I I I I I I I I I I I I I I I I I I I Report Godfrey 4-Corners Property Overburden Stripping, Sampling and Analysis Prepared for: Ken Pye By: True North Mineral Laboratories 475 Railway Street Timmins, ON P4N 2P5 CE/VED SEP 15 2009 GEOSCIENCE ASSESSMfMT

Transcript of I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey...

Page 1: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

I I I I I I I I I I I I I I I I I I I

Report

Godfrey 4-Corners Property

Overburden Stripping, Sampling and Analysis

Prepared for:

Ken Pye

By:

True North Mineral Laboratories 475 Railway Street

Timmins, ON P4N 2P5

CE/VED

SEP 15 2009 GEOSCIENCE ASSESSMfMT

O~FICE

Page 2: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

I I I I I I I I I I I I I I I I I I I

True North Mineral Laboratories Inc. Table of Contents

Table of Contents Introduction Property Description Access Work Program Methods Material Handling Results/Analysis Recommendations

Appendix I, II and III - Note

Appendix IV - Material Handling Process prior to analysis- methods and procedures Appendix V - Field Logs Appendix VI - Sample Coordinates- NAD 83, UTM, Zone17 Appendix VII - Analytical Results - Actlabs Appendix VIII - Daily Logs Author Qualifications and Experience Report Completion Date

Lists of Figures and Tables Figure 1 - Location and Access Figure 2 - Sample Locations Figure 3 - Claim Locations and Key map

Page no.

1 2 2 2

--2,6 and 7

7 --

7 8 8

9

10

! 11t015

16 17 to 20

21 i 22 and 23 i

24

1 I 3 I 4

5 ,

I

I

I

i I !

Page 3: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

I I I I I I I I I I I I I I I I I I I

Introduction

Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen Townships, Porcupine Mining Division, near Timmins, Ontario.

This report covers overburden stripping, sampling, sample processing and analysis carried out between Sept 4,2008 and Sept 9,2009.

Property Description

Claim Numbers 3015806, 3015807 and 4223131, are located in Godfrey and Bristol Townships, Porcupine Mining Division, approximately 25km driving distance from Timmins.

Refer to Figure 1 (Location and Access map) for more detailed claim locations.

Access

The property is accessed from Timmins by travelling West on HWY 101 to Malette Road. Refer to Figure 1 (Location and Access map) for more detailed access information.

A Komatsu PC-120 excavator was used to strip overburden in September, 2008. The Komatsu was floated to the property via Malette Road and walked along an existing trail approximately 150m to the work site.

In August, 2009 a 4x4 A TV was used on the same trail to retrieve 18 samples.

Work Program

Overburden stripping, using Komatsu PC-120 and Wajax pump equipment was carried out between Sept 4th and September 15th

, 2008.

The purpose of the work was to expose bedrock so that sampling could be carried out. A daily log for the stripping work is provided in Appendix VII/. The location and extents of stripping is shown on Figure 2 (Sample Location map)

Overburden stripping was carried out by Steve Anderson. Komatsu PC-120 was hired on a contract basis, managed by Steve Anderson. Daily logs in Appendix VIII provide more details.

Page 4: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

-------------------Figure 1

Location and Access scale

Page 5: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

- - - - - - - - - -~

---------- --- ---'-- ------ 01 ' --- ---N5,366,775 ---

~ neh ---- ------- -------- ---- ----

!i'

New Stripping 1, 500 sq.m.

NS,366,7S0

N5,366,725 0 Ll'l Ll'l r-... 0'> 0'> Ll'l Ll'l Ll'l Ll'l '<j- o;t W W

- ---- --- ---

- - - - - -

--- -----'0

-----'C

-----C)

---------- -----Old Pit -...... -...... -- Old r

'-.... /' rene!) --- ----- -----

Figure 2

Godfrey - 4 Corners Property

Sample Location Map August 15, 2009

""""---o 5

Scale

111 N o \£)'

Ll'l o;t W

15m

-

Page 6: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

-------------------Figure 3

Claim Locations and Key Map Godfrey-4 Corners Property

Scale

•••

I • I.· .

Turbt5ull

Coordinates are NAD83, UTM, Z17 ~ . ..

