Hydrogeological Investigation - Toronto
Transcript of Hydrogeological Investigation - Toronto
City of Toronto
Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B Hydrogeological Investigation September 17, 2018
Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B Hydrogeological Investigation City of Toronto
Project No.: 161-16086-02
Date: September 2018
WSP
100 Commerce Valley Drive West
Thornhill, Ontario L3T 0A1
wsp.com
100 Commerce Valley Drive West Thornhill, ON, Canada L3T 0A1 Tel: +1-905-882-1100 Fax: +1-905-882-0055 wsp.com WSP Canada Inc.
September 17, 2018
City of Toronto Engineering and Construction Services Metro Hall, 16th Floor 55 John Street Toronto, Ontario M5V 3C6
Attention: Darrell Wunder, P.Eng., PMP, Senior Engineering, Design & Construction, Linear Underground Infrastructure
Subject: Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B
Dear Mr. Wunder:
WSP Canada Inc. (WSP) is pleased to submit this hydrogeological investigation as part of Phase 4 of the Basement Flooding Area Program for Area 8 in the City of Toronto, Ontario. The investigation assessed hydrogeological conditions in the field towards characterization of dewatering requirements for the proposed infrastructure replacements.
Should you have any comments regarding the contents of this report, please do not hesitate to contact the undersigned.
Yours truly,
Derek Brunner, M.Sc., P.Geo.
Hydrogeologist/Project Manager, Environment
DB/nah WSP ref.: 161-16086-02
R E V I S I O N H I S T O R Y
VERSION DATE DESCRIPTION
1 MAY 25, 2018 Draft report
2 SEP. 17, 2018 Final report
Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B WSP Project No. 161-16086-02 September 2018 City of Toronto Page iii
TABLE OF CONTENTS
1 Introduction .............................................................. 1
1.1 Background ................................................................ 1
1.2 Methodology ............................................................... 1
2 Site Description ........................................................ 2
2.1 Physiography.............................................................. 2
2.2 Geology and Hydrogeology ........................................ 2
3 Field Assessment ..................................................... 7
3.1 Groundwater Levels ................................................... 7
3.2 Single Well Hydraulic Testing ..................................... 9
3.3 Water Quality Sampling ............................................ 11
4 Dewatering Assessment ........................................ 14
4.1 Dewatering Equations .............................................. 15
4.2 Thorncrest Road ....................................................... 16
4.3 Sir Williams Lane ...................................................... 16
4.4 Kipling Avenue ......................................................... 17
4.5 Great Oak Drive ....................................................... 17
4.6 Summary .................................................................. 18
5 Conclusions and Recommendations ................... 19
5.1 Conclusions .............................................................. 19
5.2 Recommendations ................................................... 20
6 References .............................................................. 21
WSP Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B September 2018 Project No. 161-16086-02 Page iv City of Toronto
Tables
Table 1 Groundwater Levels – Thorncrest Road ........ 7 Table 2 Groundwater Levels – Sir Williams
Lane ............................................................... 8 Table 3 Groundwater Levels – Kipling Avenue ........... 8 Table 4 Groundwater Levels – Great Oak Drive ......... 9
Table 5 Hydraulic Conductivity Estimates from Slug Testing – Thorncrest Road .................. 10
Table 6 Hydraulic Conductivity Estimates from Slug Testing – Sir Williams Lane ................. 10
Table 7 Hydraulic Conductivity Estimates from Slug Testing – Kipling Avenue ..................... 11
Table 8 Hydraulic Conductivity Estimates from Slug Testing – Great Oak Drive ................... 11
Table 9 Water Quality Sampling Program ................. 12 Table 10 Dewatering Summary .................................. 18
Figures
Figure 1 Location Map Figure 2 Surficial Geology Figure 3 Thorncrest Road Cross-Section Figure 4 Sir Williams Lane and Great Oak Drive
Cross-Section Figure 5 Kipling Avenue Cross-Section
Appendices
Appendix A Geotechnical Borehole Logs
Appendix B Slug Test Analysis
Appendix C Water Quality Sampling Results
Appendix D Dewatering Calculations
Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B WSP Project No. 161-16086-02 September 2018 City of Toronto Page 1
1 Introduction
1.1 Background WSP Canada Inc. (WSP) was retained by the City of Toronto (the City) to undertake a hydrogeological investigation as part of the Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B, Sanitary Sewer, Watermain and Substandard Water Service Replacement in Toronto, Ontario. Areas 8-04A and 8-04B are located east of Highway 427 and south of Highway 401, with the areas requiring specific infrastructure located on Thorncrest Road, Great Oak Drive, Kipling Avenue and Sir Williams Lane (Figure 1). Infrastructure is proposed to be constructed along Beaverbrook Avenue in Area 8, but this is assessed under separate cover.
The hydrogeological investigation is required to evaluate dewatering and discharge requirements for the installation of the proposed infrastructure and to determine whether a Permit to Take Water (PTTW) is needed from the Ministry of the Environment and Climate Change (MOECC) or alternatively if the project is to be registered on the MOECC’s Environmental Activity and Sector Registry (EASR). In the past, a PTTW was generally required from MOECC to pump water in excess of 50,000 L/day. However, specific types of construction related water takings at rates less than 400,000 L/day, including construction dewatering for groundwater control, and many construction related consumptive takings, are now instead to be authorized and monitored under the MOECC EASR process. Category 3 PTTW applications are generally required for water takings in excess of 400,000 L/day at any one time (including concurrent projects on adjacent streets). The PTTW process generally requires 60-90 days of technical review time from MOECC, whereas the EASR registration does not require a technical review by MOECC and can be completed by a qualified person on behalf of the owner prior to construction.
1.2 Methodology The hydrogeological program includes the following tasks:
— Desktop review of geological / geotechnical / hydrogeological information;
— Measurement of groundwater levels from monitoring wells installed as part of the geotechnical program;
— Single well hydraulic testing (slug tests) of monitoring wells installed as part of the geotechnical program;
— Water quality sampling and testing from monitoring wells with results assessed relative to standards associated with applicable bylaws; and
— Assessment of dewatering requirements.
WSP Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B September 2018 Project No. 161-16086-02 Page 2 City of Toronto
The results of the hydrogeological investigation are provided in the following sections.
2 Site Description
2.1 Physiography The project area is situated within the South Slope physiographic region of Chapman and Putnam (1984) as represented in the OGS Earth application accessible through the Ministry of Northern Development and Mines Web Page (http://www.geologyontario.mndm.gov.on.ca/). The South Slope is the southern slope of the Oak Ridges Moraine, but in the study area it includes the strip of land south of the Peel Plain. In the study area it is represented at ground surface by drumlinized till plains.
2.2 Geology and Hydrogeology The geological and hydrogeological properties of the subsurface along each of the streets were investigated using the following sources:
— Existing geological mapping.
— A geotechnical investigation conducted as part of the basement flooding investigation.
This information is discussed in the following sections.
2.2.1 Existing Geological Mapping
Surficial geological mapping of the site (Ontario Geological Survey, 2003; Figure 2) indicates that native subsurface materials over most of the area generally consist of clay to silt textured till derived from glaciolacustrine deposits or shale. The unit is expected to behave as an aquitard and may correspond to Halton Till (Sharpe et al., 1997). To the west in the vicinity of Mimico Creek, modern alluvial deposits are identified, consisting of clay, silt, sand and gravel. These materials may behave as local aquifers or aquitards depending upon the composition.
Bedrock geological mapping for southern Ontario indicates that bedrock underlying the site consists of the shales of the Georgian Bay Formation (Hewitt, 1972). The shale is expected to behave as an aquitard, except when fractured or weathered, where it may behave as a weak aquifer. The bedrock outcrops in the walls of the Mimico Creek valley to the south. Topographic mapping from the Atlas of Canada (http://atlas.gc.ca/toporama/en/index.html) indicates that the elevation in the area of the observed bedrock outcrop is between 120 and 130 metres above sea level (masl), suggesting that bedrock may be 10 – 20 m below ground surface in the study area.
Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B WSP Project No. 161-16086-02 September 2018 City of Toronto Page 3
2.2.2 Geotechnical Investigation
A geotechnical drilling program was undertaken as part of this project (WSP Canada Inc., 2018a, 2018b, 2018c, 2018d) to characterize subsurface conditions along the proposed infrastructure alignments. Basement Flooding Project Area 8 was separated into different streets for the purposes of simplifying the assignment from a geotechnical perspective. The discussions of subsurface geology and hydrogeology in this report are based on these breakdowns and are provided in the following sections. A discussion of the groundwater conditions is provided in Section 3.
Thorncrest Road
The proposed infrastructure upgrades along Thorncrest Road are as follows:
— Replace the existing 250 mm sanitary sewer with new 300 mm sanitary sewer between Kipling Avenue and Sir Williams Lane, a distance of approximately 570 m and about 5 to 7 m depth.
— New 250 mm sanitary sewer along Thorncrest Road connecting to the new 300 mm sanitary sewer, a distance of 140 m and about 4 m depth.
— Replace the existing 900 mm and 825 mm storm sewer with new 975 mm storm sewer from 110 m east of Kipling Avenue to 75 m west of The Wynd, a distance of 270 m, and approximately 5.5 m depth.
— Replace the existing 975 mm storm sewer with new 900 mm storm sewer between 130 m east of Kipling Avenue and Sir Williams Lane, a distance of about 195 m, and approximately 5.5 m depth.
— New 300 mm storm sewer between 150 m east of Kipling Avenue and 210 m east of Kipling Avenue connecting to the new 975 mm storm sewer, a distance of 60 m and approximately 3.1 m depth.
Twelve (12) geotechnical boreholes were drilled along Thorncrest Road between Sir Williams Lane and Kipling Avenue. The subsurface materials encountered along the alignment, as interpreted in the geotechnical borehole logs, are shown in a cross-section (Figure 3) and described as follows, from the ground surface downwards:
— Asphalt and granular fill (sand and gravel to gravelly sand) were identified to depths of between 0.2 and 0.5 m below ground surface (bgs).
— Sandy clayey silt fill to silty clay fill or sand to sandy silt fill were found below the granular fill. The clayey fill was found to be between 0.9 and 1.8 m in thickness. The sandy fill was found to be between 0.9 and 1.7 m in thickness. The clayey fill is expected to behave as an aquitard and the sandy fill is expected to behave as an aquifer.
— Sandy clayey silt till to sandy silty clay till was identified below the fill in boreholes BH18-8-14 to BH18-8-22. This unit was found to be varied from 2.3 m to 4.9 m in thickness and extended to the termination depths (5.0 m to 7.0 m) of boreholes BH18-8-16 to BH18-8-18. Hydraulic conductivity of this material was estimated in the geotechnical report from grain size analyses to be 1x10-7 m/s (WSP, 2018a). This unit is expected to behave as an aquitard.
WSP Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B September 2018 Project No. 161-16086-02 Page 4 City of Toronto
— Sandy silt till to sand and silt till was encountered in BH18-8-12 and BH18-8-13 underlying the fill material and in BH18-8-19 underlying the silty clay till. This unit had thicknesses ranging from 0.6 m to 2.0 m. BH18-8-19 was terminated in this unit. Hydraulic conductivity of this material was estimated in the geotechnical report from grain size analyses to range between 1x10-5 m/s and 1x10-7 m/s (WSP, 2018a). This unit is expected to behave as an aquitard.
— Below the till in BH18-8-11 to BH18-8-15 and BH18-8-20 to BH18-8-22, a layer that ranged in composition from silt to sand was encountered to the maximum drilled depths of 5.0 to 8.1 m bgs. Hydraulic conductivity of this material was estimated in the geotechnical report from grain size analyses to range between 1x10-4 and 1x10-5 m/s (WSP, 2018a). This unit is expected to behave as an aquifer.
More detailed descriptions of the units can be found in the Geotechnical Investigation Report (WSP Canada Inc., 2018a). Borehole logs are provided in Appendix A-1.
Sir Williams Lane
The proposed infrastructure upgrades along Sir Williams Lane are as follows:
— New 750 mm storm sewer on Sir Williams Lane from Thorncrest Road to 170 m west of Thorncrest Road, a length of 180 m and approximately 4.5 m depth.
Four (4) geotechnical boreholes were drilled along Sir Williams Lane from 170 m West of Thorncrest Road to Thorncrest Road. The subsurface materials encountered along the alignment, as interpreted in the geotechnical borehole logs, are shown in a cross-section (Figure 4) and described as follows, from the ground surface downwards:
— Asphalt and granular fill (sand and gravel) were identified to depths of between 0.2 and 0.5 m below ground surface (bgs).
— A layer of fill ranging in composition from sandy silt to sand and gravel was encountered underlying the granular fill. It extends to depths approximately at 0.7 m to 2.1 m below existing ground surface. Hydraulic conductivity of this material was estimated in the geotechnical report from grain size analysis to be 1x10-4 m/s (WSP, 2018b). This unit is expected to behave as an aquifer.
— Clayey silt fill to silty clay fill was found below the silty sand to sandy gravel fill in BH18-8-23 to BH18-8-25. This fill was found to be between 0.6 and 1.0 m in thickness. Hydraulic conductivity of this material was estimated in the geotechnical report from grain size analysis to be 1x10-5 m/s (WSP, 2018b), which seems high for a silt / clay fill. This unit is expected to behave as an aquitard.
— Below the fill materials, native silt, sandy silt and silty sand was encountered in all boreholes. All the boreholes were terminated in this unit at depths ranging from 2.7 to 6.1 m below existing ground surface. Hydraulic conductivity of this material was estimated in the geotechnical report from grain size analysis to range between 1x10-4 and 1x10-5 m/s (WSP, 2018). This unit is expected to behave as an aquifer.
More detailed descriptions of the units can be found in the Geotechnical Investigation Report (WSP Canada Inc., 2018b). Borehole logs are provided in Appendix A-2.
Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B WSP Project No. 161-16086-02 September 2018 City of Toronto Page 5
Kipling Avenue
The proposed infrastructure upgrades along Kipling Avenue are as follows:
— Replace existing 200 mm sanitary sewers with a new 675 mm diameter sanitary sewer from Great Oak Drive to Thorncrest Road, a distance of 270 m and approximately 6 m depth
— New 200 mm watermain from Rathburn Road to Wingrove Hill, a distance of 650 m and approximately 2 m depth.
A total of twelve (12) geotechnical boreholes were drilled along Kipling Avenue between Kipling Avenue Thorncrest Road to Wingrove Hill. The subsurface materials encountered along the alignment, as interpreted in the geotechnical borehole logs, are shown in a cross-section (Figure 5) and described as follows, from the ground surface downwards:
— Asphalt, concrete and granular fill (sand and gravel to sandy gravel) were identified to depths of between 0.5 and 0.8 m below ground surface (bgs).
— A layer of fill was encountered below the granular fill in all boreholes. The fill ranged in composition from silty clay to clayey silt over most of the area and was found to be between 0.4 and 2.0 m in thickness. Hydraulic conductivity of this material was estimated in the geotechnical report from grain size analyses to be 1x10-7 m/s (WSP, 2018c). This unit is expected to behave as an aquitard.
— In three boreholes (BH18-8-27, BH18-8-KA6 and BH18-8-KA8), the fill was coarser, ranging in composition from sand to gravelly sand. It had a thickness of 1.8 and 3.0 m in BH18-8-27 and BH18-8-KA6, respectively, and extended to the termination depth of 3.0 m bgs at BH18-8-KA8. Hydraulic conductivity of this material was estimated in the geotechnical report from grain size analyses ranging from 1x10-3 to 1x10-5 m/s (WSP, 2018c). This unit is expected to behave as an aquifer.
— Sandy silty clay till was identified below the fill in BH18-8-27 to BH18-8-30, BH18-8-KA2 and BH18-8-KA6, extending to the bottom of the 5.0 m deep borehole at BH18-8-KA6 and to depths of between 3.0 and 5.5 m in the other boreholes. Hydraulic conductivity of this material was estimated in the geotechnical report from grain size analysis to be 1x10-8 m/s (WSP, 2018c). This unit is expected to behave as an aquitard.
— In three boreholes the till was identified as sandy silt till (BH18-8-28, BH18-8-KA3 and BH18-8-KA7). This coarser till had a thickness ranging from 0.4 m to 2.3 m, but extended to the maximum drilled depth of BH18-8-KA3. Hydraulic conductivity of this unit was estimated in the geotechnical report from grain size analyses to range from 1x10-6 to 1x10-8 m/s (WSP, 2018c). This unit is expected to behave as an aquitard.
— Below the till in boreholes all the boreholes, a layer of silt to sandy silt to silt and sand to silty sand to sand was encountered to the maximum drilled depths ranging from 3.1 m to 8.1 m. In boreholes BH18-8-KA3, BH18-8-KA6 and H18-8-KA8, this unit was directly below the fill. Hydraulic conductivity of this material was estimated in the geotechnical report from grain size analyses to range between 1x10-5 and 1x10-7 m/s (WSP, 2018c). This unit is expected to behave as an aquifer.
The shallow boreholes south of Great Oak Drive in Figure 5 did not have monitoring wells installed and are not discussed further. More detailed descriptions of the units can be found in
WSP Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B September 2018 Project No. 161-16086-02 Page 6 City of Toronto
the Geotechnical Investigation Report (WSP Canada Inc., 2018c). Borehole logs are provided in Appendix A-3.
Great Oak Drive
The proposed infrastructure upgrades along Great Oak Drive are as follows:
— Replace existing 525 mm sanitary sewer with new 1050 mm sanitary sewer between 90 meters West of Pippin Place and 40 m west of Remington Drive, 90 m length and 4 m depth.
— Replace existing 525 mm sanitary sewer with new 1500 mm sanitary sewer from 90 meters West of Pippin Place to135 m west of Remington Drive, 230 m length and 5 m depth.
— Install new 375 mm sanitary sewer between the new 1050 mm sanitary sewer and 1500 sanitary sewer, 10-meter length and 4 m depth.
— Replace existing 200 mm sanitary sewer with new 675 mm sanitary sewer from 90 meters West of Pippin Place to Kipling Avenue, 85 m length and 7.5 m depth.
A total of five (5) geotechnical boreholes were drilled along Great Oak Drive between Kipling Avenue and Remington Drive. The subsurface materials encountered along the alignment, as interpreted in the geotechnical borehole logs, are shown in a cross-section (Figure 4) and described as follows, from the ground surface downwards:
— Asphalt and granular fill (sand and gravel) were identified to depths of between 0.3 and 0.4 m below ground surface (bgs).
— A layer of fill was encountered below the granular fill in BH18-8-35 and BH18-8-36. In BH18-8-36, it had a composition of sandy silt with a thickness of 0.5 m. This unit is expected to behave as an aquifer.
— Silty clay fill to clayey silt fill was found below the granular fill/sandy silt fill in boreholes BH18-8-35 and BH18-8-36. This fill was found to be between 0.5 and 1.6 m in thickness. This unit is expected to behave as an aquitard.
— A native silty clay deposit was encountered underlying the granular fill materials in BH18-8-32. This unit extended to depths of 1.2 m below existing ground surface. Hydraulic conductivity of this material was estimated in the geotechnical report from grain size analysis to be 1x10-8 m/s (WSP, 2018d). This unit is expected to behave as an aquitard.
— Cohesive glacial till was identified below the fill materials and native silty clay deposit in all five boreholes, extending to the bottom of BH18-8-32 and to depths of between 2.1 and 3.7 m in the remaining boreholes. This unit varied in composition from sandy clayey silt till, to silty clay till. Hydraulic conductivity of this material was estimated in the geotechnical report from grain size analysis ranging from 1x10-7 to 1x10-9 m/s (WSP, 2018d). This unit is expected to behave as an aquitard.
— Non-cohesive glacial till was found below the sandy clayey silt till in BH18-8-33 and BH18-8-34. This unit varied in composition from silt till to sandy silt till. It extended to 3.7 m below existing ground surface in BH18-8-33 and the termination depth of 6.1 m below existing ground surface in BH18-8-34. Hydraulic conductivity of this material was estimated in the geotechnical report from grain size analysis to be 1x10-7 m/s (WSP, 2018d). This unit is expected to behave as an aquifer.
Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B WSP Project No. 161-16086-02 September 2018 City of Toronto Page 7
— Below the till in all five boreholes, a layer of native deposit consisting of silty sand, silt and sand, sandy silt and silt was encountered. It extended to the maximum drilled depths of 5.0 and 6.1 m in BH18-8-33, BH18-8-35 and BH18-8-36. In the other two boreholes, it was identified between layers of till. Hydraulic conductivity of this material was estimated in the geotechnical report from grain size analysis to range between 1x10-7 m/s (WSP, 2018d). This unit is expected to behave as an aquifer.
More detailed descriptions of the units can be found in the Geotechnical Investigation Report (WSP Canada Inc., 2018d). Borehole logs are provided in Appendix A-4.
3 Field Assessment The hydrogeological field program included measurement of groundwater levels, conducting single well hydraulic testing (slug tests) and obtaining water quality samples for laboratory analysis. The hydrogeological field work took place in the months of February and April 2018. The results of the field program are discussed in the following sections.
3.1 Groundwater Levels Groundwater levels were measured in each monitoring well by the geotechnical field team approximately one week after installation and again by the hydrogeological field team prior to field testing. Water levels that are reported are considered to be static conditions for winter and spring months and are expected to represent seasonally high groundwater conditions.
3.1.1 Thorncrest Road
Static groundwater levels were measured in six accessible wells during site visits on April 9 and April 24, 2018. The measured water levels are presented in Table 1.
Table 1 Groundwater Levels – Thorncrest Road
Well DEPTH
(M)
SCREENED INTERVAL APRIL 9, 2018 APRIL 24, 2018
TOP (M BGS)
BOTTOM (M BGS) (M BGS) (MASL) (M BGS) (MASL)
BH18-8-11 8.1 6.6 8.1 5.36 135.84 5.15 136.05
BH18-8-13 7.0 5.5 7.0 4.74 135.66 4.54 135.87
BH18-8-15 7.0 5.5 7.0 4.29 136.31 4.09 136.51
BH18-8-17 4.6 3.1 4.6 3.10 135.70 2.42 136.38
BH18-8-19 5.0 3.5 5.0 3.07 134.43 2.91 134.59
BH18-8-21 6.1 4.6 6.1 2.93 134.37 2.71 134.60
WSP Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B September 2018 Project No. 161-16086-02 Page 8 City of Toronto
3.1.2 Sir Williams Lane
Static groundwater levels were measured in two accessible wells during site visits on January 4, February 5, February 12, and April 25, 2018. BH18-8-25 was dry in January and February of 2018, but had measurable water levels in April 2018. The measured water levels are presented in Table 2.
