SUBJECT Weekly Progress Report(Control Valve Development Unit)Week Ending 13 March 1965
5636
14 Inch 275 PSI Diverter Valves - Coca (C . Holden)
The third and final valve was reworked to the new seal con-figuration,, tested and shipped to the stand.
8 Inch 275 PSI Diverter Valve - VTS-2 (C . Holden)
Two valves, for replacement of existing VTS-2 8 inch Pacificvalves, were reworked to the new seal configuration, tested andare available for installation.
!a Inch 1850 PSI Fisher-Vickery Cam Ball Valve - Bravo-2 (C . Holden )
The can ball valve successfully completed in excess of 3,00 cryo-genic actuations, It is scheduled for removal from the Bravosystem for examination during the next report period .
14 Inch Hydromatics Ball Valve - EFL. .2A (C . Holden)
EFL Task Request 111o . 28 for repair of the burned LOX tank valvewas completed in the SSFL Machine Shop on 11 March .
10 Inch 275 PSI FadleY Thitterfly Valve Evaluation (J . Garrison )
Initial cryogenic leaka ;;e tests were completed. Cyclin,• testshave been initiated.
1/}x Inch NAA Pneumatic Operated Valves - IiFL Gemini (D, :`nicer)
Sixteen 1/4 inch valves were assembled, tested and shipped toNFL this week.
1/4, 3/B and 1/2 Inch 5,000 PSI Hoke Pall Valves (D, Tyker )
FL11-5-6057 was issued as the evaluation report on the subjectvalves with recommendation the valves be placed on the-PreferredEquipment List .
].f 2 Inch 3000 PSI H'rdromratics Ball Valves (C . Browne )
A 1/2 inch valve was tested in excess of 12,003 PIG w'Ltho',tbursting to verify the It to 1 safety factor . The vendor erasunable to conduct this test at their facility .
I I I LII I LII IBNA00562456
HDMSPOO1809381
r
TO : E. G. Spencer Fi11~5 065F WY t J. Eo Hicks 15 Larch 1965S??3JECT: Weekly Progress Report Page 2
(Control Valve Development Unit)Week Ending 13 March 1965
6 Inch Mission "Duo-Check" Check Valves Vacuum Service (Km Tlaehki /Mitchell )
Results of helium mass spectrometer tests on two valv's Wereinconclusive. Other methods of measuring loa' a„e are beinginvestigated .
6 Inch 10,000 PSI Grove Valve for Hi Pc Pram (A . Pevan/?", Ross)
A D/096-211 representative visited Grove to examine the newgland packing design and witness tests . Gland parkin7 leakageof 1.5 cc/min. of helium was detected . However, a design errorprevented adjustment of the gland packing . The packing designwill be modified to allow for adjustment ,
h Inch Darling Cryogenic Gate Valve Evaluation (A . Hurwitz)
A 25R was sent to Purchasing to obtain a l inch valve on con-signment. Delivery will be approximately two (2) months fromreceipt of purchase order.
Inc), 6000 PST Hydril Ball Valve Evaluation (M . Ross )
The valve is being reassembled with new seat seals for furtherevaluation testing.
Comco Throttle Val"e ® CTL.V, Cell 2ri (G, Johnson )
Comco received the stem assembly forging ahead of schedule .a? in prloesfs On the stp ., e.-A :~t r=g o
J . F . HicksControl Valve Development snitAnalys ts Ar Equipment Section