• •

• • •• "I I .. Ii.. ,. •••• It"

• .-• 301 07 •

r ' ", '::ON '

w NS,36

• 6114 • 51 147 Bristol

... .. 4245128

Page 7: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

I I I I I I I I I I I I I I I I I I I

Work Program .... continued

True North Mineral Laboratories I Actlabs-Timmins was hired to map and sample the stripped area. The site was found to be clear of overburden and well washed down to bedrock. Total area stripped was 1500 square metres, as shown in Figure 2 (Sample Location map).

Overburden piles surrounding the stripped area confirm and suppont the 4 to 8ft overburden thickness described in the daily logs.

Field sampling was carried out during 2 property visits, on August 1:3th and 14th,

2009. A Grub-hoe I rock hammer was used to retrieve samples.

Photo of sample KC-640

Sample information and further details are located in Appendix V.

Page 8: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

I I I I I I I I I I I I I I I I I I I

Work Program .... continued

Sampling and laboratory work was carried out by True North Mineral Laboratories I Actlabs -Timmins, on a contract basis for the claimholders. Refer to Figure 2 for more detailed sample locations.

Sample Field Logs can be found in Appendix V. Sample Coordinates can be found in Appendix VI.

Methods

Field

For the sampling methods described below, all materials were bagged, labeled and logged in the field then delivered to True North Mineral Laboratories.

Rock Hammer and Grub Hoe

18 samples were retrieved using grub hoe I rock hammer.

2 sample lines (L 1 and L2) follow quartz veins, or series of smaller quartz veins. Other samples are grab samples taken across the stripped area, normally where quartz veins were present, but not long enough to warrant a line of samples.

Host rock surrounding quartz veins was found to contain abundant (pyrite) mineralization. Effort was made to retrieve samples that contained significant % host rock. Samples were typically between 10% and 60% quartz, as described in sample logs found in Appendix V.

Sample weights were between 0.5kg and 2.2kg and the goal was to obtain reliable gold values across the stripped area.

Material Handling

Handling of sample material was carried out by True North Mineral Laboratories I Actlabs - Timmins on a contract basis for the claimholders. A general description of material handling prior to analysis can be found in Appendix IV.

A split portion of the 18 samples was sent to Actlabs-Ancaster (Activation Laboratories) for gold assay. (Fire Assay with Atomic Absorption follow-up)

Page 9: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

I I I I I I I I I I I I I I I I I I I

Results

Three samples show exceptional gold values, namely sample KC-640, 641 and 642, which are adjacent samples on Line 1.

Analysis

Analytical results can be found in Appendix VII, along with Certificate of Analysis from Activation Laboratories.

Recommendations

Quartz veins on surface and surrounding host rock have obvious mineralization. Analytical results demonstrate that the mineralized rock contains significant amounts of gold.

The area stripped under the current program is very small, relative to the property as a whole. The Author recommends further overburden stripping and sampling, in order to expand upon the positive results of this program.

Future sampling and mapping would help to design a drill program, which would be the next logical step, as the current program was limited to surface sampling.

8

Page 10: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

I I I I I Note:

I Appendix I, II and III I I only apply to Kimberlite Reports

I I I I I I I I I I I 9

Page 11: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

I I I I I I I I I I I I I I I I I I I

Appendix IV - for Geochem

Till Samples

Samples are dried in a laboratory oven for 24 hours, then dry-sieved using a #80 Tyler mesh sieve. Samples originally retrieved / processed for kimberlite indicator minerals, normally have all -70 Tyler mesh material separated already, in which case the -70 fraction is dry-sieved using #80 Tyler mesh sieve. If volume exceeds the typical 100 to 125g portion required for most geochem, material is split using riffle splitter to ensure a representative and homogenous portion.

Rock Samples

Rock samples are dried in a laboratory oven for 24 hours, then crushed, split (homogenized) and pulverized, according to published Actlabs' standards. (typically pulverized to 85% passing a 75 micron sieve)

10

Page 12: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

I I I I I I I I I I I I I I I I I I I

Sample # Kc-<o35

name: KC/LW 7

date: AUG·13/os I

project: GODF~£Y

Location: (Nad 83, UTM, Zone 17)

Northing: 51 '3(O~. -=r59 . Easting: 455,8.95

Location: (Local grid reference)

SAMPL..E LU-.le :1 J Ow Sampling method: RocK. t-\Ar-Ir1~

Depth: 5u~Fp..c.r:::....

