1 508

Accessibility;

Maximo 7.5 on PureApplication System

2014

SmartCloud Control Desk

Fix-pack 7.5.1.1

SmartCloud Control Desk

Fix-pack 7.5.0.2

Tivoli Asset Discovery for z/OS 8.1.0

• Lower TCO w/ SQLite support;

• Enhance audit readiness reporting

Analytics• Predictive Insights

TRIRIGA Energy Optimization

• Real-time energy & operating analytics

• Event filtering & root cause analysis

Mobile • iOS Support• TRIRIGA, SCCD,

Maximo applications

• Appl Designer

Maximo Next • Multi Tenancy • Usability• Crews• Mapping• Broad capability

enhancements

SmartCloud Control Desk Next

The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion. .

TRIRIGA• Lease accounting• User experience• Serviceability / time

to value

SaaS• Intelligent Asset Mgt

© 2013 IBM Corporation6

Enhancing our purpose built applications, and extending common services

• Enhanced mobile platform• Common BIM enablement• Common middleware• One UI user experience

enhancements• Unified Analytics solution

• EAM Space management integration

• Unified mobile platform• Integrated EAM, Space

Management, Facility Condition Assesment

• Enhanced integration capabilities (OSLC-based)

Maximo

TRIRIGA

• Enhanced mobile platform• Multiple solution delivery

models• User experience

enhancements• Unified Analytics solution

TRIRIGATRIRIGA 10.xTRIRIGA 10.3

MaximoMaximo 7.xMaximo 7.5

2012 2013* 2014*• Advanced scheduling & dispatch • Flexible graphical mapping• Nuclear Enhancements• Service Provider updates

• Scheduling optimization• New mobile applications• Predictive analytics• Enhanced HS&E capabilities• Industry solution enhancements

• Support for crews, mapping service addresses

• Usability, Reporting and KPI enhancements

• Additional mobile applications• SaaS enabled platform (Multi-tenancy)• Time to Value Enhancements

2015+ *• Supply Chain and Financial

mgmt enhancements• Manifesting and logistics• Additional mobile applications• Energy Management

enhancements

• Reservation management• Sustainability management

enhancements• Building Mgmt System integration

enablement• Additional translations

• Implementation and upgrade accelerators

• Localization compliance enhancements• US Federal enhancements• FASB/IASB Lease Accounting updates• Additional database and browser support• Updated ESRI / Energy Star integrations

• Energy Management enhancements• Next generation mobile applications• Localization compliance enhancements• CAD integrator support for Revit• FASB/IASB Lease Accounting updates• Implementation and upgrade accelerators

* Considered investment

• Additional mobile applications• Facility and real estate management

analytics• Workplace performance

management benchmarking • Energy Management enhancements• Demographic analysis with GIS

integration

The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion. .

© 2013 IBM Corporation7

A New Approach to Work Force ManagementSupport for optimization models,

automated labor and crew assignment

IBM Maximo Scheduler 7.5.x Embedded engine delivers objective based

optimization models Scenario based work planning Graphical crew management capabilities Optimized spatial scheduling for reduced crew

windshield time

Replaces the need for pure planning and scheduling tools

Effective resource utilization through optimized work schedules

Improves the ability to respond quickly to emergency situations

© 2013 IBM Corporation88

Scheduler Optimization Models

Capacity Planning

A set of work orders that need to be completed within a certain time period

Adjusts craft, skill and crew type availability to execute as best as possible the work as required (overutilization and underutilization periods are possible). Gaps are identified.

Resource LevellingWork orders are scheduled within their allowed time window to minimize overutilization and underutilization.

Craft, skill and crew type availability

Craft, skill and crew type availability

(1) Long/Medium Term Planning

(2) Medium/Short Term PlanningA set of work orders that need to be completed within a certain time period

ResourceAssignment

Scheduled work orders

Specific workers are assigned to the activities to fulfil the craft or crew type requirement.

Dynamic Work Scheduling

Dynamically assign emergency work orders to labor/crews and reassign/reschedule affected work orders.

Named resources availability with specific craft, skill set, crew type and location.

Specific resources with required craft, skill set, crew type for a given geographic location.