Table 2 Groundwater Levels – Sir Williams Lane
Well DEPTH
(M)
SCREENED INTERVAL JAN. 4, 2018 FEB. 5, 2018 FEB. 12, 2018 APR. 25, 2018
TOP (M BGS)
BOTTOM (M BGS) (M BGS) (M BGS) (M BGS) (M BGS) (M BGS) (M BGS) (M BGS) (M BGS)
BH18-8-23 6.1 4.6 6.1 5.65 135.65 5.68 135.63 - - - -
BH18-8-25 4.6 3.1 4.6 Dry N/A - - Dry N/A 3.38 137.22
‘-‘ not measured
3.1.3 Kipling Avenue
Static groundwater levels were measured in three accessible wells during site visits on April 25, 2018. The measured water levels are presented in Table 3.
Table 3 Groundwater Levels – Kipling Avenue
Well DEPTH
(M)
SCREENED INTERVAL APR. 25, 2018
TOP (M BGS)
BOTTOM (M BGS) (M BGS) (MASL)
BH18-8-27 4.6 3.1 4.6 2.58 134.13
BH18-8-29 7.0 5.5 7.0 2.22 135.88
BH18-8-31 6.1 4.6 6.1 3.49 134.81
3.1.4 Great Oak Drive
Static groundwater levels were measured in three accessible wells during site visits on January 4 and 23, February 5 and 12, and April 25, 2018. The measured water levels are presented in Table 4.
Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B WSP Project No. 161-16086-02 September 2018 City of Toronto Page 9
Table 4 Groundwater Levels – Great Oak Drive
Well DEPTH
(M)
SCREENED INTERVAL JAN. 4, 2018 JAN. 23, 2018 FEB. 5, 2018 FEB. 12, 2018 APR. 25, 2018
TOP (M BGS)
BOTTOM (M BGS) (M BGS) (MASL) (M BGS) (MASL) (M BGS) (MASL) (M BGS) (MASL) (M BGS) (MASL)
BH18-8-32 7.0 5.5 7.0 3.16 134.24 - - 2.97 134.43 - - - -
BH18-8-34 5.2 3.7 5.2 - 2.63 133.27 - - 2.94 132.96 - -
BH18-8-36 5.0 3.5 5.0 2.45 132.15 - - - - - - 1.79 132.81
‘-‘ not measured
3.2 Single Well Hydraulic Testing Single well hydraulic tests were conducted on all of the monitoring wells within the study area that were not dry by purging the wells using bailers. The wells were purged of at least three well volumes where possible and allowed to recover. Water levels were recorded by a combination of manual measurements using a water level tape and through the use of an electronic pressure transducer/datalogger as a backup. Hydraulic response was analyzed using the Hvorslev method to estimate hydraulic conductivity. Most of the results are not necessarily representative of a single unit, since the saturated zone of several of the wells intersect different layers of fill and native soils. Results are compared with values from the available literature wherever possible (Freeze and Cherry, 1979) and are presented in Appendix B.
3.2.1 Thorncrest Road
Along Thorncrest Road, six wells were drilled and installed as part of the geotechnical field program. Two wells were screened across multiple units. The well at BH18-8-19 was screened across two tills (sandy clayey silt till and silt and sand till), while the well at BH18-8-21 was screened across sandy clayey silt till and sandy silt. The other wells were fully screened within one unit. Hydraulic conductivity (K) estimates ranged between 2.5x10-6 to 1.1x10-5 m/s for the silty sand to sand (BH18-8-11, BH18-8-13 and BH18-8-15), which is within the expected range of results for this material from the literature. K estimates ranged from 3.1x10-8 to 4.1x10-7 m/s for the glacial till in BH18-8-17 and BH18-8-19, which is within the expected range of results for this material from the literature. Estimates from BH18-8-21 ranged between 1.9x10-6 and 2.5x10-6 m/s. This is likely more representative of the sandy silt than the till. The results are summarized in Table 5 and calculations are provided in Appendix B.
WSP Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B September 2018 Project No. 161-16086-02 Page 10 City of Toronto
Table 5 Hydraulic Conductivity Estimates from Slug Testing – Thorncrest Road
Well Analysis Material Screened Estimated Hydraulic Conductivity (M/S)
BH18-8-11 Hvorslev Sand and Silt 2.5x10-6 to 5.0x10-6
BH18-8-13 Hvorslev Sand 2.5x10-6 to 7.3x10-6
BH18-8-15 Hvorslev Silty Sand 5.4x10-6 to 1.1x10-5
BH18-8-17 Hvorslev Sandy Clayey Silt Till 3.1x10-8 to 9.2x10-8
BH18-8-19 Hvorslev Sandy Clayey Silt Till / Silt and Sand Till 1.2x10-7 to 4.1x10-7
BH18-8-21 Hvorslev Sandy Clayey Silt Till / Sandy Silt 1.9x10-6 to 2.5x10-6
3.2.2 Sir Williams Lane
Two wells were drilled and installed as part of the geotechnical field program along Sir Williams Lane within the project limits. Both wells were screened within the silty sand and silt unit only, so the results are assumed to be representative of that unit. Hydraulic conductivity (K) estimates ranged between 1.8x10-7 to 9.7x10-7 m/s in both wells, which are within the expected range of results for silty material from the literature. The results are summarized in Table 6 and calculations are provided in Appendix B.
Table 6 Hydraulic Conductivity Estimates from Slug Testing – Sir Williams Lane
Well Analysis Material Screened Estimated Hydraulic Conductivity (M/S)
BH18-8-23 Hvorslev Silt 1.8x10-7 to 9.7x10-7
BH18-8-25 Hvorslev Silty Sand / Silt 5.0x10-7 to 8.5x10-7
3.2.3 Kipling Avenue
Along Kipling Avenue, three wells were drilled and installed as part of the geotechnical field program. The well at BH18-8-27 was screened across two units (sandy silty clay till and sandy silt). However, wells at BH18-8-29 and BH18-8-31 were screened within the silt to silty sand unit only, so the results are assumed to be representative of that unit. Hydraulic conductivity (K) estimates ranged between 1.8x10-7 to 2.2x10-6 m/s for the silt to silty sand, which is within the expected range of results for this material from the literature. Estimates from BH18-8-27 ranged between 3.0x10-7 to 6.4x10-7 m/s, which is within the expected range of results from the literature for both till and sandy silt. The results are summarized in Table 7 and calculations are provided in Appendix B.
Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B WSP Project No. 161-16086-02 September 2018 City of Toronto Page 11
Table 7 Hydraulic Conductivity Estimates from Slug Testing – Kipling Avenue
Well Analysis Material Screened Estimated Hydraulic Conductivity (M/S)
BH18-8-27 Hvorslev Sandy Silty Clay Till / Sandy Silt 3.0x10-7 to 6.4x10-7
BH18-8-29 Hvorslev Sandy Silt / Silt 1.8x10-7 to 6.0x10-7
BH18-8-31 Hvorslev Silty Sand / Silt 1.2x10-6 to 2.2x10-6
3.2.4 Great Oak Drive
Along Great Oak Drive, three wells were drilled and installed as part of the geotechnical field program. The well at BH18-8-32 was screened within the till. The other two wells were screened across multiple units. The hydraulic conductivity (K) estimate was 4.1x10-8 m/s for the clay and silt till to silty clay till, which is within the expected range of results for this material from the literature. Estimates from BH18-8-34 and BH18-8-36 ranged between 1.2x10-6 to 2.4x10-6 m/s, which is slightly high for a clayey silt till or silty clay, but within the expected range of results sandy silt, silt or sand and silt till. The results are summarized in Table 8 and calculations are provided in Appendix B.
Table 8 Hydraulic Conductivity Estimates from Slug Testing – Great Oak Drive
Well Analysis Material Screened Estimated Hydraulic Conductivity (M/S)
BH18-8-32 Hvorslev Clay and Silt Till to Silty Clay Till 4.1x10-8
BH18-8-34 Hvorslev Sandy Silt / Sand and Silt Till to Silt Till 1.5x10-6 to 2.4x10-6
BH18-8-36 Hvorslev Clayey Silt Till / Silty Clay / Silt 1.2x10-6 to 2.2x10-6
3.3 Water Quality Sampling Water quality sampling was conducted on all wells within the study area that were not dry. The wells were purged using bailers. Standard practice involves removing at least three (3) well volumes of groundwater to provide a sample that is representative of the formation water. Two types of samples were taken. The first type was tested and assessed relative to the City of Toronto Sewer Use Bylaw (sewer use bylaw) for both sanitary and storm parameters. The second type of sample was tested for general chemistry and metals parameters that were also compared to the bylaw criteria. The samples were packed on ice and delivered to ALS Laboratories for analysis. The packages that were sampled are shown in Table 9. A discussion of water quality sampling results for each street are discussed in the following sections. Summary results tables and Certificates of Analysis (CoA) from the laboratory are provided in Appendix C.
WSP Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B September 2018 Project No. 161-16086-02 Page 12 City of Toronto
Table 9 Water Quality Sampling Program
STREET NAME NUMBER OF MONITORING
WELLS TESTED SEWER USE BYLAW
SAMPLES GENERAL WATER
QUALITY SAMPLES
Thorncrest Road Six (6) One (1) Five (5)
Sir Williams Lane Two (2) None Two (2)
Kipling Avenue Three (3) One (1) Two (2)
Great Oak Drive Three (3) One (1) Two (2)
TOTAL Fourteen (14) Three (3) Eleven (11)
3.3.1 Thorncrest Road
Six monitoring wells on Thorncrest Road had measurable water levels and were able to be sampled. One sample was tested for the full suite of sewer use bylaw parameters (BH18-8-11) and the other samples were tested for general water quality parameters (BH18-8-13, BH18-8-15, BH18-8-17, BH18-8-19, BH18-8-21), which were also compared with sewer use bylaw criteria. The sewer use sample was unfiltered, whereas the general chemistry samples were filtered to simulate treatment.
Based on the results of the water quality sampling and analysis from BH18-8-11, total suspended solids (TSS) parameter was greater than the standards used for the sanitary sewer use bylaw criteria and TSS, total phosphorus, total copper, total manganese, total nickel and total zinc were greater than the standard for the storm sewer use by law criteria. In addition, the detection limit for Polycyclic Aromatic Hydrocarbons (PAHs) was raised by the laboratory during sample testing. The resulting detection limit exceeded the standard for the storm sewer use bylaw criteria, but does not necessarily reflect the presence of PAHs. Concentrations of total manganese in BH18-8-13, BH18-8-17, BH18-8-19 and BH18-9-21 were greater than the storm sewer use bylaw criteria.
3.3.2 Sir Williams Lane
Two monitoring wells on Sir Williams Lane had measurable water levels and were able to be sampled. Both samples tested for general water quality parameters (BH18-8-23 and BH18-8-25), which were also compared with sewer use bylaw criteria. Samples were filtered to simulate treatment. The full suite of sewer use bylaw parameters could not be sampled as there were insufficient volumes of water for testing.
Based on the results of the water quality sampling, total manganese exceeded the storm sewer use bylaw criteria in BH18-8-23 only.
Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B WSP Project No. 161-16086-02 September 2018 City of Toronto Page 13
3.3.3 Kipling Avenue
Three monitoring wells on Kipling Avenue had measurable water levels and were able to be sampled. One sample was tested for the full suite of sewer use bylaw parameters (BH18-8-29) and the other samples were tested for general water quality parameters (BH18-8-27, BH18-8-31), which were also compared with sewer use bylaw criteria. The sewer use sample was unfiltered, whereas the general chemistry samples were filtered to simulate treatment.
Based on the results of the water quality sampling and analysis from BH18-8-29, total suspended solids (TSS) concentration was greater than the standards used for the sanitary sewer use bylaw criteria and TSS, and total manganese concentrations were greater than the storm sewer use bylaw criteria. In addition, the detection limit for Polycyclic Aromatic Hydrocarbons (PAHs) was raised by the laboratory during sample testing. The resulting detection limit exceeded the standard for the storm sewer use bylaw criteria, but does not necessarily reflect the presence of PAHs. Manganese concentrations were greater than the storm sewer use bylaw criteria in BH18-8-27 and BH18-8-31.
3.3.4 Great Oak Drive
Three monitoring wells on Great Oak Drive had measurable water levels and were able to be sampled. One sample was tested for the full suite of sewer use bylaw parameters (BH18-8-32) and the other samples were tested for general water quality parameters (BH18-8-34 and BH18-8-36), which were also compared with sewer use bylaw criteria. The sewer use sample was unfiltered, whereas the general chemistry samples were filtered to simulate treatment.
Based on the results of the water quality sampling and analysis from BH18-8-32, total aluminium, total manganese and bis(2-ethylhexyl)phthalate concentrations were greater than the standards used for the sanitary sewer use bylaw criteria. Concentrations of several parameters were greater than the storm sewer use bylaw criteria in BH18-8-32, including TSS, total arsenic, total chromium, total copper, total manganese, total nickel, total zinc and bis(2-ethylhexyl)phthalate. Manganese concentrations were greater than the storm sewer use bylaw criteria in BH18-8-34 only.
3.3.5 Summary
In general, the water quality samples collected and tested during this field program contained parameter concentrations that were greater than criteria established by both sewer use bylaws. Concentrations of TSS were greater than the sanitary sewer use bylaw criteria in the unfiltered samples from BH18-8-11 and BH18-29. Concentrations of total aluminium and manganese were greater than the sanitary sewer use bylaw criteria in BH18-8-32. Filtration of the samples reduced the concentration of metals parameters to levels that were lower than the sewer use bylaw criteria, suggesting that discharge water treated for TSS may also meet the sanitary sewer use bylaw.
WSP Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B September 2018 Project No. 161-16086-02 Page 14 City of Toronto
The storm sewer use bylaw has more stringent criteria than those for the sanitary sewer, and as such more parameters do not meet the bylaw criteria. Filtration was shown to reduce the concentration of most metals parameters to levels that meet the storm sewer use bylaw criteria. However, it is commonly found that natural manganese levels in groundwater in the City of Toronto are greater than the bylaw criteria, even after treatment (filtration). It is noted that there is no manganese criterion under the Provincial Water Quality Objectives (PWQO) and the storm sewer use bylaw criterion of 0.05 mg/L is the same as the aesthetic guideline for manganese under the Ontario Drinking Water Quality Standards (ODWQS) with the intent to minimize long-term staining of porcelain fixtures. Additional types of treatment are available to reduce manganese levels to meet the storm sewer use bylaw, but they are expensive.
Bis(2-ethylhexyl)phthalate concentration was greater than both the sanitary and storm sewer use bylaw criteria in BH18-8-32. This chemical is a plasticizer that is used in the production of PVC. An article from the US Environmental Protection Agency web page shows that bis(2-ethylhexyl)phthalate (also known as di-2-ethylhexyl-phthalate) can be removed using granular activated carbon (US EPA, 2016). If this is unsuccessful, it can also be removed using bio-treatment. Summary results tables and Certificates of Analysis (CoA) from the laboratory are provided in Appendix C.
4 Dewatering Assessment An estimation of dewatering volumes associated with the construction of infrastructure is required to evaluate permitting requirements as follows:
— Takings of greater than 400,000 L/day at any one time for the project (includes multiple streets) will require a Category 3 PTTW;
— Takings of greater than 50,000 L/day but less than 400,000 L/day at any one time for the project (includes multiple streets) will require registration as an EASR; or
— Takings of less than 50,000 L/day at any one time do not require a permit.
For the purposes of providing a manageable and realistic dewatering plan, it was assumed that the below ground infrastructure is to be constructed using open-cut trenching techniques. The excavation dimensions are expected to vary based on the type of infrastructure being installed and will differ from street to street depending on the specific design details as discussed in separate sections below. The following general assumptions are used for all sections:
ASSUMPTIONS
— No measures are to be put in place to restrict flow into the excavations (e.g., sheet piling, caissons) to provide more conservative (overestimate) dewatering rates;
— The subsurface materials are uniform, continuous and of infinite extent unless otherwise noted;
— It is expected that seepage will mainly come from the underlying silt / sand and silt / silt and sand / sand unit;
— Two dewatering rates were estimated, one from the highest hydraulic conductivity estimated from field testing and one for the lowest to account for variability in the subsurface soils;
Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B WSP Project No. 161-16086-02 September 2018 City of Toronto Page 15
— Seepage across the base of the excavation is assumed to be negligible;
— The trench will require dewatering over a stretch of 60 m at a time;
— Groundwater levels are assumed to be consistent with the highest values monitored during the field testing and considered to be representative of the highest seasonal levels; and,
— All dewatering estimates are based on the assumption that it will be necessary to lower the water level to 1 m below the excavation invert.
Dewatering equations are discussed in the following section.
4.1 Dewatering Equations Given the subsurface conditions encountered in the study area, equations are used to account for excavations under unconfined groundwater conditions. For the purposes of these calculations, trench equations are assumed to be more appropriate to estimate flows, since the length to width ratio of the excavations are expected to be greater than 1.5.
TRENCH EQUATION – UNCONFINED CONDITIONS
For seepage from the walls of an excavation, dewatering volumes were estimated using the following equation from Powers (1992) for flow to a trench for an unconfined system:
L
hHxK
r
R
hHKQ
s
22
ln
22
0
22
where Q is discharge (m3/s), K is hydraulic conductivity (m/day), H is initial water level (m), h is the required drawdown (m), R0 is the equivalent radius of influence (m), rs is the equivalent well radius (m), x is trench length (m) and L is an equivalent line source (m). For the purposes of these calculations, rs is the approximate distance to the centre of the trench from a theoretical dewatering well. The first term of the equation represents radial flow to the ends of the trench, while the second term represents flow across the trench walls. For more details, please refer to Powers (1992).
EQUIVALENT WELL RADIUS (RS)
The equivalent well radius rs is estimated in different ways depending on the type of system that is being evaluated. For a circular shaft, rs is simply the radius of the shaft. For a rectangular shaft, rs can be assumed to act as a circular system of the same enclosed area:
abrs
For a trench, rs is the approximate distance to the centre of the trench from a theoretical dewatering well. For more details, please refer to Powers (1992).
WSP Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B September 2018 Project No. 161-16086-02 Page 16 City of Toronto
EQUIVALENT RADIUS OF INFLUENCE (Ro)
The equivalent radius of influence R0 is assumed to be equivalent to the zone of influence (ZOI). R0 was estimated using the empirical Sichart equation as described in Powers (1992):
KhHR 30000
where R0 is the equivalent radius of influence or ZOI (meters), H is the initial water level (meters), h is the required drawdown (meters), and K is hydraulic conductivity (meters/second).
4.2 Thorncrest Road The subsurface geology identified along Thorncrest Road shows silty clay / clayey silt /sandy silt fill overlying sandy silty clay till / sandy clayey silt till / sand and silt till / sandy silt till overlying silt / sand and silt / sandy silt / silty sand / sand (Figure 3). It is expected that there will be some seepage from the silt / sand and silt / sandy silt / silty sand / sand. The excavations for this section are expected to encounter this unit near Kipling Avenue and from The Wynd to Sir Williams Lane. Based on monitoring data, water levels will be close to the base of the excavation at the east end near Sir Williams Lane and above the excavation elsewhere. The following additional site-specific assumptions were made to simplify the calculations:
— Excavation depth is assumed to be 7 m;
— Excavation width is assumed to be 6 m;
— The silt / sand and silt / sandy silt / silty sand / sand is assumed to be a continuous unit with a hydraulic conductivity range of 2.5x10-6 to 1.1x10-5 m/s, which will be used to calculate the minimum and maximum dewatering rate, respectively;
— Groundwater levels are assumed to be 2.4 m bgs based on the highest measured groundwater level in the section, for a total drawdown of 5.6 m (excavation depth + 1 m); and
— No additional factors of safety have been added.
Based on these assumptions, the dewatering rates for each 60 m stretch along Thorncrest Road are expected to range between 55,000 and 125,000 L/day with a projected zone of influence (ZOI) ranging between 27 and 56 m.
4.3 Sir Williams Lane The subsurface geology identified along Sir Williams Lane shows sand and gravel / silty sand / sandy silt / clayey silt / silty clay fill overlying native silt / sandy silt / silty sand (Figure 4). It is expected that there will be seepage from the native silt / sandy silt / silty sand. The excavations for this section are expected to encounter this unit along the entire street. Based on monitoring data, water levels will be below the base of the excavation. As such, dewatering is not expected to be required in this location.
Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B WSP Project No. 161-16086-02 September 2018 City of Toronto Page 17
4.4 Kipling Avenue The subsurface geology identified along Kipling Avenue shows silty clay / clayey silt / sand / gravelly sand fill overlying silty clay / clayey silt / sandy silt till overlying silt / sandy silt / silty sand / sand (Figure 5). It is expected that there will be some seepage from the silt / sandy silt / silty sand / sand. This unit is treated as being fully saturated. The excavations for this section are expected to encounter this unit from Thorncrest Road to Great Oak Drive. Based on monitoring data, water levels will be above the base of the sewer excavation. The following additional site-specific assumptions were made to simplify the calculations:
— Excavation depth is assumed to be 6 m;
— Excavation width is assumed to be 3 m;
— The silt / sandy silt / silty sand / sand is assumed to be a continuous unit with a hydraulic conductivity range of 1.8x10-7 to 2.2x10-6 m/s, which will be used to calculate the minimum and maximum dewatering rate, respectively;
— Groundwater levels are assumed to be 2.2 m bgs based on the highest measured groundwater level in the section, for a total drawdown of 4.8 m (excavation depth + 1 m); and
— No additional factors of safety have been added.
Based on these assumptions, the dewatering rates for each 60 m stretch along Kipling Avenue are expected to range between 1,800 and 38,000 L/day with a projected zone of influence (ZOI) ranging between 6 and 21 m.
