IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

38
IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII IAP PHASE VII (2012 - 2017) (2012 - 2017) Information sessions Information sessions

Transcript of IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

Page 1: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

09/11/2012

13/11/2012

IAP PHASE VIIIAP PHASE VII(2012 - 2017)(2012 - 2017)

Information sessionsInformation sessions

Page 2: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

I. Introduction (1)

2

Frank MONTENY, head of the department research programmes

Véronique FEYS and Corinne LEJOUR, programme managers

Dita USLU and Naziha BENALI, administrative assistants

Yves ROUSSEAU, Vincent MEUNIER, Geert VERSTRAETE and Anne-Marie VAN DEN HUL, financial administrators

Page 3: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

I. Introduction (2)

3

General email address :

[email protected]

Mention in each correspondence :

IAP P7/..

Page 4: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

II. Objectives

4

To reinforce fundamental research in Belgium

To provide excellent research teams with additional human and material resources

To promote long-term, structured collaboration among university research teams of both Belgium’s linguistic Communities

To enable young emerging teams to benefit from the environment of excellence provided by a network

To facilitate the insertion of Belgian research teams into European and international networks

Page 5: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

III. The different IAP phases

5

PHASE I (1987 - 1991) 14 networks 45 million EUR

PHASE II (1990 – 1995)

23 networks 50 million EUR

PHASE III (1992 – 1996) 16 networks 50 million EUR

PHASE IV (1997 -2001) 35 networks 110 million EUR

PHASE V (2002 – 2006) 36 networks 112 million EUR

PHASE VI (2007 – 2011) 44 networks 143 million EUR

PHASE VII (2012 -2017) 47 networks 156,5 million EUR

Page 6: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

IV. A few figures

• 47 networks (including 17 new networks)

- 24 in life sciences- 15 in exact or applied sciences- 8 in human sciences

• 369 research groups

- 257 Belgian promoters- 112 International partners

6

Page 7: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

V. General conditions

Contract IAP-VII

Administrative guidelines

Homepage : www.belspo.be/iap

7

Page 8: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

VI. Organisation of the network (1)

Coordination of the network

Meetings- Kick-off meeting- Minimum 1 meeting per year

Follow-up committee (external experts)

Website of the network

International symposium

Network-driven training activities

8

Page 9: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

VI. Organisation of the network (2)

Guidelines for the annual meetings

Introduction by the coordinator

Presentation of the results and collaborations by the WP-leaders

Presentations by young researchers (also posters, …)

Short administrative meeting (+ minutes)

Rotation in the organisation

Do not forget to invite BELSPO

9

Page 10: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

VI. Organisation of the network (3) Guidelines for the website

names of partners summary and/or description of the project list of publications agenda of the IAP meetings, conferences, workshops “network-driven” training activities job offers newsletter discussion forum annual reports

If necessary : password for restricted access

Do not forget : Belspo and IAP logos + links with the Belspo and IAP websites

10

Page 11: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

VI. Organisation of the network (4)

Network-driven training activities

To promote interdisciplinary training of PhD students and postdocs

Graduate school, summer schools …

11

Page 12: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

Regular organisation of meetings (WP-meetings)

Numerous contacts between researchers of different groups

Exchange of personnel, information and materials

Common use of equipment, databases, ...

Common activities: network-driven training activities, symposia, co-supervision of thesis, …

Collective participation: co-publications, EU-projects

Website

Electronic newsletter, …

Good practices of an IAP network

12

VI. Organisation of the network (5)

Page 13: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

For each International partner a Belgian partner is designated as contact person

Contract between the Institution of the International partner and the Institution of the Belgian promoter

Cooperation with the International partners

13

VI. Organisation of the network (6)

Page 14: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

VII. Categories of expenses

Personnel

Operating costs

Equipment

Subcontracting

Overheads

International partnership

14

Page 15: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

VII. Personnel (1)

15

Personnel budget = minimum 60% of the total budget

Doctoral and postdoctoral grants = maximum 60% of the personnel budget

(derogation if the total budget < 600.000 €)

Minimum 1 full-time (or equivalent in part-time) researcher

Minimum 1 post-doc researcher for teams with a budget of ≥ 900.000 € (recommendation)

Page 16: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

VII. Personnel (2)

16

Employment or fellowship contract

- Duration: 1 year minimum (except derogations)

- IAP promoter namely mentioned

- Copy transmitted to Belspo upon entry into service

Page 17: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information 17

VII. Operating costs (1) «Forfait» = maximum 15% of the total budget

Any type of expenses related to the project

No pieces of justification to be sent to Belspo

But possibility of control by auditing :

- Compliance with laws and internal rules

- “Forfait” used for the project (promoter’s account)

Page 18: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information 18

VII. Operating costs (2) In addition to the «forfait»: possibility of reimbursement of expenses under certain conditions

- Expense > 500 € incl.VAT (amount of the accounting document)