Comments: -AppRo" r \, Q'z· Vt:JN

- SAMPL..£ L...JNE.. i IS 17·5,." Lo~ AND 5A""YI-e..5 SflAa..L.oW '-RSr-JCU (FRoM S'T'RI f'.pIN~

- 5AMPt-E C -~3.S Is filts-r $AMP/,,£ ON L..:1, AT" ow

- PHo-rO

Sample # KC- fo'3=t-

name: Kc.LLW • date: A u~· 13L0 9 •

project: GoDFRe:y

Location: (Nad 83, UTM, Zone 17)

Northing: 5,3~~l -=r<D I Easting: 455, !:7.90

Location: (Local grid reference)

L~ I 5-0""'-./

Sampling method: F(oCK l-IAt-J,...., E!S.

Depth: SuItFA('£

Comments: -~O-·I. Q'z.. J vv P'l'f'ITE

Sample # KC-<D3Co

name: KC/LW date: AUG 13Lo!!} • project: GODF"REY

Location: (Nad 83, UTM, Zone 17)

Northing: 5,3~~ I -=rroo Easting: 455, .993

Location: (Local grid reference)

L1. I 2-5w i

Sampling method: Roc~ t4A.HMC R

Depth: SURF"Ac..E

Comments: - 50/. QTZ- J W .pvP.. I'T£

- SA""f'L..E: TA~EN 2·5M V\.!(S.!S. ... of PREVo

SAMI't-€ / .@f. f::1'1

Sample # KC - <038

name: KC!Lw date: Au~ 13Las I

project: GODF~E'T

Location: (Nad 83, UTM, Zone 17)

Northing: 5, 3~<Ol '"rCa I Easting: 455, ses

Location: (Local grid reference)

L~ ,I i-5w

Sampling method: RocK. f..l.Ar--tM£ ~

Depth: 5u~FAC.£

Comments:

- ~o·?, QTZ-, W Pi R \'\ E.

1\

Page 13: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

I I I I I I I I I I I I I I I I I I I

Sample # KC-(Q3.9-

name: KC./LW date: A!,.!G 13/08 I

project: GODFREY

Location: (Nad 83, UTM, Zone 17)

Northing: 5,3~<Ol -=rCo2-Easting: 4-55,980

Location: (Local grid reference)

1-1. I lOw

Sampling method: ~OCK ~At-'l,......£g

Depth: SURFA-c.E.

Comments: - 10/. QTZ; W P'CR I "IE..

- P~o .. o

Sample # K'c - ~4-1

name: Kc.. /LW date: AU(2 13LOfJ I

project: GODFREY

Location: (Nad 83, UTM, Zone 17)

Northing: 5, 3(Q~l '"::f- '-3

Easting: 455,.9~ I

Location: (Local grid reference)

L:1., 15w ,

Sampling method: ~OCK" I-l A r-tt,"\ e is

Depth: SURFACE

Comments:

- 40/. G2TZ..J W P'{~ ITE..

Sample # KC-~40

name: KC!Lvv date: A uG 13/0.9-

project: Got>F~EY

Location: (Nad 83, UTM, Zone 17)

Northing: 5, 3 ~dol -:r (02-Easting: 4551 383

Location: (Local grid reference)

L:1. J 12'5w

Sampling method: Rock' I-J.A,....,~~~

Depth: SUBFAC'£_

Comments: - 50/'. 4lT~1 W P .. (f~.ITE

- PH-oTO

Sample # KC-(Q42.

name: KC/Lw date: Au<::, 13L0 9 I

project: (;oCFREY

Location: (Nad 83, UTM, Zone 17)

Northing: 5, 3 <0 b l "T <04---Easting: 4-55, 8-:[-8

Location: (Local grid reference)

L1 t 1-:r'5w (. .. £ .... 0 L.:t.) •

Sampling method: J:{OCK WAMM£~

Depth: SUj;ZrAcE

Comments:

- 4-c/. GT"Z-}W P'fR 1"lE.

t2..

Page 14: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

I I I I I I I I I I I I I I I I I I I

Sample # K'c- (0+3

name: KC/LvV date: AUG 14Los . project: GODFFZ£'1'

Location: (Nad 83, UTM, Zone 17)

Northing: 5/3<Ob l 7-53

Easting: 455, .991-

Location: (Local grid reference)

5AMPl-E LI,...,E- 2. IO W .

