    Scope and Options for RefurbishingExisting Facilities

    UN Symposium on Hydropower and Sustainable

    Development

    Beijing, October 2004

    Presentation by

    Dr. Konrad RothPresident

    Shanghai Hydro Equipment Company SHEC'[email protected]'

  • 7/25/2019 hydro_roth_refurbishment.pdf

    2/20

    2

    Table of Content

    Technical Scope

    Market Scope

    Benefits and Costs

    Procedural Options

  • 7/25/2019 hydro_roth_refurbishment.pdf

    3/20

    3

    Modernization (beyond maintenance) consists of:

    Plant Rehabilitation to restore it to its original designperformance. Improves plant reliability and extendsservice life

    Plant Upgrading is based on advances in technology,

    design and materials since the plant was commissioned orits last rehabilitation. Improves plant efficiency, outputand reliability, extends service life and reduces losses

    Plant Automation is the replacement of obsolete andunreliable control systems with up-to-date technology.Enables an older power plant to be operated with thesame degree of reliability/performance as a new plant

    HYDRO POWER PLANT MODERNIZATION

    SCOPE DEFINITIONS (I)

    3

  • 7/25/2019 hydro_roth_refurbishment.pdf

    4/20

    4

    HYDRO POWER PLANT MODERNIZATION

    SCOPE DEFINITIONS (II)

    Time

    Revenues

    End of warrantyCommissioning

    Upgrading

    Rehabilitation

    Breakdown Repair

    Degradation

    of condition

    4

  • 7/25/2019 hydro_roth_refurbishment.pdf

    5/20

    5

    ITEMS* IN HYDRO PLANTS

    THAT CAN BE MODERNIZED

    3

    2

    4

    5

    68

    4

    9

    7

    1011. Gates

    2. Penstocks

    3. Inlet valve

    4. Turbine5. Generator

    6. Automation, Control & Protection

    7. Medium Voltage Switchgear

    8. Power Transformer

    9. High Voltage Switchgear (GIS)

    10.Transmission Line

    *Other than civil works 5

  • 7/25/2019 hydro_roth_refurbishment.pdf

    6/20

    6

    Applicable new technologies in modernizing

    Hydropower Plants:

    VPI High Voltage Generator Insulation

    New Hydraulic Shapes to improve

    output and efficiency Use of surface coatings extend the Service

    Intervals and slow down efficiency decline

    Oil-free and Fish-friendly turbines

    TECHNICAL INNOVATIONS

    6

  • 7/25/2019 hydro_roth_refurbishment.pdf

    7/20

    7

    Paldang, Korea, 4 X 30 MW Bulb

    Head Increase of 2.2 m

    newanchorsnew

    statornew wicket

    gates new drafttube

    Comprehensive Refurbishment with actual increases of 38% inenergy generation and 50% in installed capacity (Source: Alstom)

  • 7/25/2019 hydro_roth_refurbishment.pdf

    8/20

    8

    Upgrading of the Raccoon Mountain1900 MVA pumped storage plant (built 1979),Source: Voith Siemens Hydro

    Project objectives:increase plant capacity as well as plant reliability

    CASE STUDIES:

    TENNESSEE VALLEY AUTHORITY (USA)

    Key Project Data

    Contract Award

    Unit Output

    Increase

    Efficiency Increase

    Others

    Pump Turbines

    January 1998

    422 MW481 MW

    1.62% - points (T)

    1.55% - points (P)

    New/revised

    spherical valves

    Generators-Motors

    December 1998

    425 MVA476 MVA

    12%

    Excessive vibrations

    eliminated8

  • 7/25/2019 hydro_roth_refurbishment.pdf

    9/20

    9

    Why is Modernization favourable?

    Investments with short amortization times

    Efficiency improvement / output improvementReduction of the maintenance costs

    Avoiding CO2 emissions

    (Kyoto approach European / intl. emission trading - JI/CDM)

    NO additional impact on the environment

    Almost half of the total installed hydro capacity worldwide is older than30 years. And it pays to modernize existing hydro systems:

  • 7/25/2019 hydro_roth_refurbishment.pdf

    10/20

    10

    Market Scope

    Global Annually Installed Capacity

    0

    5.000

    10.000

    15.000

    20.000

    25.000

    30.000

    1.930 1.940 1.950 1.960 1.970 1.980 1.990 2.000

    AnnualCapacityAddition(MW

    )

    North America Europe South & Central AmericaAsia Excl. China China Middle East & Africa

    The ageing of the existing installed base generatesThe ageing of the existing installed base generates

    a strong underlying growth trend for modernisationa strong underlying growth trend for modernisation

  • 7/25/2019 hydro_roth_refurbishment.pdf

    11/20

    11

    Hydro Modernization

    Market Scope

    0

    2.000

    4.000

    6.000

    8.000

    10.000

    12.000

    92 93 94 95 96 97 98 99 00 01 F02 F03 F04

    Orders(MW)

    MIDDLE EAST & AFRICA

    CHINA

    ASIA EXCL_ CHINA

    SOUTH & CENTRAL AMERICA

    EUROPE

    NORTH AMERICA

    Total Orders for Refurbishment Close to 10 GW p.a.Total Orders for Refurbishment Close to 10 GW p.a.

    With 100 US$/kW this requires 1000 mUS$!With 100 US$/kW this requires 1000 mUS$!

