: I !Liz Leacy * j I* ' Subject:) Attachments: FW: Becton Dickinson PO648-02 - Economic Feasibility Installation Cost l.pdf; Installation Cost 5.pdf; Installation Cost 2.pdf; Installation Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3.pdf I '0 Kelly [mailto:[email protected]] 2016 14:51 1 1 Current Rudningcosts per annum 4ower 1 €1,577 Gas €7,500 Mains water €130 4 I < Hi Orla, ' I ' I While BD consider that it is not technical feasible to install a system to capture the remaining solvent vapour, a preliminarylcost benefit analysis was carried out to assess the economic feasibility. The cost of installing and runnijlg the existing carbon adsorption plant was used as a basis for this analysis on a conservative basis as any /lew/hdditional abatement plant installed would most likely be much larger and therefore more expensive to install '$md o'perate tdan the existing plant. The capital cost of installation of the existing plant is given in terms of actual cost in 2007 and have not been gdjusted for inflation in order to take a conservative approach. The total project cost was in the region of €1.5 I million with' a breakdown as shown below. Quotes etc. for the larger line items are attached. : I I _. ' I I 1 F ' ' ;: *i I ,I :I !Solvent Abatement Plant Project Costs * I Quote ,, " €IO00 No. 11 1 i. 1 karbon adsorption plant 820 1 , .. I Mechanical services to abatement plant 1 254 I 21 I Vapour collection Mechanical works I Cladding & Civil works I 160 I 4.5 I I 'Misc. works I 90 I I ~ ~ I Total 1,504 1 For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 15-12-2016:02:08:12

Transcript of I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing...

Page 1: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

: I !Liz Leacy

*

j I * '

Subject:) Attachments:

FW: Becton Dickinson PO648-02 - Economic Feasibility Installation Cost l.pdf; Installation Cost 5.pdf; Installation Cost 2.pdf; Installation Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3.pdf I

' 0

Kelly [mailto:[email protected]] 2016 14:51

1 1

Current Rudning costs per annum

4ower 1 €1,577 Gas €7,500 Mains water €130

4 I

< Hi Orla, ' I '

I While BD consider that it is not technical feasible to install a system to capture the remaining solvent vapour, a preliminarylcost benefit analysis was carried out to assess the economic feasibility. The cost of installing and runnijlg the existing carbon adsorption plant was used as a basis for this analysis on a conservative basis as any /lew/hdditional abatement plant installed would most likely be much larger and therefore more expensive to install

'$md o'perate tdan the existing plant. The capital cost of installation of the existing plant is given in terms of actual cost in 2007 and have not been gdjusted for inflation in order to take a conservative approach. The total project cost was in the region of €1.5 I million with' a breakdown as shown below. Quotes etc. for the larger line items are attached.

: I

I _ . ' I I 1

F ' '

; : *i I , I :I !Solvent Abatement Plant Project Costs

* I

Quote , , "

€IO00 No. 1 1 1 i . 1 karbon adsorption plant 820 1

, . .

I Mechanical services to abatement plant 1 254 I 2 1 I Vapour collection Mechanical works I Cladding & Civil works I 160 I 4.5 I I 'Misc. works I 90 I I

~ ~

I

Total 1,504

1

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 2: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

I i j t ? I

i, Sustainability Leader I1 BD Medical

il Emer Kelly ' '1

i 'I [email protected]

j, Pottery Road, Dun Laoghaire, Co. Dublin, Ireland il

, I 1 i I

" t: +353.1.2025384 i i

I

I bd.com

i ! . " /

. . . ' 3 .

pLuutzLtps3MILfw- nvcm-aqrruua

1 Sent: 29 November 2016 12:34 ' To: Emer Kelly i Subject: Economic Feasibility i Importance: High

t HiEmer I , In the regulation 10 response (received 15 November 2016) BD stated that capital cost for an additional abatement I plant would cost in the region of €l.SMillion. Can you provide proof of this figure e.g. quotation/correspondence ' from/with the manufacturers. Also provide a breakdown of the operating costs associated with this abatement. !I Include proof of cost where available. This information will be uploaded to the web for public viewing.

I

i 1 8 ! Regards

, Orla i I Orla Harrington l Inspector

Licensing ' EPA ' Cork 1 021 4860832

I

I

! [email protected] I

i l ttttt****..tttt*******~~***~~****~*~******~********~****"****.****~**.