- Expense clearly related to the project

- Name of the IAP promoter or a colleague on the invoice

Some expenses are excluded from this possibility

Page 19: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information 19

VII. Operating costs (3) List of expenses excluded from the «Expenses in addition to the forfait»:

Office supplies (including computer equipment)

Photocopies, documentation, shipping, telecom, insurances

Travel and accomodation in Belgium and abroad

Restaurants, catering, food (except for organisation of IAP workshops)

Internal invoices for purchases of goods (general stores)

Page 20: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information 20

VII. Operating costs (4) Examples of «in addition to the forfait» expenses:

Internal invoices for the delivery of services

Remuneration for student jobs

Cost of maintenance of specific machines and instruments

Allowances to visiting researchers

Costs for organising IAP events

Internal subcontracting

Accounting document > 500 € incl.VAT

Page 21: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information 21

VII. Operating costs (5)

Internal subcontratcing

For the services of a colleague from another research unit of its institution

Subject to the approval of the programme manager :

via the annex 1 of the administrative guidelines 

Page 22: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information 22

VII. Operating costs (6)

Remarks:

If 15 % in operating costs are sufficient → possibility to charge all expenses of operating costs on the “forfait”

No obligation to request the maximum “forfait”

Page 23: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

VII. Equipment (1)

23

Scientific and technical machines and instruments (including computer equipment and office supplies)

Unit cost > 500 € incl.VAT

If purchase > 25.000 € and and not in the acquisition plan → permission of Belspo needed

Page 24: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

VII. Equipment (2)

24

invoice = 1 PC full → equipment if > 500 €

invoice = computer accessories→ operating costs « forfait » if unit cost < 500 €

Page 25: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

VII. Equipment (3)

25

No Office furniture

No acquisition after 31/12/2016

Page 26: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

VII. Subcontracting

26

For costs incurred by a third party

If not foreseen by the annex I of the contract → permission of Belspo needed

Limited to 25% of the budget of the promoter

Page 27: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

VII. Overheads

27

« Forfait » → no pieces of justification (no control by auditing)

Maximum 5 % of the total personnel and operating costs

Cover fixed costs for administration, rents, the depreciation of equipment, insurances

Page 28: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

VII. International partnership (1) 50 % co-financing

IAP Contribution:

- ± 100.000 € / network

- only for personnel and operating costs

- budget is added in budgettary table of the Belgian

partner

28

Page 29: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

VII. International partnership (2)

29

Expenses to the account of the IAP budget :

- Expenses incurred by the international partner :Expense claim on letterhead of the institution of the

international partner and signed by its legal representative

- Expenses incurred by the Belgian promoter :Invoices or expense reports relating to expenses

concerning the international partnership

Page 30: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

VIII. Financial regulations (1)

7 annual instalments: 2012 to 2018(independent of expenses)

The allocated budget is available during the entire period of the contract

Budget

30

Page 31: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

VIII. Financial regulations (2)

Within the same budget category:

- balances automatically transferred to the following year

Between different budget categories:- Form for the transfer of credits + approval by financial department (annex 2 of administrative guidelines)

Minimum 60 % personnel budget

Transfer of credits

31

Page 32: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

VIII. Financial regulations (3)

To be sent twice a year by the financial department of the institution

No expenses after the end date of the contract

Justification of expenses

32

Page 33: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

VIII. Financial regulations (4)

33

Page 34: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

IX. Reports (1) Initial report : before 30 November 2012

Annual reports :

Administrative part (personnel): Excel file Scientific part (research results and overview of

terms of cooperation)

Report for the evaluation : ?

Final report: before 31 December 2017

General summary of results

34

Page 35: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

IX. Reports (2) Dates of submission of annual reports

= 3 months after the end of each working year

for networks that started on 1 April 2012 : 30 June

for networks that started on 1 October 2012 : 31 December

Common reports for the whole network to be sent by the coordinator

35

Page 36: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

X. Dissemination of results (1) Publications, patents, posters, website,

announcements of conferences, power point presentations, ... :

- mention the Federal Belgian Science Policy Office as source of funding :→ This research has been funded by the Interuniversity Attractive Poles Programme initiated by the Belgian Science Policy Office

- use of logos: BELSPO, IAP, network, ...

36

Page 37: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

X. Dissemination of results (2)

Open Access (OA) : Declaration of Berlin (2003)

Publications in «on line» journals

Results of the research in the OA repository of the institution (Institutional OA Repository)

or in the OA repository of Belspo (soon available)

IAP final report in the OA repository of Belspo

37

Page 38: IAP-VII Information 09/11/2012 13/11/2012 IAP PHASE VII (2012 - 2017) Information sessions.

IAP-VII Information

X. Dissemination of results (3)

For datasets relating to biodiversity:

Belgian biodiversity platform

For cultivable biological material such as bacteria, yeasts, filamentous fungi, viruses, cells, tissues, plasmids,...:

Biological Resource Centre

in preference to the BCCM consortium(http://www.belspo.be/bccm)

38