4.5 Great Oak Drive The subsurface geology identified along Great Oak Drive shows silty clay / clayey silt / sandy silt fill at the west and east ends of the alignment, generally overlying silty clay till/ clayey silt till / sandy silt till overlying silt / sandy silt / silty sand (Figure 4). It is expected that there will be some seepage from the silt / sandy silt / silty sand. The excavations for this section are expected to encounter this unit in different thicknesses throughout the subject street. Based on monitoring data, water levels will be above the base of the excavation. The following additional site-specific assumptions were made to simplify the calculations:
— Excavation depth is assumed to be 7.5 m;
— Excavation width is assumed to be 3 m;
— The silt / sandy silt / silty sand is assumed to be a continuous unit with a hydraulic conductivity range of 4.1x10-8 to 2.4x10-6 m/s, which will be used to calculate the minimum and maximum dewatering rate, respectively;
— Groundwater levels are assumed to be 1.8 m bgs based on the highest measured groundwater level in the section, for a total drawdown of 6.7 m (excavation depth + 1 m); and
WSP Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B September 2018 Project No. 161-16086-02 Page 18 City of Toronto
— No additional factors of safety have been added.
Based on these assumptions, the dewatering rates for each 60 m stretch along Great Oak Drive are expected to range between 4,000 and 57,000 L/day with a projected zone of influence (ZOI) ranging between 22 and 31 m.
4.6 Summary A summary table showing the expected dewatering volumes per 60 m of open excavation is provided in Table 10. Dewatering calculation tables are provided in Appendix D.
Table 10 Dewatering Summary
STREET NAME MINIMUM (L/DAY) MAXIMUM (L/DAY) MAXIMUM ZOI (M)
Thorncrest Road 55,000 125,000 56
Sir Williams Lane 0 0 N/A
Kipling Avenue 1,800 38,000 21
Great Oak Drive 4,000 57,000 31
Note: Highlighted text indicates exceedance of MOECC EASR criteria
Estimated maximum dewatering rates across the walls of the excavations are expected to range between 0 and 125,000 L/day with a projected ZOI of between 0 and 56 m. The highest rates fall within the range required for registration on the MOECC EASR web site, which can be obtained prior to the start of construction. Note that no factor of safety has been applied to these estimates in the event that local areas with more permeable materials are intersected during construction. Typically, a factor of safety of 3 is used in these situations to account for unforeseen circumstances and to provide flexibility during construction. For this reason, it is recommended that an EASR be procured for dewatering rates of up to 400,000 L/day. It is noted that under an EASR, combined dewatering rates cannot exceed 400,000 L/day at any one time for the duration of construction. This may result in temporary restrictions on operations over short periods if work is proceeding simultaneously in several areas. Dewatering rates exceed 400,000 L/day would require a Category 3 PTTW.
This assessment does not represent an engineering design of a dewatering operation, but a preliminary hydrogeological analysis for assessment of dewatering volumes. The actual design of the dewatering operation will be the responsibility of the contractor.
[
G
r
a
b
y
o
u
r
r
e
a
d
e
r
’
s
a
t
t
e
n
t
i
o
n
w
Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B WSP Project No. 161-16086-02 September 2018 City of Toronto Page 19
5 Conclusions and Recommendations
5.1 Conclusions WSP was retained by the City of Toronto to undertake a hydrogeological investigation as part of the Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B - Sanitary, and Watermain Replacement and Substandard Water Service Replacement in Toronto. The hydrogeological investigation is required to evaluate dewatering and discharge requirements for the installation of the proposed infrastructure and to determine whether a Permit to Take Water (PTTW) is needed from the Ministry of the Environment and Climate Change (MOECC) or alternatively if the construction project will require to be registered on the MOECC’s Environmental Activity and Sector Registry (EASR).
The subsurface generally consists of a sandy and clayey fill at ground surface overlying glacial tills in both sandy and clayey textures. Native silt / sandy silt / silty sand / sand is encountered below the tills in most locations. This layer is expected to behave as an aquifer.
Shallow groundwater levels were measured during winter and spring of 2018 and were found to generally be within 1.8 to 5.7 m of ground surface.
Hydraulic conductivity values estimated from slug test data ranged between a maximum of 1.2x10-7 m/s in glacial till to 1.1x10-5 m/s in silt / sand units.
Based on the results of the water quality sampling and analyses, total suspended solids (TSS) concentrations were greater than the standards used for the sanitary sewer use bylaw criteria in the unfiltered samples taken from BH18-8-11 and BH18-8-29 and concentrations of total aluminum, total manganese and Bis(2-ethylhexyl)phthalate exceeded the sanitary bylaw criteria in the unfiltered sample taken from BH18-8-32. Concentrations of several parameters were greater than the storm sewer use bylaw criteria, including TSS, total phosphorus, total arsenic, total chromium, total copper, total manganese, total nickel, total zinc and Bis(2-ethylhexyl)phthalate.
In general, the water quality samples collected and tested during this field program contained parameter concentrations that were greater than criteria established by both sewer use bylaws. Concentrations of TSS were greater than the sanitary sewer use bylaw criteria in the unfiltered sample from BH18-8-11 and BH18-8-29. Concentrations of several metals were greater than the sanitary sewer use bylaw criteria. Filtration of the samples tends to reduce the metals to levels meeting the sanitary sewer use bylaw. However, concentrations of manganese do not meet the storm sewer use criteria even after filtration.
Bis(2-ethylhexyl)phthalate concentrations were greater than both the sanitary and storm sewer use bylaw criteria in BH18-8-32. Water containing this chemical may need to be treated prior to discharge to the public sewers.
WSP Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B September 2018 Project No. 161-16086-02 Page 20 City of Toronto
Dewatering rates across the study area are expected to remain below levels requiring a PTTW. Dewatering rates for 60 m intervals estimated with a factor of safety of 3 may exceed 50,000 L/day, but are not expected to exceed 400,000 L/day. Provided that combined dewatering volumes do not exceed 400,000 L/day at any one time for this project, these rates fall within the range required for registration on the MOECC EASR web site, which can be obtained prior to the start of construction.
5.2 Recommendations The following recommendations are provided as a result of this investigation:
— The project should be registered with the MOECC EASR website for takings up to 400,000 L/day. A Category 3 PTTW will be required if the dewatering rates exceeding 400,000 L/day.
— Dewatering volumes will need to be treated to reduce TSS and metal concentrations prior to discharge to the sanitary sewer. Testing completed indicates that filtration will be effective in achieving the water quality suitable for discharge to the sanitary sewer. This option will avoid the need to use more expensive treatment systems designed to remove manganese as would be required to discharge to the storm sewer.
— Groundwater shall be sampled for Bis(2-ethylhexyl)phthalate prior to discharge to the sanitary sewer. Should the parameter concentrations remain greater than the bylaw criteria, the groundwater should be treated prior to discharge to the sanitary sewer. Treatment options, include granular activated carbon or bio-treatment.
Basement Flooding Area Program, Phase 4, Assignment 8-04A and 8-04B WSP Project No. 161-16086-02 September 2018 City of Toronto Page 21
6 References — Chapman, L.J. and Putnam, D.F., 1984. The Physiography of Southern Ontario, 3rd ed.
Ministry of Natural Resources, Ontario Geological Survey Special Volume 2.
— Freeze, R.A., and J.A. Cherry, 1979. Groundwater. Prentice-Hall Inc. Englewood Cliffs, NJ. 604pp.
— Hewitt D. F., 1972. Paleozoic Geology of Southern Ontario; Ontario Div. Mines, GR105, 18p. Accompanied by Map 2254, scale l inch to 16 miles.
— Ontario Geological Survey, 2003. Surficial Geology of Southern Ontario.
— Powers, J.P., 1992: Construction Dewatering: New Methods and Applications, 2nd edition. John Wiley & Sons.
— Sharpe, D.R., Barnett, P.J., Brennand, T.A., Finley, D., Gorrell, G., Russell, H.A.J., and Stacey, P., 1997. Surficial Geology of the Greater Toronto and Oak Ridges Moraine Area, Southern Ontario. Geological Survey of Canada, Open File 3062, Scale 1:200,000.
— US EPA, 2016. https://safewater.zendesk.com/hc/en-us/sections/202346397-Di-2-ethylhexyl-phthalate
— WSP Canada Inc., 2018a. Geotechnical Factual Report, Basement Flooding Protection Program Phase 4, Assignment 8-04A, Project 2, Thorncrest Road Local Road
Resurfacing, Storm and Sanitary Sewer Replacement from Sir Williams Lane to Kipling Avenue, Toronto, Ontario.
— WSP Canada Inc., 2018b. Geotechnical Factual Report, Basement Flooding Protection Program Phase 4, Assignment 8-04A, Project 3, Sir Williams Lane Storm Sewer and Catch Basin Installation from 170 m West of Thorncrest Road to Thorncrest Road, Toronto, Ontario.
— WSP Canada Inc., 2018c. Geotechnical Factual Report, Basement Flooding Protection Program Phase 4, Assignment 8-04B, Project 4, Kipling Avenue Sanitary Sewer and Watermain Replacement from Thorncrest Road to Wingrove Hill, Toronto, Ontario.
— WSP Canada Inc., 2018d. Geotechnical Factual Report, Basement Flooding Protection Program Phase 4, Assignment 8-04B, Project 5, Great Oak Drive Sanitary Sewer Replacement from Kipling Avenue to Remington Drive, Toronto, Ontario.
FIGURES
PROJECT 2PROJECT 1
PRO
JECT 3
PR
OJE
CT
4
PROJECT 5
KIP
LIN
G A
VE
NU
E
RATHBURN ROAD
ABILENE D
RIVE
THE KIN
GSW
AY
BYWOOD DRIVE
TW
YF
OR
D R
OA
D
GREAT OAK DRIVE
THOR
NC
RE
ST
RO
AD
PRINCE GEORGE DRIVE
ISL
ING
TO
N A
VE
NU
E
LLO
YD
MA
NO
R R
OA
D
GL
EN
AG
AR
DRIVE
CE
DA
RLA
ND
DR
IVE
NORTH HEIGHTS ROAD
HA
LIB
UR
TO
N A
VE
NU
E
A
PPLEDALERO
ADPHEASANT LANE
FIRWOOD CRESCENT
RIVER
CO
VE
DR
IVE
BEAVERBROOK AVENUE
LESMAR DRIVE
SIR
WIL
LIA
MS
LAN
E
AYLESBURY ROAD
HILL
CR
OF
T D
RIV
E
BU
RR
OW
S A
VE
NU
E
PR
INC
ESS
MAR
GARET
BOULEVARD
MARTINGROV
ER
OA
D
RAVENSCREST DRIVE
ROCKINGHAM DRIVE
AB
ING
ER
CR
ES
CE
NT
VA
SS
AR
DR
IVE
BIR
CH
CR
OF
TR
OA
D
TOTTERIDGE
ROAD
WINGROVE HILL
BLAIR ATHOL CRESCENT
RANDOM STREET
PERRY CRESCENT
DONALBERT ROAD
GRAYWOOD DRIVE
RE
MIN
GT
ON
DR
IVE
SH
AD
OW
BR
OO
K D
RIV
E
THE WYND
AGAR
CRESCENT
HAMPSHIRE HE IGH
TS
DU
NC
AIRN DRIVE
FARN
ING
HAM
CR
ESC
EN
T
GOLFCREST ROAD
ASHWOOD CRESCENT
FR
IARS
LAN
E
SW
IND
ON
RO
AD
BA
LLANTYNECOURT
PRINC
ESSANNE CRESCENT
TH
OR
NB
URY CR
ES
CE
NT
AP
PL
EB
Y C
OU
RT
WE
YB
RIDGE
COURT
ORRELL AVENUE
MULVEY AVENUE
CHESHIR ED
RIV
E
KE
VI LA
NE
LLOYDM
AN
OR
RO
AD
HYDROGEOLOGICAL REPORT
Basement Flooding Protection Program Phase 4
BF Assignment 8-03
Toronto, Ontario
LOCATION MAP
1
FILE. NO.:161-16086-02 F1PROJECT: 161-16086-02
DATE: MARCH 2018
FIGURE
100 0 10050 Metres
.1:10000SCALE:
Data Source: Ministry of Natural Resources,Ontario Base Mapping, March 2014.
LEGEND
BF ASSIGNMENT 8-03-PROJECT 1
BF ASSIGNMENT 8-04A-PROJECT 2
BF ASSIGNMENT 8-04A-PROJECT 3
BF ASSIGNMENT 8-04B-PROJECT 4
BF ASSIGNMENT 8-04B-PROJECT 5
PROJECT 2
PROJECT 1
PRO
JECT 3
PR
OJE
CT
4
PROJECT 5
Mim
ico
Cre
ek
KIP
LIN
G A
VE
NU
E
RATHBURN ROAD
TW
YF
OR
D R
OA
D
ABILENE DRIVE
BYWOOD DRIVE
TH
OR
NC
RE
ST
RO
AD
GREAT OAK DRIVE
THE
KINGSWAY
PRINCE
GEORGE DRIVE
GLE
NA
GA
RD
RIV
E
MARTIN
GROVER
OA
D
LLO
YD
MA
NO
R R
OA
D
RAVENSCREST DRIVE
NORTH HEIGHTS ROAD
HA
LIB
UR
TO
N A
VE
NU
E
CE
DA
RLA
ND
DR
IVE
A
PPLEDALE
RO
ADPHEASANT LANE
FIRWOOD CRESCENT
RIVER
CO
VE
DR
IVE
BEAVERBROOK AVENUE
LESMAR DRIVE
SIR
WIL
LIA
MS
LAN
E
AYLESBURY ROAD
HIL
LC
RO
FT
DR
IVE
ISLIN
GTO
N A
VE
NU
E
BU
RR
OW
S A
VE
NU
E
COWLEY AVENUE
ROCKINGHAM DRIVE
VA
SS
AR
DR
IVE
ABINGER CRESCENT
AGAR
CRESCENT
DONALBERT ROAD
PR
INCESS
MAR
GARET
BO
ULE
VA
RD
WINGROVE HILL
BL AIR ATHOL CRESCENT
LORRAINE
GARDENS
RANDOM STREET
GRAYWOOD DRIVE
RE
MIN
GT
ON
DR
IVE
TO
TTERIDGE ROAD
SH
AD
OW
BR
OO
K D
RIV
E
THE W
YND
HAMPSHIRE HEIGH
TS
DU
NC
AIRN DRIVE
PERRY CRESCENT
FR
IARS
LAN
EBA
LLANTYNECOURT
NASHLAND AVENUE
THO
RN
BURY CR
ES
CE
NT
WE
YBRID
GE
CO
URT
FAR
NIN
GH
AM
CR
ESC
EN
T
MULVEY AVENUE
CHESHIRED
RIV
E
KE
VI LA
NE
LLOYD
MA
NO
RR
OA
D
HYDROGEOLOGICAL REPORT
Basement Flooding Protection Program Phase 4
BF Assignment 8-03
Toronto, Ontario
SURFICIAL GEOLOGY
2
FILE. NO.:161-16086-02 F2PROJECT: 161-16086-02
DATE: MARCH 2018
FIGURE
100 0 10050 Metres
.
1:10000SCALE:
Data Source: Ministry of Natural Resources, Ontario Base Mapping,March 2014. Surficial Geology of Southern Ontario, MRD 128,Ministry of Northern Development and Mines.
LEGEND
BF ASSIGNMENT 8-03-PROJECT
BF ASSIGNMENT 8-04A-PROJECT
BF ASSIGNMENT 8-04A-PROJECT
BF ASSIGNMENT 8-04B-PROJECT
BF ASSIGNMENT 8-04B-PROJECT
PALEOZOIC BEDROCK
GLACIOLACUSTRINE-DERIVED SILTY TO CLAYEY
ICE-CONTACT STRATIFIED DEPOSITS
FORESHORE-BASINAL DEPOSITS
OLDER ALLUVIAL
MODERN ALLUVIAL
APPENDIX
A GEOTECHNICAL
BOREHOLE LOGS
APPENDIX
A-1 THORNCREST ROAD
0.2
0.4
2.1
5.5
8.1
141.0
140.8
139.1
135.7
133.1
Borehole located on west side(southbound lane) of ThorncrestRoad, adjacent to 25 ThorncrestRoad.
GSA SS4:Gravel: 0%Sand: 15%Silt and Clay: 85%
Borehole caved to 4.0 m belowground surface upon completion ofdrilling.
Groundwater level measured inmonitoring well at 5.4 m below groundsurface on April 9, 2018.
GSA SS8:Gravel: 0%Sand: 55%Silt and Clay: 45%
ASPHALT: (155 mm)
GRANULAR FILL: (200 mm)Brown sand and gravel FILL, trace silt and clay, moist,loose.
FILL:Brown sandy silt FILL, some clay, trace gravel, moist,compact.
SILT:Brown SILT, some sand, trace clay, moist, compact todense.
SAND AND SILT:Brown SAND AND SILT, trace clay, wet, compact.
- Spoon wet.
Borehole terminated at 8.1 m below ground surface inSAND AND SILT.
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
SS9
7
20
20
16
28
35
45
29
15
16
10
11
15
12
17
16
21
23
42
44
83
61
100
100
85
100
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Sir Williams Lane to Kipling Avenue
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 141.2 m
W
BOREHOLE NO. BH18-8-11PROJECT NAME: Thorncrest Road Local Road Resurfacing, Storm And Sanitary Sewer Replacement
DATE COMPLETED: Mar 26, 2018
SUPERVISOR: ES
REVIEWER: NE
141.2
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/802
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301679Northing: 4835721T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
TH
OR
NC
RE
ST
RO
AD
- 0
4032
018.
GP
J W
SP
_EN
V_V
1.G
DT
5/
10/1
8
45
0.1
0.3
1.3
2.4
3.9
7.0
140.8
140.6
139.6
138.5
137.0
133.9
Borehole located on east side(northbound lane) of ThorncrestRoad, in front of 45 Thorncrest Road
GSA SS3:Gravel: 3%Sand: 32%Silt and Clay: 65%
GSA SS6:Gravel: 0%Sand: 78%Silt and Clay: 22%
Borehole caved to 5.1 m belowground surface upon completion ofdrilling.
ASPHALT: (110 mm)
GRANULAR FILL: (230 mm)Brown sand and gravel FILL, trace silt and clay, moist,compact.
FILL:Brown clayey silt FILL, some sand, trace gravel, APL,very stiff.
SANDY SILT TILL:Brown SANDY SILT TILL, some clay, trace gravel,moist, compact to dense.
SANDY SILT:Brown SANDY SILT, trace clay, moist, dense to veydense.
SAND:Brown SAND, some silt, trace clay, moist, compact todense.
Borehole terminated at 7.0 m below ground surface inSAND.
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
11
19
24
47
55
39
24
43
6
13
12
10
5
15
19
19
58
44
56
89
83
100
100
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Sir Williams Lane to Kipling Avenue
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 140.9 m
W
BOREHOLE NO. BH18-8-12PROJECT NAME: Thorncrest Road Local Road Resurfacing, Storm And Sanitary Sewer Replacement
DATE COMPLETED: Mar 26, 2018
SUPERVISOR: ES
REVIEWER: NE
140.9
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/802
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301666Northing: 4835683T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
TH
OR
NC
RE
ST
RO
AD
- 0
4032
018.
GP
J W
SP
_EN
V_V
1.G
DT
5/
10/1
8
47
55
43
0.2
0.4
1.3
3.3
7.0
140.3
140.0
139.1
137.2
133.4
Borehole located on west side(southbound lane) of ThorncrestRoad, adjacent to 28 ThorncrestRoad.
GSA SS4:Gravel: 5%Sand: 39%Silt and Clay: 56%
Groundwater level measured inmonitoring well at 4.7 m below groundsurface on April 9, 2018.Borehole caved to 4.8 m belowground surface upon completion ofdrilling.
GSA SS7:Gravel: 0%Sand: 76%Silt and Clay: 24%
ASPHALT: (150 mm)
GRANULAR FILL: (280 mm)Brown sand and gravel FILL, trace silt and clay, moist,compact.
FILL:Brown clayey silt FILL, some sand, trace gravel, APL,stiff.
SILT AND SAND TILL:Brown SILT AND SAND TILL, some clay, trace gravel,moist, compact to dense.
SAND:Brown SAND, some silt, trace clay, moist, dense.
- Spoon wet.
Borehole terminated at 7.0 m below ground surface inSAND.
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
14
13
21
42
50
46
45
45
5
20
11
9
9
16
17
14
38
45
67
83
72
100
75
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Sir Williams Lane to Kipling Avenue
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 140.4 m
W
BOREHOLE NO. BH18-8-13PROJECT NAME: Thorncrest Road Local Road Resurfacing, Storm And Sanitary Sewer Replacement
DATE COMPLETED: Mar 26, 2018
SUPERVISOR: ES
REVIEWER: NE
140.4
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/802
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301649Northing: 4835645T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
TH
OR
NC
RE
ST
RO
AD
- 0
4032
018.
GP
J W
SP
_EN
V_V
1.G
DT
5/
10/1
8
42
50
46
45
45
0.10.2
1.7
4.1
7.0
140.1140.0
138.5
136.1
133.2
Borehole located on east side(northbound lane) of ThorncrestRoad, adjacent to 35 Pheasant Lane.
GSA SS5:Gravel: 5%Sand: 35%Silt and Clay: 60%
AL SS5:PL: 13%LL: 19%PI: 6%
Borehole caved to 4.4 m belowground surface upon completion ofdrilling.
GSA SS8:Gravel: 0%Sand: 72%Silt and Clay: 28%
ASPHALT: (115 mm)
GRANULAR FILL: (100 mm)Brown sand and gravel FILL, trace silt and clay, moist,compact.
FILL:Black to greyish brown sandy silt FILL, some clay, tracegravel, trace organics, moist, compact.
SANDY CLAYEY SILT TILL:Brown SANDY CLAYEY SILT TILL, trace gravel, DTPLto APL, very stiff to hard.
SILTY SAND:Brown SILTY SAND, trace clay, moist to wet, dense.
- Spoon wet.
Borehole terminated at 7.0 m below ground surface inSILTY SAND.
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
16
12
20
40
53
34
40
39
15
18
15
12
13
20
20
17
46
56
72
83
83
100
75
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Sir Williams Lane to Kipling Avenue
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 140.2 m
W
BOREHOLE NO. BH18-8-14PROJECT NAME: Thorncrest Road Local Road Resurfacing, Storm And Sanitary Sewer Replacement
DATE COMPLETED: Mar 26, 2018
SUPERVISOR: ES
REVIEWER: NE
140.2
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/802
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301624Northing: 4835595T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
TH
OR
NC
RE
ST
RO
AD
- 0
4032
018.