!' 1' This email and any files transmitted with it are confidential and

' intended solely for the use of the individual or entity to whom they

: are addressed If you have received this email in error please notify

the EPA postmaster - postmaster@epa le

The opinions contained within are personal to the sender and

do not necessarily reflect the policy of the Environmental Protection

I

+

,

1' Agency I

2

i .; i j

.. . _ . I .

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 3: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

This email has been scanned by the Symantec Email Security.cloud service. For more information please visit http://www.symanteccloud.com I

I I

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . IZMPbRTANT f MESSAGE FOR ~ ~ P I E N T s THE U.S.A.:

' 1 I Fhis messs)ge/may constitute an advertisement of a BD group's products or services or a solicitation of interist in them. If this is such a message and you would like to opt out of receiving future advertisements or

1 1 I solicitatioqs from this BD group, please forward this e-mail to optoutbynroup@,bd.com. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I I Fhis bessage (which includes any attachments) is intended only for the designated recipient(s). It may

I ' G ,cont{in confidential or proprietary information and may be subject to the attorney-client I I :privilege or other confidentiality protections. If you are not a designated recipient, you may not review, use,

$copy ,or diitribute this message. If you received this in error, please notify the sender by reply e-mail and I I delete this )message. Thank you.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

I j ,Corporate 4 1 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417 U.S.A.

I

! This email has been scanned by the Symantec Email Security.cloud service. For more information please visit http://www.symanteccloud.com I I I

3

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 4: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 5: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

, ' ,

I , 'i 1

I , . i

I , i I !

I : I i'

-ealthcare Pottery Road, Dun Laoghaire Co. Dublin Ireland

Your ref. m e c o v e r y

QUOTATION

D e a m

Subiect: Solvent Recoverv plant- 3,000 Nm3lh.

24Ih December 2006 Our case: 05217 ..

our ref.: SHM/05217/8

Further to our recent pre-order meeting with contractors; I am delighted to confirm our firm quotation for the supply of one special activated carbon adsorption and recovery plant to recover the extract emissions generated by the special coating process; for a designed capacity of 3,000 NrnYh.

Reaenerative Carbon Adsorption Plant

Delivery of a complete automated regeneration plan . designed to specifically remove volatile organic compounds and solvents inc lud ingbzeot rope (chlorinated) prior to discharging to atmosphere.

The regeneration plant is designed with all necessary options as discussed to extend the flexibility and operating conditions of the plant. The drying air contaminated with traces of solvents will be channelled via a dedicated quench absorbing and cooling step to avoid plume and prevent intermittent release, while ensuring emission kept be- low 20 mglm3.

The carbon adsorbers will be designed to hold about 45-50 kgs of solvents (mainly

through, hence period between regeneration at the average loading is approximately 12 hours.

The proposed TWO bed adsorption plant is specially designed with higher bed depth to ensure sufficient adsorption capacity and selected to run continuously. Our design will guarantee plant performance to achieve the limit values inline with IPPC regulations for Organic Compounds, and thus maintain emission to atmosphere below 20 mgClNm3.

m e f o r e breaking

The regenerative activated carbon plant will be designed to operate up to 3,000 Nm3/hr, according to the enclosed flow-sheet no. 05217.001 and the data and specifi- cation mentioned below.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 6: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

I/ I 1

i'

I '

/I

i

I I'

1:

Technical Data:

Extract flow rate; ,. I .. Inlet Temperature:

Relative Humidity: Pollutant:

2

0 - 3,000 Nm3/h (EXPECTED 1000 Nm3/h) 20-23 "C

Mass #ow rate: Operation: Outlet Concentration:

0 - 5 kg/h, average c 4 kg/h Batch processes, bul continuous Purification 20 mgC/Nm3

DimenSPon of twin bed recoverv plant:

Length : approx 9.0 m Width: approx. 4 0 m Height: approx. 6.0 m Weight: 12 tons

Steam generator additional dimension. 2.0m x 2.0m

Carbon reaeneration cvcles.

The solvent load tolerated between regeneration WJ Time for regeneration cycle:

Runnina Costs:

!

. max. 50 kgs of solvents 4-5 hours

I(

1

Steam: Cooling Water: Electricity: Approx 25 kWlhr. Liquid generated. 600 litreslregeneration

Material.

Housing and main components: Actuated valves:

Supporting feet and skid: Steam pipes: cast iron

General:

approx. 500 kgs/hr @ 1.5 bar for 1 hour (during regeneration). approx. 3 mVhr @ 6 "C, over the same 1 hr period.

