I-5 Design | Casino Design, Renovation, Project Planning and Execution
-
Upload
acarpenter -
Category
Design
-
view
441 -
download
0
description
Transcript of I-5 Design | Casino Design, Renovation, Project Planning and Execution
![Page 1: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/1.jpg)
5I‐ DESIGN & MANUFACTURE
800.459.2967 | www.i5design.com | 8751 Commerce Place Drive Lacey, WA 98516
![Page 2: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/2.jpg)
BEFORE
ISLETA RESORT & CASINO ALBUQUERQUE, NM
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 3: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/3.jpg)
BEFORE
ISLETA RESORT & CASINO ALBUQUERQUE, NM
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 4: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/4.jpg)
BEFORE
ISLETA RESORT & CASINO ALBUQUERQUE, NM
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 5: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/5.jpg)
BEFORE
ISLETA RESORT & CASINO ALBUQUERQUE, NM
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 6: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/6.jpg)
CASINO PAUMA
ENTIRE PROPERTY REMODEL
CASINO PAUMA PAUMA VALLEY, CA
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 7: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/7.jpg)
CASINO PAUMA
ENTIRE PROPERTY REMODEL
CASINO PAUMA PAUMA VALLEY, CA
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 8: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/8.jpg)
CASINO PAUMA
ENTIRE PROPERTY REMODEL
CASINO PAUMA PAUMA VALLEY, CA
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 9: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/9.jpg)
CASINO PAUMA
ENTIRE PROPERTY REMODEL
CASINO PAUMA PAUMA VALLEY, CA
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 10: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/10.jpg)
CASINO PAUMA
ENTIRE PROPERTY REMODEL
CASINO PAUMA PAUMA VALLEY, CA
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 11: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/11.jpg)
CASINO PAUMA
ENTIRE PROPERTY REMODEL
CASINO PAUMA PAUMA VALLEY, CA
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 12: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/12.jpg)
CASINO PAUMA
ENTIRE PROPERTY REMODEL
CASINO PAUMA PAUMA VALLEY, CA
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 13: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/13.jpg)
CASINO PAUMA
ENTIRE PROPERTY REMODEL
CASINO PAUMA PAUMA VALLEY, CA
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 14: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/14.jpg)
CASINO PAUMA
ENTIRE PROPERTY REMODEL
CASINO PAUMA PAUMA VALLEY, CA
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 15: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/15.jpg)
CASINO PAUMA
ENTIRE PROPERTY REMODEL
PAUMA VALLEY, CA
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 16: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/16.jpg)
LITTLE CREEK CASINO SHELTON, WA
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 17: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/17.jpg)
LITTLE CREEK CASINO SHELTON, WA
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 18: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/18.jpg)
LITTLE CREEK CASINO SHELTON, WA
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 19: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/19.jpg)
LITTLE CREEK CASINO SHELTON, WA
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 20: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/20.jpg)
THEMING, DECOR, RE-IMAGING, MANUFACTURE, IMPLEMENTATION
www.i5design.com
ROUTE 66 CASINO ALBUQUERQUE, NM
360
& MANUFACTUREI-5 DESIGN
![Page 21: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/21.jpg)
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
ROUTE 66 CASINO ALBUQUREQUE, NM
![Page 22: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/22.jpg)
AVONITE STUDIO COLLECTIONRUBY GLASSCOUNTER TOP
CHEMETALRIPPLECOUNTER FACING DESIGNTEX
ALCAZAR NECTARINEUPHOLSTERY
ARCHITEXMOVIETONE CARDINALUPHOLSTERY
GENON CONTRACT SERENDIPITY MARIGOLDCOMMERCIAL WALLCOVERINGS
GENON CONTRACT SERENDIPITY WILDFLOWERCOMMERCIAL WALLCOVERINGS
SUSAN JABLON MOSAICSHELLS KITCHEN 6GLASS TILE MOSAICS
iMETALAMBERCOLUMN CLADDING
iMETALRUBYCOLUMN CLADDING
ROUTE 66 CASINO ALBUQUERQUE, NM
360 LOUNGEo
FINISH SELECTIONS
& MANUFACTUREI-5 DESIGNTHEMING, DECOR, RE-IMAGING, MANUFACTURE, IMPLEMENTATION
![Page 23: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/23.jpg)
ROUTE 66 CASINO ALBUQUREQUE, NM
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 24: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/24.jpg)
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 25: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/25.jpg)
BEFORE & AFTER
BEFORE
BIG DEX’S PIZZERIA
BEFORE & AFTER5 5I‐ DESIGN | www.i design.com
AFTER
MATERIAL SELECTIONS
![Page 26: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/26.jpg)