GP
J W
SP
_EN
V_V
1.G
DT
5/
10/1
8
53
0.1
0.4
1.3
4.8
7.0
140.5
140.2
139.3
135.9
133.6
Borehole located on east side(northbound lane) of ThorncrestRoad, adjacent to 51 ThorncrestRoad.
GSA SS4:Gravel: 4%Sand: 29%Silt and Clay: 67%
AL SS4:PL: 12%LL: 22%PI: 10%
Groundwater level measured inmonitoring well at 4.3 m below groundsurface on April 9, 2018.
Borehole caved to 5.2 m belowground surface upon completion ofdrilling.GSA SS7:Gravel: 0%Sand: 63%Silt and Clay: 37%
ASPHALT: (90 mm)
GRANULAR FILL: (300 mm)Brown sand and gravel FILL, trace silt and clay, moist,compact.
FILL:Brown sandy silt FILL, some clay, some gravel, moist,compact.
SANDY SILTY CLAY TILL:Brown SANDY SILTY CLAY TILL, trace gravel, DTPL toAPL, very stiff to hard.
SILTY SAND:Brown SILTY SAND, trace clay, moist, very dense.
- Spoon wet.
Borehole terminated at 7.0 m below ground surface inSILTY SAND.
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
15
19
24
44
59
74
73
46
4
13
13
9
12
10
16
18
42
67
67
72
83
100
100
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Sir Williams Lane to Kipling Avenue
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 140.6 m
W
BOREHOLE NO. BH18-8-15PROJECT NAME: Thorncrest Road Local Road Resurfacing, Storm And Sanitary Sewer Replacement
DATE COMPLETED: Mar 27, 2018
SUPERVISOR: ES
REVIEWER: NE
140.6
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/802
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301594Northing: 4835547T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
TH
OR
NC
RE
ST
RO
AD
- 0
4032
018.
GP
J W
SP
_EN
V_V
1.G
DT
5/
10/1
8
44
59
74
73
46
0.1
0.3
2.1
6.9
140.1
139.9
138.1
133.3
Borehole located on south side(eastbound lane) of Thorncrest Road,in front of 55 Thorncrest Road.
Borehole caved to 2.1 m belowground surface upon completion ofdrilling.GSA SS4:Gravel: 4%Sand: 30%Silt and Clay: 66%
AL SS4:PL: 13%LL: 21%PI: 8%
GSA SS6:Gravel: 5%Sand: 25%Silt and Clay: 70%
AL SS6:PL: 12%LL: 20%PI: 8%
ASPHALT: (120 mm)
GRANULAR FILL: (150 mm)Brown sand and gravel FILL, trace silt and clay, moist,compact.
FILL:Grey to brown clayey silt FILL, some sand, tracerootlets, APL, stiff.
SANDY SILTY CLAY TILL:Brown SANDY SILTY CLAY TILL, trace gravel, DTPL toWTPL, hard.
- Becoming APL
- Becoming WTPL
Borehole was terminated at 6.9 m below ground surfacein SANDY SILTY CLAY TILL.
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
13
14
10
57
50/130mm
35
75/280mm
75
16
16
16
9
9
12
11
19
50
28
33
83
64
100
67
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Sir Williams Lane to Kipling Avenue
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 140.2 m
W
BOREHOLE NO. BH18-8-16PROJECT NAME: Thorncrest Road Local Road Resurfacing, Storm And Sanitary Sewer Replacement
DATE COMPLETED: Mar 27, 2018
SUPERVISOR: ES
REVIEWER: NE
140.2
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/802
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301548Northing: 4835518T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
TH
OR
NC
RE
ST
RO
AD
- 0
4032
018.
GP
J W
SP
_EN
V_V
1.G
DT
5/
10/1
8
57
75
75
0.1
0.4
2.1
5.0
138.7
138.4
136.7
133.8
Borehole located on north side(westbound lane) of Thorncrest Road,in front of 64 Thorncrest Road.
GSA SS4:Gravel: 9%Sand: 28%Silt and Clay: 63%
Groundwater level measured inmonitoring well at 3.1 m below groundsurface on April 9, 2018.
GSA SS7:Gravel: 12%Sand: 31%Silt and Clay: 57%
AL SS7:PL = 11%LL = 18%PI = 7%Borehole was open upon completionof drilling.
ASPHALT: (115 mm)
GRANULAR FILL: (300 mm)Brown sand and gravel FILL, trace silt and clay, moist,compact.
FILL:Brown clayey silt FILL, some sand, trace gravel, APL,very stiff.
SANDY CLAYEY SILT TILL:Brown to grey SANDY CLAYEY SILT TILL, trace tosome gravel, APL to DTPL, very stiff to hard.
Borehole terminated at 5.0 m below ground surface inSANDY CLAYEY SILT TILL.
SS1
SS2
SS3
SS4
SS5
SS6
SS7
17
20
25
28
83
76
38
15
14
12
12
10
10
9
42
67
67
100
100
67
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Sir Williams Lane to Kipling Avenue
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 138.8 m
W
BOREHOLE NO. BH18-8-17PROJECT NAME: Thorncrest Road Local Road Resurfacing, Storm And Sanitary Sewer Replacement
DATE COMPLETED: Apr 04, 2018
SUPERVISOR: AC
REVIEWER: NE
138.8
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/802
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301505Northing: 4835519T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
TH
OR
NC
RE
ST
RO
AD
- 0
4032
018.
GP
J W
SP
_EN
V_V
1.G
DT
5/
10/1
8
83
76
0.1
0.3
1.7
3.7
4.9
137.5
137.3
135.9
133.9
132.7
Borehole located on south side(eastbound lane) of Thorncrest Road,in front of 65 Thorncrest Road.
GSA SS4:Gravel: 7%Sand: 25%Silt and Clay: 68%
AL SS4:PL = 14%LL = 24%PI = 10%
GSA SS6:Gravel: 6%Sand: 27%Silt and Clay: 67%
ATT SS6:PL = 12%LL = 19%PI = 7%
Borehole was open and dry uponcompletion of drilling.
ASPHALT: (125 mm)
GRANULAR FILL: (180 mm)Brown sand and gravel FILL, trace silt, trace clay, moist,loose.
FILL:Black to brown silty clay FILL, some sand, some gravel,APL, stiff to hard.
SANDY SILTY CLAY TILL:Brown SANDY SILTY CLAY TILL, trace gravel, DTPL,hard.
SANDY CLAYEY SILT TILL:Grey SANDY CLAYEY SILT TILL, trace gravel, WTPL toATPL, hard.
Borehole was terminated at 4.9 m below ground surfacein SANDY CLAYEY SILT TILL.
SS1
SS2
SS3
SS4
SS5
SS6
SS7
8
14
45
83
50/130mm
46
50/150mm
5
26
11
10
8
15
9
17
33
67
76
100
67
67
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Sir Williams Lane to Kipling Avenue
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 137.6 m
W
BOREHOLE NO. BH18-8-18PROJECT NAME: Thorncrest Road Local Road Resurfacing, Storm And Sanitary Sewer Replacement
DATE COMPLETED: Apr 02, 2018
SUPERVISOR: ES
REVIEWER: NE
137.6
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/802
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301447Northing: 4835500T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
TH
OR
NC
RE
ST
RO
AD
- 0
4032
018.
GP
J W
SP
_EN
V_V
1.G
DT
5/
10/1
8
45
83
46
0.1
0.4
2.1
4.4
5.0
137.4
137.1
135.4
133.1
132.5
Borehole located on south side(eastbound lane) of Thorncrest Road,in front of 70 Thorncrest Road.
GSA SS5:Gravel: 6%Sand: 24%Silt and Clay: 70%
AL SS5:PL = 13%LL = 20%PI = 7%Groundwater level measured inmonitoring well at 3.1 m below groundsurface on April 9, 2018.
GSA SS7:Gravel: 4%Sand: 38%Silt and Clay: 58%
AL SS7:PL = NPLL = NVPI = NPBorehole was open upon completionof drilling.
ASPHALT: (130 mm)
GRANULAR FILL: (300 mm)Brown gravelly sand FILL, some silt, some clay, moist,compact.
FILL:Black to brown silty clay FILL, trace to some sand, traceto some gravel, WTPL to APL, stiff to very stiff.
SANDY CLAYEY SILT TILL:Brown to grey SANDY CLAYEY SILT TILL, trace gravel,DTPL, hard.
SILT AND SAND TILL:Grey SILT AND SAND TILL, some clay, trace gravel,moist, dense.
Borehole was terminated at 5.0 m below ground surfacein SILT AND SAND TILL.
SS1
SS2
SS3
SS4
SS5
SS6
SS7
26
11
20
39
72
33
43
5
23
15
12
11
9
10
67
44
78
78
67
83
89
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Sir Williams Lane to Kipling Avenue
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 137.5 m
W
BOREHOLE NO. BH18-8-19PROJECT NAME: Thorncrest Road Local Road Resurfacing, Storm And Sanitary Sewer Replacement
DATE COMPLETED: Apr 02, 2018
SUPERVISOR: ES
REVIEWER: NE
137.5
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/802
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301401Northing: 4835513T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
TH
OR
NC
RE
ST
RO
AD
- 0
4032
018.
GP
J W
SP
_EN
V_V
1.G
DT
5/
10/1
8
72
43
0.1
0.4
1.3
4.4
5.3
6.1
137.3
137.0
136.1
133.0
132.1
131.3
Borehole located on east side(northbound lane) of ThorncrestRoad, adjacent to 77 ThorncrestRoad.
GSA SS3:Gravel: 1%Sand: 25%Silt and Clay: 74%
AL SS3:PL = 15%LL = 22%PI = 7%
GSA SS7:Gravel: 6%Sand: 33%Silt and Clay: 61%
AL SS7:PL = 10%LL = 18%PI = 8%
Borehole was open and dry uponcompletion of drilling.
ASPHALT: (135 mm)
GRANULAR FILL: (230 mm)Brown gravelly sand FILL, some clay, some gravel,moist, compact.
FILL:Brown silty clay FILL, trace sand, trace gravel, APL,stiff.
SANDY CLAYEY SILT TILL:Brown SANDY CLAYEY SILT TILL, trace gravel, DTPL,very stiff to hard.
SANDY SILTY CLAY TILL:Brown SANDY SILTY CLAY TILL, trace gravel, WTPL,very stiff.
SILTY SAND:Grey SILTY SAND, moist to wet, dense.
Borehole terminated at 6.1 m below ground surface inSILTY SAND.
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
11
13
18
22
37
22
20
37
5
13
14
10
11
11
18
17
78
100
100
100
100
100
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Sir Williams Lane to Kipling Avenue
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 137.4 m
W
BOREHOLE NO. BH18-8-20PROJECT NAME: Thorncrest Road Local Road Resurfacing, Storm And Sanitary Sewer Replacement
DATE COMPLETED: Dec 07, 2017
SUPERVISOR: ES
REVIEWER: NE
137.4
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/802
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301342Northing: 4835503T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
TH
OR
NC
RE
ST
RO
AD
- 0
4032
018.
GP
J W
SP
_EN
V_V
1.G
DT
5/
10/1
8
0.1
0.3
2.1
5.2
6.1
137.2
137.0
135.2
132.1
131.2
Borehole located on south side(eastbound lane) of Thorncrest Road,in front of 77 Thorncrest Road.
GSA SS6:Gravel: 2%Sand: 24%Silt and Clay: 74%
AL SS6:PL = 13%LL = 21%PI = 8%Groundwater level measured inmonitoring well at 2.9 m below groundsurface on April 9, 2018.
Water level was measured at 5.2 mbelow ground surface uponcompletion of drilling.Borehole caved to 5.3 m belowground surface upon completion ofdrilling.GSA SS8:Gravel: 0%Sand: 32%Silt and Clay: 68%Borehole was open upon completionof drilling.
ASPHALT: (145 mm)
GRANULAR FILL: (200 mm)Brown gravelly sand FILL, some silt, some clay, moist,compact.
FILL:Black to brown clayey silt FILL, trace to some sand,trace to some gravel, APL, stiff.
SANDY SILTY CLAY TILL:Brown to grey SANDY SILTY CLAY TILL, trace gravel,APL to DTPL, very stiff.
SANDY SILT:Grey SANDY SILT, trace clay, wet, compact.
Borehole was terminated at 6.1 m below ground surfacein SANDY SILT.
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
18
9
8
28
25
21
21
28
5
14
18
13
11
11
8
20
55
39
44
78
56
67
83
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Sir Williams Lane to Kipling Avenue
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 137.3 m
W
BOREHOLE NO. BH18-8-21PROJECT NAME: Thorncrest Road Local Road Resurfacing, Storm And Sanitary Sewer Replacement
DATE COMPLETED: Apr 02, 2018
SUPERVISOR: ES
REVIEWER: NE
137.3
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/802
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301315Northing: 4835512T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
TH
OR
NC
RE
ST
RO
AD
- 0
4032
018.
GP
J W
SP
_EN
V_V
1.G
DT
5/
10/1
8
0.2
0.5
2.1
4.4
6.1
136.7
136.3
134.7
132.4
130.7
Borehole located on south side(eastbound lane) of Thorncrest Road,in front of 80 Thorncrest Road.
GSA SS5:Gravel: 6%Sand: 27%Silt and Clay: 67%
AL SS5:PL = 11%LL = 18%PI = 7%
Water level was measured at 4.6 mbelow ground surface uponcompletion of drilling.
Borehole caved to 5.2 m belowground surface upon completion ofdrilling.GSA SS8:Gravel: 0%Sand: 38%Silt and Clay: 62%
ASPHALT: (150 mm)
GRANULAR FILL: (380 mm)Brown gravelly sand FILL, some silt, some clay, moist,compact.
FILL:Brown clayey silt FILL, some sand, trace to somegravel, APL, stiff to very stiff.
SANDY CLAYEY SILT TILL:Brown to grey SANDY CLAYEY SILT TILL, trace gravel,WTPL to DTPL, very stiff.
SAND AND SILT:Grey SAND AND SILT, trace clay, moist to wet,compact.
Borehole terminated at 6.1 m below ground surface inSAND AND SILT.
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
15
9
17
28
19
23
16
24
6
15
15
13
8
9
10
18
54
67
56
100
61
61
56
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Sir Williams Lane to Kipling Avenue
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 136.8 m
W
BOREHOLE NO. BH18-8-22PROJECT NAME: Thorncrest Road Local Road Resurfacing, Storm And Sanitary Sewer Replacement
DATE COMPLETED: Apr 02, 2018
SUPERVISOR: ES
REVIEWER: NE
136.8
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/802
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301267Northing: 4835501T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
TH
OR
NC
RE
ST
RO
AD
- 0
4032
018.
GP
J W
SP
_EN
V_V
1.G
DT
5/
10/1
8
APPENDIX
A-2 SIR WILLIAMS LANE
0.2
0.5
0.8
1.4
2.1
2.9
3.7
6.1
141.1
140.8
140.5
139.9
139.2
138.4
137.6
135.2
Borehole located at north side of SirWilliams lane, adjacent to 26 SirWilliams lane.
GSA SS4:Gravel: 0%Sand: 40%Silt and Clay: 60%
GSA SS8:Gravel: 1%Sand: 8%Silt and Clay: 91%Groundwater level measured inmonitoring well at 5.65 m belowground surface on January 04, 2018.Borehole was open and dry uponcompletion of drilling.
ASPHALT (155 mm)
GRANULAR FILL: (300 mm)Brown sand and gravel FILL, some silt and clay, moist,loose.
FILL:Brown silty sand FILL, trace clay, trace to some gravel,moist, loose.
FILL:Brown silty clay FILL, zones of silty sand, some sand,trace to some gravel, APL, stiff.
FILL:Brown silty sand FILL, moist, loose.
SANDY SILT:Brown SANDY SILT, trace clay, moist, compact.
SILTY SAND TO SANDY SILT:Brown SILTY SAND TO SANDY SILT, moist to wet,compact.
SILT:Brown SILT, trace clay, trace sand, trace gravel, moistto wet, compact to very dense.
Borehole terminated at 6.1 m below ground groundsurface in SILT.
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
10
9
6
15
14
25
36
39
7
9
9
6
15
20
20
21
33
44
100
100
100
100
100
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: Sir Willaims Lane from 170m West of Thorncrest Road to Thorncrest Road, Toronto, Ontario
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 141.3 m
W
BOREHOLE NO. 18-8-23PROJECT NAME: Sir Willaims Lane Storm Sewer And Catch Basin Installation
DATE COMPLETED: Dec 07, 2017
SUPERVISOR: AC
REVIEWER: KK
141.3
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/803
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301674Northing: 4835747T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
161-
1608
6-02
-SIR
WIL
LIA
MS
RD
.GP
J W
SP
_EN
V_V
1.G
DT
1/
9/18
0.1
0.2
0.7
1.7
2.9
5.0
141.1
141.0
140.5
139.5
138.3
136.2
Borehole located at south side of SirWilliams lane, in front of 27 SirWilliams lane.
GSA SS3A:Gravel: 4%Sand: 10%Silt and Clay: 86%
GSA SS5:Gravel: 0%Sand: 13%Silt and Clay: 87%
Borehole was open and dry uponcompletion of drilling.
ASPHALT (95 mm)
GRANULAR FILL: (130 mm)Brown sand and gravel FILL, some silt and clay, moist,compact.
FILL:Brown silty sand FILL, some gravel, trace clay, moist,compact.
FILL:Brown clayey silt FILL, zones of sand and gravel, tracesand, trace gravel, APL, very stiff.
- Some sand
SILTY SANDBrown SILTY SAND, moist, dense.
SILTBrown SILT, some sand, trace clay, moist to wet, dense.
Borehole terminated at 5.0 m below ground surface inSILT.
SS1
SS2
SS3A
SS3B
SS4
SS5
SS6
SS7
11
16
8
37
53
42
45
6
12
19
13
13
9
14
20
25
67
89
100
100
100
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: Sir Willaims Lane from 170m West of Thorncrest Road to Thorncrest Road, Toronto, Ontario
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 141.2 m
W
BOREHOLE NO. 18-8-24PROJECT NAME: Sir Willaims Lane Storm Sewer And Catch Basin Installation
DATE COMPLETED: Dec 07, 2017
SUPERVISOR: AC
REVIEWER: KK
141.2
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/803
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301609Northing: 4835764T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
161-
1608
6-02
-SIR
WIL
LIA
MS
RD
.GP
J W
SP
_EN
V_V
1.G
DT
1/
9/18
53
42
45
0.1
0.5
0.7
1.4
3.7
5.0
140.5
140.1
139.9
139.2
136.9
135.6
Borehole located at south side of SirWilliams lane, in front of 33 SirWilliams lane.
GSA SS2:Gravel: 3%Sand: 17%Silt and Clay: 80%
GSA SS6:Gravel: 6%Sand: 19%Silt and Clay: 75%
Borehole was dry on January 04,2018.Borehole was open and dry uponcompletion of drilling.
ASPHALT (130 mm)
GRANULAR FILL: (390 mm)Brown sand and gravel FILL, some silt and clay, moist,dense.
FILL:Brown sand and gravel FILL, some silt, moist, dense.
FILL:Brown clayey silt FILL, some sand, trace gravel, moist,compact.
SILTY SAND:Brown SILTY SAND, moist to wet, compact to verydense.
SILT:Brown SILT, some sand, trace gravel, moist, dense.
Borehole terminated at 5.0 m below ground surface inSILT.
SS1
SS2
SS3
SS4
SS5
SS6
SS7
35
15
22
34
48
62
43
4
17
10
18
18
18
17
33
22
100
100
100
100
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: Sir Willaims Lane from 170m West of Thorncrest Road to Thorncrest Road, Toronto, Ontario
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 140.6 m
W
BOREHOLE NO. 18-8-25PROJECT NAME: Sir Willaims Lane Storm Sewer And Catch Basin Installation
DATE COMPLETED: Dec 07, 2017
SUPERVISOR: AC
REVIEWER: KK
140.6
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/803
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301528Northing: 4835760T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
161-
1608
6-02
-SIR
WIL
LIA
MS
RD
.GP
J W
SP
_EN
V_V
1.G
DT
1/
9/18
48
62
43
0.2
0.4
0.8
2.1
2.7
140.8
140.6
140.2
138.9
138.3
Borehole located at south side of SirWilliams lane, adjacent to 39 SirWilliams lane.
GSA SS3:Gravel: 0%Sand: 40%Silt and Clay: 60%
GSA SS4:Gravel: 0%Sand: 31%Silt and Clay: 69%
Borehole was open and dry uponcompletion of drilling.
ASPHALT (155 mm)
GRANULAR FILL: (260 mm)Brown sand and gravel FILL, some silt and clay, moist,compact.
FILL:Brown sand and gravel FILL, some silt, moist, compact.
FILL:Brown sandy silt FILL, trace clay, moist, compact.
SANDY SILT:Brown SANDY SILT, trace clay, moist, compact.
Borehole terminated at 2.7 m below ground surface inSANDY SILT.
SS1
SS2
SS3
SS4
13
13
5
26
5
15
13
19
33
75
100
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: Sir Willaims Lane from 170m West of Thorncrest Road to Thorncrest Road, Toronto, Ontario
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 141.0 m
W
BOREHOLE NO. 18-8-26PROJECT NAME: Sir Willaims Lane Storm Sewer And Catch Basin Installation
DATE COMPLETED: Dec 07, 2017
SUPERVISOR: AC
REVIEWER: KK
141.0
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/803
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301494Northing: 4835777T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
161-
1608
6-02
-SIR
WIL
LIA
MS
RD
.GP
J W
SP
_EN
V_V
1.G
DT
1/
9/18
APPENDIX
A-3 KIPLING AVENUE
0.1
0.3
0.5
2.1
3.7
5.0
136.6
136.4
136.2
134.6
133.0
131.7
Borehole located on east side(northbound lane) of Kipling Avenue,adjacent to 80 Thorncrest Road.
GSA SS4:Gravel: 4%Sand: 21%Silt and Clay: 75%
AL SS4:PL: 10%LL: 26%PI: 16%Groundwater level measured inmonitoring well at 2.6 m below groundsurface on April 25, 2018.
GSA SS6:Gravel: 7%Sand: 29%Silt and Clay: 64%
Water level was measured at 4.9 mbelow ground surface uponcompletion of drilling.Borehole was open upon completionof drilling.
ASPHALT: (90 mm)
CONCRETE: (220 mm)
GRANULAR FILL: (230 mm)Brown sandy gravel FILL, some silt and clay, moist,compact.