Sampling method: J;(OGK: I-+At-v-1cfS

Depth: 5LJREAC£

Comments: -ApPROY- 3/4-" Ve:.I,-.J -APPEp\;~S LESS M,/'-J6AAL.lz..lO 1""/-IA,... V~It-J.5

FoI..U-'D Or-o I--::L - SAMf'L-C KG -~+3 Is FiRS"'- SA,...., PI.,£

0,...., L..2.,) A-r Ow

- L2.. I~ 15M Lot--lG Af"'P SAMPI.-IE"S A ) ,S,;,R,"S of :s,...,AI-I- QTZ,.. V€Ir'5> (1ct-7 34"

Sample # KC-~45

name: KelLIN date: A u6 14- /(J,9 •

project: GoP Fl<.E,(

Location: (Nad 83, UTM, Zone 17)

Northing: 5, 3b6l 'T4-:r Easting: 4-55/ .9B3

Location: (Local grid reference)

L2) lOW

Sampling method: ROCK I-+AMM~f

Depth: 5uRFAc.e.

Comments: I '\ V - i2 Q-rz. iSi N

- A€c.~~ BROKe,..., OFF WER~ <461· QTZ-

Sample # I<C - c044-

name: I<C. LI-w i

date: AUG 14!o,j-,

project: GoDF"~E1

Location: (Nad 83, UTM, Zone 17)

Northing: 5, 3<O<Ol +50 Easting: 455,98=r

Location: (Local grid reference)

L2. I 5\1\/

Sampling method: ~oc.K t!AM~e;g

Depth: .su 1lF"A-c.£

Comments:

- ..34 ~V€Ir-J - Pt~E=-~ g~oK£t--I-ot="F W~R~ ':::401. QTz,.. - PHOiO

Sample # I< c- Co4-~

name: KcLLW date: Au" 1+/0 $ . project: GODF"P.E)'

Location: (Nad 83, UTM, Zone 17)

Northing: 5, 36~l -=r4-+ Easting: 4-55, .9-=1-.9

Location: (Local grid reference)

L2. 1 15W

Sampling method: ~oc.K I-tAt-'1M~g

Depth: 5URFACE..

Comments: - V'2 h Q'T2. VEIf'J I W P'r'Fi:.!lE:

- PI£C.€,S .:::: 4-0/. Qiz..·

Page 15: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

I I I I I I I I I I I I I I I I I I I

Sample # K' c - <o4::r-

name: KeLLIN •

date: AU6 14 /o.s

project: GODFR.Ey

Location: (Nad 83, UTM, Zone 17)

Northing: 5. 3'=>~l -=fz=r Easting: 45~,oo8

Location: (Local grid reference)

Apf'~~ 31-M SoC.1T"f+ OF L-z-/ON Sampling method: Roc.K HAMMEg:

Depth: SURF"A-cE

Comments: 2' II - YZ QTZ. V~Ct--I

- L£s>S r-11""6~A ... I'Z..£D -rHAN 1--:1.. o~ L2. - S Ol""\ E M I,...., E.P.A 1.-11. A'f"IOJ'-j A-t- Cor-'TA (.,

- SAMI'I.-£ APtR.o"" 4-0% QTZ.·

- PH-OTC)

Sample #

name: date:

project:

Location: (Nad 83, UTM, Zone 17)

Northing:

Easting:

Location: (Local grid reference)

Sampling method:

Depth:

Comments:

Sample # KC-(o+8

name: k.c L£-vv I

date: 4 u~ 14- / CJ:i. I

project: GODFREY

Location: (Nad 83, UTM, Zone 17)

Northing: 5, .3b~l "TIl Easting: 455, eTa

Location: (Local grid reference)

Af'PR.O,)£ 33M .sOI.1TI-I- 0 F LZ/15w I

Sampling method: 1=<0c.1<: H~""M6 R

Depth: ~:efBO~ I ·S!:::)

Comments: _ A WATe~ SUMP VV,a..s E"CAVA"-€D D(J~If'.6

5'T'~IPPIr-J6 . - No Gl-rz. VEIr-J VI!:.IC>L-E. Ot--l SoItf"AC.E:

WI-rHU"" 51"\. OF SUMP I Du~ ""rO C~'( 0\;8·

- 5EI.rE;;IloAL- ~oc."'.s PItE-~6""'TI FIlOI\'\. SuMP £Y-CA V·

- '/:hfYIl Q'T"Z J BuT P"tltlTC VtS.OL-E ;> 2.0,. - PHOTO

Sample #

name: date:

project:

Location: (Nad 83, UTM, Zone 17)

Northing:

Easting:

Location: (Local grid reference)

Sampling method:

Depth:

Comments:

14-

Page 16: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

I I I I I I I I I I I I I I I I I I I

ApP6NPI-,<.. y Sample # 2 Sample # 4-name: k'eILIN date: AUG 1+/08 name: KC.Lt-w • date: AUG 14/a.:t

project: GoPFFllSY project: GODFREY

Location: (Nad 83, UTM, Zone 17) Location: (Nad 83, UTM, Zone 17)

Northing: 5, 3~Col "T3+- Northing: 5,36<0,( T?""T

Easting: 4-55 J.9 88 Easting: +55,951

Location: (Local grid reference) Location: (Local grid reference)

APfflo-J.. 1 bM Sovrw J L~L.5W 29"" 'Np! •• of L2/ 15~ I I

Sampling method: ~O'K I--IAMMEg Sampling method: ROGJ( I-lAI-1I'-'1E"/?.

Depth: SUP..FAC.£ Depth: SURFA-CE..

Comments: Comments: - GRE~ -r'''''6~ -50/. QTZ,...

- .9S /. ~-rz.. - Pa'Pc£EOD ~ RO!'T'f SfcrrS - NOT"" MuC.H J'V\ .,..J6I2A ..... "Z A-T""I ~

... ~ AN D. "" GItAB* - R~DOr-\ GIE-A!3

Sample # Co Sample # Ie

name: KcLI..W • date: AU6 I~ {OJ i

name: KeLLIN • date: AUG 1+/05

project: GODFReY project: GOOFR~'f

Location: (Nad 83, UTM, Zone 17) Location: (Nad 83, UTM, Zone 17)

Northing: 5, 3"'~1 -=r4-4- Northing: 5, 3(Q~ l ":f42..

Easting: 455(S~3 Easting: 455).983-

Location: (Local grid reference) Location: (Local grid reference)

Afffto)t . Ipl'""\ Wt:~'T of" 1-2 l/5w 8M 501.1'it\ of L2.Lsw i I

Sampling method: RocI' -WAM MEg, Sampling method: ROCK HAMMER

Depth: SuRFAC£ Depth: ..sURFACE"

Comments: Comments: - 95}. QIZ- - ~B' Q-rz.. V{:I,.... I~SlDC-

- GlZ.r~ N "'-\t .. .1 G e. ~/~/. Gtrz·

- ~AI"'<DoM ~AlS - L.6HT GIl.~~ 'T,f'J6E

IS

Page 17: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

-------------------True North Mineral Laboratories Inc.

r---~.-----.~-- ~-- ... -- -.~ --' ~-----. ~--~

~. __ ~_. ___ . ___ ._ . ___ . ______ Appendix VI .. __ . ___ ~ _ Proj~ct: Godfrey ~.:.~~rners

~- .---.--~.-------

Client: Ken Pye Sample loc-ations - NADa3, UTM~ Zone-17 calculated based on cufgrld locations--~'- ---.. -- ---~ - ---

.~.- .. -~~ -_ .... ~ -~~-. -'--- - ---~ ---~.---- .. -~ .. -~ .. ---. ..~--~ ... - .. ----

r--' - - .----~-. -f-- ~- ---- -+-- --.. ----.----~----.- ----- .. -Local Grid Local Grid ~Tf\.I1_NAD8~, ?one 17 ~ ~ UTM NAD83, Zone 17

Easting Northing Northing Easting r------------' ~-t---.--~.-~-. --f----. --- ---.' .. ----f-- -~ --------=-~-___I

g_odfrey _ 4 Corners Prop. KC-635 455995 5366759 --.f- .----. -.-----~ -.~-- .- - .. -.~-f___--.- .. -.--~ -"'--- -' ~--- ---~---~--. -.------1

Project Township Sample No.