MAPLE ROOM BAR2
1
THE PROCESSTRANSFORMING THE DESIGN FROM CONCEPT
TO COMPLETION
3 BEFORE PHOTO OF BAR AREA.
2 COMPLETED PROJECT PHOTO.
1 DESIGN RENDERING CREATED FROM 3D MODEL.
3
5 5I‐ DESIGN | www.i design.com
![Page 27: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/27.jpg)
5 5I‐ DESIGN | www.i design.com
LEELANAU CASINO BAR
![Page 28: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/28.jpg)
DUCK CREEK CASINOCREEK NATION BEGGS, OK
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 29: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/29.jpg)
DUCK CREEK CASINOCREEK NATION BEGGS, OK
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 30: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/30.jpg)
DUCK CREEK CASINOCREEK NATION BEGGS, OK
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 31: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/31.jpg)
DUCK CREEK CASINOCREEK NATION BEGGS, OK
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 32: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/32.jpg)
COMANCHE NATION CASINO LAWTON, OK
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 33: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/33.jpg)
COMANCHE NATION CASINO LAWTON, OK
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 34: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/34.jpg)
COMANCHE NATION CASINO LAWTON, OK
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 35: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/35.jpg)
SPECIALTY MATERIALS
ARCHITECTURAL ELEMENTSAn LED lit trellis suspends over the pit area creating
a dramatic gaming environment.
Textured wall panels combined with sleek metal finishes
add interest and compliment the space.
CUSTOM LIGHTINGChandeliers with warm amber mica diffusers contrast
with the dramatic blue LED lit trellis and cast a warm
glow to the gaming area below.
![Page 36: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/36.jpg)
ENVY NIGHTLIFEROUTE 66 CASINO ALBUQUERQUE, NM
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 37: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/37.jpg)
ENVY NIGHTLIFEROUTE 66 CASINO ALBUQUERQUE, NM
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 38: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/38.jpg)
ONE FIRE CASINOCREEK NATION OKMULGEE, OK
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 39: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/39.jpg)
ONE FIRE CASINOCREEK NATION OKMULGEE, OK
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 40: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/40.jpg)
ONE FIRE CASINOCREEK NATION OKMULGEE, OK
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 41: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/41.jpg)
ONE FIRE CASINOCREEK NATION OKMULGEE, OK
BEFORE
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 42: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/42.jpg)
TRIBE:
FORT GIBSON CASINOLOCATION:
5 5I‐ DESIGN | www.i design.com
CHEROKEE NATIONFORT GIBSON, OK
![Page 43: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/43.jpg)
FORT GIBSON, OKFORT GIBSON CASINO5 5I‐ DESIGN www.i design.com
![Page 44: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/44.jpg)
SPECIALTY METALDecorative panels add interest and color to the space as they mount from counter face.
WOOD CEILING ELEMENTThe wood beam ceiling structure was designed and manufactured in our in‐house facility.
CUSTOM CHANDELIERSWarm amber mica diffusers enclosed in a tribaldesign pattern, cast a warm glow to the gamingarea below.
5 5I‐ DESIGN www.i design.com
FORT GIBSON, OK
FORT GIBSON CASINO
![Page 45: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/45.jpg)
CONCEPTUAL DESIGN RENDERING
CONCEPTUAL SKETCH ‐ SEATING AREA
FORT GIBSON CASINOFROM INITIAL CONCEPT TO COMPLETION
5 5I‐ DESIGN | www.i design.com
![Page 46: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/46.jpg)
CHOCTAW CASINOROUTE 69 CASINO STRINGTOWN, OK
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 47: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/47.jpg)
CHOCTAW CASINOROUTE 69 CASINO STRINGTOWN, OK
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 48: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/48.jpg)
THUNDER ROADROUTE 66 CASINO ALBUQUERQUE, NM
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 49: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/49.jpg)
THUNDER ROADROUTE 66 CASINO ALBUQUERQUE, NM
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 50: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/50.jpg)
THUNDER ROADROUTE 66 CASINO ALBUQUERQUE, NM
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 51: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/51.jpg)
CLASSIC ELEMENTS
CUSTOM LIGHTINGa large custom candle chandelier suspends from the
overhead beam structure to add interest and enhance
the detail of the ceiling.