FILL:Brown sand FILL, some gravel, trace silt and clay,moist, compact to loose.
SANDY SILTY CLAY TILL:Brown SANDY SILTY CLAY TILL, trace gravel, APL,very stiff to hard.
- Turn grey, layers of sand and gravel.
SANDY SILT:Grey SANDY SILT, trace gravel, trace clay, moist,dense.
Borehole was terminated at 5.0 m below ground surfacein SANDY SILT.
SS1
SS2
SS3
SS4
SS5
SS6
SS7
24
17
9
28
35
31
43
8
4
9
13
10
15
17
83
56
44
78
100
100
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Thorncrest Road to Wingrove Hill, Toronto, Ontario
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 136.7 m
W
BOREHOLE NO. BH18-08-27PROJECT NAME: Kipling Avenue Sanitary Sewer And Watermain Replacement
DATE COMPLETED: Mar 22, 2018
SUPERVISOR: AC
REVIEWER:
136.7
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/804
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301245Northing: 4835517T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
161-
1608
6-02
KIP
LIN
G.G
PJ
WS
P_E
NV
_V1.
GD
T
9/5/
18
43
0.1
0.3
0.8
2.1
4.4
5.3
6.1
137.0
136.8
136.3
135.0
132.7
131.8
131.0
Borehole located on east side(northbound lane) of Kipling Avenue,in front of 1243 Kipling Avenue.
GSA SS5:Gravel: 10%Sand: 27%Silt and Clay: 63%
AL SS5:PL: 13%LL: 20%PI: 7%
GSA SS8:Gravel: 0%Sand: 2%Silt and Clay: 98%
Borehole was open and dry uponcompletion of drilling.
ASPHALT: (125 mm)
CONCRETE: (215 mm)
GRANULAR FILL: (440 mm)Brown sandy gravel FILL, some silt and clay, moist,compact.
FILL:Grey silty clay FILL, trace to some sand, trace gravel,APL, stiff to very stiff.
SANDY SILT TILL:Grey to brown SANDY SILT TILL, some clay, tracegravel, moist, compact to dense.
- Turn grey, moist, compact.
SILTY SAND:Grey SILTY SAND, trace gravel, trace clay, moist, verydense.
SILT:Grey SILT, some clay, trace sand, moist, dense.
Borehole was terminated at 6.1 m below ground surfacein SILT.
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
18
16
14
22
42
13
53
48
6
21
24
10
11
11
16
17
67
44
56
89
78
67
100
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Thorncrest Road to Wingrove Hill, Toronto, Ontario
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 137.1 m
W
BOREHOLE NO. BH18-08-28PROJECT NAME: Kipling Avenue Sanitary Sewer And Watermain Replacement
DATE COMPLETED: Mar 12, 2018
SUPERVISOR: AC
REVIEWER:
137.1
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/804
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301270Northing: 4835437T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
161-
1608
6-02
KIP
LIN
G.G
PJ
WS
P_E
NV
_V1.
GD
T
9/5/
18
42
53
48
0.1
0.3
0.6
1.4
2.9
6.3
7.0
138.0
137.8
137.5
136.7
135.2
131.9
131.1
Borehole located on east side(northbound lane) of Kipling Avenue,adjacent to 120 Rathburn Road.
Groundwater level measured inmonitoring well at 2.2 m below groundsurface on April 25, 2018.GSA SS4:Gravel: 8%Sand: 37%Silt and Clay: 55%
AL SS4:PL: 8%LL: 21%PI: 13%
GSA SS8:Gravel: 0%Sand: 6%Silt and Clay: 94%
Water level was measured at 7.0 mbelow ground surface uponcompletion of drilling.Borehole was open upon completionof drilling.
ASPHALT: (120 mm)
CONCRETE: (200 mm)
GRANULAR FILL: (280 mm)Brown sandy gravel FILL, some silt and clay, moist,compact.
FILL:Brown sandy clayey silt FILL, trace gravel, APL, hard.
SANDY SILTY CLAY TILL:Brown SANDY SILT CLAY TILL, trace gravel, APL, verystiff to hard.
- Auger grinding
SANDY SILT:Brown to grey SANDY SILT, trace gravel, trace clay,moist to wet, dense.
SILT:Grey SILT, trace clay, trace sand, moist to wet, dense.
Borehole was terminated at 7.0 m below ground surfacein SILT.
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
12
32
21
50/150mm
44
42
36
43
14
14
15
9
11
16
18
18
42
44
100
100
100
100
100
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Thorncrest Road to Wingrove Hill, Toronto, Ontario
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 138.1 m
W
BOREHOLE NO. BH18-08-29PROJECT NAME: Kipling Avenue Sanitary Sewer And Watermain Replacement
DATE COMPLETED: Mar 22, 2018
SUPERVISOR: AC
REVIEWER:
138.1
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/804
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301290Northing: 4835376T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
161-
1608
6-02
KIP
LIN
G.G
PJ
WS
P_E
NV
_V1.
GD
T
9/5/
18
10150/150 mm
54
42
43
50/150 mm
0.1
0.3
0.6
1.4
5.5
8.1
138.6
138.4
138.1
137.3
133.2
130.6
Borehole located on east side(northbound lane) of Kipling Avenue,adjacent to 125 Rathburn Road.
GSA SS4:Gravel: 6%Sand: 28%Silt and Clay: 66%
AL SS4:PL: 13%LL: 22%PI: 9%
Water level was measured at 4.2 mbelow ground surface uponcompletion of drilling.Borehole caved to 4.3 m belowground surface upon completion ofdrilling.
GSA SS8A:Gravel: 21%Sand: 39%Silt and Clay: 40%
Borehole was open upon completionof drilling.
ASPHALT: (130 mm)
CONCRETE: (170 mm)
GRANULAR FILL: (280 mm)Brown sandy gravel FILL, some silt and clay, moist,loose.
FILL:Brown sandy clayey silt FILL, trace gravel, APL, verystiff.
SANDY CLAYEY SILT TILL:Brown SANDY CLAYEY SILT TILL, trace gravel, APL,very stiff to hard.
- Spoon wet.
SANDY SILT:Brown to grey SANDY SILT, some gravel, trace clay,moist to wet, dense to very dense.
--------------------Gravelly Silty Sand
Borehole was terminated at 8.1 m below ground surfacein SANDY SILT.
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
SS9
8
26
27
49
72/250mm
65
33
39
54
6
22
14
10
11
12
13
14
16
58
67
72
78
75
67
100
100
67
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Thorncrest Road to Wingrove Hill, Toronto, Ontario
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 138.7 m
W
BOREHOLE NO. BH18-08-30PROJECT NAME: Kipling Avenue Sanitary Sewer And Watermain Replacement
DATE COMPLETED: Apr 20, 2018
SUPERVISOR: ES
REVIEWER:
138.7
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/804
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301306Northing: 4835302T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
161-
1608
6-02
KIP
LIN
G.G
PJ
WS
P_E
NV
_V1.
GD
T
9/5/
18
49
72
65
54
0.1
0.3
0.7
2.1
3.7
4.8
7.0
8.1
138.2
138.0
137.6
136.2
134.6
133.5
131.3
130.2
Borehole located on middle lane ofKipling Avenue, adjacent to 2Random Street.
Groundwater level measured inmonitoring well at 3.5 m below groundsurface on April 25, 2018.
GSA SS7B:Gravel: 0%Sand: 75%Silt and Clay: 25%Borehole caved to 5.0 m belowground surface upon completion ofdrilling.Water level was measured at 5.0 mbelow ground surface uponcompletion of drilling.
GSA SS9:Gravel: 0%Sand: 12%Silt and Clay: 88%Borehole was open upon completionof drilling.
ASPHALT: (105 mm)
CONCRETE: (205 mm)
GRANULAR FILL: (410 mm)Brown sandy gravel FILL, some silt and clay, moist,compact.
FILL:Brown clayey sandy silt FILL, some gravel, DTPL, verystiff to hard.
SILTY SAND:Brown SILTY SAND, trace gravel, moist, dense.
SANDY SILT:Brown SANDY SILT, trace gravel, trace clay, moist,dense.
SILTY SAND:Brown SILTY SAND, trace clay, moist, compact todense.
SILT:Brown SILT, some sand, some clay, moist, dense.
Borehole terminated at 8.1 m below ground surface inSILT.
SS1A
SS1B
SS2
SS3
SS4
SS5
SS6
SS7A
SS7B
SS8
SS9
20
33
24
39
47
30
24
37
37
5
12
13
14
11
19
23
15
20
14
16
75
44
67
54
83
54
70
63
54
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Thorncrest Road to Wingrove Hill, Toronto, Ontario
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 138.3 m
W
BOREHOLE NO. BH18-08-31PROJECT NAME: Kipling Avenue Sanitary Sewer And Watermain Replacement
DATE COMPLETED: Mar 26, 2018
SUPERVISOR: ES
REVIEWER:
138.3
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/804
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301328Northing: 4835228T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
161-
1608
6-02
KIP
LIN
G.G
PJ
WS
P_E
NV
_V1.
GD
T
9/5/
18
47
0.1
0.3
0.5
2.3
3.7
137.8
137.6
137.4
135.6
134.2
Borehole located on west side(southbound lane) of Kipling Avenue,adjacent to 1208 Kipling Avenue.
GSA SS3:Gravel: 18%Sand: 34%Silt and Clay: 48%
AL SS3:PL: 13%LL: 21%PI: 8%
GSA SS5:Gravel: 0%Sand: 67%Silt and Clay: 33%
Borehole was open and dry uponcompletion of drilling.
ASPHALT: (100 mm)
CONCRETE: (200 mm)
GRANULAR FILL: (180 mm)Brown sand and gravel FILL, some silt and clay, moist,loose.
FILL:Brown silty sandy clay FILL, trace gravel, APL, firm.
SILTY SAND:Brown SILTY SAND, trace clay, moist, compact.
Borehole was terminated at 3.7 m below ground surfacein SILTY SAND.
SS1
SS2
SS3
SS4
SS5
7
7
7
13
15
9
14
14
12
21
75
100
75
33
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Thorncrest Road to Wingrove Hill, Toronto, Ontario
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 137.9 m
W
BOREHOLE NO. BH18-08-KA1PROJECT NAME: Kipling Avenue Sanitary Sewer And Watermain Replacement
DATE COMPLETED: Apr 03, 2018
SUPERVISOR: AC
REVIEWER:
137.9
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/804
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301347Northing: 4835169T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
161-
1608
6-02
KIP
LIN
G.G
PJ
WS
P_E
NV
_V1.
GD
T
9/5/
18
0.1
0.3
0.6
1.4
2.3
3.1
136.8
136.6
136.3
135.5
134.6
133.9
Borehole located on west side(southbound lane) of Kipling Avenue,adjacent to 1202 Kipling Avenue.
GSA SS3:Gravel: 10%Sand: 25%Silt and Clay: 65%
AL SS3:PL: 14%LL: 24%PI: 10%GSA SS4:Gravel: 0%Sand: 10%Silt and Clay: 90%
Borehole was open and dry uponcompletion of drilling.
ASPHALT: (120 mm)
CONCRETE: (180 mm)
GRANULAR FILL: (260 mm)Brown sand and gravel FILL, some silt and clay, moist,compact.
FILL:Brown silty clay FILL, trace gravel, APL, firm.
SANDY SILTY CLAY TILL:Brown to grey SANDY SILTY CLAY TILL, trace gravel,APL, hard.
SILT:Brown SILT, some clay, some sand, moist, compact.
Borehole was terminated at 3.1 m below ground surfacein SILT.
SS1
SS2
SS3
SS4
17
8
36
31
25
12
11
17
75
75
100
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Thorncrest Road to Wingrove Hill, Toronto, Ontario
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 136.9 m
W
BOREHOLE NO. BH18-08-KA2PROJECT NAME: Kipling Avenue Sanitary Sewer And Watermain Replacement
DATE COMPLETED: Apr 03, 2018
SUPERVISOR: AC
REVIEWER:
136.9
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/804
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301364Northing: 4835116T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
161-
1608
6-02
KIP
LIN
G.G
PJ
WS
P_E
NV
_V1.
GD
T
9/5/
18
0.1
0.3
0.6
1.4
3.1
135.6
135.4
135.2
134.3
132.7
Borehole located on west side(southbound lane) of Kipling Avenue,in front of 1190 Kipling Avenue.
GSA SS2:Gravel: 5%Sand: 29%Silt and Clay: 66%
AL SS2:PL: 13%LL: 23%PI: 10%
GSA SS4:Gravel: 6%Sand: 34%Silt and Clay: 60%
Borehole was open and dry uponcompletion of drilling.
ASPHALT: (120 mm)
CONCRETE: (190 mm)
GRANULAR FILL: (240 mm)Brown sand and gravel FILL, some silt and clay, moist,compact.
FILL:Brown sandy silty clay FILL, trace gravel, APL, very stiff.
SANDY SILT TILL:Brown SANDY SILT TILL, some clay, trace gravel,moist, dense to very dense.
Borehole was terminated at 3.1 m below ground surfacein SANDY SILT TILL.
SS1
SS2
SS3
SS4
15
21
46
68
13
11
9
8
75
100
100
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Thorncrest Road to Wingrove Hill, Toronto, Ontario
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 135.7 m
W
BOREHOLE NO. BH18-08-KA3PROJECT NAME: Kipling Avenue Sanitary Sewer And Watermain Replacement
DATE COMPLETED: Apr 03, 2018
SUPERVISOR: AC
REVIEWER:
135.7
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/804
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301387Northing: 4835044T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
161-
1608
6-02
KIP
LIN
G.G
PJ
WS
P_E
NV
_V1.
GD
T
9/5/
18
46
68
0.1
0.3
0.5
2.3
3.1
134.9
134.7
134.5
132.7
132.0
Borehole located on west side(southbound lane) of Kipling Avenue,in front of 1182 Kipling Avenue.
GSA SS2:Gravel: 0%Sand: 15%Silt and Clay: 85%
AL SS2:PL: 18%LL: 45%PI: 27%
GSA SS4:Gravel: 1%Sand: 42%Silt and Clay: 57%
Borehole was open and dry uponcompletion of drilling.
ASPHALT: (130 mm)
CONCRETE: (190 mm)
GRANULAR FILL: (150 mm)Brown sand and gravel FILL, some silt and clay, moist,compact.
FILL:Brown mix with grey clay and silt FILL, some sand, APL,very stiff.
SAND AND SILT:Brown SAND AND SILT, trace gravel, trace clay, moist,very dense.
Borehole was terminated at 3.1 m below ground surfacein SAND AND SILT.
SS1
SS2
SS3
SS4
16
22
16
53
16
21
16
13
75
42
25
63
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Thorncrest Road to Wingrove Hill, Toronto, Ontario
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 135.0 m
W
BOREHOLE NO. BH18-08-KA4PROJECT NAME: Kipling Avenue Sanitary Sewer And Watermain Replacement
DATE COMPLETED: Mar 16, 2018
SUPERVISOR: AC
REVIEWER:
135.0
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/804
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301405Northing: 4834987T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
161-
1608
6-02
KIP
LIN
G.G
PJ
WS
P_E
NV
_V1.
GD
T
9/5/
18
53
0.1
0.3
0.5
3.5
5.0
135.1
134.9
134.7
131.7
130.2
Borehole located on west side(southbound lane) of Kipling Avenue,in front of 1162 Kipling Avenue.
GSA SS3:Gravel: 29%Sand: 52%Silt and Clay: 19%
GSA SS5:Gravel: 0%Sand: 15%Silt and Clay: 85%
AL SS5:PL: 13%LL: 22%PI: 9%
Borehole was open and dry uponcompletion of drilling.
ASPHALT: (120 mm)
CONCRETE: (190 mm)
GRANULAR FILL: (160 mm)Brown sand and gravel FILL, some silt and clay, moist,dense.
FILL:Brown gravelly sand FILL, some silt, trace clay, moist,compact to loose.
SANDY SILTY CLAY TILL:Brown SANDY SILTY CLAY TILL, trace gravel, APL,very stiff to hard.
Borehole was terminated at 3.1 m below ground surfacein SANDY SILTY CLAY TILL.
SS1
SS2
SS3
SS4
SS5
SS6
42
28
10
4
21
72
5
3
4
4
13
11
100
100
100
25
100
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Thorncrest Road to Wingrove Hill, Toronto, Ontario
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 135.2 m
W
BOREHOLE NO. BH18-08-KA6PROJECT NAME: Kipling Avenue Sanitary Sewer And Watermain Replacement
DATE COMPLETED: Mar 13, 2018
SUPERVISOR: AC
REVIEWER:
135.2
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/804
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301448Northing: 4834847T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
161-
1608
6-02
KIP
LIN
G.G
PJ
WS
P_E
NV
_V1.
GD
T
9/5/
18
42
72
0.1
0.3
0.5
0.9
1.4
2.3
3.1
133.8
133.6
133.4
133.0
132.5
131.6
130.9
Borehole located on east side(northbound lane) of Kipling Avenue,in front of 1155 Kipling Avenue.
GSA SS2:Gravel: 2%Sand: 34%Silt and Clay: 64%
GSA SS4:Gravel: 0%Sand: 2%Silt and Clay: 98%
Borehole was open and dry uponcompletion of drilling.
ASPHALT: (125 mm)
CONCRETE: (200 mm)
GRANULAR FILL: (160 mm)Brown sand and gravel FILL, some silt and clay, moist,compact.
FILL:Brown silty clay FILL, trace gravel, trace sand, APL,stiff.
SANDY SILT TILL:Brown SANDY SILT TILL, trace sand, moist, dense.
SILTY SAND:Brown SILTY SAND, trace clay, layers of sandy silt,moist, dense.
SILT:Brown SILT, trace clay, trace sand, moist, dense.
Borehole was terminated at 3.1 m below ground surfacein SILT.
SS1
SS2
SS3
SS4
11
40
42
37
15
11
18
18
58
100
100
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Thorncrest Road to Wingrove Hill, Toronto, Ontario
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 133.9 m
W
BOREHOLE NO. BH18-08-KA7PROJECT NAME: Kipling Avenue Sanitary Sewer And Watermain Replacement
DATE COMPLETED: Mar 13, 2018
SUPERVISOR: AC
REVIEWER:
133.9
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/804
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301477Northing: 4834788T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
161-
1608
6-02
KIP
LIN
G.G
PJ
WS
P_E
NV
_V1.
GD
T
9/5/
18
42
0.1
0.3
0.6
3.1
130.5
130.3
130.0
127.6
Borehole located on east side(northbound lane) of Kipling Avenue,adjacent to 2 Wingrove Hill.
GSA SS2:Gravel: 18%Sand: 57%Silt and Clay: 25%
Borehole was open and dry uponcompletion of drilling.
ASPHALT: (110 mm)
CONCRETE: (210 mm)
GRANULAR FILL: (280 mm)Brown sand and gravel FILL, some silt and clay, moist,compact.
FILL:Brown sand FILL, some gravel, some sit, trace clay,moist, compact to loose.
Borehole was terminated at 3.1 m below ground surfacein sand FILL.
SS1
SS2
SS3
SS4
13
23
14
10
6
5
5
14
67
100
100
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: From Thorncrest Road to Wingrove Hill, Toronto, Ontario
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 130.6 m
W
BOREHOLE NO. BH18-08-KA8PROJECT NAME: Kipling Avenue Sanitary Sewer And Watermain Replacement
DATE COMPLETED: Mar 22, 2018
SUPERVISOR: AC
REVIEWER:
130.6
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/804
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301493Northing: 4834728T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
161-
1608
6-02
KIP
LIN
G.G
PJ
WS
P_E
NV
_V1.
GD
T
9/5/
18
APPENDIX
A-4 GREAT OAK DRIVE
0.2
0.4
1.2
3.7
4.0
7.0
137.2
137.0
136.2
133.7
133.4
130.4
Borehole located on the south side(eastbound lane) of Great Oak Drive,in front of 95 Great Oak Drive .
GSA SS3:Gravel: 3%Sand: 19%Silt and Clay: 78%
ATT SS3:PL: 16%LL: 29%PI: 13%
Groundwater level measured inmonitoring well at 3.2 m below groundsurface on January 04, 2018.
Groundwater level was measured at3.7 m below ground surface uponcompletion of drilling.
GSA SS6B:Gravel: 0%Sand: 6%Silt and Clay: 94%
Borehole was open upon completionof drilling.
ASPHALT: (180 mm)
GRANULAR FILL: (178 mm)Brown sand and gravel FILL, trace silt and clay, moist,compact.
SILTY CLAY:Brown SILTY CLAY, some gravel, trace sand, APL, stiffto hard.
SILTY CLAY TILLBrown to grey SILTY CLAY TILL, some sand, tracegravel, APL, stiff.
SILTY SANDGrey SILTY SAND, wet, compact.
CLAY AND SILT TILL TO SILTY CLAY TILLGrey CLAY AND SILT TILL to SILTY CLAY TILL, tracesand, APL to WTPL, stiff to very stiff.
Borehole terminated at 7.0 m below ground surface inCLAY AND SILT TILL to SILTY CLAY TILL.
SS1
SS2
SS3
SS4
SS5
SS6A
SS6B
SS7
SS8
SS9
10
38
23
23
23
10
29
29
24
11
15
15
10
10
16
18
19
21
16
42
72
67
50
67
72
67
58
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: Great Oak Drive from Kipling Avenue to Remington Drive, Toronto, Ontario
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 137.4 m
W
BOREHOLE NO. BH18-8-32PROJECT NAME: Great Oak Drive Sanitary Sewer Replacement
DATE COMPLETED: Dec 18, 2017
SUPERVISOR: ES
REVIEWER: SL
137.4
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/805
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301399Northing: 4835264T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
161-
1608
6-02
-GE
O-8
05 -
GR
EA
T O
AK
DR
IVE
- 2
0180
131
.GP
J W
SP
_EN
V_V
1.G
DT
20
/2/1
8
0.30.3
2.9
3.7
6.1
136.2136.2
133.6
132.8
130.4
Borehole located on the west side(southbound lane) of Great OakDrive, in front of 91 Great Oak Drive.
GSA SS4:Gravel: 7%Sand: 23%Silt and Clay: 70%
ATT SS4:PL: 14%LL: 20%PI: 6%
Borehole caved to and groundwaterlevel measured at 3.8 m belowground surface upon completion ofdrilling.
