June 14, 2017 I-85 Widening Design-Build from I-985 to SR 211 SRTA Joint Resolution Joe Carpenter, PE P3 Division Director

Transcript of I-85 Widening Design-Build from I-985 to SR 211 SRTA Joint ... Meeting...accelerate solutions...

Page 1: I-85 Widening Design-Build from I-985 to SR 211 SRTA Joint ... Meeting...accelerate solutions •Keeping the promise of the TFA 3. 4. I-85 Widening Project Location Two phases in Gwinnett,

June 14, 2017

I-85 Widening Design-Build from I-985 to SR 211

SRTA Joint Resolution

Joe Carpenter, PE

P3 Division Director

Page 2: I-85 Widening Design-Build from I-985 to SR 211 SRTA Joint ... Meeting...accelerate solutions •Keeping the promise of the TFA 3. 4. I-85 Widening Project Location Two phases in Gwinnett,

Innovative Delivery Benefits:

• Accelerated construction

• Earlier open to traffic

• Construction and design innovation

• More price certaintyI-75 South Metro Express Lanes

2

Page 3: I-85 Widening Design-Build from I-985 to SR 211 SRTA Joint ... Meeting...accelerate solutions •Keeping the promise of the TFA 3. 4. I-85 Widening Project Location Two phases in Gwinnett,

11 major mobility projects into construction in 10 years:

• $11 billion program

• Improve passenger and freight movement

• Use Innovative Delivery to accelerate solutions

• Keeping the promise of the TFA

3

Page 4: I-85 Widening Design-Build from I-985 to SR 211 SRTA Joint ... Meeting...accelerate solutions •Keeping the promise of the TFA 3. 4. I-85 Widening Project Location Two phases in Gwinnett,

4

Page 5: I-85 Widening Design-Build from I-985 to SR 211 SRTA Joint ... Meeting...accelerate solutions •Keeping the promise of the TFA 3. 4. I-85 Widening Project Location Two phases in Gwinnett,

I-85 Widening Project LocationTwo phases in Gwinnett, Barrow, and Jackson Counties

• I-985 to SR 211 - 12.7 miles (PI 116010)

• SR 211 to US 129 - 10.4 miles (PI 0013545 - FY 25 Funding)

5

Page 6: I-85 Widening Design-Build from I-985 to SR 211 SRTA Joint ... Meeting...accelerate solutions •Keeping the promise of the TFA 3. 4. I-85 Widening Project Location Two phases in Gwinnett,

Widen I-85 to the inside north of I-985

Expand from two lanes to three lanes in each direction

Install median barrier and 9-ft to 12-ft inside shoulders for section between Hamilton Mill Road/CR 134 and SR 211

Convert 14-foot striped buffer between general purpose and managed lane north of I-985 to south of Hamilton Mill Road / CR 134 to a general purpose lane in both directions

No right of way acquisition

Replace I-85 mainline and overpass bridges within project limits

SRTA partnership for multi-year contracting

Estimated project cost: $135 Million

Estimated open to traffic: 2020

6

Page 7: I-85 Widening Design-Build from I-985 to SR 211 SRTA Joint ... Meeting...accelerate solutions •Keeping the promise of the TFA 3. 4. I-85 Widening Project Location Two phases in Gwinnett,

Mainline bridge replacementsOverpass bridge replacements

7

Page 8: I-85 Widening Design-Build from I-985 to SR 211 SRTA Joint ... Meeting...accelerate solutions •Keeping the promise of the TFA 3. 4. I-85 Widening Project Location Two phases in Gwinnett,

• I-85 North Widening from Hamilton Mill Road to SR 211

– Creates 13 additional lane miles

– Expected reduction in delay – 56%

• I-85 North Widening from SR 211 to U.S. 129

– Creates 20 additional lane miles

– Expected reduction in delay – 69%

8

Page 9: I-85 Widening Design-Build from I-985 to SR 211 SRTA Joint ... Meeting...accelerate solutions •Keeping the promise of the TFA 3. 4. I-85 Widening Project Location Two phases in Gwinnett,

9

Page 10: I-85 Widening Design-Build from I-985 to SR 211 SRTA Joint ... Meeting...accelerate solutions •Keeping the promise of the TFA 3. 4. I-85 Widening Project Location Two phases in Gwinnett,

a. GDOT issues Public Notice Advertisement 11/16/2016

b. Industry Forum 12/15/2016

c. GDOT issues Request for Qualifications (RFQ) 03/24/2017

d. Deadline for submission of Statement of Qualifications (SOQ) 04/28/2017

e. GDOT issues the Notice to Finalists 05/12/2017

f. GDOT issues the Request for Proposals (RFP) to the Finalists 05/26/2017

g. GDOT Board Joint Resolution with SRTA for Contracting 06/15/2017

h. Deadline for receipt of Technical and Price Proposals 08/18/2017

f. GDOT letting (publicly open scope and price proposals) 09/15/201710

Page 11: I-85 Widening Design-Build from I-985 to SR 211 SRTA Joint ... Meeting...accelerate solutions •Keeping the promise of the TFA 3. 4. I-85 Widening Project Location Two phases in Gwinnett,

• Seeking innovative solutions; with minimal upfront design

• Receive qualifications in first step• Opportunity for Proposer to submit innovative

Alternative Technical Concepts• Receive/evaluate sealed technical proposals• Receive sealed price proposals, publicly open • Contract awarded to Proposer with highest

combined score based on a weighting of the price proposal and technical proposal evaluation score

11

Page 12: I-85 Widening Design-Build from I-985 to SR 211 SRTA Joint ... Meeting...accelerate solutions •Keeping the promise of the TFA 3. 4. I-85 Widening Project Location Two phases in Gwinnett,

• Multi-year contracting through SRTA

• $115 million budget over three years

• Annual cumulative payment cap schedule

• Variable scope allows Proposers to include work beyond the initial project limits within the existing budget

12

Page 13: I-85 Widening Design-Build from I-985 to SR 211 SRTA Joint ... Meeting...accelerate solutions •Keeping the promise of the TFA 3. 4. I-85 Widening Project Location Two phases in Gwinnett,

13

Page 14: I-85 Widening Design-Build from I-985 to SR 211 SRTA Joint ... Meeting...accelerate solutions •Keeping the promise of the TFA 3. 4. I-85 Widening Project Location Two phases in Gwinnett,

• Approve Joint Resolution

14