Presented by: The City of Dublin | May 14, 2013
Phase 1
I-270/US33 Interchange Upgrade
![Page 2: I-270/US33 Interchange Upgrade TRAC Heari… · IBM Battelle Nationwide Insurance OhioHealth Columbus 1-270/US 33 Interchange Solution PHASE 1 CITY OF DUBLIN„ City of Dublin morpc](https://reader035.fdocuments.us/reader035/viewer/2022081613/5fb435c31b5e345e1715ef89/html5/thumbnails/2.jpg)
Location
Dublin
To US 23/SR 315
To I-70/ Hilliard
To Marysville
![Page 3: I-270/US33 Interchange Upgrade TRAC Heari… · IBM Battelle Nationwide Insurance OhioHealth Columbus 1-270/US 33 Interchange Solution PHASE 1 CITY OF DUBLIN„ City of Dublin morpc](https://reader035.fdocuments.us/reader035/viewer/2022081613/5fb435c31b5e345e1715ef89/html5/thumbnails/3.jpg)
Economic Influence
![Page 4: I-270/US33 Interchange Upgrade TRAC Heari… · IBM Battelle Nationwide Insurance OhioHealth Columbus 1-270/US 33 Interchange Solution PHASE 1 CITY OF DUBLIN„ City of Dublin morpc](https://reader035.fdocuments.us/reader035/viewer/2022081613/5fb435c31b5e345e1715ef89/html5/thumbnails/4.jpg)
The Problem… Congestion & Safety
33
![Page 5: I-270/US33 Interchange Upgrade TRAC Heari… · IBM Battelle Nationwide Insurance OhioHealth Columbus 1-270/US 33 Interchange Solution PHASE 1 CITY OF DUBLIN„ City of Dublin morpc](https://reader035.fdocuments.us/reader035/viewer/2022081613/5fb435c31b5e345e1715ef89/html5/thumbnails/5.jpg)
Meets Application Criteria
• Freight
• Improves geometry of interchange ramps
• Intermodal connector
• Removes truck bottlenecks
![Page 6: I-270/US33 Interchange Upgrade TRAC Heari… · IBM Battelle Nationwide Insurance OhioHealth Columbus 1-270/US 33 Interchange Solution PHASE 1 CITY OF DUBLIN„ City of Dublin morpc](https://reader035.fdocuments.us/reader035/viewer/2022081613/5fb435c31b5e345e1715ef89/html5/thumbnails/6.jpg)
Funding
• Phase 1 total: $91.75 million
– TRAC application request through 2016: $46 million
– Dublin match: $17.25 million
Clear environmental
60% design for full interchange
Finalize Phase 1 design
Construction
– MORPC Attributable Funding
$7 million awarded for construction
$18 million additional being considered
![Page 7: I-270/US33 Interchange Upgrade TRAC Heari… · IBM Battelle Nationwide Insurance OhioHealth Columbus 1-270/US 33 Interchange Solution PHASE 1 CITY OF DUBLIN„ City of Dublin morpc](https://reader035.fdocuments.us/reader035/viewer/2022081613/5fb435c31b5e345e1715ef89/html5/thumbnails/7.jpg)
Recommended Phase 1 Solution
New pavement
Pavement removed
![Page 8: I-270/US33 Interchange Upgrade TRAC Heari… · IBM Battelle Nationwide Insurance OhioHealth Columbus 1-270/US 33 Interchange Solution PHASE 1 CITY OF DUBLIN„ City of Dublin morpc](https://reader035.fdocuments.us/reader035/viewer/2022081613/5fb435c31b5e345e1715ef89/html5/thumbnails/8.jpg)
Recommended Phase 2 Solution
Phase 1 new pavement
Phase 1 pavement removed
Phase 2 new pavement
Phase 2 pavement removed