GSA SS8:Gravel: 0%Sand: 9%Silt and Clay: 91%
ASPHALT: (255 mm)
GRANULAR FILL: (50 mm)Dark brown sand and gravel FILL, trace silt and clay,some asphalt fragments, moist, compact.
SANDY CLAYEY SILT TILL:Brown SANDY CLAYEY SILT TILL, trace gravel, DTPLto APL, very stiff.
SILT AND SAND TILL:Grey SILT AND SAND TILL, trace to some clay, tracegravel, occasional sand seams, moist, dense to verydense.
SILT:Grey SILT, some clay, trace sand, moist to wet, denseto very dense.
--- Wet spoon
Borehole terminated at 6.1 m below ground surface inSILT.
SS1A
SS1B
SS2
SS3
SS4
SS5
SS6
SS7
SS8
18
20
27
29
50
35
53
38
4
10
14
13
11
16
19
13
13
29
89
72
100
100
100
94
71
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: Great Oak Drive from Kipling Avenue to Remington Drive, Toronto, Ontario
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 136.5 m
W
BOREHOLE NO. BH18-8-33PROJECT NAME: Great Oak Drive Sanitary Sewer Replacement
DATE COMPLETED: Dec 20, 2017
SUPERVISOR: KR
REVIEWER: SL
136.5
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/805
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301460Northing: 4835220T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
161-
1608
6-02
-GE
O-8
05 -
GR
EA
T O
AK
DR
IVE
- 2
0180
131
.GP
J W
SP
_EN
V_V
1.G
DT
20
/2/1
8
50
53
0.2
0.4
2.1
3.7
4.4
6.1
135.7
135.5
133.8
132.2
131.5
129.8
Borehole located on the east side(northbound lane) of Great Oak Drive,in front of 80 Great Oak Drive .
Groundwater level measured inmonitoring well was at 2.6 m belowground surface on January 23, 2018.
GSA SS6:Gravel: 0%Sand: 31%Silt and Clay: 69%
GSA SS8:Gravel: 0%Sand: 18%Silt and Clay: 82%
ATT SS8:PL: NPLL: NVPI: NPBorehole caved to and was dry at 3.9m below ground surface uponcompletion of drilling.
ASPHALT: (240 mm)
GRANULAR FILL: (190 mm)Dark brown sand and gravel FILL, trace silt and clay,some asphalt fragments, moist, compact.
SANDY CLAYEY SILT TILL:Brown SANDY CLAYEY SILT TILL, some gravel, DTPLto APL, very stiff to hard.
SANDY SILT TILL :Brown to grey SANDY SILT TILL, trace to some clay,some gravel to gravelly, moist, dense.
SANDY SILT:Grey SANDY SILT, trace clay, moist, compact.
SAND AND SILT TILL TO SILT TILL:Grey SAND AND SILT TILL TO SILT TILL, trace gravel,some clay, moist to wet, compact to dense.
Borehole terminated at 6.1 m below ground surface inSAND AND SILT TILL TO SILT TILL
SS1A
SS1B
SS2
SS3
SS4
SS5
SS6
SS7A
SS7B
SS8
19
35
31
40
47
24
22
40
4
12
13
13
13
16
11
15
11
15
54
46
67
94
83
67
71
79
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: Great Oak Drive from Kipling Avenue to Remington Drive, Toronto, Ontario
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 135.9 m
W
BOREHOLE NO. BH18-8-34PROJECT NAME: Great Oak Drive Sanitary Sewer Replacement
DATE COMPLETED: Dec 20, 2017
SUPERVISOR: KR
REVIEWER: SL
135.9
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/805
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301513Northing: 4835168T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
161-
1608
6-02
-GE
O-8
05 -
GR
EA
T O
AK
DR
IVE
- 2
0180
131
.GP
J W
SP
_EN
V_V
1.G
DT
20
/2/1
8
47
0.2
0.3
0.8
3.7
5.0
135.1
135.0
134.5
131.6
130.3
Borehole located on the east side(northbound lane) of Great Oak Drive,in front of 74 Great Oak Drive.
GSA SS5:Gravel: 18%Sand: 28%Silt and Clay: 54%
ATT SS5:PL: 14%LL: 21%PI: 7%GSA SS6:Gravel: 2%Sand: 35%Silt and Clay: 63%
Borehole was open and dry uponcompletion of drilling.
ASPHALT: (165 mm)
GRANULAR FILL: (150 mm)Dark brown sand and gravel FILL, trace silt and clay,moist, compact.
FILL:Brown silty clay to clayey silt FILL, some gravel, APL,stiff to very stiff.
SILTY CLAY TILL TO SANDY CLAYEY SILT TILL:Brown to grey SILTY CLAY TILL TO SANDY CLAYEYSILT TILL, trace to some gravel, occasional sandseams, APL to DTPL, hard to very stiff.
SILT AND SAND:Grey SILT AND SAND, trace to some clay, trace gravel,moist, compact.
Borehole terminated at 5.0 m below ground surface inSILT AND SAND.
CC
SS1
SS2
SS3
SS4
SS5
SS6
SS7
15
40
30
26
30
21
23
14
12
15
13
10
14
15
33
83
67
67
61
83
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: Great Oak Drive from Kipling Avenue to Remington Drive, Toronto, Ontario
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 135.3 m
W
BOREHOLE NO. BH18-8-35PROJECT NAME: Great Oak Drive Sanitary Sewer Replacement
DATE COMPLETED: Dec 18, 2017
SUPERVISOR: ES
REVIEWER: SL
135.3
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/805
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301539Northing: 4835110T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
161-
1608
6-02
-GE
O-8
05 -
GR
EA
T O
AK
DR
IVE
- 2
0180
131
.GP
J W
SP
_EN
V_V
1.G
DT
20
/2/1
8
0.2
0.3
0.8
2.1
3.7
4.4
5.0
134.4
134.3
133.8
132.5
130.9
130.3
129.6
Borehole located on the south side(eastbound lane) of Great Oak Drive,between 69 and 71 Great Oak Drive .
Groundwater level measured inmonitoring well at 2.5 m below groundsurface on January 04, 2018.
GSA SS6:Gravel: 1%Sand: 3%Silt and Clay: 96%
ATT SS6:PL: 15%LL: 24%PI: 9%GSA SS7:Gravel: 0%Sand: 2%Silt and Clay: 98%Groundwater level was measured at4.6 m below ground surface uponcompletion of drilling.Borehole was open upon completionof drilling.
ASPHALT: (175 mm)
GRANULAR FILL: (127 mm)Brown sand and gravel FILL, trace silt and clay, moist,compact.
FILL:Brown sandy silt FILL, some gravel, trace clay, moist,compact.
FILL:Dark brown to brown clayey silt to silty clay FILL, traceto some gravel, trace to some sand, occasional rootletsand sand pockets, WTPL to APL, very stiff.
CLAYEY SILT TILL:Brown to grey CLAYEY SILT TILL, trace to some gravel,trace to some sand, DTPL to APL, hard.
SILTY CLAY:Grey SILTY CLAY, trace sand, trace gravel, APL, hard.
SILT:Grey SILT, some clay, trace sand, moist, dense.
Borehole terminated at 5.0 m below ground surface inSILT.
CC
SS1
SS2
SS3
SS4
SS5
SS6
SS7
25
30
19
39
49
32
39
13
20
16
12
9
15
17
33
50
67
100
83
100
100
WATERCONTENT %
STRATIGRAPHIC DESCRIPTION
ST
RA
TIG
RA
PH
Y
20 30
REMARKS
CONEPENETRATION
"N" VALUE
SHEARSTRENGTH
PROJECT LOCATION: Great Oak Drive from Kipling Avenue to Remington Drive, Toronto, Ontario
BOREHOLE TYPE: 110 mm SOLID STEM AUGER / 51 mm O.D. SPLIT SPOON
10 1030
L
20
W
GROUND ELEVATION: 134.6 m
W
BOREHOLE NO. BH18-8-36PROJECT NAME: Great Oak Drive Sanitary Sewer Replacement
DATE COMPLETED: Dec 18, 2017
SUPERVISOR: ES
REVIEWER: SL
134.6
ELE
V (
mA
SL)
DE
PT
H (
m)
P
PROJECT NO.: 161-16086-02/GEO/805
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
SAMPLE
PAGE 1 of 1
MTM CO-ORDINATES
Zone: 10 NAD: 27Easting: 301613Northing: 4835098T
YP
E
N V
ALU
E
% W
AT
ER
% R
EC
OV
ER
Y
RQ
D (%
)
MONITORDETAILS
CO
T M
TM
WIT
H C
OO
RD
S
161-
1608
6-02
-GE
O-8
05 -
GR
EA
T O
AK
DR
IVE
- 2
0180
131
.GP
J W
SP
_EN
V_V
1.G
DT
20
/2/1
8
49
APPENDIX
B SLUG TEST ANALYSIS
Hvorslev Testing: BH18-8-11
Date: 24-Apr-18 H = Static Water Level mbg
Conducted by: NU Ho = Head at time = 0 mbg
h = Water Level at time t mbg
Well Number: BH18-8-11 ToE = 125 sec
Well Depth: 7.47 mbtop ToL= 250 sec
Top of Pipe: 0 mag Screen Length (L) = 150 cm
Well Diameter: 51 mm Hole Radius (R) = 7.5 cm
Well Elevation: 141.20 masl Well Radius (r) = 2.5 cm
Static Water Level: 5.15 mbtop
Ground Elevation: 141.20 masl 4.99E-04 cm/s
2.50E-04 cm/s
Time t (sec)
Water Level
(mtop)
Water Level
Elevation
(masl) Time t (sec) H-h H-Ho (H-h)/(H-Ho)
0 6.470 134.73 0 1.320 1.320 1.000
30 6.140 135.06 30 0.990 1.320 0.750
60 5.940 135.26 60 0.790 1.320 0.598
90 5.770 135.43 90 0.620 1.320 0.470
120 5.650 135.55 120 0.500 1.320 0.379
150 5.650 135.55 150 0.500 1.320 0.379
180 5.470 135.73 180 0.320 1.320 0.242
210 5.410 135.79 210 0.260 1.320 0.197
240 5.365 135.84 240 0.215 1.320 0.163
270 5.335 135.87 270 0.185 1.320 0.140
300 5.305 135.90 300 0.155 1.320 0.117
330 5.275 135.93 330 0.125 1.320 0.095
360 5.260 135.94 360 0.110 1.320 0.083
390 5.240 135.96 390 0.090 1.320 0.068
420 5.225 135.98 420 0.075 1.320 0.057
450 5.215 135.99 450 0.065 1.320 0.049
540 5.195 136.01 540 0.045 1.320 0.034
660 5.180 136.02 660 0.030 1.320 0.023
780 5.170 136.03 780 0.020 1.320 0.015
900 5.165 136.04 900 0.015 1.320 0.011
1020 5.160 136.04 1020 0.010 1.320 0.008
1140 5.160 136.04 1140 0.010 1.320 0.008
1200 5.160 136.04 1200 0.010 1.320 0.008
KE = r2ln(L/R)/(2LTo) =
KL = r2ln(L/R)/(2LTo) =
0.0
0.0
0.1
1.0
0 250 500 750 1000 1250 1500
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-11 - Early Time
0.37
ToE= 125
0.0
0.0
0.1
1.0
0 250 500 750 1000 1250 1500
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-11 - Late Time
0.37
ToL= 250
Hvorslev Testing: BH18-8-13
Date: 24-Apr-18 H = Static Water Level mbg
Conducted by: NU Ho = Head at time = 0 mbg
h = Water Level at time t mbg
Well Number: BH18-8-13 ToE = 85 sec
Well Depth: 6.69 mbtop ToL= 250 sec
Top of Pipe: 0 mag Screen Length (L) = 150 cm
Well Diameter: 51 mm Hole Radius (R) = 7.5 cm
Well Elevation: 140.40 masl Well Radius (r) = 2.5 cm
Static Water Level: 4.535 mbtop
Ground Elevation: 140.40 masl 7.34E-04 cm/s
2.50E-04 cm/s
Time t (sec)
Water Level
(mtop)
Water Level
Elevation
(masl) Time t (sec) H-h H-Ho (H-h)/(H-Ho)
0 5.150 135.25 0 0.615 0.615 1.000
30 5.070 135.33 30 0.535 0.615 0.870
60 4.820 135.58 60 0.285 0.615 0.463
90 4.740 135.66 90 0.205 0.615 0.333
120 4.695 135.71 120 0.160 0.615 0.260
150 4.642 135.76 150 0.107 0.615 0.174
180 4.618 135.78 180 0.083 0.615 0.135
210 4.601 135.80 210 0.066 0.615 0.107
240 4.587 135.81 240 0.052 0.615 0.085
270 4.581 135.82 270 0.046 0.615 0.075
300 4.573 135.83 300 0.038 0.615 0.062
360 4.565 135.84 360 0.030 0.615 0.049
390 4.561 135.84 390 0.026 0.615 0.042
420 4.561 135.84 420 0.026 0.615 0.042
540 4.555 135.85 540 0.020 0.615 0.033
660 4.553 135.85 660 0.018 0.615 0.029
780 4.551 135.85 780 0.016 0.615 0.026
900 4.548 135.85 900 0.013 0.615 0.021
1200 4.545 135.86 1200 0.010 0.615 0.016
KE = r2ln(L/R)/(2LTo) =
KL = r2ln(L/R)/(2LTo) =
0.0
0.1
1.0
0 250 500 750 1000 1250 1500
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-13 - Early Time
0.37
ToE= 85
0.0
0.1
1.0
0 250 500 750 1000 1250 1500
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-13 - Late Time
0.37
ToL= 250
Hvorslev Testing: BH18-8-15
Date: 24-Apr-18 H = Static Water Level mbg
Conducted by: NU Ho = Head at time = 0 mbg
h = Water Level at time t mbg
Well Number: BH18-8-15 ToE = 200 sec
Well Depth: 6.90 mbtop ToL= 390 sec
Top of Pipe: 0 mag Screen Length (L) = 150 cm
Well Diameter: 51 mm Hole Radius (R) = 7.5 cm
Well Elevation: 140.60 masl Well Radius (r) = 4.6 cm
Static Water Level: 4.09 mbtop
Ground Elevation: 140.60 masl 1.06E-03 cm/s
5.42E-04 cm/s
Time t (sec)
Water Level
(mtop)
Water Level
Elevation
(masl) Time t (sec) H-h H-Ho (H-h)/(H-Ho)
0 5.830 134.77 0 1.740 1.740 1.000
30 5.601 135.00 30 1.511 1.740 0.868
60 5.421 135.18 60 1.331 1.740 0.765
90 5.225 135.38 90 1.135 1.740 0.652
120 5.051 135.55 120 0.961 1.740 0.552
150 4.871 135.73 150 0.781 1.740 0.449
180 4.792 135.81 180 0.702 1.740 0.403
210 4.699 135.90 210 0.609 1.740 0.350
240 4.616 135.98 240 0.526 1.740 0.302
270 4.541 136.06 270 0.451 1.740 0.259
300 4.477 136.12 300 0.387 1.740 0.222
330 4.429 136.17 330 0.339 1.740 0.195
360 4.391 136.21 360 0.301 1.740 0.173
390 4.355 136.25 390 0.265 1.740 0.152
420 4.321 136.28 420 0.231 1.740 0.133
450 4.293 136.31 450 0.203 1.740 0.117
480 4.269 136.33 480 0.179 1.740 0.103
540 4.235 136.37 540 0.145 1.740 0.083
660 4.186 136.41 660 0.096 1.740 0.055
780 4.157 136.44 780 0.067 1.740 0.039
900 4.141 136.46 900 0.051 1.740 0.029
1200 4.115 136.49 1200 0.025 1.740 0.014
1500 4.102 136.50 1500 0.012 1.740 0.007
KE = r2ln(L/R)/(2LTo) =
KL = r2ln(L/R)/(2LTo) =
0.0
0.0
0.1
1.0
0 250 500 750 1000 1250 1500 1750 2000
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-15 - Early Time
0.37
ToE= 200
0.0
0.0
0.1
1.0
0 250 500 750 1000 1250 1500 1750 2000
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-15 - Late Time
0.37
ToL= 390
Hvorslev Testing: BH18-8-17
Date: 24-Apr-18 H = Static Water Level mbg
Conducted by: NU Ho = Head at time = 0 mbg
h = Water Level at time t mbg
Well Number: BH18-8-17 ToE = 23,000 sec
Well Depth: 4.44 mbtop ToL= 69,000 sec
Top of Pipe: 0 mag Screen Length (L) = 150 cm
Well Diameter: 51 mm Hole Radius (R) = 7.5 cm
Well Elevation: 138.80 masl Well Radius (r) = 4.6 cm
Static Water Level: 2.42 mbtop
Ground Elevation: 138.80 masl 9.19E-06 cm/s
3.06E-06 cm/s
Time t (sec)
Water Level
(mtop)
Water Level
Elevation
(masl) Time t (sec) H-h H-Ho (H-h)/(H-Ho)
0 3.895 134.91 0 1.475 1.475 1.000
30 3.885 134.92 30 1.465 1.475 0.993
60 3.879 134.92 60 1.459 1.475 0.989
90 3.875 134.93 90 1.455 1.475 0.986
120 3.871 134.93 120 1.451 1.475 0.984
150 3.869 134.93 150 1.449 1.475 0.982
180 3.865 134.94 180 1.445 1.475 0.980
210 3.865 134.94 210 1.445 1.475 0.980
240 3.863 134.94 240 1.443 1.475 0.978
270 3.860 134.94 270 1.440 1.475 0.976
300 3.857 134.94 300 1.437 1.475 0.974
420 3.851 134.95 420 1.431 1.475 0.970
540 3.845 134.96 540 1.425 1.475 0.966
660 3.841 134.96 660 1.421 1.475 0.963
780 3.838 134.96 780 1.418 1.475 0.961
900 3.835 134.97 900 1.415 1.475 0.959
1200 3.828 134.97 1200 1.408 1.475 0.955
1500 3.823 134.98 1500 1.403 1.475 0.951
1800 3.819 134.98 1800 1.399 1.475 0.948
2100 3.815 134.99 2100 1.395 1.475 0.946
2400 3.811 134.99 2400 1.391 1.475 0.943
2700 3.808 134.99 2700 1.388 1.475 0.941
3000 3.804 135.00 3000 1.384 1.475 0.938
3300 3.801 135.00 3300 1.381 1.475 0.936
3600 3.796 135.00 3600 1.376 1.475 0.933
KE = r2ln(L/R)/(2LTo) =
KL = r2ln(L/R)/(2LTo) =
0.0
0.1
1.0
0 10000 20000 30000 40000 50000 60000 70000 80000
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-17 - Early Time
0.37
ToE= 23000
0.0
0.1
1.0
0 10000 20000 30000 40000 50000 60000 70000 80000
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-17 - Late Time
0.37
ToL= 69000
Hvorslev Testing: BH18-8-19
Date: 24-Apr-18 H = Static Water Level mbg
Conducted by: NU Ho = Head at time = 0 mbg
h = Water Level at time t mbg
Well Number: BH18-8-19 ToE = 5,200 sec
Well Depth: 5.02 mbtop ToL= 17,900 sec
Top of Pipe: 0 mag Screen Length (L) = 150 cm
Well Diameter: 51 mm Hole Radius (R) = 7.5 cm
Well Elevation: 137.50 masl Well Radius (r) = 4.6 cm
Static Water Level: 2.91 mbtop
Ground Elevation: 137.50 masl 4.06E-05 cm/s
1.18E-05 cm/s
Time t (sec)
Water Level
(mtop)
Water Level
Elevation
(masl) Time t (sec) H-h H-Ho (H-h)/(H-Ho)
0 4.410 133.09 0 1.500 1.500 1.000
30 4.415 133.09 30 1.505 1.500 1.003
60 4.398 133.10 60 1.488 1.500 0.992
90 4.388 133.11 90 1.478 1.500 0.985
120 4.381 133.12 120 1.471 1.500 0.981
150 4.373 133.13 150 1.463 1.500 0.975
180 4.365 133.14 180 1.455 1.500 0.970
210 4.357 133.14 210 1.447 1.500 0.965
240 4.351 133.15 240 1.441 1.500 0.961
270 4.345 133.16 270 1.435 1.500 0.957
300 4.338 133.16 300 1.428 1.500 0.952
420 4.320 133.18 420 1.410 1.500 0.940
540 4.303 133.20 540 1.393 1.500 0.929
660 4.289 133.21 660 1.379 1.500 0.919
780 4.279 133.22 780 1.369 1.500 0.913
900 4.266 133.23 900 1.356 1.500 0.904
1200 4.237 133.26 1200 1.327 1.500 0.885
1500 4.214 133.29 1500 1.304 1.500 0.869
1800 4.195 133.31 1800 1.285 1.500 0.857
2100 4.175 133.33 2100 1.265 1.500 0.843
2400 4.158 133.34 2400 1.248 1.500 0.832
2700 4.141 133.36 2700 1.231 1.500 0.821
