Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS...

21
PLANT REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS CHEMINS DE FER FEDERAUX SWITZERLAND SALZBURG AG A USTRIA ENERGIE AG OBERÖSTERREICH A USTRIA STÄDT. ELEKTRIZITÄTS- UND WASSERWERK BRUNECK IT AL Y DOMLEC DOMINICA ELECTRICITY SERVICES LTD. DOMINICA - WEST INDIES KREBSÖGE 1) VERNAYAZ 1) WALD 1) ARTHURWERK 1) KNIEPASS 1) NEW TRAFALGAR 1) CUSTOMER COUNTRY YEAR OF SUPPLY ANDINO SUPPLIES PLANT 1 1 2 1 1 2 1 2 1 3 2 2 2 Hydropower Engineering 1 TURBINES, VALVES, ELECTRO-MECHANICAL EQUIPMENT & TURNKEY CONTRACTS EQUIPMENT SUPPLIED SINCE 1986 RESPECTIVELY WORKS UNDER CONSTRUCTION Release date: 15.02.2010 Vertical KAPLAN Turbine N = 1250 kW Hmax = 30 m Butterfly Valve D = 1200 mm Horizontal PELTON Turbines N = 38000 kW/unit H = 640 m Vertical FRANCIS Turbine N = 20500 kW H = 178 m Spherical Valve D = 1300 mm Butterfly Valves D = 1800 mm Horizontal PELTON Turbine N = 6000 kW H = 263 m KAPLAN "S" Type Turbines N = 3015 kW/unit H = 12.3 m KAPLAN "S" Type Turbine N = 1220 kW H = 12.3 m Speed Increasers Horizontal PELTON Turbines N = 1760 kW/unit H = 280.5 m Spherical Valves D = 450 mm Syn. Generators with brushless excitation B 3, 2200 kVA, 750 rpm each 1986 1986 1988 1989 1990 1990

Transcript of Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS...

Page 1: Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS CHEMINS DE FER FEDERAUX SWITZERLAND SALZBURG AG AUSTRIA ENERGIE AG OBERÖSTERREICH

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

WUPPERVERBAND

GERMANY

CFF - SBB - FFSCHEMINS DE FER FEDERAUX

SWITZERLAND

SALZBURG AG

AUSTRIA

ENERGIE AGOBERÖSTERREICH

AUSTRIA

STÄDT. ELEKTRIZITÄTS- UNDWASSERWERK BRUNECK

ITALY

DOMLECDOMINICA ELECTRICITYSERVICES LTD.

DOMINICA - WEST INDIES

KREBSÖGE 1)

VERNAYAZ 1)

WALD 1)

ARTHURWERK 1)

KNIEPASS 1)

NEW TRAFALGAR 1)

CUSTOMER

COUNTRY

YEAR OF

SUPPLY

ANDINO SUPPLIESPLANT

1

1

2

1

12

1

2

1

3

2

22

Hydropower Engineering

1

TURBINES, VALVES, ELECTRO-MECHANICAL EQUIPMENT & TURNKEY CONTRACTS EQUIPMENT SUPPLIED SINCE 1986 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 15.02.2010

Vertical KAPLAN TurbineN = 1250 kWHmax = 30 mButterfly Valve D = 1200 mm

Horizontal PELTON TurbinesN = 38000 kW/unitH = 640 m

Vertical FRANCIS TurbineN = 20500 kWH = 178 mSpherical Valve D = 1300 mmButterfly Valves D = 1800 mm

Horizontal PELTON TurbineN = 6000 kWH = 263 m

KAPLAN "S" Type TurbinesN = 3015 kW/unitH = 12.3 mKAPLAN "S" Type TurbineN = 1220 kWH = 12.3 mSpeed Increasers

Horizontal PELTON TurbinesN = 1760 kW/unitH = 280.5 mSpherical Valves D = 450 mmSyn. Generators with brushlessexcitation B 3, 2200 kVA, 750 rpm each

1986

1986

1988

1989

1990

1990

Page 2: Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS CHEMINS DE FER FEDERAUX SWITZERLAND SALZBURG AG AUSTRIA ENERGIE AG OBERÖSTERREICH

TURBINES, VALVES, ELECTRO-MECHANICAL EQUIPMENT & TURNKEY CONTRACTS EQUIPMENT SUPPLIED SINCE 1986 RESPECTIVELY WORKS UNDER CONSTRUCTION

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

DOMLECDOMINICA ELECTRICITYSERVICES LTD.

DOMINICA - WEST INDIES

R W ERHEINISCH-WESTFÄLISCHEELEKTRIZITÄTSWERKE AG

GERMANY

RONELEIGH / ALTEKEL. SANT. TESIS ISL.VE TIC. A.S.

TURKEY

THE CITY OF SEATTLECITY LIGHT DEPARTMENT

U.S.A.

