I maxi 2014 en

34
Since 1969

description

Presentación

Transcript of I maxi 2014 en

Page 1: I maxi 2014 en

Since

1969

Page 2: I maxi 2014 en

QCD (Indicators: Quality – Cost – Delivery date)

Chain Value (Engineering – Welding - Machining – Assembly – Metrology)

Staff: 107 pax

Facilities surface: 6.000 m2

Turnover: 12,1 M€ (Export 30%)

Business Lines (Automotive – Aeronautic – Food and Auxiliar Industry)

General information

ISO 9001 ISO 14001

Page 3: I maxi 2014 en

Add Value

Industrial Solutions

Metrology

Engineering Welding

Machining

Assembly

Internal resources and capabilities to manage an industrial turnkey project

Page 4: I maxi 2014 en

Mechanical Engineering Projects

Electrical Engineering Projects

Automation Engineering Projects

Robotics Engineering Projects

Engineering

Page 5: I maxi 2014 en

Mechanical Engineering

Page 6: I maxi 2014 en

Automation Engineering

Page 7: I maxi 2014 en

Welding

Welding

Stabilizing station

Page 8: I maxi 2014 en

Welding

Page 9: I maxi 2014 en

Machining

Milling (up to 18 m)

5 Axes – High Speed Milling

Machining Centers

Lathes

Grinders

Capabilities

Page 10: I maxi 2014 en

Machining

Page 11: I maxi 2014 en

Machining

Page 12: I maxi 2014 en

Assembly

Adjustment & Tuning

Testing

Painting room

Assembly

Page 13: I maxi 2014 en

Assembly

Page 14: I maxi 2014 en

Assembly

Page 15: I maxi 2014 en

Metrology

Automatic Gantry CMM

Manual CMM

Laser Tracker

Romer Arm

Metrolog II

Page 16: I maxi 2014 en

Metrology

Page 17: I maxi 2014 en

Automotive

Special Machines

Robotics Cells

Welding Tools

Assembly Tools

Control Tools

Paint Tools

Out Flow preparations

Ergonómics Solutions

Maintenances

Page 18: I maxi 2014 en

Kuka X87

Automotive

MICHELIN Strieuse

NISSAN Weld Line F91G

PSA Tools B9

MICHELIN Machine covers take off treads

Page 19: I maxi 2014 en

Automotive

RENAULT Scapes welding Tanger

RENAULT Weld Tools body sides X87 RENAULT Automatic battery exchanger L38

MICHELIN PAP 22

Page 20: I maxi 2014 en

Automotive

RENAULT Punching guarnitura Roof X95

RENAULT Bumper Punching Romania

PSA Welding Tools Pisos B9

Page 21: I maxi 2014 en

Automotive

RENAULT Welding Pallets Box Sides X85

RENAULT Flats Box under X77 THYSSEN Hot forming Machine (steering rods)

Page 22: I maxi 2014 en

Aeronautics

Assembly Tools

Machining Tools

Moulding Tools

Drilling Tools

Assembly Jigs

Transport Tools

Page 23: I maxi 2014 en

ACITURRI Moulding Tools Spars A350 VTP

Aeronautics

Page 24: I maxi 2014 en

EMBRAER Assembly Jigs and Drilling Rear Fuselage 170-EMB EMBRAER Assembly Jigs Rudder 170 EMB

ACITURRI Assembly Jigs WFF KC390

Aeronautics

AERNNOVA Assembly Jigs Aileron KC390

Page 25: I maxi 2014 en

Aeronautics

AERNNOVA Spars VTP ACITURRI Spars VTP

ACITURRI Moulding Tools Atlante AIRBUS Curing Tool RTM

Page 26: I maxi 2014 en

Wind

Gear Boxes

Wind Turbines Parts

Page 27: I maxi 2014 en

Wind

MADE Turbine Cover 2 MW

GAMESA Box GEBOX Box

Page 28: I maxi 2014 en

Railway

Boggies

Renfort

Brake Discs

Axis

Page 29: I maxi 2014 en

Railway

Underground Programs:

Chile Caracas

Estambul Madrid

Train Programs:

Cerdeña Izmir

Sao Paulo Delhi

Medellin

Page 30: I maxi 2014 en

Industrial

Food Industry

Shipping Industry

Recycling

Packaging

Page 31: I maxi 2014 en

Industrial

SPR Tire crusher

ABR Ice Cutter

IBERSNACKS Bagging chips

MARTIFER Nodes domed stadium

Page 33: I maxi 2014 en

33

(4)

(1)

(2)

(3)

(5)

(7)

(8)

(9)

(11)

(6)

(12)

(10)

(13)

(14)

(15)

(16)

ESPAÑA (1) PORTUGAL (2)

MARRUECOS (3) FRANCIA (4)

INGLATERRA (5) BELGICA (6)

DINAMARCA (7) ALEMANIA (8)

REPUBLICA CHECA (9)

ESLOVAQUIA (10) RUMANIA (11) TURQUIA (12)

SUECIA (13)

BRASIL (14) INDIA (15) CHINA (16)

COREA DEL SUR (17)

Projects in the world

Page 34: I maxi 2014 en