SMO 254 SMO 254 internals with spring return

Galvanised or painted steel Piping: WET-SMO 254

1. The main part of the plant and wet process pipe lines will be manufactured in special austenitic stainless steel grade SMO 254, with high content of Molybde- num and Nickel suitable for halogenated solvents.

i'

. , I .

.!

i

I

1: i'

! !.

I

, i:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 7: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

3

2. The main extract fan will be delivered with frequency converter to m$h-3ingrq- - ess airflow through to the scrubber as per process condition. A pres&e6ohtrb&'. ler will be fixed at the inlet to the VOC abatement plant, which will control the frequency converter. I

3. The dryingkooling air introduced during the regeneration of the carbon beds will be routed through a separate quench cooler and absorber,, and not . . directly through the stack to remove plurqe during the drying'cycle.

4. All equipments and instruments inclvling solenoid valves will bs (IS.) classified, and motors rated to IP65 enclosQ; although '&cove$ PI&{ &I be placed in safe area.

5. All actuated valves will include limit switches; valve position will be monitored so that a discrepancy alarm can be generated in the event that a valve fails to move when the solenoid is energised.

6. Insulation of the condenser and holding tank is included; AlulZn or tin cladding will be selected.

+! ' . , I I . &I

. I . $9

f

" 1

7. All field instruments are wired to junction boxes on the skid, Eex barriers will be included in the main panel, which is installed in a safe area (not known). Wiring between junction box and panel, and any other links to DCS will be completed by others.

8. Allan Bradley PLC system will be selected.

9. Additional Operator slave panel will be provided to mount in the control room.

10. Several project meetings are anticipated, but we have included for 2 meetings as well as attending a one day Hazop study on site.

. ,

Technical Specification:

Connection for introducing fresh air for drying and cooling cycles, with mesh for protection, including a fresh air blower with frequency converter.

One heat exchanger with actuatedwalve and temperature controller and flow control valve to control steam feed rate for heating the drying air dur- ing regeneration.

Two Carbon bed adsorbers, 0 1900 mm with supporting grid for the acti- vated carbon and necessary internals. The adsorber height will extended to allow sufficient space for the carbon. Material: SMO 254

1)

2)

. j '

3)

!'

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 8: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

4

The adsorbers are pressure designed and certified as a pressure vessel for 1.5 bar gauge, and for operating in Ireland according to BS rules.

The adsorber bed changeover will be monitored and activated by the concentration analyser installed in the plant exhaust stream.

'. Approx. 3000 kgs of selected activated carbon suitable for regeneration and recovery of the solvents ',

All necessary valves for process air and drying air, steam and regenerated vapour complete with pneumatic actuators-with spring return, switches and solenoid valves. Valves for air, regenerated vapour, Nitrogen and steam complete with pneumatic actuators, solenoid valves, and limit switches in SS and SMO 254 depending on location.

Quenching system complete, to remove plume and any release during the dryinglcooling stages of the regeneration process.

The LESNI plume eliminator is designed as a water jet scrubber with level and fresh water controls with circulating pump and cooler. The controls include pumplcooler start /stop when drying stage of the regeneration Cycle is in operation.

. . 6)

During the drying cycle, the humid and solvent laden air is channelled after the adsorbers through the wet scrubber before mixing with process air and back into the recovering adsorber.

During cooling cycle, the extract cool air is discharged directly to atmos- phere through the stack.

One extract fan in SMO 254 for total process exhaust air, complete with frequency converter and motor.

Pressure transmitter and controller in IS version, fixed to set pressure to reflect process conditions.

Cooling Condenser (shell and tube type) for the desorption cycle to con- dense steamlsolvent mixture complete with flow control valve, and hand valves for connecting to chilled cooling water supply. With cooling water flow control actuated valve. Material: SMO 254.

10) Complete interconnecting pipeline system; Wet lines in SMO 254, and Dry lines in SS316 L including: . .

. Adsorber manifold . Steam / condensate distribution pipe work and pressure reducing valves etc.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 9: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

I I

(L i

I .

I

I I

5

I I . t I 1-4)

. HTF, cooling water pipe work within skid only. Vent piping. Compressed air piping. f . All flanges; tie-in points shall be ANSI standard and shall be lo- cated at the edge of the skid boundary where possible.

Insulation material for absorbers, steam linesoetc.

Holding tank with capacity to hold roughly 2 complete regenerations.