PREUSSEN ELEKTRA AG

GERMANY

LAUDAT 1)

NIEDERHAUSEN 1)

HASANLAR 1)

GORGE 1)

HEMFURTH 1)

Horizontal PELTON TurbineN = 1300 kWH = 211 mSpherical Valve D = 450 mmSyn. Generator with brushlessexcitation B 3, 1650 kVA, 750 rpmTurnkey Electrical Control Equip-ment for both power stations incl.Power Transformers 11 kV Switchgear and Telecontrol System

Vertical KAPLAN TurbineN = 1398 kWH = 5.65 mVertical KAPLAN TurbineN = 550 kWH = 5.65 m

Horizontal FRANCIS TurbinesN = 4550 kW/unitH = 46.2 mButterfly Valves D = 1500 mmSyn. Generators with brushlessexcitation D6, 5500 kVA, 500 rpm eachAutomatic and Supervisory Controland Measuring System

Vertical FRANCIS TurbinesN = 38000 kW/unitH = 100 m

Vertical FRANCIS TurbinesN = 10100 kW/unitH = 41 mButterfly Valves D = 2500 mmSyn. Generators with programmablestatic excitation W 41, 12.5 MVA, 250 rpm each with leads and neutralcubicles

1990

1991

1991

19921993

1993

CUSTOMER

COUNTRY

YEAR OF

SUPPLY

ANDINO SUPPLIESPLANT

1

11

1

1

2

22

1

2

2

22

Hydropower Engineering

2Release date: 15.02.2010

Page 3: Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS CHEMINS DE FER FEDERAUX SWITZERLAND SALZBURG AG AUSTRIA ENERGIE AG OBERÖSTERREICH

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

THE CITY OF SEATTLECITY LIGHT DEPARTMENT

U.S.A.

IRRICANIRRIGATION CANAL POWERCOOPERATIVE LTD.

CANADA

IRRICANIRRIGATION CANAL POWERCOOPERATIVE LTD.

CANADA

EEMEMPRESA DE ELECTRICIDADEDA MADEIRA

PORTUGAL

SALZBURG AG

AUSTRIA

DIABLO 1)

RAYMOND 1)

CHIN CHUTE 1)

SOCORRIDOS 1)

KREUZBERGMAUT 1)

Vertical FRANCIS TurbinesN = 91500 kW/unitH = 100 m

Vertical KAPLAN TurbineN = 20530 kWH = 44 mButterfly Valve D = 3500 mmSyn. Generator with static excitation W 41, 26.2 MVA, 300 rpm with neutralcubicle

Vertical FRANCIS TurbineN = 11400 kWH = 40.5 mSyn. Generator with static excitation W 41, 13 MVA, 300 rpm with generatorterminal cubicle and neutral groundingcubicle

Horizontal PELTON TurbinesN = 8000 kW/unitH = 460 mSpherical Valves D = 600 mmSyn. Generators with brushlessexcitation D 6, 10 MVA, 750 rpm eachPower transformer and 30 kV MV SwitchgearPenstockD = 1500/1400/1300/1200 mmL = approx. 1200 mManifoldD = 1200 / 3 x 600 mmAll related Civil Works

BULB TurbinesN = 10000 kW/unitH = 10.8 m

19941995

1994

1994

1994

1995

CUSTOMER

COUNTRY

YEAR OF

SUPPLY

ANDINO SUPPLIESPLANT

2

1

11

1

1

3

33

1

1

1

2

Hydropower Engineering

3

TURBINES, VALVES, ELECTRO-MECHANICAL EQUIPMENT & TURNKEY CONTRACTS EQUIPMENT SUPPLIED SINCE 1986 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 15.02.2010

Page 4: Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS CHEMINS DE FER FEDERAUX SWITZERLAND SALZBURG AG AUSTRIA ENERGIE AG OBERÖSTERREICH

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

VATTENFALL EUROPEGENERATION AG

GERMANY

D S IDEVLET SU ISLERI

TURKEY

EOSSA DE L'ENERGIE OUESTSUISSE

SWITZERLAND

THE CITY OF SEATTLECITY LIGHT DEPARTMENT

U.S.A.

TIWAGTIROLER WASSERKRAFT AG

AUSTRIA

BLEILOCH 1)

ÇATALAN 1)

CLEUSON-DIXENCE 1)

BOUNDARY 1)

ACHENSEE 5 1)

Butterfly Valves for turbinesD = 3700 mmH = 60 mButterfly Valve for the pumpD = 3000 mmH = 60 m

Vertical FRANCIS TurbinesN = 56300 kW/unitH = 52 mInlet Butterfly Valves D = 4500 mmCompressed Air SystemCooling SystemSyn. Generators with static excitation W 42, 65 MVA, 166.7 rpm eachElectrical Control Equipment incl.65 MVA Power Transformers35 kV MV Switchgear and 150 kVOutdoor Switchyard

Penstock SectionsD = 1700 mm L = 35 m eachTransition ConesD = 1700 / 1400 mm incl. manholes D = 500 mm and Connections FlangesTest CoversSteel Grade StE 690ENominal Head = 2073 mPressure Test = 305 bar

Design, Manufacture and Test campaignin an independent laboratory of TurbineModel for refurbishment of the BoundaryFRANCIS units # 51, 52, 53 and 54N = 206000 kW/unitHmax = 82.6 m

Twin PELTON Turbine refurbishmentN = 24200 kWH = 390 mSpherical Valve D = 1200 mm

1995

1997

1997

1997

1997

CUSTOMER

COUNTRY

YEAR OF

SUPPLY

ANDINO SUPPLIESPLANT

2

1

3

3113

3

3

2

1

1

Hydropower Engineering

4

TURBINES, VALVES, ELECTRO-MECHANICAL EQUIPMENT & TURNKEY CONTRACTS EQUIPMENT SUPPLIED SINCE 1986 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 15.02.2010

Page 5: Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS CHEMINS DE FER FEDERAUX SWITZERLAND SALZBURG AG AUSTRIA ENERGIE AG OBERÖSTERREICH

