CLONMINAM INDUSTRIAL ESTATE PORTLAOISE CO.LAOIS Tel: 057 8678600 Fax: eMail: [email protected] HYDROSTATIC AND PRESURE TESTING Client: LUFTHANSA TECHNIK AIRMOTIVE IRL. BALDONNELL DUBLIN Tel. 0872364168 Project number: 6 Project: Start of project: 09/04/2014 09:49:39 Principale cont.: Last change: 30/04/2014 18:58:43 Side 1 © 1999-2013, Sklarz GmbH For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 31-07-2015:23:37:23

Transcript of HYDROSTATIC AND PRESURE TESTING - epawebapp.epa.ie

Page 1: HYDROSTATIC AND PRESURE TESTING - epawebapp.epa.ie

CLONMINAM INDUSTRIAL ESTATE PORTLAOISE CO.LAOISTel: 057 8678600 Fax:eMail: [email protected]

HYDROSTATIC AND PRESURE TESTING

Client: LUFTHANSA TECHNIK AIRMOTIVE IRL. BALDONNELL DUBLIN

Tel. 0872364168

Project number: 6

Project:

Start of project: 09/04/2014 09:49:39

Principale cont.:

Last change: 30/04/2014 18:58:43

Side 1© 1999-2013, Sklarz GmbH

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 31-07-2015:23:37:23

Page 2: HYDROSTATIC AND PRESURE TESTING - epawebapp.epa.ie

Order no.: 6 Test no.: 67

PORTLAOISE CO.LAOIS - CLONMINAM INDUSTRIAL ESTATE - Tel : 057 8678600

Client:LUFTHANSA TECHNIK AIRMOTIVE IRL. BALDONNELL DUBLINTel. 0872364168

Pressure test report Pipe - Air/EN 1610

0 1 2 3 4 5 6 7 8 9 10 11Time in min

Pressure

0.0 mbar

127.1 mbar

112.1 mbar

140.0 mbar

Pressure build-upPre-fill time

Test duration Pressure drop

Location :Location : DUBLIN Drawing No. :Street : BALDONNELL Section no.: :Tester : Ray o Connell from manhole : F 1ETest equipment : MASTERTEST® SN:130515 to manhole : F 22.1Order no. : 6 Length of test section : 97.5 mTest date : 30/04/2014 11:16:09 Pipe profile : CircleTest method : Air/EN 1610 Diameter : 225 mmTest category : Air LCTest section : Pipe Pipe no. :Material : PVC Internal protection : withoutRemark :

Sensor : PMC131 -300 - +300 mbar, SN: H4086001052 Sensor test : 16/05/2013Approval :

Test pressure : 127.1 mbar Pre-fill time : 5:02 minPermiss. pressure loss : 15.0 mbar Test duration : 3:01 minAct. pressure loss : -2.6 mbar Result : Passed

Testing contractor Client

Side 2© 1999-2013, Sklarz GmbH

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 31-07-2015:23:37:23

Page 3: HYDROSTATIC AND PRESURE TESTING - epawebapp.epa.ie

Order no.: 6 Test no.: 68

PORTLAOISE CO.LAOIS - CLONMINAM INDUSTRIAL ESTATE - Tel : 057 8678600Client:LUFTHANSA TECHNIK AIRMOTIVE IRL. BALDONNELL DUBLINTel. 0872364168

Pressure test report Pipe - Air/EN 1610

0 1 2 3 4 5 6 7 8Time in min

Pressure

0.0 mbar

148.7 mbar133.7 mbar

164.0 mbar

Pressure build-upPre-fill time

Test duration Pressure drop

Location :Location : Dublin Drawing No. :Street : Baldonnell Section no.: :Tester : Ray o Connell from manhole : ALK 1Test equipment : MASTERTEST® SN:130515 to manhole : ALK 1AOrder no. : 6 Length of test section : 15.5 mTest date : 30/04/2014 14:18:31 Pipe profile : CircleTest method : Air/EN 1610 Diameter : 100 mmTest category : Air LCTest section : Pipe Pipe no. :Material : PVC Internal protection : withoutRemark :

Sensor : PMC131 -300 - +300 mbar, SN: H4086001052 Sensor test : 16/05/2013Approval :

Test pressure : 148.7 mbar Pre-fill time : 5:00 minPermiss. pressure loss : 15.0 mbar Test duration : 3:03 minAct. pressure loss : -0.8 mbar Result : Passed