3000 4.125 133.38 3000 1.215 1.500 0.810
3300 4.107 133.39 3300 1.197 1.500 0.798
3600 4.093 133.41 3600 1.183 1.500 0.789
KE = r2ln(L/R)/(2LTo) =
KL = r2ln(L/R)/(2LTo) =
0.0
0.1
1.0
0 2000 4000 6000 8000 10000
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-19 - Early Time
0.37
ToE= 5200
0.0
0.1
1.0
0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-19 - Late Time
0.37
ToL= 17900
Hvorslev Testing: BH18-8-21
Date: 24-Apr-18 H = Static Water Level mbg
Conducted by: NU Ho = Head at time = 0 mbg
h = Water Level at time t mbg
Well Number: BH18-8-21 ToE = 840 sec
Well Depth: 5.66 mbtop ToL= 1,100 sec
Top of Pipe: 0 mag Screen Length (L) = 150 cm
Well Diameter: 51 mm Hole Radius (R) = 7.5 cm
Well Elevation: 137.30 masl Well Radius (r) = 4.6 cm
Static Water Level: 2.705 mbtop
Ground Elevation: 137.30 masl 2.52E-04 cm/s
1.92E-04 cm/s
Time t (sec)
Water Level
(mtop)
Water Level
Elevation
(masl) Time t (sec) H-h H-Ho (H-h)/(H-Ho)
0 5.030 132.27 0 2.325 2.325 1.000
30 4.965 132.34 30 2.260 2.325 0.972
60 4.891 132.41 60 2.186 2.325 0.940
90 4.802 132.50 90 2.097 2.325 0.902
120 4.729 132.57 120 2.024 2.325 0.871
150 4.647 132.65 150 1.942 2.325 0.835
180 4.567 132.73 180 1.862 2.325 0.801
210 4.511 132.79 210 1.806 2.325 0.777
240 4.414 132.89 240 1.709 2.325 0.735
270 4.369 132.93 270 1.664 2.325 0.716
300 4.301 133.00 300 1.596 2.325 0.686
420 4.083 133.22 420 1.378 2.325 0.593
540 3.886 133.41 540 1.181 2.325 0.508
660 3.743 133.56 660 1.038 2.325 0.446
780 3.625 133.68 780 0.920 2.325 0.396
900 3.504 133.80 900 0.799 2.325 0.344
1200 3.268 134.03 1200 0.563 2.325 0.242
1500 3.132 134.17 1500 0.427 2.325 0.184
1800 3.042 134.26 1800 0.337 2.325 0.145
2100 2.974 134.33 2100 0.269 2.325 0.116
2400 2.921 134.38 2400 0.216 2.325 0.093
2700 2.889 134.41 2700 0.184 2.325 0.079
3000 2.861 134.44 3000 0.156 2.325 0.067
3300 2.838 134.46 3300 0.133 2.325 0.057
3600 2.851 134.45 3600 0.146 2.325 0.063
KE = r2ln(L/R)/(2LTo) =
KL = r2ln(L/R)/(2LTo) =
0.0
0.1
1.0
0 1000 2000 3000 4000 5000
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-17 - Early Time
0.37
ToE= 840
0.0
0.1
1.0
0 1000 2000 3000 4000 5000
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-17 - Late Time
0.37
ToL= 1100
Hvorslev Testing: BH18-8-23
Date: 05-Feb-18 H = Static Water Level mbg
Conducted by: JFA/SWE Ho = Head at time = 0 mbg
h = Water Level at time t mbg
Well Number: BH18-8-23 ToE = 2,170 sec
Well Depth: 6.07 mbtop ToL= 11,900 sec
Top of Pipe: 0 mag Screen Length (L) = 150 cm
Well Diameter: 51 mm Hole Radius (R) = 7.5 cm
Well Elevation: 141.30 masl Well Radius (r) = 4.6 cm
Static Water Level: 5.68 mbtop
Ground Elevation: 141.30 masl 9.74E-05 cm/s
1.78E-05 cm/s
Time t (sec)
Water Level
(mtop)
Water Level
Elevation
(masl) Time t (sec) H-h H-Ho (H-h)/(H-Ho)
30 5.890 135.41 30 0.210 0.210 1.000
45 5.890 135.41 45 0.210 0.210 1.000
60 5.885 135.42 60 0.205 0.210 0.976
90 5.880 135.42 90 0.200 0.210 0.952
120 5.875 135.43 120 0.195 0.210 0.929
150 5.875 135.43 150 0.195 0.210 0.929
180 5.875 135.43 180 0.195 0.210 0.929
210 5.870 135.43 210 0.190 0.210 0.905
240 5.870 135.43 240 0.190 0.210 0.905
270 5.870 135.43 270 0.190 0.210 0.905
300 5.865 135.44 300 0.185 0.210 0.881
420 5.865 135.44 420 0.185 0.210 0.881
540 5.860 135.44 540 0.180 0.210 0.857
660 5.860 135.44 660 0.180 0.210 0.857
780 5.855 135.45 780 0.175 0.210 0.833
900 5.855 135.45 900 0.175 0.210 0.833
1200 5.850 135.45 1200 0.170 0.210 0.810
1500 5.850 135.45 1500 0.170 0.210 0.810
1800 5.845 135.46 1800 0.165 0.210 0.786
KE = r2ln(L/R)/(2LTo) =
KL = r2ln(L/R)/(2LTo) =
0.0
0.1
1.0
0 250 500 750 1000 1250 1500 1750 2000 2250
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-23 - Early Time
0.37
ToE= 2170
0.0
0.1
1.0
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-23 - Late Time
0.37
ToL= 11900
Hvorslev Testing: BH18-8-25
Date: 25-Apr-18 H = Static Water Level mbg
Conducted by: NU Ho = Head at time = 0 mbg
h = Water Level at time t mbg
Well Number: BH18-8-25 ToE = 2,500 sec
Well Depth: 4.52 mbtop ToL= 4,270 sec
Top of Pipe: 0 mag Screen Length (L) = 150 cm
Well Diameter: 51 mm Hole Radius (R) = 7.5 cm
Well Elevation: 141.20 masl Well Radius (r) = 4.6 cm
Static Water Level: 3.38 mbtop
Ground Elevation: 141.20 masl 8.45E-05 cm/s
4.95E-05 cm/s
Time t (sec)
Water Level
(mtop)
Water Level
Elevation
(masl) Time t (sec) H-h H-Ho (H-h)/(H-Ho)
0 4.220 136.98 0 0.840 0.840 1.000
30 4.199 137.00 30 0.819 0.840 0.975
60 4.195 137.01 60 0.815 0.840 0.970
90 4.186 137.01 90 0.806 0.840 0.960
120 4.175 137.03 120 0.795 0.840 0.946
150 4.165 137.04 150 0.785 0.840 0.935
180 4.158 137.04 180 0.778 0.840 0.926
210 4.149 137.05 210 0.769 0.840 0.915
240 4.141 137.06 240 0.761 0.840 0.906
270 4.138 137.06 270 0.758 0.840 0.902
300 4.132 137.07 300 0.752 0.840 0.895
420 4.108 137.09 420 0.728 0.840 0.867
540 4.085 137.12 540 0.705 0.840 0.839
660 4.063 137.14 660 0.683 0.840 0.813
780 4.045 137.16 780 0.665 0.840 0.792
900 4.026 137.17 900 0.646 0.840 0.769
1200 3.979 137.22 1200 0.599 0.840 0.713
1500 3.931 137.27 1500 0.551 0.840 0.656
1800 3.889 137.31 1800 0.509 0.840 0.606
2100 3.857 137.34 2100 0.477 0.840 0.568
2400 3.831 137.37 2400 0.451 0.840 0.537
2700 3.804 137.40 2700 0.424 0.840 0.505
3000 3.778 137.42 3000 0.398 0.840 0.474
3300 3.754 137.45 3300 0.374 0.840 0.445
3600 3.738 137.46 3600 0.358 0.840 0.426
KE = r2ln(L/R)/(2LTo) =
KL = r2ln(L/R)/(2LTo) =
0.0
0.1
1.0
0 500 1000 1500 2000 2500 3000 3500 4000
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-25 - Early Time
0.37
ToE= 2500
0.0
0.1
1.0
0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-25 - Late Time
0.37
ToL= 4270
Hvorslev Testing: BH18-8-27
Date: 25-Apr-18 H = Static Water Level mbg
Conducted by: NU Ho = Head at time = 0 mbg
h = Water Level at time t mbg
Well Number: BH18-8-27 ToE = 3,300 sec
Well Depth: 4.50 mbtop ToL= 7,080 sec
Top of Pipe: 0 mag Screen Length (L) = 150 cm
Well Diameter: 51 mm Hole Radius (R) = 7.5 cm
Well Elevation: 136.70 masl Well Radius (r) = 4.6 cm
Static Water Level: 2.575 mbtop
Ground Elevation: 136.70 masl 6.40E-05 cm/s
2.98E-05 cm/s
Time t (sec)
Water Level
(mtop)
Water Level
Elevation
(masl) Time t (sec) H-h H-Ho (H-h)/(H-Ho)
0 4.045 132.66 0 1.470 1.470 1.000
30 4.029 132.67 30 1.454 1.470 0.989
60 4.011 132.69 60 1.436 1.470 0.977
90 3.994 132.71 90 1.419 1.470 0.965
120 3.979 132.72 120 1.404 1.470 0.955
150 3.971 132.73 150 1.396 1.470 0.950
180 3.962 132.74 180 1.387 1.470 0.944
210 3.951 132.75 210 1.376 1.470 0.936
240 3.939 132.76 240 1.364 1.470 0.928
270 3.932 132.77 270 1.357 1.470 0.923
300 3.925 132.78 300 1.350 1.470 0.918
420 3.894 132.81 420 1.319 1.470 0.897
540 3.867 132.83 540 1.292 1.470 0.879
660 3.845 132.86 660 1.270 1.470 0.864
780 3.826 132.87 780 1.251 1.470 0.851
900 3.808 132.89 900 1.233 1.470 0.839
1200 3.766 132.93 1200 1.191 1.470 0.810
1500 3.732 132.97 1500 1.157 1.470 0.787
1800 3.691 133.01 1800 1.116 1.470 0.759
2100 3.656 133.04 2100 1.081 1.470 0.735
2400 3.615 133.09 2400 1.040 1.470 0.707
2700 3.584 133.12 2700 1.009 1.470 0.686
3000 3.537 133.16 3000 0.962 1.470 0.654
3300 3.446 133.25 3300 0.871 1.470 0.593
3600 3.388 133.31 3600 0.813 1.470 0.553
KE = r2ln(L/R)/(2LTo) =
KL = r2ln(L/R)/(2LTo) =
0.0
0.1
1.0
0 500 1000 1500 2000 2500 3000 3500 4000
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-27 - Early Time
0.37
ToE= 3300
0.0
0.1
1.0
0 1000 2000 3000 4000 5000 6000 7000 8000
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-27 - Late Time
0.37
ToL= 7080
Hvorslev Testing: BH18-8-29
Date: 25-Apr-18 H = Static Water Level mbg
Conducted by: NU Ho = Head at time = 0 mbg
h = Water Level at time t mbg
Well Number: BH18-8-29 ToE = 1,040 sec
Well Depth: 6.22 mbtop ToL= 3,450 sec
Top of Pipe: 0 mag Screen Length (L) = 150 cm
Well Diameter: 51 mm Hole Radius (R) = 7.5 cm
Well Elevation: 138.10 masl Well Radius (r) = 2.5 cm
Static Water Level: 2.22 mbtop
Ground Elevation: 138.10 masl 6.00E-05 cm/s
1.81E-05 cm/s
Time t (sec)
Water Level
(mtop)
Water Level
Elevation
(masl) Time t (sec) H-h H-Ho (H-h)/(H-Ho)
0 5.030 133.07 0 2.810 2.810 1.000
30 4.965 133.14 30 2.745 2.810 0.977
60 4.891 133.21 60 2.671 2.810 0.951
90 4.802 133.30 90 2.582 2.810 0.919
120 4.729 133.37 120 2.509 2.810 0.893
150 4.647 133.45 150 2.427 2.810 0.864
180 4.567 133.53 180 2.347 2.810 0.835
210 4.511 133.59 210 2.291 2.810 0.815
240 4.414 133.69 240 2.194 2.810 0.781
270 4.369 133.73 270 2.149 2.810 0.765
300 4.300 133.80 300 2.080 2.810 0.740
420 4.083 134.02 420 1.863 2.810 0.663
540 3.886 134.21 540 1.666 2.810 0.593
660 3.743 134.36 660 1.523 2.810 0.542
780 3.625 134.48 780 1.405 2.810 0.500
900 3.504 134.60 900 1.284 2.810 0.457
1200 3.268 134.83 1200 1.048 2.810 0.373
1500 3.132 134.97 1500 0.912 2.810 0.325
1800 3.042 135.06 1800 0.822 2.810 0.293
2100 2.974 135.13 2100 0.754 2.810 0.268
2400 2.921 135.18 2400 0.701 2.810 0.249
2700 2.889 135.21 2700 0.669 2.810 0.238
3000 2.861 135.24 3000 0.641 2.810 0.228
3300 2.838 135.26 3300 0.618 2.810 0.220
3600 2.821 135.28 3600 0.601 2.810 0.214
KE = r2ln(L/R)/(2LTo) =
KL = r2ln(L/R)/(2LTo) =
0.0
0.1
1.0
0 500 1000 1500 2000 2500 3000 3500 4000
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-29 - Early Time
0.37
ToE= 1040
0.0
0.1
1.0
0 500 1000 1500 2000 2500 3000 3500 4000
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-29 - Late Time
0.37
ToL= 3450
Hvorslev Testing: BH18-8-31
Date: 25-Apr-18 H = Static Water Level mbg
Conducted by: NU Ho = Head at time = 0 mbg
h = Water Level at time t mbg
Well Number: BH18-8-31 ToE = 1,780 sec
Well Depth: 6.06 mbtop ToL= 950 sec
Top of Pipe: 0 mag Screen Length (L) = 150 cm
Well Diameter: 51 mm Hole Radius (R) = 7.5 cm
Well Elevation: 134.60 masl Well Radius (r) = 4.6 cm
Static Water Level: 3.49 mbtop
Ground Elevation: 134.60 masl 1.19E-04 cm/s
2.22E-04 cm/s
Time t (sec)
Water Level
(mtop)
Water Level
Elevation
(masl) Time t (sec) H-h H-Ho (H-h)/(H-Ho)
0 5.160 129.44 0 1.670 1.670 1.000
30 5.145 129.46 30 1.655 1.670 0.991
60 5.135 129.47 60 1.645 1.670 0.985
90 5.119 129.48 90 1.629 1.670 0.975
120 5.057 129.54 120 1.567 1.670 0.938
150 5.033 129.57 150 1.543 1.670 0.924
180 4.994 129.61 180 1.504 1.670 0.901
210 4.979 129.62 210 1.489 1.670 0.892
240 4.971 129.63 240 1.481 1.670 0.887
270 4.963 129.64 270 1.473 1.670 0.882
300 4.898 129.70 300 1.408 1.670 0.843
420 4.744 129.86 420 1.254 1.670 0.751
540 4.569 130.03 540 1.079 1.670 0.646
660 4.435 130.17 660 0.945 1.670 0.566
780 4.312 130.29 780 0.822 1.670 0.492
900 4.224 130.38 900 0.734 1.670 0.440
1200 4.026 130.57 1200 0.536 1.670 0.321
1500 3.892 130.71 1500 0.402 1.670 0.241
1800 3.793 130.81 1800 0.303 1.670 0.181
2100 3.721 130.88 2100 0.231 1.670 0.138
2400 3.665 130.94 2400 0.175 1.670 0.105
2700 3.628 130.97 2700 0.138 1.670 0.083
3000 3.597 131.00 3000 0.107 1.670 0.064
3300 3.575 131.03 3300 0.085 1.670 0.051
3600 3.556 131.04 3600 0.066 1.670 0.040
KE = r2ln(L/R)/(2LTo) =
KL = r2ln(L/R)/(2LTo) =
0.0
0.1
1.0
0 500 1000 1500 2000 2500 3000 3500 4000
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-31 - Early Time
0.37
ToE= 1780
0.0
0.1
1.0
0 500 1000 1500 2000 2500 3000 3500 4000
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-31 - Late Time
0.37
ToL= 950
Hvorslev Testing: BH18-8-32
Date: 05-Feb-18 H = Static Water Level mbg
Conducted by: JFA/SWE Ho = Head at time = 0 mbg
h = Water Level at time t mbg
Well Number: BH18-8-32 To = 52,000 sec
Well Depth: 6.96 mbtop
Top of Pipe: 0 mag Screen Length (L) = 150 cm
Well Diameter: 51 mm Hole Radius (R) = 7.5 cm
Well Elevation: 137.40 masl Well Radius (r) = 4.6 cm
Static Water Level: 2.97 mbtop
Ground Elevation: 137.40 masl 4.06E-06 cm/s
Time t (sec)
Water Level
(mtop)
Water Level
Elevation
(masl) Time t (sec) H-h H-Ho (H-h)/(H-Ho)
15 6.850 130.55 15 3.880 3.880 1.000
30 6.845 130.56 30 3.875 3.880 0.999
45 6.840 130.56 45 3.870 3.880 0.997
60 6.835 130.57 60 3.865 3.880 0.996
90 6.830 130.57 90 3.860 3.880 0.995
120 6.825 130.58 120 3.855 3.880 0.994
150 6.820 130.58 150 3.850 3.880 0.992
180 6.820 130.58 180 3.850 3.880 0.992
210 6.815 130.59 210 3.845 3.880 0.991
240 6.815 130.59 240 3.845 3.880 0.991
270 6.810 130.59 270 3.840 3.880 0.990
300 6.810 130.59 300 3.840 3.880 0.990
420 6.795 130.61 420 3.825 3.880 0.986
540 6.790 130.61 540 3.820 3.880 0.985
660 6.785 130.62 660 3.815 3.880 0.983
780 6.785 130.62 780 3.815 3.880 0.983
900 6.775 130.63 900 3.805 3.880 0.981
1200 6.765 130.64 1200 3.795 3.880 0.978
1500 6.765 130.64 1500 3.795 3.880 0.978
1800 6.760 130.64 1800 3.790 3.880 0.977
K = r2ln(L/R)/(2LTo) =
0.0
0.1
1.0
0 10000 20000 30000 40000 50000 60000
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-32
0.37
To= 52000
Hvorslev Testing: BH18-8-34
Date: 12-Feb-18 H = Static Water Level mbg
Conducted by: JFA/SWE Ho = Head at time = 0 mbg
h = Water Level at time t mbg
Well Number: BH18-8-34 ToE = 875 sec
Well Depth: 5.38 mbtop ToL= 1,440 sec
Top of Pipe: 0 mag Screen Length (L) = 150 cm
Well Diameter: 51 mm Hole Radius (R) = 7.5 cm
Well Elevation: 135.90 masl Well Radius (r) = 4.6 cm
Static Water Level: 2.94 mbtop
Ground Elevation: 135.90 masl 2.41E-04 cm/s
1.47E-04 cm/s
Time t (sec)
Water Level
(mtop)
Water Level
Elevation
(masl) Time t (sec) H-h H-Ho (H-h)/(H-Ho)
15 5.600 130.30 15 2.660 2.660 1.000
30 5.542 130.36 30 2.602 2.660 0.978
45 5.487 130.41 45 2.547 2.660 0.958
60 5.449 130.45 60 2.509 2.660 0.943
90 5.312 130.59 90 2.372 2.660 0.892
120 5.268 130.63 120 2.328 2.660 0.875
150 5.198 130.70 150 2.258 2.660 0.849
180 5.130 130.77 180 2.190 2.660 0.823
210 5.070 130.83 210 2.130 2.660 0.801
240 5.015 130.89 240 2.075 2.660 0.780
270 4.950 130.95 270 2.010 2.660 0.756
300 4.883 131.02 300 1.943 2.660 0.730
420 4.681 131.22 420 1.741 2.660 0.655
540 4.610 131.29 540 1.670 2.660 0.628
660 4.540 131.36 660 1.600 2.660 0.602
780 4.425 131.48 780 1.485 2.660 0.558
900 4.307 131.59 900 1.367 2.660 0.514
1200 3.980 131.92 1200 1.040 2.660 0.391
KE = r2ln(L/R)/(2LTo) =
KL = r2ln(L/R)/(2LTo) =
0.0
0.1
1.0
0 250 500 750 1000 1250 1500
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-34 - Early Time
0.37
ToE= 875
0.0
0.1
1.0
0 200 400 600 800 1000 1200 1400 1600 1800 2000
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-34 - Late Time
0.37
ToL= 1440
Hvorslev Testing: BH18-8-36
Date: 25-Apr-18 H = Static Water Level mbg
Conducted by: NU Ho = Head at time = 0 mbg
h = Water Level at time t mbg
Well Number: BH18-8-36 ToE = 980 sec
Well Depth: 4.93 mbtop ToL= 1,720 sec
Top of Pipe: 0 mag Screen Length (L) = 150 cm
Well Diameter: 51 mm Hole Radius (R) = 7.5 cm
Well Elevation: 134.60 masl Well Radius (r) = 4.6 cm
Static Water Level: 1.79 mbtop
Ground Elevation: 134.60 masl 2.16E-04 cm/s
1.23E-04 cm/s
Time t (sec)
Water Level
(mtop)
Water Level
Elevation
(masl) Time t (sec) H-h H-Ho (H-h)/(H-Ho)
0 4.390 130.21 0 2.600 2.600 1.000
30 4.325 130.28 30 2.535 2.600 0.975
60 4.209 130.39 60 2.419 2.600 0.930
90 4.142 130.46 90 2.352 2.600 0.905
120 4.056 130.54 120 2.266 2.600 0.872
150 3.985 130.62 150 2.195 2.600 0.844
180 3.897 130.70 180 2.107 2.600 0.810
210 3.823 130.78 210 2.033 2.600 0.782
240 3.759 130.84 240 1.969 2.600 0.757
270 3.718 130.88 270 1.928 2.600 0.742
300 3.681 130.92 300 1.891 2.600 0.727