Complete skid supporting structure with access ladders up to the adsorber Man way and valves. Material: Mild steel - painted.

Junction boxes for all digital and analog signals, mounted on the skid.

VOC analyser (IR) and controller with data logger to detect record and control levels of solvent in the exhaust; while using signal to trigger ad- sorber switching and start of regeneration cycle.

h

. I

Switch and electric panel mounted on the skid for automatic control of the plant, with PLC, Fitted with operator panel, which will operate and control the plant.

All signals and contacts will be provided and prepared in control panel for connection to slave operator panel and site DCS. Wiring and links by others. Switch control cabinet rated to IP 65 but suitable for locating in free zone safe area, complete with necessary barriers to link to terminal

e

box on the skid.

lmuts and outDuts list of all sianals and inDuVoutDut list of all hard e Motor starters, by- e

wired signals between.DCS and PLC will be part of the functional desi n specification "FDS" description.

including the FDS. e & ag numbers will be used on all documentation and P &ID'S

One additional slave OP for mounting in the control room or operator room Wiring between the Main paneVoperator panel and slave panel to be completed by others.

12 m free standing stack.

Delivery to site, Dublin.

Project review meeting on site and HAZOP Study.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 10: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

21

22

6

Mechanical and electrical installation within the plant boundary of the skid only; including wiring of all local instruments to the junction boxes and main switch control panel on the skid by our installation team.

Electrical connection of all instruments to local junction terminals, comply- ing where applicable with minimum control requirements, glanding and ca- bling requirements of the site.

23) Service engineer for commissioning and running in the plant; including SAT.

Training of personnel after completion. 24)

25) Spares, complete list for recommended spares will provided later during project engineering. However, we suggest for budget purposes that 4% of project value is used to budget for recommended spares.

Complete detailed engineering and delivery of documentation for operation and maintenance of the plant according to your requirements but generally including 5 sections:

0 Description 0 Operation 0 Maintenance 0 Components 0 Drawings, 4

26)

,

Price: Euro (E) 729;995.00

Additional ODtions: . .. 1. Supply of one dedicated steam boiler and generator to provide sufficient and re-

quired amounts of steam for the regeneration and drying cycles. With all associ- ated pipin$, controls and connections, to be part of the solvent recovery system.

Steam boiler- fired by natural gas; for outdoor installation complete with lagging and all necessary parts generally comprising of:

*w*$i

0 Steam boiler. 0 Presario reducing valve. 0 Blow down vessel for condensate 0 Steam trap. 0 Internal piping. 0 Instruments and valves. 0 Water tank.

Additional mice: Euro (El 75.000.00

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 11: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

I: ~

!

i I

,

!'

I I

1: I

I

im I 1 .

I

I

! 1

i, i !

i i 1

7

2. Supply of two actuated diverting valves to switch exhaust to by pass and direct * { venting to'stack, complete with additional ducting and connection to the stack,

when recovery and purification system is not ready.

Additional Drice: Euro (El 15.000.00 , "

Time of Delivew: 30 - 34 weeks from order. Time of delivery with reservations against conditions we do not control

Exclusions:

Foundation and civil works. Power supply and connection to main panel on the skid, electrical wiring and connec- tion between slave operator panel and the main OP. All utility supply and service connections, including steam, chilled cooling water, com- pressed air and nitrogen. Connections and links to DCS Supply of extract piping from vacuum pumps and ducting from extract hoods; placed in the machines. Crane and lifting equipment for positioning and erection of plant on site.

References:

Pavment terms:

30 % with order. 50 % on delivery ex-works. 10% on satisfactory installation. 5% on completion of running in and setting plant for normal operation. 5% after commissioning and training of personnel and submittal of final documentation.

Guarantee- and deliverv conditions:

Where nothing else is mentioned, the General European Conditions No. Orgalime SE 01 will apply.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 12: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

8

I trust this offer will meet your interest and satisfaction, looking forward to receive you formal instructions.

In the meantime, if you have any questions please do not hesitate to contact us.

Yours sincerely - $ 1 ,

Sales Manager

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 13: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

Becton Dickinson Final Account for Works in Removina Roof Plinths

Dated Februarv 8th 2008

I

I

1

' I

!