Testing contractor Client

Side 3© 1999-2013, Sklarz GmbH

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 31-07-2015:23:37:23

Page 4: HYDROSTATIC AND PRESURE TESTING - epawebapp.epa.ie

Order no.: 6 Test no.: 69

PORTLAOISE CO.LAOIS - CLONMINAM INDUSTRIAL ESTATE - Tel : 057 8678600Client:LUFTHANSA TECHNIK AIRMOTIVE IRL. BALDONNELL DUBLINTel. 0872364168

Pressure test report Pipe - Air/EN 1610

0 1 2 3 4 5 6 7 8Time in min

Pressure

0.0 mbar

139.1 mbar

124.1 mbar

153.0 mbar

Pressure build-upPre-fill time

Test duration Pressure drop

Location :Location : Dublin Drawing No. :Street : Baldonnell Section no.: :Tester : Ray o Connell from manhole : ACID 2Test equipment : MASTERTEST® SN:130515 to manhole : SUMPOrder no. : 6 Length of test section : 7.0 mTest date : 30/04/2014 14:28:59 Pipe profile : CircleTest method : Air/EN 1610 Diameter : 150 mmTest category : Air LCTest section : Pipe Pipe no. :Material : Relined clay Internal protection : withoutRemark :

Sensor : PMC131 -300 - +300 mbar, SN: H4086001052 Sensor test : 16/05/2013Approval :

Test pressure : 139.1 mbar Pre-fill time : 5:00 minPermiss. pressure loss : 15.0 mbar Test duration : 3:01 minAct. pressure loss : 0.0 mbar Result : Passed

Testing contractor Client

Side 4© 1999-2013, Sklarz GmbH

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 31-07-2015:23:37:23

Page 5: HYDROSTATIC AND PRESURE TESTING - epawebapp.epa.ie

Order no.: 6 Test no.: 70

PORTLAOISE CO.LAOIS - CLONMINAM INDUSTRIAL ESTATE - Tel : 057 8678600Client:LUFTHANSA TECHNIK AIRMOTIVE IRL. BALDONNELL DUBLINTel. 0872364168

Pressure test report Pipe - Air/EN 1610

0 1 2 3 4 5 6 7 8Time in min

Pressure

0.0 mbar

141.0 mbar126.0 mbar

156.0 mbar

Pressure build-upPre-fill time

Test duration Pressure drop

Location :Location : Dublin Drawing No. :Street : Baldonnell Section no.: :Tester : Ray o Connell from manhole : F26Test equipment : MASTERTEST® SN:130515 to manhole : F14AOrder no. : 6 Length of test section : 7.3 mTest date : 30/04/2014 15:57:54 Pipe profile : CircleTest method : Air/EN 1610 Diameter : 100 mmTest category : Air LCTest section : Pipe Pipe no. :Material : PVC Internal protection : withoutRemark :

Sensor : PMC131 -300 - +300 mbar, SN: H4086001052 Sensor test : 16/05/2013Approval :

Test pressure : 141.0 mbar Pre-fill time : 5:00 minPermiss. pressure loss : 15.0 mbar Test duration : 3:01 minAct. pressure loss : -10.1 mbar Result : Passed

Testing contractor Client

Side 5© 1999-2013, Sklarz GmbH

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 31-07-2015:23:37:23

Page 6: HYDROSTATIC AND PRESURE TESTING - epawebapp.epa.ie

Order no.: 6 Test no.: 71

PORTLAOISE CO.LAOIS - CLONMINAM INDUSTRIAL ESTATE - Tel : 057 8678600Client:LUFTHANSA TECHNIK AIRMOTIVE IRL. BALDONNELL DUBLINTel. 0872364168

Pressure test report Pipe - Air/EN 1610

0 1 2 3 4 5 6 7 8Time in min

Pressure

0.0 mbar

180.2 mbar165.2 mbar

199.0 mbar

Pressure build-upPre-fill time

Test duration Pressure drop

Location :Location : Dublin Drawing No. :Street : Baldonnell Section no.: :Tester : Ray o Connell from manhole : F27Test equipment : MASTERTEST® SN:130515 to manhole : F23Order no. : 6 Length of test section : 7.0 mTest date : 30/04/2014 16:10:18 Pipe profile : CircleTest method : Air/EN 1610 Diameter : 100 mmTest category : Air LCTest section : Pipe Pipe no. :Material : PVC Internal protection : withoutRemark :