Godfrey.. 4 Corne!~ ~rop-=-_ KC-~~__ __ . __ _ -f---" 455~93 __ _ ._.~~667~9 Godfrey 4 Corners Prop. KC-637 455990 5366761 f--------. - .. -\----. . ~. ----~.-~--f_-~ ~ - --~ -~ ~-.-... ---.- ~-

Godfrey 4 Corners Prop. KC-638 455988 5366761 -'--'- .. ~~---- ---'-"-- '--' _._.' ~ ~- -_. ~ ------- _._.- _ .. ~ ----- ._- - - ----

Godfrey 4 Corners Prop. KC-639 455986 5366762 -----. f----~ .~- --~-~ .. - ---. ~ ~-I--- ~- -- -. -- -- .- -.~

Godfrey 4 Corners Prop. KC-640 455983 5366762 f-~----' ----\----.. ~---.- - .. ~- -- ~ - -.~-~- - ~-I--.~~-.- ----~ .. ~-. ~----'--~ - ---~----

Godfrey 4 Corners Prop. KC-641 455981 5366763 r---~--" --' ~ f----.~-~.--~ ~- .. ~.---.-- -~- _. ~ - . ----

~()<!frey 4 Corners Prop. ~~ KC-642 455978 5366764 .----~~ - --.-~ ----.----... ~- ~.--~---1

_ Godfrey 4 Corners Prop. KC-643 455991 5366753 6"' Godfrey 4 Corners Prop. KC-644 455987 -- ~ 5366750

~:~~-'}~:~:~I~~~;=> ... - ----~ ----:~HH~~H:~~ - - --' r---- -'~-' .---.. -~~----__t_-~--

Godfrey _ ~ 4 Corners ~Eop._ !5f-648___ . ___ ... _~__ ___~5597.!! ___ 5366711 Godfrey 4 Corners Prop. 2 455988 5366734 --.~- ----~ .. _--_._. __ ._- '-~ ----.. ~ . - -~ .. ---~~- .. -- ~--~ - - ... ~~----- ~- .~---

~()~!rey _ 4 Corners Prop.___ _ _ __ ~ .. _~___ _ __ . ~._.~ ______ ~ ___ ~__ ___ 455951 ____ _ ____ . ~~66737 Godfrey____ 4 Corners Prop.~___ _ 6 ... _,___ ___________ __ ____ 455963_____ 5366744 ~()cjfr~L____ __ ~ Co£ner~_Prop. __ .~ ___ !2-_ . __ _~..__ . ___ .____ _ ~. 4559!!Z . ___ ... _ 5366~

-_._---- ~- ------~--- ---.- ~.~ --- --_._--+--. -----~ ---~.-- --~-.- .. ---.-

.. ~--- -.~ ---- -- -_. - - ~.-- . -- ---~~ .. -~ ----... - -.~-~-~

~ --~-~.- ---'- -~. ~--- .. -.---.-. \--.~-- -'-' ~ -- ~ .. ~- -~~ ~ -'-'--- -----

.~ -I-~-~-~ ~ ~'~~-r-- - --.... --------~

r---~~ ~ --... -'- ---. ~----f-----~. ---~- . __ . -I------~ .. ---~.-----~

t---.. - -- --~---- -~.--- --.---+ ----.-t---~-~-.-- -+-- - -.------~~-I--~~----- - ..

Page 18: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

I I Appendix VII

I I I CF Microprobe I I And/or

I I Actlabs

I Analysis

I I I Certificates and Details I I I I I r=r

I

Page 19: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

I I I I I I I I I I I I I I I I I I

Quality Analysis ... Innovative Technologies

Date Submitted: 17-Aug-09

Invoice No.: A09-4457

Invoice Date: 28-Aug-09

Your Reference:

True North Mineral Laboratories

475 Railway Street Timmins Ontario P4N 2P5 Canada

ATTN: Kevin Cool

CERTIFICATE OF ANALYSIS

18 Crushed Rock samples were submitted for analysis.

The following analytical package was requested: Code 1A2 Au - Fire Assay AA

REPORT A09-4457

This report may be reproduced without our consent. If only selected portions of the report are reproduced, permission must be obtained. If no instructions were given at time of sample submittal regarding excess material, it will be discarded within 90 days of this report. Our liability is limited solely to the analytical cost of these analyses. Test results are representative only of material submitted for analysis.

