* I-64 and I-265 were analyzed as 6-lane facilities in both the build and no-build scenarios. The north to westbound ramp will be a flyover by 2030.
2006 LOS (E/36)
2030 B LOS (D/33)
2030 NB LOS (D/34)
DIVERGE
2006 LOS (E/75)
2030 B LOS (N/A)
2030 NB LOS (N/A)
WEAVE
2006 LOS (C/27)
2030 B LOS (D/31)
2030 NB LOS (D/29)
DIVERGE
2006 LOS (D/31)
2030 B LOS (E/48)
2030 NB LOS (E/52)
MERGE
2006 LOS (C/21)
2030 B LOS (C/25)
2030 NB LOS (C/23)
MERGE
2006 LOS (E/92)
2030 B LOS (N/A)
2030 NB LOS (N/A)
WEAVE
2006 LOS (B/19)
2030 B LOS (B/18)
2030 NB LOS (C/20)
MERGE
2006 LOS (C/25)
2030 B LOS (C/25)
2030 NB LOS (C/23)
DIVERGE
2006 LOS (E/46)
2030 B LOS (E/40)
2030 NB LOS (E/40)
MERGE
2006 LOS (D/32)
2030 B LOS (D/31)
2030 NB LOS (E/35)
DIVERGE
2006 LOS (E/45)
2030 B LOS (E/45)
2030 NB LOS (E/56)
WEAVE
2006 LOS (E/47)
2030 B LOS (E/53)
WEAVE
2030 NB LOS (E/60)
I-64 @ I-265 Interchange AM Design Hour
I-64 Interchange Detailed Analysis
Appendix P - 1 Operational Analysis
*I-64 and I-265 were analyzed as 6-lane facilities in both the build and no-build scenarios. The north to westbound ramp will be a flyover by 2030.
PM Design Hour
2006 LOS (C/21)
2030 B LOS (C/25)
2030 NB LOS (C/21)
MERGE
2006 LOS (B/19)
2030 B LOS (B/17)
2030 NB LOS (C/25)
DIVERGE
2006 LOS (E/40)
2030 B LOS (N/A)
2030 NB LOS (N/A)
WEAVE
2006 LOS (C/23)
2030 B LOS (C/28)
2030 NB LOS (C/23)
DIVERGE
2006 LOS (C/28)
2030 B LOS (B/17)
2030 NB LOS (D/32)
MERGE
2006 LOS (D/34)
2030 B LOS (E/41)
2030 NB LOS (E/37)
MERGE
2006 LOS (E/68)
2030 B LOS (N/A)
2030 NB LOS (N/A)
WEAVE
2006 LOS (C/28)
2030 B LOS (C/25)
2030 NB LOS (C/28)
MERGE
2006 LOS (F/60)
2030 B LOS (F/86)
2030 NB LOS (F/86)
DIVERGE
2006 LOS (C/27)
2030 B LOS (C/27)
2030 NB LOS (C/25)
MERGE
2006 LOS (C/25)
2030 B LOS (B/18)
2030 NB LOS (C/25)
DIVERGE
2006 LOS (E/40)
2030 B LOS (D/29)
2030 NB LOS (E/43)
WEAVE
2006 LOS (E/119)
2030 B LOS (E/123)
WEAVE
2030 NB LOS (E/146)
I-64 @ I-265 Interchange PM Design Hour
I-64 Interchange Detailed Analysis
Appendix P - 2 Operational Analysis
2030 B LOS (D/29)
DIVERGE
2030 B LOS (C/23)
MERGE
2030 B LOS (D/35)
MERGE
2030 B LOS (C/24)
DIVERGE
I-64 @ Proposed Connector AM Design Hour
I-64 Interchange Detailed Analysis
Appendix P - 3 Operational Analysis
2030 B LOS (C/25)
DIVERGE
2030 B LOS (D//34)
MERGE
2030 B LOS (D/32)
MERGE
2030 B LOS (D/34)
DIVERGE
I-64 @ Proposed Connector PM Design Hour
I-64 Interchange Detailed Analysis
Appendix P - 4 Operational Analysis
* I-64 was analyzed as a 6-lane facility in both the 2030 build and no-build scenarios.
2006 LOS (C/22)
2030 B LOS (C/22)
2030 NB LOS (C/24)
MERGE
2006 LOS (D/30)
2030 B LOS (D/30)
2030 NB LOS (D/30)
DIVERGE
2006 LOS (D/33)
2030 B LOS (D/32)
2030 NB LOS (D/34)
MERGE
2006 LOS (C/23)
2030 B LOS (C/23)
2030 NB LOS (C/28)
DIVERGE
I-64 @ KY 1848 Interchange AM Design Hour
I-64 Interchange Detailed Analysis
Appendix P - 5 Operational Analysis
I-64 was analyzed as a 6-lane facility in both the 2030 build and no-build scenarios.