E I I

B. 1

8.2

8.3

8.4

8.5

8.6

8.7

. .,

h. Oriainal Contract: Per Quotation dated 16/09/07

I B. Enaineerina Related Adiustments - On Roof Plinths; I I' I

Fild steel dowels closed to lOOrnrn centres in lieu of 200mrn on all sidesjnclud- ng drilling and grouting in position with UPM44,to original Plinth Ref.3 (36 No.in ieu of 22 No.)

dild steel dowels closed to lOOrnrn centres in lieu of 200mrn on all sides,includ- ng drilling and grouting in position with UPM44,to original Plinth Ref.4 (36 No.in ieu of 22 No.) ! I . I

>ut and bent reinforcing bars fixed @ 150rnm centres both ways,in lieu of 200rnm :entres,to original Plinth Ref.5 (3 No.additional longitudinal and 7 No.additional ransverse bars)

I ' I :ut and bent reinforcing bars fixed @ 150rnrn centres both ways,in lieu of 200rnrn ,entres,to original Plinth Ref.6 (1 No.additional longitudinal and 7 No.additional ransverse bars)

Aild steel dowels closed to lOOmrn centres in lieu of 200mm on all sides,includ- i g drilling and grouting in position with UPM44,to original Plinth Ref.9 (22 No.in eu of 12 No.) I *

j. I l i ld steel dowels closed to lOOmm centres in lieu of 200rnrn on all sidesjnclud- ig drilling and grouting in position with UPM44,to original Plinth Ref.lO'(24 No.in l eu of 12 No.) I

lild steel dowels closed to lOOmrn centres in lieu of 200mrn on all sidesjnclud- ig drilling and grouting in position with UPM44,to original Plinth Ref.11 (22 No.in eu of 12 No.)

1

cll blf

18,340.7

t 131.7 1

131.7

(

50.5

44.41

94.1

1 12.9:

94.1(

19,000.3( 19,000.3(

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 14: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

8.8

c. 1

c.2

c.3

D.l.

D.2

.I .

lild steel dowels closed to lOOmm centres in lieu of 200mm on all sides,includ- g drilling and grouting in position with UPM44,to original Plinth Ref.12 (24 N o h ?U of 12 No.)

. Client Adiustments - On Rainwater Drainaae;

imit 50% of Quotation Item 29 for 1 No.rainwater ope formed in roof in lieu of No.originally

hnit 50% of Quotation Item 30 for, 1 No.ope formed in external wall in lieu of No.originally

'ary rainwater pipe for 1 No.between underside of outlet and external wall in lieu f 2 No.and for hopperhead and 100mm pipe carried to front corner of building in eu of 75mm pipe carried rere of building

1. Client Additions - On Roof Plinths;

ireaking out 150 x lOOmm concrete upstands to perimeter of Plinths Ref.1,2,3, 1,5 & 6,discovered on removal of existing timber plinths,comprising;

i ) Breaking out concrete perimeter plinths (35m total). 1) Depositing rubble in skips ;) Associated skip hire costs in disposal

. a . . . , . . ' .

nfilling of roof slab at Plinths Ref.1 & 2,following discovery of opes on removal of imber upstands,comprising;

2) Cutting out sections of screed (all as Quotation Item 04 for Plinths 3 & 4) ,

5) Dowels,reinforcing and mesh (all as Quotation Item 05 for Plinths 3 & 4) ;) Formwork and concrete (all as Quotation Item O6'for Plinths 3 & 4) 9) Extra-over on dowels to Plinth 1 (per Adjustment Item 8.2 above for Plinth 3) 9) Extra-over on dowels to Plinth 2 (per Adjustment Item 8.2 above for Plinth 4)

1

.

. .

2

!

296.1 132.8 104.5

533.5

170.4 499. t 564.5 131.; 131.;

1,498.!

cll b/l

I

I

I

1 12.9;

-164.9f

-45.6!

' 11 2.91

533.5

I

1,498.E

21,047.; 21,047.;

1 !

,I

.! !

1 I

a i

II i I

*

ii 'I

8.

' I !

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 15: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

I .

I

!!I i I , ' I

,

D.:

E.l

E.2

E.3

F.l

F.2

F.3

All works to additional Plinth Ref.13 adjacent to Plinth Ref.5,discovered following removal of ventilation cow1,including;

. . . . . a) Remove timber 'upstand, cut back membrane etc. ' . . .

b) Breaking out perimeter concrete upstand,disposal etc. c) Breaking out screed (all as Quotation Item 24,fOr 1 No.) d) Dowels and mesh (all as Quotation Item 25, for 1 No.) e) Formwork and concrete to ope (all as Quotation Item 26, for 1 No.) f) Making good roof membrane (all as Quotation Item 27,for 1 No.) g) Extra-over on dowels to Plinth 13 (per Adjustment Item B.6 above for Plinth 10) '

'

1 . t . , , . i 1:

! I

E. Client Additions - Solvent Recoverv Roof Repairs; !

?arry out repair to roof membrane at front of Solvent Recovery roof,comprising {pproximately 2300 x 2000mm new membrane section with 150mm upstand to (,sides.of 550 x 550mm projecting

I

. ~.. > . ,I , .