(3) Short Term Planning

(4) Short Term Planning Emergent work orders

© 2013 IBM Corporation9

IBM Maximo Health, Safety and Environment Manager

Eliminates defects to deliver safe and reliable operations

Identifies safety climate issues and audit safety barriers

Single point of entry - eliminates confusion

Manage complexity and risk by enabling increased visibility and automation across digital and physical infrastructures

Permit to Work capability allows customers to replace custom PTW system Audits & Surveys improve compliance and facilitate assessment of cumulative operational riskPreparation Activities & Certifications capabilities allow a much wider range of business processesLocation Profiles support better operational and HSE decision making

© 2013 IBM Corporation10

IBM Maximo MobileOptimize an increasingly mobile workforce to increase organizational effectiveness

Device support extended to the Android platform RFID support for Asset Audits and Enhanced history

and exception handling Barcoding via camera – no scanner required Supports Device inherent capabilities - Voice to Text

and Photo attachments

Expands choice of available ruggedized field devices

Improved performance for increased productivity

Enables Scheduler Field Technicians

© 2013 IBM Corporation11

Mobility Strategy

• A new mobile solution based on IBM’s MobileFirst technologies

• Deliver a modern mobile solution to meet the evolving needs of our customers

• Redefine the way our customers access our products with a common UI across our portfolio

Benefits:• Single platform • Easily tailored• Access from anywhere• Multiple modern devices/OS

© 2013 IBM Corporation12

Leveraging OSLC standards for User Interface Flexibility

© 2013 IBM Corporation13

IBM SmartCloud Control Desk

Accelerated cross-functional coordination of resources and tasks

Enhance visibility of business impact of issues across IT, space, power, cooling

Enhance problem identification & resolution by correlating IT & non-IT events

Manage complexity and risk by enabling increased visibility and automation across digital and physical infrastructures

Integrated view of resources & relationships beyond the data center; can visualize on mapsAutomated logical fixes thru endpoint management integrationWhat-if impact analytics

IBM Data Center Infrastructure MgmtPartnership with Emerson linking management of the logical and physical aspects of the data center

IT assets

Physical assets

IncidentProblemChange

ConfigurationRequest

© 2013 IBM Corporation14

IT Assets

Service Request Incident Problem Release

Non-IT Assets

Change

IBM Maximo

Holistically manage complex service management processes

Configuration IT Asset Procurement License

Common Services

User Interface and self help

Process automation workflows

Reports and Analytics

© 2013 IBM Corporation15

IBM Predictive Asset OptimizationAutomate execution based on insights from operational data to increase predictability of outcomes

Big Data, Asset Management and Predictive Analytics software and services with a pre-built solution framework Analyzes structured, unstructured and streaming information to determine asset performancePredicts asset failure to optimize quality and supply chain processesIntegrates data and predictive insights to proactively enable corrective actions

Reduces repeat repairs by up to 50%

Reduces overall accident rates by 20% or more

Reduces utility network incidents by up to 41%

© 2013 IBM Corporation16

Workplace management is essential

16

Facilities Infrastructure

ProductionInfrastructure

TransportationInfrastructure

TechnologyInfrastructure

Communications Infrastructure

++++

real estate portfolio(owned, leased)

facility systems & infrastructure

Buildings & building systems are

instrumented, measured and

monitored in real time to enable strategic and

tactical business processes

Energy & environmental management

Monitoring, real-time and planning analytics, and event management to identify patterns and drive actions that reduce energy costs and improve environmental impact

Asset management Building and building system maintenance including asset tracking, work order management, scheduling, spare parts inventory management

Space management Space utilization, chargeback and optimization to reduce occupancy costs

Capital project management

Condition assessment of buildings and facility systems, plan capital requirements, project management

Strategic facility planning Forecasting space requirements, prioritizing facility investment, optimizing alternative

Portfolio management Optimize real estate strategy based on projected requirements; assess lease vs purchase options; manage leases

© 2013 IBM Corporation17

AnalyticsDescriptive visualization to predictive

‘Mobility’ & new systems of engagement

Managing and harnessing ‘Operational Technology’

Work force optimization

Life cycle collaboration

Continued capability expansion

Architectural evolution

Continued Focus on Innovation for the Discipline of Managing and Optimizing Asset Infrastructure

The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion. .

© 2013 IBM Corporation18

www.smconnect.net

30,000+

18

Peers and subject experts

Open beta projects

© 2013 IBM Corporation19

© 2013 IBM Corporation20 © 2013 IBM Corporation20