Sensor : PMC131 -300 - +300 mbar, SN: H4086001052 Sensor test : 16/05/2013Approval :

Test pressure : 180.2 mbar Pre-fill time : 5:02 minPermiss. pressure loss : 15.0 mbar Test duration : 3:00 minAct. pressure loss : -0.1 mbar Result : Passed

Testing contractor Client

Side 6© 1999-2013, Sklarz GmbH

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 31-07-2015:23:37:23

Page 7: HYDROSTATIC AND PRESURE TESTING - epawebapp.epa.ie

Order no.: 6 Test no.: 72

PORTLAOISE CO.LAOIS - CLONMINAM INDUSTRIAL ESTATE - Tel : 057 8678600Client:LUFTHANSA TECHNIK AIRMOTIVE IRL. BALDONNELL DUBLINTel. 0872364168

Pressure test report Pipe - Air/EN 1610

0 1 2 3 4 5 6 7 8 9Time in min

Pressure

0.0 mbar

125.6 mbar

110.6 mbar

139.0 mbar

Pressure build-upPre-fill time

Test duration Pressure drop

Location :Location : Dublin Drawing No. :Street : Baldonnell Section no.: :Tester : Ray o Connell from manhole : F3Test equipment : MASTERTEST® SN:130515 to manhole : F3AOrder no. : 6 Length of test section : 13.0 mTest date : 30/04/2014 18:27:00 Pipe profile : CircleTest method : Air/EN 1610 Diameter : 150 mmTest category : Air LCTest section : Pipe Pipe no. :Material : Relined pvc Internal protection : withoutRemark :

Sensor : PMC131 -300 - +300 mbar, SN: H4086001052 Sensor test : 16/05/2013Approval :

Test pressure : 125.6 mbar Pre-fill time : 5:02 minPermiss. pressure loss : 15.0 mbar Test duration : 3:00 minAct. pressure loss : -0.7 mbar Result : Passed

Testing contractor Client

Side 7© 1999-2013, Sklarz GmbH

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 31-07-2015:23:37:23

Page 8: HYDROSTATIC AND PRESURE TESTING - epawebapp.epa.ie

Order no.: 6 Test no.: 73

PORTLAOISE CO.LAOIS - CLONMINAM INDUSTRIAL ESTATE - Tel : 057 8678600Client:LUFTHANSA TECHNIK AIRMOTIVE IRL. BALDONNELL DUBLINTel. 0872364168

Pressure test report Pipe - Air/EN 1610

0 1 2 3 4 5 6 7 8 9Time in min

Pressure

0.0 mbar

125.8 mbar

110.8 mbar

139.0 mbar

Pressure build-upPre-fill time

Test duration Pressure drop

Location :Location : Dublin Drawing No. :Street : Baldonnell Section no.: :Tester : Ray o Connell from manhole : F27.2Test equipment : MASTERTEST® SN:130515 to manhole : F27.3Order no. : 6 Length of test section : 25.0 mTest date : 30/04/2014 18:37:41 Pipe profile : CircleTest method : Air/EN 1610 Diameter : 100 mmTest category : Air LCTest section : Pipe Pipe no. :Material : PVC Internal protection : withoutRemark :

Sensor : PMC131 -300 - +300 mbar, SN: H4086001052 Sensor test : 16/05/2013Approval :

Test pressure : 125.8 mbar Pre-fill time : 5:02 minPermiss. pressure loss : 15.0 mbar Test duration : 3:01 minAct. pressure loss : -0.7 mbar Result : Passed

Testing contractor Client

Side 8© 1999-2013, Sklarz GmbH

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 31-07-2015:23:37:23

Page 9: HYDROSTATIC AND PRESURE TESTING - epawebapp.epa.ie

Order no.: 6 Test no.: 74

PORTLAOISE CO.LAOIS - CLONMINAM INDUSTRIAL ESTATE - Tel : 057 8678600Client:LUFTHANSA TECHNIK AIRMOTIVE IRL. BALDONNELL DUBLINTel. 0872364168

Pressure test report Pipe - Air/EN 1610

0 1 2 3 4 5 6 7 8Time in min

Pressure

0.0 mbar

128.6 mbar

113.6 mbar

142.0 mbar

Pressure build-upPre-fill time

Test duration Pressure drop

Location :Location : Dublin Drawing No. :Street : Baldonnell Section no.: :Tester : Ray o Connell from manhole : F11Test equipment : MASTERTEST® SN:130515 to manhole : F11AOrder no. : 6 Length of test section : 8.0 mTest date : 30/04/2014 18:48:05 Pipe profile : CircleTest method : Air/EN 1610 Diameter : 150 mmTest category : Air LCTest section : Pipe Pipe no. :Material : Relined clay Internal protection : withoutRemark :