I

I

I

2arry out upstand repair to roof membrane along wall at rere of Solvent Recovery ,oaf (behind ducting),comprising approximately 7.0m in new 350mm girth ipstand including working around abutting concrete upstands i; c , . _ -

:arry out upstand repair to roof membrane along wall at rere of Solvent Recovery oof (behind ducting),comprising approximately 3.0m in 350mm girth bitumenous oof seal applied to existing upstand

:. Client Additions - Internal Works to Floor & Soffits;

lemove rubber floor tiles,clean off all adhesives and dispose of debris 1 I 1

:repare floor with cement and Ronafix bonding mix applied to concrete

inish floor with latex levelling compound

3

43.81 53.0, 49.3i

131.1. 72.5 95. Od

112.9;

557.91

clf blf

557

254

72

263

341

479

23,255 23,255

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 16: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

F.4

G.l

G.2

G.3

i ish soffit of roof slab in corridor or room areas,to 4 infilled opes,with 2 coat lite emulsion (all others carried out by Client)

, Adjustments on Overheads & Insurances;

oportionate adjustment on Quotation Items 34,39 & 40 due to increased scope id value of works,comprising

Movement on value for power too/s,plant and equipment Movement on value for transporl of materials and equipment Movement on value for supervision of the works

roportionate adjustment on Quotation Item 41 (central overheads) due to creased scope and value of works

roportionate adjustment on Quotation Item 42 (insurances) due to increased :ope and value of works

Final Account,excluding VAT

Movement on Original Contract

1 75.74 58.96

127.44

362.14

I

127.E

' I

362.1

137.L

197.'

24,080.!

5,739.'

4

'I

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 17: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

BD CONSUMER HEALTHCARE, Pottery Road, Dunlaoghaire,

Co. Dublin

Mechanical Draft Cost for Pipework Utilities Project for Solvent Recovery System

1 , I !

Chilled Water Installation

Compressed Air Instal I ati on 1 i $ 3

t i Naturol Gas Installation Wyer :Services Installat ion

Above' Ground Drainage I Controls Y Mechanical Plant Power & Controls Wiring

Prciiminaries & Insurance's O&M Manuals Borid Additional Items (for detail see below) Colit i ngency (5 %)

Sub-Total Section

c

i

Add Main Contractors Discount

Sud-Total

I

1 Adqtiorral Iferris: Builders Work For- Gas Installntion Add,itiqnal Gas Filter Additiqnnl Gas Regulator Roof Protection (4 Weeks only) Pcrip ncn t Roof Edge Protection Gas' S I am S h 11 t M ech ;in i ca I Protcc t ion

I

I i

1 f.) g.) -to act as PSCS for thc Pipework

Utilities Project for the Solvent Recovery

I

* I 1 h.) , Buillders work for SKU drain over roof 1 t ' Sub-Total Section (Item 1 1 above) 1 1 i I

Tender Tender Amount Adjustments Comments Euro(€) Euro(€)

1 14,920.00 -..--I. - I 14,920.00 Addition of cost to compressed

Omit gas pipework and trenching froin gas meter to

22,135.00 35,785.00 I air plant ( + € I 3.650.00) --__

I 8,780. I0 boilerhouse ( - € 14,250.00) --. 33,030. I0 3,200.00 3,200.00 - - .__

Omit drainage pump 10,690.00 4,200.00 ( - €6.490.00) I9,000.00 I3,358.00 25,000.00 9,545.00 - _ ~ 1 1,700.00 1 1,700.00

800.00 800.00 I,S00.00 I,200.00

0.00 19,804.00 12,000.00 030

253,975.10 233.292.10

- -.....

13,367. I I 0.00

267,342.2 I 233,292. IO >

1 of 1

6,944 .OO 960.00 460.00

3,000.00 'r. 13. A T.B.A

7.500.00 940.00

19.804.00

2211 012007

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 18: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

. , I t i I

/ '

t

. .. .

' , . I .

. . I

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 19: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

!