    NAM and Europe Remain the Main Markets (70% of Total)NAM and Europe Remain the Main Markets (70% of Total)

  • 7/25/2019 hydro_roth_refurbishment.pdf

    12/20

    12

    Certificate Subsidies Increase Market

    Scope (Source: VA Tech)

    Legal initiation through ROCs (=Renewable Obligation Certificates) in 2001.Increasing the share of renewable energies up to 2010 is subsidized.

    Investments in the refurbishment of existing small hydropower plants.

    CruachanOutput improvement:+30%

    CO2 reduction:

    130,000 t/year

    GaurOutput improvement:+12%

    CO2 reduction:

    4,000 t/year

    KilmorackOutput improvement:+5%

    CO2 reduction:

    4,800 t/year

    AigasOutput improvement:+5%

    CO2 reduction:

    4,800 t/year

    Output Improvement of Hydropower Plants in the UK

    Refurbishment: Renewable Obligation Certificates

  • 7/25/2019 hydro_roth_refurbishment.pdf

    13/20

    13

    Plant modernization can extend plant capacity ata fraction of the cost of greenfield plant capacity.

    For example, the USBR has undertaken a major programof upgrading its hydro power electrical systems at anaverage cost of US$ 69/KW

    Example: Rehabilitating a Hydro Power Plant of 100 MW,producing 500 GWh per year,will cost about 8 - 15 m$ capital cost (80-150 US$/kW),generate a revenue of 15 m$ per year

    for an operating cost as low as 2,5 m$ per year (no fuel cost)

    Low capital cost MW - Low operating cost MWh

    BENEFITS AND COSTS OFHYDROPOWER PLANT MODERNIZATION

    13

  • 7/25/2019 hydro_roth_refurbishment.pdf

    14/20

    14

    Capacity (MW)

    Max. Uprate

    for Turbine

    GeneratorLimit

    Transformer

    Limit

    ExistingTurbine

    60

    50

    58

    52

    1.25 Uprate Costs ($M).5 1.6

    IRR=27%

    IRR=30%

    IRR=23%

    New Runner New Transformer New Winding

    SIMPLE EXAMPLE OF OPTIMIZATION

    ANALYSIS FOR UPRATE

    Source:14

  • 7/25/2019 hydro_roth_refurbishment.pdf

    15/20

    15

    TimeEnergy=f(Availability,P

    erformance,H

    ydrology)

    Existing As-New Energy

    Current Energy-Before Mod

    Failure

    Life Extension Benefit -Avoidance of Future Failure

    Restoration Benefit -

    from Current Energy to

    As-New Levels

    Optimization Benefit

    Uprate Benefit

    Uprated Energy

    Anticipated Future Energy - without Mod.

    Optimized Operational Energy

    Cost

    allocation

    30 - 40 %

    70 - 60 %

    Source:

    COST ALLOCATION TO SPECIFIC

    ENERGY INCREASES

    15

  • 7/25/2019 hydro_roth_refurbishment.pdf

    16/20

    16

    OPTIONS TO PROCEED

    Assessment of a number of preselected plants forprioritizing the plants to be modernized accordingto the highest IRR

    a) either through a Consultant

    b) or in direct cooperation with one or more

    potential supplier(s)

    Result of the assessment phase:

    scope and cost of modernization power output,revenues,operating cost schedule

    IRR

    16

  • 7/25/2019 hydro_roth_refurbishment.pdf

    17/20

    17

    EVALUATION OF ALTERNATIVES (I)

    Alternative a): Consultant

    independance of supply interests

    standard procedure of development banks

    integrated approach for all plant elements

    suppliers special modernization know howintroduced only indirectly

    scope/specification does not reflect special

    supplier technologies contract wording and performance inherently based

    on diverging interests of customer,consultant andsupplier

    17

  • 7/25/2019 hydro_roth_refurbishment.pdf

    18/20

    18

    EVALUATION OF ALTERNATIVES (II)

    Alternative b): Supplier

    special suppliers know how and technologies lead to

    optimized scope and most precise cost information

    performance based contract with bonus/malus system leads tocommon interests of customer and supplier during contract

    execution in achieving highest IRR

    shortening of time to re-commissioning by approx. one yearincreases return

    corresponds to + of alternative a) 18

  • 7/25/2019 hydro_roth_refurbishment.pdf

    19/20

    19

    Assumptions

    20 MW Plant

    50% Capacity Factor

    Average Value of Incremental Generation = $30/MW-HR

    Total Project Value = $4M (Life Extension & Uprate)

    Calculations

    Capacity Increase

    10% 15% 20%MW 2 3 4

    MW-HRS 8,760 13,140 17,520

    Revenue $263K $394K $525,600

    % of Total Contract(Life Extension & Uprate)

    7% 10% 13%

    EXAMPLE OF SAVINGS FOR BEING

    ONE YEAR EARLIER ON LINE

    19

  • 7/25/2019 hydro_roth_refurbishment.pdf

    20/20

    20

    EVALUATION OF ALTERNATIVES (III)

    Possible solution for combining advantages of a) and b):

    consultant responsible for the overall project managementintegrating the environmental and regulatory tasks,the civilconstruction tasks and the equipment tasks

    equipment tasks (starting with the assessment) performedon the basis of performance based contracting

    different suppliers work on different projects

    competitive benchmark of results (IRRs) before approval

    of project execution 20