Notes: If value exceeds upper limit we recommend reassay by fire assay gravimetric-Code 1A3

ACTIVA TION LABORATORIES LTD.

CERTIFIED BY :

Emmanuel Eseme . Ph.D.

Quality Control

1336 Sandhill Drive. Ancaster Ontario Canada L9G 4V5 TELEPHDNE +1 9056489611 or +1 8882285227 FAX +1.905 648 9613

E-MAIL ancaster@actlabslnt com ACTLABS GROUP WEBSITE http./Iwwwactlabslnt com

I 16

Page 20: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

- - - - -r:U~~I~t:;:;b~1 ~~ ;~ ~:n:~-- -Detection Limit 5 0 03

I\n~l~sis Metho~_~~A~F":~~

KC-635

KC-636

KC-637

KC-638

KC-639

KG-640

KC-641

KC-S42

KC-643

KC-644

KC-645

KC-646

KC-647

KC-648

10

<5

23

<5

'> 3000 27.7

> 3000 53.9

2310

<5

< 5

<5

32

96

54

<5

< 5

< 5

- - - - - - - - - - - - - -Activation laboratories ltd. Report: A09-4457

Page 2 of 3

Page 21: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

- - - - - - - - - - - - - - - - - - -Activation Laboratories Ltd. Report: A09-44S7

r----~-------- - --_._-

Quality Control

Analyte Symbol All Au

Unit Symbol ppb g/lonn8

Detection Limit 0.03

Analy~is_Method _ FA-AA FA·GRA

CDN-GS-S8 Meas 495

CDN-GS-S8 Cert 483

OxC72 Meas 202

Oxe72 eM 205.00 KG-641 Ong ;> 3000 525

KC-541 Dup ;0 3000 553

60rig <5

6 Dup < 5

100ri9 < 5

10 Split < 5

Method Blank Method < 5 Blank

Method Blank Method .::: 0 03 Blank

Page 3 of 3

Page 22: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

------ - - - - - - - - - - - -ApP6f'JDI"t-. VII l

______ ___ ______ _____________________ Daily Log - Overburden stripping and washing Note: Hourly rate for Komatsu-PC~120Ts$1507hrwith Operator. DailY Rate forWC-Caj""'ax-pu-m-p is $500 'day with Oper~------------

-- ----:J=R~---- --- --- ----- -----~-----=-------~-------=----=~- -----=--==-~------------=----===~---Date ___ Kot1ia~~PC-1201~aia.x Pump Notes and Observatlons---- ----------- --------- --Sept 4/08 _ _ _ 12 Mobilized Equipmen(fIOatexcavator to site. Walked-excavator 150lTltosita:-Startedexcavati ng.------------Sep~_5!08 12 --- - --- EXcavate between 4ft and 8ft thick overburde~drock with quartz veins observed. --- ------ ---Sept 6/08 12-- --- 10 Excavate between 4ft and 8ft-thick overburden. Wash using Wajax pump. Bedrock withqUartZ-velrlSObserved. Sept 7108 -=-==_12 _~~xcavatebetween 4ft and 8ft thf~Enoverbu~den. Wash using WajCiXpump. Bedrock with quartz veins observed. Sept 8/08 12 ____ ~ Excavate between 4ft and 8ft thick overburden. Wash using Wajax pump. Bedrockwith quar12:_"eins observe.~ __ _ ~~pt 9/0~ 10 Continued washing bedrock. Quartz veins with mineralization observed.

-------r-:;.---------- ---------------- - --------------- -------- --------------Sept10{q~ _ _ 10 Continued washing bedrock. Quartz veins with mineralization observed. ---r------------ - --- ----------- ----------------- --------- - -------- ------ ----Sept 11108 Sept 12!9§ Sept !3/08 Sept~4/08 ~eet 15/08

12 12

---- --------Excavate between 4ft and 8ft thick overburden. Bedrock with quartz veins observed.