2006 LOS (D/34)
2030 B LOS (D/31)
2030 NB LOS (D/36)
MERGE
2006 LOS (C/23)
2030 B LOS (D/28)
2030 NB LOS (D/29)
DIVERGE
2006 LOS (C/25)
2030 B LOS (D/31)
2030 NB LOS (D/35)
MERGE
2006 LOS (D/30)
2030 B LOS (D/34)
2030 NB LOS (D/35)
DIVERGE
I-64 @ KY 1848 Interchange I-64 Interchange Detailed Analysis
PM Design Hour
Appendix P - 6 Operational Analysis
2006 LOS (C/26)
2030 B LOS (D/29)
2030 NB LOS (D/29)
MERGE
2006 LOS (D/31)
2030 B LOS (F/33)
2030 NB LOS (F/36)
DIVERGE
2006 LOS (D/32)
2030 B LOS (D/35)
2030 NB LOS (F/43)
MERGE
2006 LOS (C/27)
2030 B LOS (D/31)
2030 NB LOS (D/31)
DIVERGE
I-265 @ US 60 Interchange AM Design Hour
I-64 Interchange Detailed Analysis
Appendix P - 7 Operational Analysis
2006 LOS (C/25)
2030 B LOS (D/30)
2030 NB LOS (D/30)
MERGE
2006 LOS (D/30)
2030 B LOS (D/30)
2030 NB LOS (F/36)
DIVERGE
2006 LOS (C/26)
2030 B LOS (F/39)
2030 NB LOS (F/45)
MERGE
2006 LOS (D/29)
2030 B LOS (D/33)
2030 NB LOS (D/33)
DIVERGE
I-265 @ US 60 Interchange PM Design Hour
I-64 Interchange Detailed Analysis
Appendix P - 8 Operational Analysis
2006 AM Existing
1234
270
1540710 I-64 @ I-265
670
I-64 @ Proposed InterchangeI-64 @ KY 1848I-265 @ US 60
670
970
2480
160
290
2270
300
220
1701930
1390
330
400
3000310 40
1030 3001710 2080
310
1380
2420 430
130 4090
120
2930
140
280 120
321
4
Appendix P - 9 Operational Analysis
2006 PM Existing
1234
I-64 @ I-265I-64 @ Proposed InterchangeI-64 @ KY 1848I-265 @ US 60
2600
1760
1380
680
360
901960 2350
120
120
380
470 30
1760 4103500
850
810
1450 780 3090150
100
370
2370
290
3001090620
2902180
3820
830
570
2240 780
3820
3590
3590
321
4
Appendix P - 10 Operational Analysis
2030 AM No Build
1234
I-64 @ Proposed InterchangeI-64 @ KY 1848I-265 @ US 60
160
210
230
700 0 0
3020 0 3670600
2440
4270
760
0
1820 0 530
4420 0 4610560 0 70
250
550 0 3000 0 710
210
3400
2450
580
0
28011801180
1710
4420
510
27201250 I-64 @ I-265
510
4010
530
390
321
4
Appendix P - 11 Operational Analysis
2030 PM No Build
1234
I-64 @ I-265I-64 @ Proposed InterchangeI-64 @ KY 1848I-265 @ US 60
270
290
160
50
3600 51901500
1600
2560
1380
3110 720
4080 4620830 50
170
790 160790
210
2950
2440
1200
1470
1010
3950
1500
19201090
5103850
650
4180
510
530
321
4
Appendix P - 12 Operational Analysis
2030 AM Build
1234
I-64 @ Proposed InterchangeI-64 @ KY 1848I-265 @ US 60
510
4010
530
3902600380 I-64 @ I-265
28011001180
1710
4090
230
2850
2260
460
880
200
380 370 230190
180
510
190
5240 4900 4700450 120 50
1450 890 2003440 3380 3360550
2170
4200
680
310 100
180
170
50290
290
100
321
4
Appendix P - 13 Operational Analysis
2030 PM Build
1234
I-64 @ Proposed InterchangeI-64 @ KY 1848I-265 @ US 60
140
140
40
40120
270
380
589080
4290 5490
720
5200
5280
5890 420
1350
1110
2330
1300
310
310
2570 890
1004930 4790 5280 4690
170
540 370310
320
450
170
2590
2310
1100
1020
51038501470
1010
3950
450
1920350 I-64 @ I-265
650
4180
510
530
321
4