. .>-

1

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 20: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

. ..

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 21: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

I

i Becton Dickinson Penel Ltd. VAT Exempt no.90/14466/102015 PO Box 10006 9300 Aals! Belgium

Contact - ?hone - Your, ref. Preventive maintenance 2016 - ima" Pos. Article No. Quantity Description

1 001932 1 pc Service Preventive maintenance Gas detection system

I

' I suggested date 19.09.2016

I , Best regards 1

QUOTE 00963

Date 201 6.02.03

Our ref. Phone Ernail .

Project 05217

Unit Piice Amount

1.450,OO 1.450.00

Total Excl. VAT EUR 1.450,OO

VAT Amounl EUR 0.00

Top1 Incl. VAT EUR 1.450,QQ

_____________ Payment Terms

Delivery Dale 2016 09.19 Delivery Address

30 days net from involce dale Delivery Terns EXW

Beclon Dickinson Penel Ltd.. VAT Exempt no.90/14466/102015. PO Box 10006, 9300 Aalsl, Belgium

Invoice Address Becton Dickinson Penel Lld.. VAT Exempt no.90/14466/102015, PO Box 10006, 9300 Aalsl. Belgium

General Terms Orgalime SI14 -- --I-___-

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 22: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

Becton Dickinson Penel Ltd. VAT Exempt no.90/14466/102015 PO Box 10006 9300 Aalst Belgium

Contact - QUOTE 00964

Date 2016.02:04 Project 0521 7 Our ref. Phone Email

Pos. Article No. Quantity Description Unit Price Amount

1 1 pc Service & Preventive Maintenace 5,900.00 5,900.00 ', Activated Carbon Regeneration Plant I

I, 2 112 days plus travel in week 30. covering work as described in scope.attached.

1

I

1 \

. I

I I

I

I'

1:

Total Excl. VAT EUR 5, 0

VAT Amount EUR .. 0.00

I

Total Incl. VAT '. EUR 5,900.00 ,

Payment Terms Delivery Terms

Delivery Address ,

Invoice Address

General Terms

30 days net lrom invoice dale

1

1 , I

Delivery Date 2016.07.25 I Becton Dickinson Penel Lld., VAT Exempt no.90/14466/102015. PO Box 10006, 9300 Aalsl, Belgium

Bocton Dickinson Penel Ltd.. VAT Exempt no 90/14466/102015. PO Box 10006. 9300 Aalst, Belgium i

1 I

Orgalime SI14 I - ___-I-- --

I

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 23: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

Becton Dickinson Penel Ltd. !&on Dickinson Penel Limited Irish Branch 'ttery Road, Dun Laoghaire rp!in and

I

mtact - lone - naiil - iur ref. Fan 80 041 Parts

I

38. Article No. Quantity Description

1 ' 002823 1 pc ve80.041-06 Fan

I Shaft with bearings i Type. 040-SMIR. fabr. 10120 t i

Best regards

QUOTE 01 159

Date 2016.06.13 Project 05217 Our ref. MMN Phone Email

. . , . J

Unii ~ ; ike - Amount

2.443,45 2.443.45

. . ' . . I

Total Excl. VAT EUR 2.443,45

VAT Amouni EUR 0,oo

Total Incl. VAT 2.443,45 EUR

Payment Terms

Delivery Date 2016.06.30 Delivery Address

Invoice Address

General Terms Orgalime SI14

30 days net from invoice date Delivery Tens EXW

BD. Pottery Road. Kill 0' the Grange. Dun Laoghaire. Co. Dublin. lrland

Becton Dickinson Penel Ltd.. VAT Exempt no.90/14466/102015, PO Box 10006, 9300 Aalst. Belgium

1

I

---_.I -_ m - 1 -

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 24: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

Becton Dickinson Penel Ltd. VAT Exempt no.90/14466/102015 PO Box 10006 9300 Aalst Belgium

