I-605 Corridor Improvement Project (I-105 to I-10)
2016 Public Scoping Meetings
October 24, 26 & 27
November 1, 2 & 3
• Monday, October 24, 2016 Downey
• Wednesday, October 26, 2016 Santa Fe Springs
• Thursday, October 27, 2016 Norwalk
• Tuesday, November 1, 2016 Industry
• Wednesday, November 2, 2016 South El Monte
• Thursday, November 3, 2016 Whittier
Public Scoping Meetings
Project Team & Participating Jurisdictions
• Los Angeles County Metropolitan Transportation Authority (Metro)
• California Department of Transportation (Caltrans)
• Federal Highway Administration (FHWA)
• Gateway Cities Council of Governments (GCCOG)
• San Gabriel Valley Council of Governments (SGVCOG)
• Corridor Cities & County:
Baldwin Park
El Monte
City of Industry
Pico Rivera
South El Monte
Whittier
Downey
Norwalk
Santa Fe Springs
Unincorporated LA County
• Project Background
• Purpose of Scoping Meeting
• I-605 Project Limits
• Project Purpose & Goals
• Proposed Project Improvements
• Proposed Project Alternatives
• Environmental Studies
• Environmental Approval Process
• Anticipated Schedule
• How to Stay Informed and Notification Process
Agenda
Project Background
• Feasibility Study (2013)
• Project Study Report (2014/2015)
• Project Limits:
I-605: I-105 to I-10 (12.5 miles)
I-5: Florence Ave to Paramount Bl (3 miles)
SR-60: Santa Anita Ave to east of Turnbull
Canyon Rd (5.5 miles)
Purpose of Scoping Meetings
• Inform Public of Proposed Project
• Define Project Alternatives
• Outline Environmental Process
• Identify Issues of Concern
• Solicit Public Input
I-605 Project Limits
Project Purpose & Goals
• Purpose: Reduce Congestion
Improve Freeway Operations
Improve Local and System Interchange Operations
• Goals:
Enhance Mobility and Quality of Life for the Community
Improve Public Safety
Minimize Environmental and Property Impacts
Minimize Disruptions during Construction
Proposed Project Improvements
• Add one Mixed Flow Lane on NB and SB I-605
• Add one High-Occupancy Vehicle (HOV) Lane on NB and SB I-5
• Add one Mixed Flow Lane on WB SR-60
• Add Auxiliary Lanes as Needed
Proposed Project Alternatives
• Alternative 1 - No Build
• Alternative 2 - Full Standard Lane/Shoulder Widths
• Alternative 3 - Reduced Standard Lane/Shoulder Widths
• Alternative 4 - Transportation Systems Management (TSM)
Transportation Demand Management (TDM)
Proposed Project Alternatives: I-605 Corridor
Proposed Project Alternatives: I-5 Corridor
Proposed Project Alternatives: SR-60 Corridor
Environmental Studies
• Air Quality
• Aesthetics
• Biological Resources
• Hazards & Hazardous Materials
• Utilities/Service Systems
• Cultural Resources
• Hydrology/Water Quality
• Noise Impacts
• Community Impacts
• Section 4(f) Resources
• Transportation/Traffic
• Cumulative Analysis
Environmental Approval Process
We are here
Pu
blic
En
gage
me
nt
Anticipated Schedule
Public Scoping Meetings
Circulate Draft Environmental Document
Public Hearing
Final Environmental Document
Preferred Alternative Selected
Fall 2016
Winter 2019
Summer 2020
Spring 2019
2017/2018
Community Information Meetings
Spring 2019
How to Stay Informed
• Provide comments by December 1, 2016
• Submit a comment card at this meeting or send via postal mail to:
Isidro Panuco Project Manager Metro One Gateway Plaza, MS 99-22-9 Los Angeles, CA 90012
Ronald Kosinski Deputy Director Division of Environmental Planning Caltrans District 7 100 South Main Street, MS 16A Los Angeles, CA 90012
Phone: 213 922 4091
Metro.net/605hotspots
Additional Project Contacts
• Newspaper Ads Los Angeles Times
San Gabriel Tribune
La Opinión
Whittier Daily News
Downey Patriot
• Direct Mail Parcel data, project database, elected officials, and agencies
• E-Blast
• Project Website & Social Media
• Extended Outreach – Tool kit & Facebook ads
Notification of Scoping Meetings