----1-=-------------- --------- -------------- ------------ - ------ -----E.x_cavate between 04.!tand 8ft thic~~v~r~.tJrden. Bedrock with quartz v~in~_~~~~rved. Demo~_ Komatsu_~y float: _

10 Continued washing bedrock. Quartz veins with mineralization observed. -c-::------ ------------------ -------------- ----- --19 Continuec:l'!yashi!l~ ~e~r~~. _Quartz veills with mineralization observ~~,--____ ___________________ _

-

Page 23: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

I I I I I I I I I I I I I I I I I I I

Author: Kevin Cool *Oate corrected from previous version: Rev10ec2812008

Qualifications and Experience

1982 Graduated from Timmins High and Vocational School

1983 Studied photography at Humber College, Toronto, Ontario

1984 to 1988 Worked for family owned transportation business in Moosonee, Ontario

1988 to 1990* Studied Survey at Northern College, South Porcupine, Ontario

1990* Graduated with Survey Engineering Technician Diploma

1990* to 2001

Owned and operated General Surveys and Exploration based in Timmins, Ontario. The company provided contract survey, computer and information management services to the exploration and mining industry. Software includes Acad, Gemcom and Surpac, with specialization in using computers for the mining and exploration industry.

Work included volumetric survey of land areas to be used as tailing basins, where computerized 3D models were utilized. Diamond drillhole, underground engineering and mechanical design/construction surveys were common contracts for mining and exploration companies. Significant accomplishments include the design and construction of the 11 Okm winter road from Attawapiskat to the Victor Project.

Clients included;

De Beers Canada Exploration (Monopros), Southernera Resources, Dome Exploration, Placer Dome Detour Lake, Musselwhite and Dome Mines, Exall Glimmer Mine, Claude Rundle Gold Mine, TVX Mines' projects in Northern Greece, Moneta Porcupine Mines, Black Pearl Minerals, St. Andrew Goldfields, Battle Mountain Gold, Pentland Firth, Kinross Gold, Band-Ore Resources, McKinnon Prospecting and many other companies and individual prospectors.

2000 to 2005

Began collaborative work with Brian K. Polk (Polk Geological Services) and established a private exploration company called Big Red Diamond Company. This small company began to stake property near Attawapiskat and Coral Rapids. Eventually the survey business was put aside to focus full time on diamond exploration.

Big Red Diamond Company entered into a Joint Venture with a private company owned by Dr. Charles Fipke of Kelowona, B.C. on a group of properties near DeBeers' Victor Project in the Attawapiskat region. Dr. Fipke is the renowned geologist who found Canada's first diamond mine, the Ekati Mine in Northwest Territories.

continued

Page 24: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

I I I I I I I I I I I I I I I I I I I

Since 2001 the author has been exposed to all aspects of diamond exploration including;

Claim staking, field work, camp construction, airborne and ground magnetometer survey, planning and management of large scale geophysical programs, planning, management and interpretation of regional and property scale sampling programs.

Exposure to the industry includes training and field work under the discretion of Dr. Fipke. Introduction to kimberlite mineral identification from Dr. Fipke was expanded by personal research and study, which continues to current and lead to the establishment of True North Mineral Laboratories in Timmins, Ontario.

Advanced analysis, beyond the stage of heavy mineral separation, or observation using binocular microscope, is handled by other certified analytical laboratories, such as CF Minerals, of Kelowona, B.C.

2002

Big Red Diamond Company became a publicly traded corporation.

The author is one of the co-founders of Big Red Diamond Corporation, which trades on the TSX Venture Exchange under the symbol DIA.

The author continues to actively stake mining claims and process sample material for private and public companies.

2005 to Present

Established True North Mineral Laboratories, at 475 Railway Street, Timmins, Ontario and added Actlabs-Timmins in early 2006. Lab processes, equipment setup and procedures are now supervised by Actlabs, based in Ancaster, Ontario.

The management and employees of True North Mineral Laboratories I Actlabs-Timmins, receive ongoing support and training directly from Actlabs - Ancaster. The laboratory processes fall under Actlabs certification, providing analysis is carried out by the main facility in Ancaster. In this capacity, True North Mineral Laboratories acts as a preparation facility for Actlabs and is qualified to handle material preparation prior to direct analysis by Actlabs.

2.3

Page 25: I Godfrey 4-Corners Property · I I I I I I I I I I I I I I I I I I I Introduction Godfrey 4-Corners Property sits at the intersection of Godfrey, Bristol, Turnbull and Carscallen

I I I

TRr NORTH MINERAL LABORATORIES

I 475 Railway Street Timmins, ON

P4N 2P5

I Phone (705)268-0303 Fax (705) 268-1098

I I I Report Completion Date:

I I September 11, 2009

I I I I I I I I 2.4-

I