5

1997

1998

1998

1998

1998

1998

ELEKTROPRIVREDABOSNE I HERCEGOVINE

BOSNIA AND HERZEGOVINA

EGEEEMPRESA DE GENERACIONELECTRICA

GUATEMALA

HE BISTRICA

SLOVENIA

HE BISTRICA

SLOVENIA

ATELAARE TESSIN AG FÜRELEKTRIZITÄT

SWITZERLAND

KRAFTWERKE BRUSIO AG

SWITZERLAND

JABLANICA Small

CHIXOY 1)

BISTRICA

BISTRICA

GOESGEN 1)

PALÜ 1)

Inlet Butterfly ValvesD = 500 mmH = 93 m

Radial GatesL = 12000 mm H = 4500 mmComputerised Regulating andControl SystemElectrical Equipment, Protections andAuxiliary EquipmentRelated Civil Works

Horizontal FRANCIS TurbineN = 1665 kWH = 75 mInlet Butterfly Valve D = 700 mm

Horizontal FRANCIS TurbineN = 995 kWH = 75 mInlet Butterfly Valve D = 700 mm

Stop logs incl. auxiliaries L = 9750 mm H = 3600 mmL = 9500 mm H = 4700 mmGantry CraneSluice Gate incl. Stop LogL = 3000 mm H = 2200 mmRacks L = 9900 mm H = 7250 mm

PenstockD = 1350 / 1200 / 1075 / 1050 mmL = 660 m H = 326 mWye branchD = 1300 / 1300 / 800 mm

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

CUSTOMER

COUNTRY

YEAR OF

SUPPLY

ANDINO SUPPLIESPLANT

Hydropower Engineering

TURBINES, VALVES, ELECTRO-MECHANICAL EQUIPMENT & TURNKEY CONTRACTS EQUIPMENT SUPPLIED SINCE 1986 RESPECTIVELY WORKS UNDER CONSTRUCTION

4

3

1

1

1

1

1

2

11

5

1

1

Release date: 15.02.2010

Page 6: Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS CHEMINS DE FER FEDERAUX SWITZERLAND SALZBURG AG AUSTRIA ENERGIE AG OBERÖSTERREICH

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

HEPHRVATSKA ELEKTROPRIVREDA

CROATIA

ELEKTROPRIVREDAHRVATSKE ZAJEDNICEHERCEG-BOSNEBOSNIA AND HERZEGOVINA

EEPCOETHIOPIAN ELECTRIC POWERCORPORATION

ETHIOPIA

THE CITY OF SEATTLECITY LIGHT DEPARTMENT

U.S.A.

CEDEGECOMISION DE ESTUDIOS PARAEL D ESARROLLO DE LA CUEN-CA DEL RIO GUAJAS

ECUADOR

SENJ

JAJCE

TIS ABBAY 1)

BOUNDARY 1)

M.J.CALLE 1)

Inlet Spherical Valve D = 1400 mmH = 530 m

Inlet Butterfly ValvesD = 3700 mmH = 100 m

Vertical FRANCIS TurbinesN = 4200 kWH = 46 mButterfly inlet Valves RehabilitationD = 1600 mmSynchr. GeneratorsElectrical Equipment and ControlSystems RehabilitationMechanical and Electrical AuxiliariesRehabilitationThorough Inspection and Tests of:Vertical FRANCIS TurbineN = 3720 kW H = 46 mSynchr. GeneratorButterfly Inlet Valve D = 1600 mmOverhaulElectrical Equipment and ControlSystem OverhaulMechanical and Electrical AuxiliariesOverhaul

Vertical FRANCIS TurbinesNmax = 206000 kW/unitH = 82.6 m

Radial GatesL = 9000 mm H = 4500 mmStop logsComputerised Regulating and ControlSystemElectrical Controls, Protections andAuxiliary Equipment

1999

1999

1999

19992001

1999

CUSTOMER

COUNTRY

YEAR OF

SUPPLY

ANDINO SUPPLIESPLANT

1

2

2

2

2

1

11

4

3

21

Hydropower Engineering

6

TURBINES, VALVES, ELECTRO-MECHANICAL EQUIPMENT & TURNKEY CONTRACTS EQUIPMENT SUPPLIED SINCE 1986 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 15.02.2010

Page 7: Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS CHEMINS DE FER FEDERAUX SWITZERLAND SALZBURG AG AUSTRIA ENERGIE AG OBERÖSTERREICH

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

DSIDEVLET SU ISLERI

TURKEY

EEPCOETHIOPIAN ELECTRIC POWERCORPORATION

ETHIOPIA

AE/EWAZIENDA ENERGETICA S.p.A.ETSCHWERKE AG

ITALY

INDRHIINSTITUTO NACIONAL DE RECURSOS HIDRAULICOS

DOMINICAN REP.