RAISED SEATING AREAA raised seating area is offset by a giant "Thunder Road"
themed mural and overlooks the bar and stage to provide
a unique space for customers.
A classic ford car exploding through the brick walls,
beckons to the imagery of the 1958 movie “Thunder
Road” from which the venue derives its name.
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 52: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/52.jpg)
THEMING
DECOR
RE-IMAGING
MANUFACTURE
IMPLEMENTATION
800-459-2967
www.i5design.com
BUFFET AREA COLOR BOARD INCLUDED:
HANGING COIL CURTAIN COLORS
SOFFIT COLORS
TABLE, CHAIR & BOOTH SPECIFICATIONS
TILE FLOORING
CUSTOM CARPET PATTERN & COLORS
WALL & CEILING COLOR SPECIFICATION
WALLCOVERING SPECIFICATION
CUSTOM PRINTED WALL MURAL ART
ROUTE 66 BUFFET ALBUQUERQUE, NM
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 53: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/53.jpg)
ROUTE 66 BUFFET ROUTE 66 CASINO ALBUQUERQUE, NM
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 54: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/54.jpg)
STOCKMEN’S CASINOELKO, NV
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 55: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/55.jpg)
STOCKMEN’S CASINOELKO, NV
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 56: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/56.jpg)
STOCKMEN’S CASINOELKO, NV
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 57: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/57.jpg)
STOCKMEN’S CASINOELKO, NV
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 58: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/58.jpg)
CHINOOK WINDS RESORT LINCOLN CITY, OK
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 59: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/59.jpg)
CHINOOK WINDS RESORT LINCOLN CITY, OK
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 60: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/60.jpg)
ARCHITECTURAL DETAILS
CUSTOM LIGHTING
SPECIALTY MATERIALS
Tubular pendant lights suspend from the overhead structure and mirror the amber counter top below.
Covering the architectural mass above the bar, our specialty etched metal creates a unique statement piece in the casino.
Sleek metallic finishes are combined with vibrant leatherupholstery and warm amber diffusers to carry the color theme throughout the design.
![Page 61: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/61.jpg)
THE CORNER BAR5I‐ TRANSFORMED THIS OLD BAR INTO A SLEEK/MODERN ATTRACTION THAT
BROUGHT EXCITEMENT TO THE AREA. THE DESIGN TOOK ADVANTAGE OF THE EXISTING STRUCTURE WHICH ALLOWED FOR THE RENOVATION TO BE COST EFFECTIVE AND IMPRESSIVE.
THE PLAN
BEFORE
For the Corner Bar, I‐5 created a retro fit design that worked within the parameters of the existing
structure. Ensuring a complete design transformation and a seamless implementation plan, each
décor element was pre‐fabricated in‐house at our facility, which allowed for a fast pace renovation
with very little downtime to casino operations. Specialty‐etched metal layered with warm amber
lighting, creates an energetic palette of rust orange and lucky red, and provides an anchor point
for the glowing amber pendant lights and counter top.
“We chose a colorful palette of punchy oranges and reds along with sleek metallic finishes to focus attention to the bar.”
COLOR PALETTE
![Page 62: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/62.jpg)
SEVEN CLANS CASINO ‐ THIEF RIVER FALLS, MN
BEFORE & AFTER
BEFORE
BEFORE
ARTISTIC BIRCH FOREST MURALS (TWILIGHT BLUE)
RIVER ROCK COLUMNS
CUSTOM ETCHED METAL COUNTER FACE
CASHIER SIGN W/ AMBER MICA DIFFUSION PANELS
![Page 63: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/63.jpg)
BEFORE
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
SEVEN CLANS CASINOTHIEF RIVER FALLS, MN
![Page 64: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/64.jpg)
SEVEN CLANS CASINO ‐ TRIPLE SEVEN MALT SHOP
BEFORE & AFTER
BEFORE
BEFORE
![Page 65: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/65.jpg)
CUSTOM CASE WORKAll the cabinetry and counter facings were designed to coordinate
with the classic 50’s malt shop theme.
