I3 EURONS
Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005
Contract for the EURONS project has been signed (~14 M€)Project started on 1.1.2005 and ends on 31.12.2008 Coordinator and management team : GSI Scientific manager : A. Mueller (IN2P3) Project coordination committee (PCC)
comprises one representative from each activity 1st PCC meeting held at Funchal (Madeira) on 7./8.2.2005
General assembly (GA) comprises one representative from each institution 1st GA planned for September 2005
Status report of the AGATA joint research activity
EURONS : Integrated Infrastructure Initiative (I3) for Nuclear Structure 45 contractors and 33 other institutions from 27 countries27 activities: 8 Trans-National Access (TNA) to research infrastructures,
9 Joint Research Activities (JRAs), e.g. AGATA, 8 Networking activities
I3 EURONS
Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005
Presentation of all activities Activity information sheet (AIP) reporting every 6 months Monitoring the progress of the project (milestones & deliverables) Preparation of the (annual) reports (management & activity)
Discussion of management organization, payments etc. Executive board of the PCC was elected (3x2 members + manager) Advance payment from GSI in early March :
2/3 of request for the first 18 months’ period Yearly payments after submission of each annual report
Audit certificate needed from each contractor every 2 years check with your local administration
Consortium agreement (CA) distributed to all institutions Comments by the end of February Signatures needed by March 31st, 2005 “Late comers” will accede to the contract
Minutes of the first PCC meeting
I3 EURONS
Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005
Objectives: Development, construction, commissioning and evaluation of the first modules for an advanced gamma ray tracking array (AGATA) including digital front-end electronics and a data acquisition system capable of handling the gamma-ray tracking procedure
Description of work:Task T-J02-1: General Tasks
Subtask T-J02-1.1: Conceptual designSubtask T-J02-1.2: Subsystem commissioningSubtask T-J02-1.3: Prototype commissioning
Task T-J02-2: Detector module and infrastructureSubtask T-J02-2.1: CharacterizationSubtask T-J02-2.2: AssemblySubtask T-J02-2.3: Tests
Task T-J02-3: Local Level Processing systemSubtask T-J02-3.1: ElectronicsSubtask T-J02-3.2: Pulse-shape analysisSubtask T-J02-3.2: PSA evaluation
Task-T_J02-4: Global Level Processing systemSubtask T-J02-4.1: Trigger and system integrationSubtask T-J02-4.2: Gamma-ray trackingSubtask T-J02-4.3: DAQ
Task-T_J02-5: MC simulation and data analysisSubtask T-J02-5.1: Physics emulatorSubtask T-J02-5.2: Data basesSubtask T-J02-5.3: Analysis routines
AGATA JRA : Objectives and Tasks
I3 EURONS
Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005
Task Nr. 1 2 3 4 5
Task name General Tasks Detector module & Infrastructure
Local Level Processing
Global Level Processing
MC Simulations & Data Analysis
1st sub-task Conceptual design of the full AGATA arrayINFN Padua
Characterisation of asymmetrically shaped 36-fold segmentedGe detectorsUniv. Liverpool
Prototype electronics for analogue and digital signal processingCCLRC Daresbury
Global trigger, synchronisation and integration of ancillary detectors INFN Padua
Conceptual array design and Monte-Carlo simulations incl. ancillary detectorsINFN Legnaro
2nd sub-task Commissioning of all sub-systems Task leaders
Cryostat and pre-amplifier developments, detector module assembly and acceptance testUniv. Köln
Pulse-shape analy sis (PSA) algorithmsTU München
Gamma-ray tracking (GRT) algorithmsCSNSM Orsay
Databases for event data storage IPN Lyon
3rd sub-task Commissioning of the full AGATA prototype systemProject leader
Test benches and infra structure for “in-beam” tests, incl. ancillary detectorsIReS Strasbourg
Simulation of detector signals and comparison with experimental dataCEA Saclay
Data acquisition, and storage, run control, graphical users interfaceIPN Orsay
Generic data analysis routines Uppsala Univ.
Tasks and Responsibilities
I3 EURONS
Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005
Milestones : Short title Date due
Date accomp.