EEPCOETHIOPIAN ELECTRIC POWERCORPORATION

ETHIOPIA

STADTWERKE SCHWAZELEKTRIZITÄTSWERK

AUSTRIA

ÇAMLIGÖZE 1)

KOKA 1)

NATURNS 1)

MONCION 1)

TIS ABBAY 1)

PILLBACH

Vertical KAPLAN TurbinesN = 17200 kW/unitH = 25 m

Rehabilitation of:Vertical FRANCIS TurbinesN = 15200 kW/unitH = 42 mButterfly Inlet Valves D = 3300 mmSynchr. GeneratorsElectrical Equipment and ControlSystemsMechanical and Electrical Auxiliaries

Rehabilitation of:Twin PELTON TurbinesN = 30400 kW/unitH = 1129 mSpherical Valves D = 600 mm

Vertical FRANCIS TurbinesN = 30200 kW/unitH = 138 mSpherical Inlet Valves D = 1750 mmOverhead Travelling Crane 850 kNAll related mechanical Auxiliaries

Vertical FRANCIS TurbineN = 3720 kWH = 46 mButterfly inlet Valve Rehabilitation

Horizontal PELTON RunnerN = 2530 kWH = 291 m

2000

2000

2000

2000

2000

2000

CUSTOMER

COUNTRY

YEAR OF

SUPPLY

ANDINO SUPPLIESPLANT

2

3

33

2

4

2

21

1

1

1

Hydropower Engineering

7

TURBINES, VALVES, ELECTRO-MECHANICAL EQUIPMENT & TURNKEY CONTRACTS EQUIPMENT SUPPLIED SINCE 1986 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 15.02.2010

Page 8: Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS CHEMINS DE FER FEDERAUX SWITZERLAND SALZBURG AG AUSTRIA ENERGIE AG OBERÖSTERREICH

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

TIWAGTIROLER WASSERKRAFT AG

AUSTRIA

VATTENFALL EUROPEGENERATION AG

GERMANY

DSIDEVLET SU ISLERI

TURKEY

TIWAGTIROLER WASSERKRAFT AG

AUSTRIA

DEBANT 2

DEBANT 1

GOLDISTHAL 1)

BATMAN 1)

ACHENSEE 1 & 2

Digital Governor and PELTON injectordesignN = 2800 kWH = 227 m

Digital Governors and hydraulic layoutfor PELTON turbines N = 920 kW/unitH = 156 m

Spherical ValvesD = 2550 mmH = 530 mOperating SystemsConnecting pipes

Vertical FRANCIS TurbinesN = 65500 kW/unitH = 68 mButterfly Inlet Valves D = 4500 mmSyn. Generators W41 with staticexcitation 75.5 MVA at 166.67 rpmMain Transformers, 75.5 MVA, 13.8/161 kVHorizontal FRANCIS TurbineN = 6100 kWH = 58 mButterfly Valve D = 1500 mmSyn. Generator D6 with brushlessexcitation 7 MVA at 500 rpmMain Transformer, 7 MVA, 6.3/161 kV Electrical Controls, Protection andSwitchyard Equipment and AuxiliaryPlant for complete GeneratingEquipment

Twin PELTON Turbine refurbishmentN = 12500 kW/unitH = 396 mSpherical Valves D = 750 mm

2000

2002

2001

2001

2001

CUSTOMER

COUNTRY

YEAR OF

SUPPLY

ANDINO SUPPLIESPLANT

1

2

4

44

3

33

3

1

11

1

2

4

Hydropower Engineering

8

TURBINES, VALVES, ELECTRO-MECHANICAL EQUIPMENT & TURNKEY CONTRACTS EQUIPMENT SUPPLIED SINCE 1986 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 05.11.2014

1) Plant Reference Rights held underNoell–Andino Transfer Agreement.

Page 9: Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS CHEMINS DE FER FEDERAUX SWITZERLAND SALZBURG AG AUSTRIA ENERGIE AG OBERÖSTERREICH

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

EEPCOETHIOPIAN ELECTRIC POWERCORPORATION

ETHIOPIA

AE/EWAZIENDA ENERGETICA S.p.A.ETSCHWERKE AG

ITALY

BORREGAARD INDUSTRIES Ltd.

NORWAY

C.V.A. S.p.A.COMPAGNIA VALDOSTANA DELLE ACQUE S.p.A.

ITALY

AWASH II & III

NATURNS

BORREGAARD

CHAVONNE

CHAMPAGNE

Electrical Control and Protection System Rehabilitation of:Vertical FRANCIS TurbinesN = 16000 kW/unitH = 59 mButterfly Inlet Valves D = 2000 mm

Rehabilitation of:PELTON RunnersN = 30400 kW/unitH = 1129 m

Rehabilitation of:PELTON RunnerN = 55000 kWH = 1129 m

Spherical Valves D = 700 mmPELTON Injectors D = 710 mm p = 130 bar

Rehabilitation of:PELTON RunnerN = 55000 kWH = 1129 m

Vertical FRANCIS Runner G 15 Vertical FRANCIS Runner G 14N = 8900 kW/unitH = 20 m

Horizontal PELTON RunnerN = 9650 kWH = 583 m

Horizontal PELTON Runner N = 5500 kW H = 464 m

2001

2001

2001

2002

2004

20022004

2002

2002

CUSTOMER

COUNTRY

YEAR OF

SUPPLY

ANDINO SUPPLIESPLANT

4

4

2

1

24

1

11

1

1

Hydropower Engineering

9

TURBINES, VALVES, ELECTRO-MECHANICAL EQUIPMENT & TURNKEY CONTRACTS EQUIPMENT SUPPLIED SINCE 1986 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 15.02.2010

Page 10: Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS CHEMINS DE FER FEDERAUX SWITZERLAND SALZBURG AG AUSTRIA ENERGIE AG OBERÖSTERREICH

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

C.V.A. S.p.A.COMPAGNIA VALDOSTANADELLE ACQUE S.p.A.