Sensor : PMC131 -300 - +300 mbar, SN: H4086001052 Sensor test : 16/05/2013Approval :

Test pressure : 128.6 mbar Pre-fill time : 5:00 minPermiss. pressure loss : 15.0 mbar Test duration : 3:02 minAct. pressure loss : -0.7 mbar Result : Passed

Testing contractor Client

Side 9© 1999-2013, Sklarz GmbH

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 31-07-2015:23:37:23

Page 10: HYDROSTATIC AND PRESURE TESTING - epawebapp.epa.ie

Order no.: 6 Test no.: 75

PORTLAOISE CO.LAOIS - CLONMINAM INDUSTRIAL ESTATE - Tel : 057 8678600Client:LUFTHANSA TECHNIK AIRMOTIVE IRL. BALDONNELL DUBLINTel. 0872364168

Pressure test report Pipe - Air/EN 1610

0 1 2 3 4 5 6 7 8 9Time in min

Pressure

0.0 mbar

120.2 mbar

105.2 mbar

133.0 mbar

Pressure build-upPre-fill time

Test duration Pressure drop

Location :Location : Dublin Drawing No. :Street : Baldonnell Section no.: :Tester : Ray o Connell from manhole : F11ATest equipment : MASTERTEST® SN:130515 to manhole : F20Order no. : 6 Length of test section : 32.2 mTest date : 30/04/2014 18:58:43 Pipe profile : CircleTest method : Air/EN 1610 Diameter : 150 mmTest category : Air LCTest section : Pipe Pipe no. :Material : Relined clay Internal protection : withoutRemark :

Sensor : PMC131 -300 - +300 mbar, SN: H4086001052 Sensor test : 16/05/2013Approval :

Test pressure : 120.2 mbar Pre-fill time : 5:01 minPermiss. pressure loss : 15.0 mbar Test duration : 3:02 minAct. pressure loss : -0.5 mbar Result : Passed

Testing contractor Client

Side 10© 1999-2013, Sklarz GmbH

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 31-07-2015:23:37:23

Page 11: HYDROSTATIC AND PRESURE TESTING - epawebapp.epa.ie

Order no.: 6 Test no.: 75Pipe Air/VacuumDiameter Manhole Test

Test no. Section no. from Location Standard Test pressure in mbarTest date No. to Street Procedure Length in m Result

Pressure loss

10068 ALK 1 Dublin EN 1610 100 -0.7530/04/2014 14:18:31 ALK 1A Baldonnell Air LC 15.5 Passed

70 F26 Dublin EN 1610 100 -10.0930/04/2014 15:57:54 F14A Baldonnell Air LC 7.3 Passed

71 F27 Dublin EN 1610 100 -0.1130/04/2014 16:10:18 F23 Baldonnell Air LC 7.0 Passed

73 F27.2 Dublin EN 1610 100 -0.6830/04/2014 18:37:41 F27.3 Baldonnell Air LC 25.0 Passed

Quantity 4 PassedTotal length in m: 54.80

15069 ACID 2 Dublin EN 1610 100 0.0030/04/2014 14:28:59 SUMP Baldonnell Air LC 7.0 Passed

72 F3 Dublin EN 1610 100 -0.6830/04/2014 18:27:00 F3A Baldonnell Air LC 13.0 Passed

74 F11 Dublin EN 1610 100 -0.7130/04/2014 18:48:05 F11A Baldonnell Air LC 8.0 Passed

75 F11A Dublin EN 1610 100 -0.4930/04/2014 18:58:43 F20 Baldonnell Air LC 32.2 Passed

Side 11© 1999-2013, Sklarz GmbH

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 31-07-2015:23:37:23

Page 12: HYDROSTATIC AND PRESURE TESTING - epawebapp.epa.ie

Order no.: 6 Test no.: 75

Quantity 4 PassedTotal length in m: 60.20

22567 F 1E DUBLIN EN 1610 100 -2.6330/04/2014 11:16:09 F 22.1 BALDONNELL Air LC 97.5 Passed

Quantity 1 PassedTotal length in m: 97.50

Side 12© 1999-2013, Sklarz GmbH

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 31-07-2015:23:37:23