Remarks/ lead participants
M-J02-1.1 Conceptual design of the full array finalised 06/05 INFN-Padua
M-J02-1.2 AGATA demonstrator sub-systems commissioned 12/07 Task leaders
M-J02-1.3 Final report delivered to managing institution 12/08 Project leader
M-J02-2.1 Asymmetric Ge detector prototype characterized 06/06 U-Liverpool
M-J02-2.2 AGATA prototype triple-cluster module assembled 12/06 U-Köln
M-J02-2.3 Infrastructure for in-beam tests commissioned 12/07 IN2P3-IReS
M-J02-3.1 Prototype local level processing electronics delivered 12/05 CCLRC
M-J02-3.2 Pulse-shape analysis algorithms optimised 06/06 TUM/IPNO
M-J02-3.3 Pulse-shape analysis performance evaluated 06/07 CEA-DSM
M-J02-4.1 Prototypes for data acquisition hardware delivered 12/05 INFN-Padua
M-J02-4.2 Gamma-ray tracking algorithms optimised 06/06 IN2P3-CSNSM
M-J02-4.3 Data acquisition system commissioned 06/07 IN2P3-IPNO
M-J02-5.1 Physics emulator integrated in MC simulations 12/05 INFN-Legnaro
M-J02-5.2 Event data base storage commissioned 12/06 IN2P3-IPNL
M-J02-5.3 Analysis routines for event data commissioned 12/07 U-Uppsala
Milestones
I3 EURONS
Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005
Deliverables: Short title Lead contractor
Date due5
Datedeliver
ed
Type[ii]
Dissemination level[iii]
Remarks :
D-J08-1.1 Delivery of the full AGATA prototype system
CCLRC 12/07 R/PU Project leader
D-J08-1.2 Final evaluation report on the full prototype system commissioning
CEA-DSM 12/08 R/PU JRA coordinator
D-J08-2.1 Delivery of prototype triple-cluster module
U-Köln 12/06 P/PU
D-J08-2.2 Report on the characterisation of the detector module
U-Liverpool 12/08 R/PU
D-J08-3.1 Delivery of prototypes of digital signal processing electronics
IN2P3 06/06 P/PU
D-J08-3.2 Report on local level processing system and pulse shape analysis
IN2P3/TUM 12/08 R/PU
D-J08-4.1 Delivery of prototypes of specific data acquisition hardware
INFN 06/06 P/PU
D-J08-4.2 Report on global level processing system and gamma-ray tracking
IN2P3/INFN 12/08 R/PU
D-J08-5.1 Report on MC simulations and data analysis routines
U-Uppsala 12/08 R/PU
Deliverables and lead contractors
I3 EURONS
Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005
AGATA JRA participant(Nr. & short name)
Personnel Networking Overheads TotalEU
First 18 months
28. CEA Saclay1 24.000 9.440 18.560 52.000 21.000
1. GSI Darmstadt 36.000 15.000 10.000 61.000 26.000
3. GANIL Caen 24.000 7.667 6.333 38.000 13.000
4. Univ. Jyväskylä 0 17.500 3.500 21.000 7.000
5. INFN Legnaro 39.000 5.333 8.867 53.200 22.000
5. INFN Milano 47.000 6.583 10.717 64.300 27.000
5. INFN Padova 56.000 6.917 12.583 75.500 32.000
11. Univ. Sofia 0 10.000 2.000 12.000 4.000
17. Univ. zu Köln 46.000 9.000 11.000 66.000 54.000
20. TU München 50.000 5.000 11.000 66.000 30.000
23. NBI Copenhagen 20.000 7.500 5.500 33.000 24.000
29. CNRS/IN2P3 70.000 26.667 19.333 116.000 50.000
33. Istanbul University 0 10.000 2.000 12.000 4.000
35. Univ. Warsaw 12.500 25.000 7.500 45.000 24.000
36. NIPNE Bucharest 0 14.167 2.833 17.000 6.000
38. KTH Stockholm 45.000 5.000 10.000 60.000 16.000
39. Uppsala Univ. 45.000 5.000 10.000 60.000 16.000
40. CCLRC Daresbury1 27.000 13.000 39.000 79.000 27.000
41. Univ. Liverpool 45.000 20.000 13.000 78.000 33.000
44. Univ. York 21.000 9.000 6.000 36.000 19.000
Project Coordination (CEA-Saclay)
0 5.000 0 5.000 2.000
TOTAL 607.500 233.334 209.166 1050.000 457.000
Finances and first payment
I3 EURONS
Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005
Participant No. 28(Coord.)