ITALY

EEPCOETHIOPIAN ELECTRICPOWER CORPORATION

ETHIOPIA

ENEL GREEN POWER S.p.A.

ITALY

HRVATSKA ELEKTROPRIVREDA

CROATIA

ISOLLAZ

ST. CLAIR

PONT ST. MARTIN

AWASH KOKA TIS ABBAY

VIGEVANO

VINODOL

Horizontal PELTON Runner N = 20100 kWH = 570 m

Vertical FRANCIS Turbines refurbishmentN = 17400 kW/unitH = 67.85 m

Horizontal PELTON Runner N = 17600 kWH = 525 m

Plant Rehabilitation of ElectricalEquipment and GeneratorsTrashrack Raking MachineAuxiliary EquipmentFire Protection 15 kV switchyard

Horizontal FRANCIS TurbinesN = 1670 kW/unit H = 18.3 mButterfly Valves D = 1700 mmSynchronous Generators with brushlessexciters 1780 kVA, 272.73 rpm each withgenerator terminal cubiclesElectrical Control EquipmentPower Transformers RehabilitationPenstocks D = 2000 mm L = approx. 35 mAll related civil works

Rehabilitation of PELTON Injectors D = 600 mm p = 66 bar

2002

2003 /2007

2003

2003

2003

2003

CUSTOMER

COUNTRY

YEAR OF

SUPPLY

ANDINO SUPPLIESPLANT

1

2

1

3

2

22

122

3

Hydropower Engineering

10

TURBINES, VALVES, ELECTRO-MECHANICAL EQUIPMENT & TURNKEY CONTRACTS EQUIPMENT SUPPLIED SINCE 1986 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 15.02.2010

Page 11: Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS CHEMINS DE FER FEDERAUX SWITZERLAND SALZBURG AG AUSTRIA ENERGIE AG OBERÖSTERREICH

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

GE HYDRO

BRAZIL

SUNNFJORD ENERGI AS

NORWAY

ENELPOWER S.p.A.

ITALY

ENELPOWER S.p.A.

ITALY

ENELPOWER S.p.A.

ITALY

DOMLECDOMINICA ELECTRICITYSERVICES LTD.

DOMINICA - WEST INDIES

PONTE DE PEDRA

BRULANDSFOSS

CAMPLICCIOLI

GALLICANO

PESCARA

LAUDAT

Butterfly Valves (design only)D = 2000 mmH = 344 m

Butterfly ValveD = 1500 mmp = 4 barOperating System, Connecting pipes

Plant rehabilitation of Turbine-Generatorunit:Horizontal PELTON TurbineN = 9500 kWH = 884 mSpherical Inlet Valve D = 450 mmAuxiliary Plant

Replacement of the former groups bytwo new generating units:Vertical FRANCIS TurbinesN = 13000 kW/unitH = 83 mButterfly Valves D = 1800 mmPressure Relief Valves D = 750/1200 mmAuxiliary Plant

Replacement of the former groups bytwo new generating units:Vertical FRANCIS TurbinesN = 5600 kW/unitH = 28 mAuxiliary Plant

Ball ValveD = 400 mmp = 40 bar

2003

2004

2004

2005

2005

2005

CUSTOMER

COUNTRY

YEAR OF

SUPPLY

ANDINO SUPPLIESPLANT

3

1

1

1

2

2

2

2

1

Hydropower Engineering

11

TURBINES, VALVES, ELECTRO-MECHANICAL EQUIPMENT & TURNKEY CONTRACTS EQUIPMENT SUPPLIED SINCE 1986 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 15.02.2010

Page 12: Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS CHEMINS DE FER FEDERAUX SWITZERLAND SALZBURG AG AUSTRIA ENERGIE AG OBERÖSTERREICH

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

TIWAGTIROLER WASSERKRAFT AG

AUSTRIA

EEPCOETHIOPIAN ELECTRIC POWERCORPORATION

ETHIOPIA

C.V.A. S.p.A.COMPAGNIA VALDOSTANADELLE ACQUE S.p.A.

ITALY

TRONDHEIM ENERGIVERKKRAFT

NORWAY

AE/EWAZIENDA ENERGETICA S.p.A.ETSCHWERKE AG

ITALY

ACHENSEE 3 & 4

MELKA WAKANA

CHAVONNE 3 & 4

NEA

NATURNS

Twin PELTON Turbine refurbishmentN = 24700 kW/unitH = 396 mincluding replacement of water conduits,manifolds and injectors

Reconditioning of Unit #1Vertical FRANCIS TurbineN = 39200 kWH = 301 mSyn. Generator, 45 kVA, 600 rpmAuxiliary Plant

Horizontal PELTON RunnersN = 9650 kWH = 583 m

Spherical ValvesD = 1300 mmp = 41 bar

Spherical ValvesD = 700 mmp = 130 bar

2006

2006

2006

2006

2006

CUSTOMER

COUNTRY

YEAR OF

SUPPLY

ANDINO SUPPLIESPLANT

2

1

1

2

3

2

Hydropower Engineering

12

TURBINES, VALVES, ELECTRO-MECHANICAL EQUIPMENT & TURNKEY CONTRACTS EQUIPMENT SUPPLIED SINCE 1986 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 15.02.2010

Page 13: Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS CHEMINS DE FER FEDERAUX SWITZERLAND SALZBURG AG AUSTRIA ENERGIE AG OBERÖSTERREICH

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

EEPCOETHIOPIAN ELECTRIC POWERCORPORATION

ETHIOPIA

SALZBURG AG

AUSTRIA

EDISON S.p.A.

