![Page 1: IBL cooling operation at bake-out IBL CO2 meeting 10 April 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Olivier Crespo Lopez 1.](https://reader036.fdocuments.us/reader036/viewer/2022062409/5697c01c1a28abf838ccfc0e/html5/thumbnails/1.jpg)
IBL cooling operation at bake-outIBL CO2 meeting 10 April 2014
Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Olivier Crespo Lopez
1
![Page 2: IBL cooling operation at bake-out IBL CO2 meeting 10 April 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Olivier Crespo Lopez 1.](https://reader036.fdocuments.us/reader036/viewer/2022062409/5697c01c1a28abf838ccfc0e/html5/thumbnails/2.jpg)
Special operation for bake out
• To have a guaranteed cooling during bake out a special procedure is in place:– Both systems in parallel
• If 1 fails we interlock the bake-out– Safe cooling down at half the flow from the 2nd system
• If both systems fail a bottle is emptied through the transfer line to have cooling for an extended time.
– Operation at a temperature set point of -20’C
2
![Page 3: IBL cooling operation at bake-out IBL CO2 meeting 10 April 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Olivier Crespo Lopez 1.](https://reader036.fdocuments.us/reader036/viewer/2022062409/5697c01c1a28abf838ccfc0e/html5/thumbnails/3.jpg)
AC042
LP101
ventevacuate
6
8
FT106
⅜”
EH106TT106TS106
EH101 / EH102 / EH103TT101 / TT102 / TT103TS101 / TS102 / TS103PT101 / PT102 / PT103
HX150
CO2 system A100 labels
LT142LT342
FT306
FL304
⅜”
FL306
VP05
6
50
40
12
4444
46
48
PV110
PT150/ TT150/ SC150
¼”
BD108PT108TT108
CO2 from experiment
CO2 to experiment
42
PT142
PV108
PV144
HX148
TT148BD148
SV042 SV043MV042
FL144
MV041
TT146
AV108
Freon chiller A
200
CO2 system B300 labels
10
LP101EH301 / EH302 / EH303TT301 / TT302 / TT303TS301 / TS302 / TS303PT301 / PT302 / PT303
4
FL344
PT304TT304
MV306
6
8
EH306TT306TS306
BD308PT308TT308
AV308
PV308
PV310
PV344
46 TT346
HX350
HX348
LP301
Fill port
nc
nc
no
nc
no
nc
MV050
MV054MV052 MV056BD054
PT054
EV148 EV348
nc nc
50
PT350/ TT350/ SC350
SV040 MV040
SV041 BD01210
MV058
NV110
MV110 MV310nc
CV142
nc
CV342
ncnc
ncnc
nc
nc
Cold CO2 lineCold R404a lineWarm service line(Cold lines require 32mm insulation)
no
NV310
no
¼” ¼”
½”½”
½”
½” ½”
48 TT348BD348
Freon chiller B
400
MV043
PT342
BV, 28-01-2014
PT040
PT042
PT056
PRC142 controlling CV142, EH142/143(PT142 & SC150)
PRC342 controlling CV342, EH342/143(PT342 & SC350)
PT050 PT058
no
FL104
4 PT104TT104
nc
FL106
Fill port
MV106
EH142/143TT142/143TS142/143
FL042
EH342/343TT342/343TS342/343
MV012
MV039
AV012
![Page 4: IBL cooling operation at bake-out IBL CO2 meeting 10 April 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Olivier Crespo Lopez 1.](https://reader036.fdocuments.us/reader036/viewer/2022062409/5697c01c1a28abf838ccfc0e/html5/thumbnails/4.jpg)
PV110
CO2 from experiment
CO2 to experiment
PV144
LP101
PV310
PV344
nc
ncnc
nc
MV012
MV039
AV012
nono
Vent
Water
no
Normal operation: 2 systems running
All pneumatic valves are pressurized
![Page 5: IBL cooling operation at bake-out IBL CO2 meeting 10 April 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Olivier Crespo Lopez 1.](https://reader036.fdocuments.us/reader036/viewer/2022062409/5697c01c1a28abf838ccfc0e/html5/thumbnails/5.jpg)
PV110
CO2 from experiment
CO2 to experiment
PV144
LP101
PV310
PV344
nc
ncnc
nc
MV012
MV039
AV012
nono
Vent
Water
no
Failure: 1 system stops, bake out is interlocked
Pneumatic valves of blow system stay pressurized
![Page 6: IBL cooling operation at bake-out IBL CO2 meeting 10 April 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Olivier Crespo Lopez 1.](https://reader036.fdocuments.us/reader036/viewer/2022062409/5697c01c1a28abf838ccfc0e/html5/thumbnails/6.jpg)
PV110
CO2 from experiment
CO2 to experiment
PV144
LP101
PV310
PV344
nc
ncnc
nc
MV012
MV039
AV012
nono
Vent
Water
no
Failure: 2 systems stop, blow system activated
All system valves loose air pressure, blow system valves automatically openend
![Page 7: IBL cooling operation at bake-out IBL CO2 meeting 10 April 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Olivier Crespo Lopez 1.](https://reader036.fdocuments.us/reader036/viewer/2022062409/5697c01c1a28abf838ccfc0e/html5/thumbnails/7.jpg)
Blow system connection location
7
R404a 2-stage chiller
CO2 unit
Accumulator
unit
![Page 8: IBL cooling operation at bake-out IBL CO2 meeting 10 April 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Olivier Crespo Lopez 1.](https://reader036.fdocuments.us/reader036/viewer/2022062409/5697c01c1a28abf838ccfc0e/html5/thumbnails/8.jpg)
Blow system summary
• A failure of both system cause automatically a blow system activation.– Safe against: cooling system failure by interlocks– Power loss, blow system is activated in fail safe
condition meaning valves will be opened• Parts have been ordered from SR1 foreseen
test ( never carried out)• Blow system activation can be tested over
junction box.