420 3.621 130.98 420 1.831 2.600 0.704
540 3.548 131.05 540 1.758 2.600 0.676
660 3.432 131.17 660 1.642 2.600 0.632
780 3.309 131.29 780 1.519 2.600 0.584
900 3.209 131.39 900 1.419 2.600 0.546
1200 2.958 131.64 1200 1.168 2.600 0.449
1500 2.749 131.85 1500 0.959 2.600 0.369
1800 2.575 132.03 1800 0.785 2.600 0.302
2100 2.471 132.13 2100 0.681 2.600 0.262
2400 2.375 132.23 2400 0.585 2.600 0.225
2700 2.291 132.31 2700 0.501 2.600 0.193
3000 2.206 132.39 3000 0.416 2.600 0.160
3300 2.151 132.45 3300 0.361 2.600 0.139
3600 2.098 132.50 3600 0.308 2.600 0.118
KE = r2ln(L/R)/(2LTo) =
KL = r2ln(L/R)/(2LTo) =
0.0
0.1
1.0
0 1000 2000 3000 4000
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-36 - Early Time
0.37
ToE= 980
0.0
0.1
1.0
0 1000 2000 3000 4000
(H-h
)/(H
-Ho
) [c
m]
Time (sec)
Hvorslev Piezometer Test - BH18-8-36 - Late Time
0.37
ToL= 1720
APPENDIX
C WATER QUALITY
SAMPLING RESULTS
Toronto Sewer Use Bylaw Summary Table
Project 2 Project 4 Project 5
Thorncrest
RoadKipling Avenue
Great Oak
Drive
BH18-8-11 BH18-8-29 BH18-8-32
26-Apr-18 26-Apr-18 12-Feb-18
Physical Tests
pH pH units 6 - 11.5 6 - 9.5 7.75 8.23 7.76
Total Suspended Solids mg/L 350 15 1,340 563 242
Anions and Nutrients
Fluoride (F) mg/L 10 0.069 0.026 0.113
Total Kjeldahl Nitrogen mg/L 100 0.069 0.78 0.35
Phosphorus, Total mg/L 10 0.4 5.98 0.234 0.0798
Cyanides
Cyanide, Total mg/L 2 0.02 <0.0020 0.0035 <0.0020
Bacteriological Tests
E. Coli CFU/100mL 200 <2 5 <2
Total Metals
Aluminum (Al)-Total mg/L 50 45.8 6.38 82.6
Antimony (Sb)-Total mg/L 5 <0.0010 0.0032 <0.0010
Arsenic (As)-Total mg/L 1 0.02 0.0147 0.0029 0.0433
Cadmium (Cd)-Total mg/L 0.7 0.008 0.000493 0.000106 0.000832
Chromium (Cr)-Total mg/L 4 0.08 0.0647 0.0275 0.135
Cobalt (Co)-Total mg/L 5 0.063 0.0055 0.0892
Copper (Cu)-Total mg/L 2 0.04 0.091 0.039 0.177
Lead (Pb)-Total mg/L 1 0.12 0.0603 0.0104 0.079
Manganese (Mn)-Total mg/L 5 0.05 3.09 0.37 5.32
Mercury (Hg)-Total mg/L 0.01 0.0004 0.000019 <0.000010 <0.000010
Molybdenum (Mo)-Total mg/L 5 0.00051 0.0118 0.00313
Nickel (Ni)-Total mg/L 2 0.08 0.0975 0.0202 0.174
Selenium (Se)-Total mg/L 1 0.02 <0.00050 <0.00050 0.00069
Silver (Ag)-Total mg/L 5 0.12 <0.00050 <0.00050 0.00057
Tin (Sn)-Total mg/L 5 0.0011 0.0051 0.0013
Titanium (Ti)-Total mg/L 5 0.67 0.196 1.03
Zinc (Zn)-Total mg/L 2 0.04 0.242 0.163 0.387
Speciated Metals
Chromium, Hexavalent mg/L 2 0.04 0.0011 0.0031 <0.0010
Aggregate Organics
BOD mg/L 300 15 <2.0 2.9 <2.0
Animal/Veg Oil & Grease mg/L 150 <2.0 1 <2.0
Mineral Oil and Grease mg/L 15 <1.0 1.3 <1.0
Phenols (4AAP) mg/L 1 0.008 0.0037 0.0059 <0.0010
Volatile Organic Compounds
Benzene ug/L 10 2 <0.50 <0.50 <0.50
Chloroform ug/L 40 2 <1.0 <1.0 <1.0
1,2-Dichlorobenzene ug/L 50 5.6 <0.50 <0.50 <0.50
1,4-Dichlorobenzene ug/L 80 6.8 <0.50 <0.50 <0.50
cis-1,2-Dichloroethylene ug/L 4,000 5.6 <0.50 <0.50 <0.50
Dichloromethane ug/L 2,000 5.2 <2.0 <2.0 <2.0
trans-1,3-Dichloropropene ug/L 140 <0.50 <0.50 <0.50
Ethylbenzene ug/L 160 2 <0.50 <0.50 <0.50
1,1,2,2-Tetrachloroethane ug/L 1,400 17 <0.50 <0.50 <0.50
Tetrachloroethylene ug/L 1,000 4.4 <0.50 <0.50 <0.50
Toluene ug/L 16 2 <0.50 <0.50 <0.50
Trichloroethylene ug/L 400 7.6 <0.50 <0.50 <0.50
Xylenes (Total) ug/L 1,400 4.4 <1.1 <1.1 <1.1
Polycyclic Aromatic Hydrocarbons
Total PAHs ug/L 5 2 <2.5 <2.5 <1.7
Phthalate Esters
Bis(2-ethylhexyl)phthalate ug/L 12 8.8 <2.0 <2.0 16
Semi-Volatile Organics
3,3'-Dichlorobenzidine ug/L 2 0.8 <0.40 <0.40 <0.40
Di-n-butylphthalate ug/L 80 15 <1.0 <1.0 <1.0
Phenolics
Pentachlorophenol ug/L 5 2 <0.50 <0.50 <0.50
Polychlorinated Biphenyls
Total PCBs ug/L 1 0.4 <0.040 <0.040 <0.040
Organic Parameters
Nonylphenol ug/L 20 1 <1.0 <1.0 <1.0
Total Nonylphenol Ethoxylates ug/L 200 10 <2.0 <2.0 <2.0
Notes:
318 Toronto Sanitary exceeded
1.86 Toronto Storm exceeded
Parameter UnitsToronto
Sanitary
Toronto
Storm
Project
General Chemistry Summary Table
BH18-8-13 BH18-8-15 BH18-8-17 BH18-8-19 BH18-8-21 BH18-8-23 BH18-8-25 BH18-8-27 BH18-8-31 BH18-8-34 BH18-8-36
26-Apr-18 26-Apr-18 26-Apr-18 26-Apr-18 26-Apr-18 12-Feb-18 26-Apr-18 26-Apr-18 25-Apr-18 12-Feb-18 26-Apr-18
Physical Tests
Colour, Apparent CU <2.0 <2.0 2.4 4.7 28.7 2.9 28.8 3.9 3.6 3.7 4.8
Conductivity umhos/cm 2,320 950 1,210 1,380 1,530 2,280 3550 3430 12500 10300 967
Hardness (as CaCO3) mg/L 881 404 431 383 506 428 165 393 1170 340 386
pH pH units 6 - 11.5 6 - 9.5 7.91 8.05 8.13 8.06 8.12 7.75 8.22 8.00 7.91 7.69 8.20
Total Suspended Solids mg/L 350 15 <2.0 <2.0 <2.0 <2.0 <2.0 3.3 <2.0 <2.0 5.1 <2.0 <2.0
Turbidity NTU 0.21 0.51 0.52 1.71 5.65 0.92 0.38 0.83 0.44 0.32 0.95
Anions and Nutrients
Alkalinity, Total (as CaCO3) mg/L 336 344 305 264 367 337 220 113 334 185 321
Ammonia, Total (as N) mg/L <0.020 0.114 0.028 0.146 0.127 0.254 0.058 0.337 0.072 0.462 0.334
Chloride (Cl) mg/L 553 36.4 172 154 270 551 558 2220 4110 4360 89.4
Fluoride (F) mg/L 10 <0.10 0.131 0.19 <0.10 0.19 <0.10 <0.10 <0.10 <1.0 <0.40 0.098
Nitrate (as N) mg/L 3.68 <0.020 0.1 <0.10 <0.10 0.30 0.77 0.13 1.6 <0.40 <0.020
Nitrite (as N) mg/L <0.050 <0.010 <0.050 <0.050 <0.050 0.182 <0.050 <0.050 <0.50 <0.20 <0.010
Orthophosphate-Dissolved (as P) mg/L <0.0030 <0.0030 <0.0030 <0.0030 <0.0030 0.0057 0.0079 <0.0030 <0.0030 0.0299 0.0051
Sulfate (SO4) mg/L 1,500 44.8 131 99.9 59.5 71.4 71.8 23.1 90.1 139 94.6 65.3
Dissolved Metals
Dissolved Metals Filtration Location FIELD FIELD FIELD FIELD FIELD FIELD FIELD FIELD FIELD FIELD FIELD
Aluminum (Al)-Dissolved mg/L 50 <0.010 <0.010 <0.010 0.034 <0.010 <0.010 <0.010 <0.050 <0.050 0.129 <0.010
Antimony (Sb)-Dissolved mg/L 5 <0.0050 <0.0050 <0.0050 <0.0050 <0.0050 <0.0050 <0.0050 <0.0050 <0.0050 <0.0050 <0.0050
Arsenic (As)-Dissolved mg/L 1 0.02 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010
Barium (Ba)-Dissolved mg/L 0.093 0.05 0.071 0.047 0.179 0.068 0.019 0.094 0.333 0.116 0.019
Beryllium (Be)-Dissolved mg/L <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010
Bismuth (Bi)-Dissolved mg/L <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010
Boron (B)-Dissolved mg/L <0.050 0.068 0.062 <0.050 <0.050 <0.050 <0.050 <0.10 <0.10 <0.10 <0.050
Cadmium (Cd)-Dissolved mg/L 0.7 0.008 <0.000090 <0.000090 <0.000090 <0.000090 <0.000090 <0.000090 <0.000090 <0.000090 0.000095 <0.000090 <0.000090
Calcium (Ca)-Dissolved mg/L 297 122 112 83 116 123 57.2 124 377 107 57.2
Chromium (Cr)-Dissolved mg/L 4 0.08 0.0008 0.00053 <0.00050 0.00134 0.00098 <0.00050 0.0188 <0.0050 <0.0050 <0.0050 0.0188
Cobalt (Co)-Dissolved mg/L 5 0.0008 0.00052 0.00092 <0.00050 <0.00050 0.00079 <0.00050 <0.0010 0.0012 <0.0010 <0.00050
Copper (Cu)-Dissolved mg/L 2 0.04 <0.0010 <0.0010 0.0021 <0.0010 <0.0010 <0.0010 <0.0010 0.0029 <0.0020 0.0035 <0.0010
Iron (Fe)-Dissolved mg/L <0.050 <0.050 <0.050 0.072 0.549 <0.050 <0.050 <0.10 <0.10 <0.10 <0.050
Lead (Pb)-Dissolved mg/L 1 0.12 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010
Magnesium (Mg)-Dissolved mg/L 33.8 24.1 36.6 42.7 52.7 29.5 5.48 20.3 54.8 17.8 5.48
Manganese (Mn)-Dissolved mg/L 5 0.05 0.0927 0.0317 0.478 0.0984 0.0789 0.185 0.0044 0.591 0.0792 0.1760 0.0044
Molybdenum (Mo)-Dissolved mg/L 5 0.0011 0.0012 0.0043 0.0033 0.0042 0.0044 0.0013 0.0051 0.0018 0.0020 0.0013
Nickel (Ni)-Dissolved mg/L 2 0.08 0.0029 <0.0020 0.0025 <0.0020 <0.0020 0.0021 0.0029 <0.0050 <0.0050 <0.0050 0.0029
Phosphorus (P)-Dissolved mg/L 10 0.4 <0.050 <0.050 <0.050 <0.050 <0.050 <0.050 <0.050 <0.50 <0.50 <0.50 <0.050
Potassium (K)-Dissolved mg/L 2.6 1.6 10 4.4 3.9 5.5 1.5 3.4 6.9 3.1 1.5
Selenium (Se)-Dissolved mg/L 1 0.02 <0.00040 <0.00040 <0.00040 <0.00040 <0.00040 <0.00040 <0.00040 0.00051 <0.00050 <0.00050 <0.00040
Silicon (Si)-Dissolved mg/L 9.3 10.5 6.9 6.9 12.6 9.3 4.3 2.9 5.9 6.5 4.3
Silver (Ag)-Dissolved mg/L 5 0.12 <0.00010 <0.00010 <0.00010 <0.00010 <0.00010 <0.00010 <0.00010 <0.00050 <0.00050 <0.00050 <0.00010
Sodium (Na)-Dissolved mg/L 121 47.4 79.7 22.1 115 152 111 986 2350 2340 111
Strontium (Sr)-Dissolved mg/L 0.671 0.313 0.391 0.321 0.537 0.364 0.178 0.618 1.65 0.53 0.178
Thallium (Tl)-Dissolved mg/L <0.00030 <0.00030 <0.00030 <0.00030 <0.00030 <0.00030 <0.00030 <0.00030 <0.00030 <0.00030 <0.00030
Tin (Sn)-Dissolved mg/L 5 <0.0010 <0.0010 0.0014 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010 <0.0010
Titanium (Ti)-Dissolved mg/L 5 <0.0020 <0.0020 <0.0020 <0.0020 <0.0020 <0.0020 <0.0020 <0.0030 <0.0030 <0.0030 <0.0020
Tungsten (W)-Dissolved mg/L <0.010 <0.010 <0.010 <0.010 <0.010 <0.010 <0.010 <0.010 <0.010 <0.010 <0.010
Uranium (U)-Dissolved mg/L <0.0050 <0.0050 0.0055 <0.0050 <0.0050 0.0103 <0.0050 <0.0050 <0.0050 <0.0050 <0.0050
Vanadium (V)-Dissolved mg/L <0.0010 <0.0010 <0.0010 0.0013 <0.0010 <0.0010 <0.0010 <0.0050 <0.0050 <0.0050 <0.0010
Zinc (Zn)-Dissolved mg/L 2 0.04 <0.0030 <0.0030 0.0036 0.0149 <0.0030 <0.0030 <0.0030 0.038 <0.010 <0.010 <0.0030
Zirconium (Zr)-Dissolved mg/L <0.0040 <0.0040 <0.0040 <0.0040 <0.0040 <0.0040 <0.0040 <0.0040 <0.0040 <0.0040 <0.0040
Notes:
318 Toronto Sanitary exceeded
1.86 Toronto Storm exceeded
Project 4
Kipling Avenue
Project 5
Great Oak Drive
Project 3
Sir Williams Lane
Project 2
Thorncrest Road
Parameter UnitsToronto
Sanitary
Toronto
Storm
Project
APPENDIX
D DEWATERING
CALCULATIONS
Construction Dewatering Worksheet - Unconfined Conditionsfrom Powers, 1992
Site
Input Parameters
Initial Elevation of Water Table (m) H 5.6 m
Final Elevation of Water Table (m) h 0 m
Hydraulic Conductivity (m/s) K 2.50E-06 m/s
Hydraulic Conductivity (m/d) K 2.16E-01 m/d
Aquifer Thickness (m) B 6.00
Linear Trench Size (m) a 60 m
Linear Trench Size (m) b 6 m
Length of Dewatering - Trench Length (m) X 60 m
Width of Dewatering (m) L 13.28 m
L = Ro / 2 (eq. 6.15, p. 105)
ZOI - Radius of Influence (m)
Ro = 3000 (H - h) x sqrt (K) (eq. 6.14, p. 104) Ro 27 m
Equivalent Radius of Well (m) Rs 11 m
Rs = sqrt ((a x b)/ pi) (eq. 6.10, p. 102)
Flow Calculations - Q
Radial Flow to a Shaft (a/b < 1.5)
Shaft Calculation (m3/day) Q 23 m3/day
Q = (pi x K x (H^2 - h^2)) / ln (Ro / Rs) (Eq. 6.3, p. 99) Q 23415 L/day
Long Narrow System - Trench (a/b > 1.5)
Trench Calculation (m3/day) Q 54 m3/day
Q = (pi x K x (H^2 - h^2)) / ln (Ro / Rs) + 2 x (X x K x (H^2 - h^2)) / 2 x L Q 54016 L/day
Thorncrest Road - Low K
Construction Dewatering Worksheet - Unconfined Conditionsfrom Powers, 1992
Site
Input Parameters
Initial Elevation of Water Table (m) H 5.6 m
Final Elevation of Water Table (m) h 0 m
Hydraulic Conductivity (m/s) K 1.10E-05 m/s
Hydraulic Conductivity (m/d) K 9.50E-01 m/d
Aquifer Thickness (m) B 6.00
Linear Trench Size (m) a 60 m
Linear Trench Size (m) b 6 m
Length of Dewatering - Trench Length (m) X 60 m
Width of Dewatering (m) L 27.86 m
L = Ro / 2 (eq. 6.15, p. 105)
ZOI - Radius of Influence (m)
Ro = 3000 (H - h) x sqrt (K) (eq. 6.14, p. 104) Ro 56 m
Equivalent Radius of Well (m) Rs 11 m
Rs = sqrt ((a x b)/ pi) (eq. 6.10, p. 102)
Flow Calculations - Q
Radial Flow to a Shaft (a/b < 1.5)
Shaft Calculation (m3/day) Q 57 m3/day
Q = (pi x K x (H^2 - h^2)) / ln (Ro / Rs) (Eq. 6.3, p. 99) Q 56760 L/day
Long Narrow System - Trench (a/b > 1.5)
Trench Calculation (m3/day) Q 121 m3/day
Q = (pi x K x (H^2 - h^2)) / ln (Ro / Rs) + 2 x (X x K x (H^2 - h^2)) / 2 x L Q 120949 L/day
Thorncrest Road - High K
Construction Dewatering Worksheet - Unconfined Conditionsfrom Powers, 1992
Site
Input Parameters
Initial Elevation of Water Table (m) H 4.8 m
Final Elevation of Water Table (m) h 0 m
Hydraulic Conductivity (m/s) K 1.80E-07 m/s
Hydraulic Conductivity (m/d) K 1.56E-02 m/d
Aquifer Thickness (m) B 6.00
Linear Trench Size (m) a 60 m
Linear Trench Size (m) b 3 m
Length of Dewatering - Trench Length (m) X 60 m
Width of Dewatering (m) L 3.05 m
L = Ro / 2 (eq. 6.15, p. 105)
ZOI - Radius of Influence (m)
Ro = 3000 (H - h) x sqrt (K) (eq. 6.14, p. 104) Ro 6 m
Equivalent Radius of Well (m) Rs 8 m
Rs = sqrt ((a x b)/ pi) (eq. 6.10, p. 102)
Flow Calculations - Q
Radial Flow to a Shaft (a/b < 1.5)
Shaft Calculation (m3/day) Q -5 m3/day
Q = (pi x K x (H^2 - h^2)) / ln (Ro / Rs) (Eq. 6.3, p. 99) Q -5253 L/day
Long Narrow System - Trench (a/b > 1.5)
Trench Calculation (m3/day) Q 2 m3/day
Q = (pi x K x (H^2 - h^2)) / ln (Ro / Rs) + 2 x (X x K x (H^2 - h^2)) / 2 x L Q 1785 L/day
Kipling Avenue - Low K
Construction Dewatering Worksheet - Unconfined Conditionsfrom Powers, 1992
Site
Input Parameters
Initial Elevation of Water Table (m) H 4.8 m
Final Elevation of Water Table (m) h 0 m
Hydraulic Conductivity (m/s) K 2.20E-06 m/s
Hydraulic Conductivity (m/d) K 1.90E-01 m/d
Aquifer Thickness (m) B 6.00
Linear Trench Size (m) a 60 m
Linear Trench Size (m) b 3 m
Length of Dewatering - Trench Length (m) X 60 m
Width of Dewatering (m) L 10.68 m
L = Ro / 2 (eq. 6.15, p. 105)
ZOI - Radius of Influence (m)
Ro = 3000 (H - h) x sqrt (K) (eq. 6.14, p. 104) Ro 21 m
Equivalent Radius of Well (m) Rs 8 m
Rs = sqrt ((a x b)/ pi) (eq. 6.10, p. 102)
Flow Calculations - Q
Radial Flow to a Shaft (a/b < 1.5)
Shaft Calculation (m3/day) Q 13 m3/day
Q = (pi x K x (H^2 - h^2)) / ln (Ro / Rs) (Eq. 6.3, p. 99) Q 13263 L/day
Long Narrow System - Trench (a/b > 1.5)
Trench Calculation (m3/day) Q 38 m3/day
Q = (pi x K x (H^2 - h^2)) / ln (Ro / Rs) + 2 x (X x K x (H^2 - h^2)) / 2 x L Q 37868 L/day
Kipling Avenue - High K
Construction Dewatering Worksheet - Unconfined Conditionsfrom Powers, 1992
Site
Input Parameters
Initial Elevation of Water Table (m) H 6.7 m
Final Elevation of Water Table (m) h 0 m
Hydraulic Conductivity (m/s) K 4.10E-08 m/s
Hydraulic Conductivity (m/d) K 3.54E-03 m/d
Aquifer Thickness (m) B 6.00
Linear Trench Size (m) a 60 m
Linear Trench Size (m) b 3 m
Length of Dewatering - Trench Length (m) X 60 m
Width of Dewatering (m) L 2.03 m
L = Ro / 2 (eq. 6.15, p. 105)
ZOI - Radius of Influence (m)
Ro = 3000 (H - h) x sqrt (K) (eq. 6.14, p. 104) Ro 4 m
Equivalent Radius of Well (m) Rs 8 m
Rs = sqrt ((a x b)/ pi) (eq. 6.10, p. 102)
Flow Calculations - Q
Radial Flow to a Shaft (a/b < 1.5)
Shaft Calculation (m3/day) Q -1 m3/day
Q = (pi x K x (H^2 - h^2)) / ln (Ro / Rs) (Eq. 6.3, p. 99) Q -805 L/day
Long Narrow System - Trench (a/b > 1.5)
Trench Calculation (m3/day) Q 4 m3/day
Q = (pi x K x (H^2 - h^2)) / ln (Ro / Rs) + 2 x (X x K x (H^2 - h^2)) / 2 x L Q 3883 L/day
Great Oak Drive - Low K
Construction Dewatering Worksheet - Unconfined Conditionsfrom Powers, 1992
Site
Input Parameters
Initial Elevation of Water Table (m) H 6.7 m
Final Elevation of Water Table (m) h 0 m
Hydraulic Conductivity (m/s) K 2.40E-06 m/s
Hydraulic Conductivity (m/d) K 2.07E-01 m/d
Aquifer Thickness (m) B 6.00
Linear Trench Size (m) a 60 m
Linear Trench Size (m) b 3 m
Length of Dewatering - Trench Length (m) X 60 m
Width of Dewatering (m) L 15.57 m
L = Ro / 2 (eq. 6.15, p. 105)
ZOI - Radius of Influence (m)
Ro = 3000 (H - h) x sqrt (K) (eq. 6.14, p. 104) Ro 31 m
Equivalent Radius of Well (m) Rs 8 m
Rs = sqrt ((a x b)/ pi) (eq. 6.10, p. 102)
Flow Calculations - Q
Radial Flow to a Shaft (a/b < 1.5)
Shaft Calculation (m3/day) Q 21 m3/day
Q = (pi x K x (H^2 - h^2)) / ln (Ro / Rs) (Eq. 6.3, p. 99) Q 20676 L/day
Long Narrow System - Trench (a/b > 1.5)
Trench Calculation (m3/day) Q 57 m3/day
Q = (pi x K x (H^2 - h^2)) / ln (Ro / Rs) + 2 x (X x K x (H^2 - h^2)) / 2 x L Q 56548 L/day
Kipling Avenue - High K