ITALY

ENEL S.p.A.

ITALY

C.V.A. S.p.A.COMPAGNIA VALDOSTANADELLE ACQUE S.p.A.

ITALY

ENEL S.p.A.

ITALY

FINCHAA

WALD

ALBANO DONGO

AVIO

FONTANEDO

VERRES

PAISCO

Rehabilitation of:Vertical PELTON TurbinesN = 42000 kW/unitH = 594 mSpherical Valves D = 914 mmAuxiliary Plant, Control System,Transformers and SwitchyardRehabilitation

Vertical FRANCIS RunnerN = 23500 kWH = 182 m

Horizontal PELTON RunnersN = 15230 kW/unitH = 402 m

Horizontal PELTON RunnerN = 2800 kWH = 815 m

Horizontal PELTON RunnerN = 1350 kWH = 301.5 m

Horizontal PELTON RunnerN = 2450 kWH = 239 m

Horizontal PELTON TurbineN = 8400 kWH = 570 mSpherical Valve D = 450 mm

2006

2006

2006

2006

2006

2006

2007

CUSTOMER

COUNTRY

YEAR OF

SUPPLY

ANDINO SUPPLIESPLANT

3

3

1

2

1

1

1

1

1

Hydropower Engineering

13

TURBINES, VALVES, ELECTRO-MECHANICAL EQUIPMENT & TURNKEY CONTRACTS EQUIPMENT SUPPLIED SINCE 1986 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 15.02.2010

Page 14: Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS CHEMINS DE FER FEDERAUX SWITZERLAND SALZBURG AG AUSTRIA ENERGIE AG OBERÖSTERREICH

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

TIWAGTIROLER WASSERKRAFT AG

AUSTRIA

HAFSLUNDHAFSLUND PRODUKSJON AS

NORWAY

TIWAGTIROLER WASSERKRAFT AG

AUSTRIA

ENEL S.p.A.

ITALY

HIMAL POWER LTD.

NEPAL

TRONDHEIM ENERGI AS

NORWAY

DORFERBACH

VAMMA

KIRCHBICHL

PALLANZENO

KHIMTI 1

LEIRFOSSENE

Vertical PELTON TurbineN = 10000 kWH = 632 m

Refurbishment of:Horizontal double FRANCIS Drum typeTurbines - Unit # 1 & 6N = 11000 kW/unitH = 27 m

Refurbishment of:Vertical KAPLAN TurbineN = 4820 kWH = 9 m

Replacement of the former groups bytwo new generating units:Horizontal PELTON TurbinesN = 21000 kW/unitH = 510 mSpherical ValvesD = 750 mmP = 64 bar

Spherical ValveD = 1500 mmP = 78.5 bar

Vertical FRANCIS TurbineN = 29000 kWH = 58 mVertical FRANCIS TurbineN = 16000 kWH = 58 mButterfly Valve D = 3500 mmButterfly Valve D = 2500 mm

2007

2007

2007

2008

2008

2008

CUSTOMER

COUNTRY

YEAR OF

SUPPLY

ANDINO SUPPLIESPLANT

1

2

1

2

2

1

1

1

11

Hydropower Engineering

14

TURBINES, VALVES, ELECTRO-MECHANICAL EQUIPMENT & TURNKEY CONTRACTS EQUIPMENT SUPPLIED SINCE 1986 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 15.02.2010

Page 15: Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS CHEMINS DE FER FEDERAUX SWITZERLAND SALZBURG AG AUSTRIA ENERGIE AG OBERÖSTERREICH

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

ENEL S.p.A.

ITALY

BORREGAARD INDUSTRIES Ltd.

NORWAY

TIWAGTIROLER WASSERKRAFT AG

AUSTRIA

DRINSKO LIMSKE HIDROELEKTRANE d.o.o.

SERBIA

DRINSKO LIMSKE HIDROELEKTRANE d.o.o.

SERBIA

DIETRO LA TORRE

BORREGAARD

DORFERBACH

OVCAR BANJA

MEDJUVRSJE

2008

2008

2008

2009

2009

CUSTOMER

COUNTRY

YEAR OF

SUPPLY

ANDINO SUPPLIESPLANT

1

1

1

2

1

1

11

1

1

11

Hydropower Engineering

15

TURBINES, VALVES, ELECTRO-MECHANICAL EQUIPMENT & TURNKEY CONTRACTS EQUIPMENT SUPPLIED SINCE 1986 RESPECTIVELY WORKS UNDER CONSTRUCTION

Replacement of the former group by:Horizontal PELTON TurbineN = 4400 kWH = 302 mSpherical Valve D = 450 mm

Vertical FRANCIS Runner G12/13N = 8900 kWH = 20 m

Vertical PELTON RunnersN = 10000 kW/unitH = 632 m

Replacement of the former groups by new generating units:Vertical KAPLAN TurbineN = 5060 kWH = 19 mVertical KAPLAN TurbineN = 3290 kWH = 19 mButterfly Valve D = 2700 mmButterfly Valve D = 2200 mm

Replacement of the former groups by new generating units:Vertical KAPLAN TurbineN = 5480 kWH = 20.5 mVertical KAPLAN TurbineN = 3550 kWH = 20.5 mButterfly Valve D = 2700 mmButterfly Valve D = 2200 mm

Release date: 15.02.2010

Page 16: Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS CHEMINS DE FER FEDERAUX SWITZERLAND SALZBURG AG AUSTRIA ENERGIE AG OBERÖSTERREICH

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

ARENDALS FOSSEKOMPANIASA

NORWAY

JP ELEKTRO PRIVREDA

BOSNIA AND HERZEGOVINA

ENEL S.p.A.