1 3 4 5 11 17 20 23
Participant short name CE
A/
DSM
Saclay
GSI
GA
NIL
JYU
INF
N
U-Sofia
U-K
öln
TU
M
UK
BH
Personnel/PM EU PI EU PI EU PI EU PI EU PI EU PI EU PI EU PI EU PI
48 months 6 48 12 48 6 36 0 24 72 252 0 36 9 84 24 96 6 12
presently spent 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
next 18 months 3 16 6 16 2 12 0 6 30 96 0 12 9 36 12 36 6 3
Personnel / k€
48 months 24 36 24 0 142 0 46 50 20
presently spent 0 0 0 0 0 0 0 0 0
next 18 months 12 18 8 0 65 0 46 25 20
Other / k€
48 months 33 25 14 21 51 12 20 16 13
presently spent 0 0 0 0 0 0 0 0 0
next 18 months 12 8 5 7 16 4 8 5 4
Sum / k€
48 months 57 61 38 21 193 12 66 66 33
Presently spent 0 0 0 0 0 0 0 0 0
next 18 months 23 26 13 7 81 4 54 30 24
Activity information sheet
I3 EURONS
Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005
Participant No. 29 33 35 36 38 39 40 41 44
Participant short name IN2P
3
U-
Istanbul
U-
Warsaw
NIP
NE
KT
H
U-
Uppsala
CC
LR
C
U-
Liverpoo
l
U-Y
ork
Personnel/PM EU PI EU PI EU PI EU PI EU PI EU PI EU PI EU PI EU PI
48 months 24 192 0 36 12 72 0 36 24 48 24 48 11 96 12 84 6 24
presently spent 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
next 18 months 12 72 0 12 9 24 0 12 6 18 6 18 4 30 6 36 4 6
Personnel / k€
48 months 80 0 12.5 0 45 45 27 45 21
presently spent 0 0 0 0 0 0 0 0 0
next 18 months 35 0 9 0 11 11 10 22 14
Other / k€
48 months 36 12 32.5 17 15 15 52 33 15
presently spent 0 0 0 0 0 0 0 0 0
next 18 months 15 4 14 6 5 5 17 11 5
Sum / k€
48 months 116 12 45 17 60 60 79 78 36
presently spent 0 0 0 0 0 0 0 0 0
next 18 months 50 4 24 6 16 16 27 33 19
Activity information sheet (cont.)
I3 EURONS
Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005
Proposed Lines of Action (major role for RI) Continue and improve the current line of action on RI Reinforce RI action
adding new line for development of new ‘unique’ RI Vision. Roadmap for RI in Europe in the next 10-20 years. The Roadmap can have periodic updates and revisions.
Criteria for priority projects in Roadmap : Pan-European interest; potential impact on ERA; Size (>50M€); maturity of the project and timeliness; Existence of multi-annual and long-term budgetary planning, Quality of management.
AGATA has good chances to become a priority RI project
Research Infrastructures in FP7(as seen by the EC)
I3 EURONS
Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005
Nuclear Physics community should submit one I3, instead of I3HP and I3EURONS; but NuPECC is open for suggestions.
A committee should be formed soon to look into the various issues and ‘new’ criteria connected with I3 applications in FP7.
New design studies and new construction projects should be inventorised. Current priorities for construction: FAIR and SPIRAL-2 Other installations such as a “High-intensity stable beam facility” and other initiatives will be discussed later (according to M. Harakeh)
The AGATA collaboration must start defending its interests
Research Infrastructures in FP7 (as seen by NuPECC)