Contact Your ref. Phone . Email

- PO: 64001 60680

ORDER CONFIRMATION 00708 1, i

& ) I Date 201 6.07.07 Project I case Our ref. BM

0521 7 / 3764-1 200

Phone Email

Pos. Article No.. Quantity Description Unit Price Amount

1 pc Y-b 11.310 2.470.50 . 2.470,50' 1 002978 Automatic valve - Butterfly

DN300,PN16

Automatic valve - Butterfly

DN300, PN16

Automatic valve - Butterfly

RC260-DA, 1N5225, NVF3-MOH-5/2-K-1/4-EX

2 002978 1 pc Y-b 11.311 2.470,50 ' '2.470,50

RC260-DA, lN5225, NVF3-MOH-5/2-K-1/4-EX I

3 002979 1 pc Y-b11.315 4.93450 4.934,50

RC250-DA, lN5225, NVF3-MOH-5/2-K-1/4-EX DN250,113-W

4 002978 1 pc Y-b 11.320 2.470,50 2.470,50 Automatic valve - Butterfly

DN300. PN16 RC260-DA, 1N5225, NVF3-MOH-5/2-K-l/4-€X

--ir- -5--002978-- 1 --- pc --Y=b-1-1-,321-------- 2:470;50---------. 2t47&50-- b.

f '

6 002982 1

I) 7 002979

! I

8 003034 I i' !

! I/ Continued. . . . .

I 10 003034

i

Automatic valve - Bunerfly

DN300, PN16

Automatic valve - Butterfly

DN250. PN16

Automatic valve - Butterfly

RC260-DA. lN5225, NVF3-MOH-5/2-K-1/4-EX

1 pc Y-b 11.324

RC250-DA, lN5225, NVF3-MOH-5/2-K-1/4-EX

1 pc Y-b 11.325

RC250-DA, lN5225, NVF3-MOH-5/2-K-1/4-EX DN250.113-W

2 pc Y-bt30.300-04 Valve - Butterfly Proximity switch SME-8M-DS-24V-K-7.5-OE. 24V 24 VDC

2 pc Y-bt 80.301-04 Valve - Butterfly

. . .

1.961,55 1.961 35

4.93430 4.934,50

35,45 , 70,90

3545 70,90

21.854,35

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 25: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

, - 1

, : : : f I ' , ' j * '

< I I

I

'I

' i

xton Dickinson Penel Ltd. 1T Exempl no.90/14466/102015 1 Box 10006 100 Aalst ?Igiurn

intact 0 lone - nail - )ur ref. PO. 64001 60680

ORDER CONFIRMATION 00708

Date 2016.07.07 Project I case Our ref. BM

05217 I 3764-1 200

Phone 0 Email -

Pos. Article No. Quantity Description Unit Price Amount ! Pntinued. . . . . . . . . . . 21.854.35

I

I ( Proximity switch SME-8M-DS-24V-K-7.5-OE, 24V 24 VDC I I

I . i

' 1 1

. i Bests

I

I Tot2 Excl. VAT VAT Amount Total Incl. VP EUR 21.854,35 EUR 0,oo EUR 21.854.35

Payment Terms Delivery Terms EXW Delivery Date 201 6.08.31 Delivery Address

Invoice Address

Cjeneial Terms

30 days net from invoice date

Becton Dickinson Penel Lld., Pottery Road, Dun Laorghaire, Dublin, lrland

Becton Dickinson Penel Lld.. VAT Exempt no.90/14466/102015, PO Box 10006, 9300 Aalsl, Belgium

Orgalime SE-01

I I

E

I

I

I . + - 2 .

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 26: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

/ '

1 ' I '

P

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 27: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

CERTIFICATE NO: 061 29- M 5 1 J Ih February 2008

1 j Solvent Extract Svstcm I:

I Mechanical Services Installation I !

' I

; WE HEREBY CERTIFY that the sum of €2 1,390.25 is due to 1-1 I n account of work camed out to date.

, i I

AMOUNT EXCLCTDING

V.A.T.

42156,240.00

C 11,234.00

i

I

Amount of Contract:

Plus Additions: t

8167,474.00 t I

Nett Tutal:

_____I--- I--LI

Viue of Work Done on Site: €167,474.00

Less Retention: 1.5% C 2,512.11

Sub-T0bl: €164,961.89

Less Previously Certified: f 14337 I -64

I

li

AMOUNT NOW CERTIFIED f 21,390.2s

V.A.T TOTAL @ 0% INCL. V.A.T.

(356,240.00

8 11,234.00

- €167,474.00

! €164,961.89

€143,571.64

E 21,390.25

I FOR PAYRIEYT 4

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12

Page 28: I Cost 4.pdf; Maintenance costs 2016.pdf; Installation Cost 3,Corporate 41 Headquarters Mailing Address: BD (Becton, Dickinson and Company) 1 Becton Drive Franklin Lakes, NJ 07417

i I '

I i

' .

' I

!

1 , '

' i ' ,

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 15-12-2016:02:08:12