ITALY

TIWAG TIROLER WASSERKRAFT AG

AUSTRIA

HAFSLUND PRODUKSJON AS

NORWAY

HEP HRVATSKA ELEKTRO-PRIVREDA

CROATIA

ENEL S.p.A.

ITALY

FLATENFOSS 3

MOSTARSKO BLATO

VERAMPIO

ACHENSEE

VAMMA

ZAKUCAC

FONTANEDO

Vertical KAPLAN TurbineN = 7220 kWH = 10.25 m

Butterfly ValveD = 3000 mmP = 5 bar

Replacement of:Horizontal Twin PELTON TurbinesN = 26400 kW/unitH = 565 mSpherical Valves D = 750 mm

Replacement of open air penstock manifoldD = 2000 mm, 3x1200 mmH = 396 m

Refurbishment of:Horizontal double FRANCIS Drumtype Turbines - Unit # 2, 3 & 4N = 11000 kW/unitH = 27 m

Refurbishment of operating system:Butterfly ValvesD = 3900 mmP = 7 bar

Horizontal PELTON RunnerN = 1350 kWH = 301.5 m

2009

2009

20082009

2009

200920102011

2008

2008

CUSTOMER

COUNTRY

YEAR OF

SUPPLY

ANDINO SUPPLIESPLANT

1

1

2

4

3

2

1

Hydropower Engineering

16

TURBINES, VALVES, ELECTRO-MECHANICAL EQUIPMENT & TURNKEY CONTRACTS EQUIPMENT SUPPLIED SINCE 1986 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 27.05.2013

^

Page 17: Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS CHEMINS DE FER FEDERAUX SWITZERLAND SALZBURG AG AUSTRIA ENERGIE AG OBERÖSTERREICH

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

ENEL S.p.A.

ITALY

ENEL S.p.A.

ITALY

ENEL S.p.A.

ITALY

TESSENDERLO ITALIA S.r.l.

ITALY

ENEL S.p.A.

ITALY

HYDROS S.r.l.

ITALY

ENEL S.p.A.

ITALY

CREVOLA TOCE

PAISCO

CREVOLA DIVERIA

MEGOLO

CEDEGOLO

CURON

VARZO

Vertical FRANCIS TurbinesN = 16600 kW/unitH = 201.7 mSpherical Valves D = 1100 mm

Horizontal PELTON RunnerN = 8400 kWH = 570 m

Vertical FRANCIS RunnersN = 24000 kW/unitH = 225 m

Vertical KAPLAN TurbinesN = 3750 kW/unitH = 10.85 mSynchronous Generators5400 kVA, 214.3 rpmElectrical Control and SCADAEquipment local and remote,Trashracks, Intake gates, RakingMachinesAuxiliary Equipment, related civil works

Horizontal PELTON RunnerN = 3730 kWH = 462.7 m

Vertical PELTON RunnersN = 13020 kWH = 321 m

Twin PELTON TurbineN = 15910 kWH = 445.5 mSpherical ValvesD = 500 mmP = 52.5 bar

2010

2009

2010

2010

2010

201020122014

2011

CUSTOMER

COUNTRY

YEAR OF

SUPPLY

ANDINO SUPPLIESPLANT

2

2

1

3

2

2

1

3

1

2

Hydropower Engineering

17

TURBINES, VALVES, ELECTRO-MECHANICAL EQUIPMENT & TURNKEY CONTRACTS EQUIPMENT SUPPLIED SINCE 1986 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 27.05.2013

Page 18: Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS CHEMINS DE FER FEDERAUX SWITZERLAND SALZBURG AG AUSTRIA ENERGIE AG OBERÖSTERREICH

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

ENEL S.p.A.

ITALY

ENEL S.p.A.

ITALY

ENEL GREEN POWER S.p.A.

ITALY

ENEL S.p.A.

ITALY

TESSENDERLO ITALIA S.r.l.

ITALY

DRAVSKE ELEKTRARNE

SLOVENIA

ENEL S.p.A.

ITALY

LEMIE

LIGONCHIO

CASTELVIERO

PONTE FORMAZZA

CEPPO MORELLI

MARKOVCI

VILLA OVESCA

Horizontal PELTON TurbinesN = 12195 kW/unitH = 341.6 mSpherical ValvesD = 750 mmP = 40 bar

Horizontal FRANCIS TurbineN = 2500 kWH = 186 mBall ValveD = 450 mmP = 25 bar

FRANCIS Generating UnitsVertical FRANCIS TurbinesN = 2900 kWH = 43 mSynchronous Generators3650 kVA, 428.57 rpmReplacement of open airpenstock manifoldD = 2100 mm - 2 x 1300 mmButterfly Valves D = 1300 mm

Replacement of:PELTON runnerN = 34000 kWH = 850 m

Repairing of:PELTON RunnersN = 3680 kWH = 485 m

Horizontal S-type UnitsN = 450 kWH = 10.5 m

PELTON RunnersN = 1610 kWH = 262.8 m

2011

2012

2012

2012

2012

2012

2012

CUSTOMER

COUNTRY

YEAR OF

SUPPLY

ANDINO SUPPLIESPLANT

2

2

1

1

22

2

2

1

2

2

2

Hydropower Engineering

18

TURBINES, VALVES, ELECTRO-MECHANICAL EQUIPMENT & TURNKEY CONTRACTS EQUIPMENT SUPPLIED SINCE 1986 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 27.05.2013

Page 19: Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS CHEMINS DE FER FEDERAUX SWITZERLAND SALZBURG AG AUSTRIA ENERGIE AG OBERÖSTERREICH

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

ENEL S.p.A.