SPECIALTY MATERIALSI‐5 incorporated their exclusive, high‐gloss etched metal
solution throughout the space creating a signature look
for the Triple Seven Malt Shop.
CLASSIC ELEMENTSFeatured at the entrance of the Malt Shop, benches created
from actual 57 Chevy’s provide an interactive and exciting
experience right from the start. With intricate detail in the
chrome designs and functioning taillights, the classic benches
enhance the 1950’s theme intended for the space.
SEVEN CLANS CASINO TRIPLE SEVEN MALT SHOP
Styled after a classic diner of the
40's & 50's; streamlined overhead
soffits with warm wood veneer and
brushed metal accents, combine
with authentic light fixtures and
vintage automobile artwork, to
create a very entertaining dining
experience.
![Page 66: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/66.jpg)
WILLIAM HILLEL DORADO CASINO RENO, NV
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 67: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/67.jpg)
BOURBON STREET CASINOELKO, NV
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 68: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/68.jpg)
BIRCH THEME - MOOD BOARDLIGHT WOOD
OLD WORLD IRON
BIRCH TREE BARK
BIRCH TREE FOREST
BIRCH COLOR PALETTE
NATURAL RIVER ROCK
SPECIALTY MATERIALS
BIRCH TREE DESIGN MOTIF
LIGHT WOOD BEAMS
![Page 69: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/69.jpg)
VIEW INSIDE BUFFET
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 70: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/70.jpg)
ROYAL RIVER CASINOFLANDREAU, SD
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 71: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/71.jpg)
SPIRIT LAKE CASINOST. MICHEL, ND
5 5I‐ DESIGN | www.i design.com
TURNKEY PROJECTS THAT CREATE RETURN
FROM DESIGN TO COMPLETION
![Page 72: I-5 Design | Casino Design, Renovation, Project Planning and Execution](https://reader035.fdocuments.us/reader035/viewer/2022062405/557d9361d8b42ad6698b521a/html5/thumbnails/72.jpg)
Partial List of Tribes That I-5 Design Has Worked With:
Oneida Nation ‐ NY
Apache Tribe of Oklahoma
Choctaw Nation
Comanche Nation Gaming Board of Directors
Delaware Tribe
Muscogee Creek Nation Tribe
Osage Nation
Seneca Cayuga Tribe
Confederated Tribes of the Siletz Indians
Klamath Tribe
Flandreau Santee Sioux Tribe
Oglala Sioux Tribe
Muckleshoot Tribe
Puyallup Indian Tribe
Skokomish Tribe
Squaxin Island Tribe
Suquamish Tribe
Yakama Indian Nation
Lac Du Flambeau Band of Lake Superior
Tohono O’odham NationBear River Band of Rohnerville RancheriaBishop Paiute TribeCoyote Valley Band of Pomo IndiansHopland Band of Pomo IndiansPauma Band of Luiseno Mission IndiansPit River TribeSanta Ynez Band of Chumash IndiansSmith River RancheriaSoboba Band of Mission IndiansSeminole Tribe of FloridaRed Lake Band of Chippewa IndiansWhite Earth Band Chippewa IndiansSpirit Lake Sioux NationThree Affiliated Tribes of the Fort Berthold Rosebud Sioux Tribal CouncilPueblo of AcomaPueblo of LagunaPueblo of PojoaquePueblo of Santa Ana
“I couldn’t be happier with the finished results, and the way the entire project was taken care of. The designs were absolutely beautiful, the planning was extremely well thought through, and the communication during the project exceeded my expectations ‐ all phases of the project were excellent and very professional. The implementation of the design was so efficient that even though it was an entire exterior and interior remodel/transformation and included the installation of a raised floor and rerouting of the entire electrical service, our doors never closed and revenues never went down, and in fact went up immediately. Both we and our customers are extremely happy with the results.”
Travis Thompson, GM
One Fire Casino (Creek Nation) Okmulgee, OK