ITALY

SALZBURG AG

AUSTRIA

HYDROS S.r.l.

ITALY

DRINSKO LIMSKEHIDROELEKTRANE d.o.o.

SERBIA

SALZBURG AG

AUSTRIA

SALZBURG AG

AUSTRIA

CTB-BTC

D.R. CONGO

CETO,GRATACASOLO,LOZIO

WALD

PREMESA

MEDJUVRSJE

BÖCKSTEIN

HOLLERSBACH

TSHOPO

CUSTOMER

COUNTRY

YEAR OF

SUPPLY

ANDINO SUPPLIESPLANT

Hydropower Engineering

PELTON RunnersN = 2 x 3150 kWH = 348.7 mN = 1 x 1800 kWH = 462.7 mN = 1 x 1100 kWH = 262 m

FRANCIS RunnerN = 23500 kWH = 182 m

PELTON RunnersN = 4070 kW/unitH = 310 m

FRANCIS TurbineN = 660 kWH = 188 m

FRANCIS RunnerN = 44500 kWH = 425 m

FRANCIS RunnerN = 5210 kWH = 77 m

KAPLAN Generating UnitVertical KAPLAN TurbineN = 7000 kWH = 18 mSynchronous Generator, 8800 kVA214.28 rpmElectrical controls, GovernorRehabilitation of dam equipment andintake gate

2012

2012

2012-2014

2013

2013

2013

2012

19

TURBINES, VALVES, ELECTRO-MECHANICAL EQUIPMENT & TURNKEY CONTRACTS EQUIPMENT SUPPLIED SINCE 1986 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 05.11.2014

4

1

3

1

1

1

1

Page 20: Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS CHEMINS DE FER FEDERAUX SWITZERLAND SALZBURG AG AUSTRIA ENERGIE AG OBERÖSTERREICH

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

RINGERIKS-KRAFT PRODUKSJON AS

NORWAY

EEMEMPRESA DE ELECTRICIDADEDA MADEIRA

PORTUGAL

ENEL S.p.A.

ITALY

OK TEDI MINING LTD

PAPUA NEW GUINEA

FORTUM

FINLAND

AGSM VERONA S.p.A.

ITALY

VITTINGFOSS 5

SOCORRIDOS

SAGITTARIO

OK MENGA

IMATRA

BELFIORE

Vertical KAPLAN TurbineN = 14475 kWH = 19.80 m

PELTON RunnerN = 8000 kWH = 460 m

Horizontal PELTON TurbineN = 10770 kWH = 345 mSpherical ValveD = 650 mmP = 40 barLower penstock extensionD = 1085/650 mm

Spherical ValvesD = 1500 mmP = 30 bar

Vertical FRANCIS TurbinesNmax = 31380 kW/unitH = 23 - 26 m

Generating UnitsKAPLAN PIT TurbinesN = 2050 kW/unitH = 2.5 - 4 mSynchronous generators 2500 kVA, 600 rpmSpeed increasersElectrical Control and SCADALV & MV electrical equipmentTrashracks, Intake gates, RakingmachinesAuxiliary Equipment

2014

2014

2014

2014

2014-2015

2015

CUSTOMER

COUNTRY

YEAR OF

SUPPLY

ANDINO SUPPLIESPLANT

1

1

1

1

2

2

3

Hydropower Engineering

20

TURBINES, VALVES, ELECTRO-MECHANICAL EQUIPMENT & TURNKEY CONTRACTS EQUIPMENT SUPPLIED SINCE 1986 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 05.11.2014

Page 21: Hydropower Engineering PLANT REFERENCE LIST REFERENCE LIST WUPPERVERBAND GERMANY CFF - SBB - FFS CHEMINS DE FER FEDERAUX SWITZERLAND SALZBURG AG AUSTRIA ENERGIE AG OBERÖSTERREICH

PPLLAANNTT RREEFFEERREENNCCEE LLIISSTT

HYDROSTADIUM S.A.GROUPE EDF

FRANCE

CHAVAROCHE Horizontal double-flow FRANCISTurbinesN = 2200 kW/unitH = 40 mHorizontal double-flow FRANCISTurbineN = 3500 kW/unitH = 40 mSpherical ValvesD = 1200 mmP = 4 barSpherical ValveD = 1350 mmP = 4 bar

2015

CUSTOMER

COUNTRY

YEAR OF

SUPPLY

ANDINO SUPPLIESPLANT

2

1

2

1

Hydropower Engineering

21

TURBINES, VALVES, ELECTRO-MECHANICAL EQUIPMENT & TURNKEY CONTRACTS EQUIPMENT SUPPLIED SINCE 1986 RESPECTIVELY WORKS UNDER CONSTRUCTION

Release date: 05.11.2014