Hydrogen,Magnets, Sustainability and the Birmingham Connection. Rex Harris University of Birmingham Low Carbon Meeting June 2012

Transcript of Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind...

Page 1: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

Hydrogen,Magnets,

Sustainability and the Birmingham Connection.

Rex Harris

University of Birmingham Low Carbon Meeting

June 2012

Page 2: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This
Page 3: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

Boulton: “I sell here,Sir, what all the world desires to have, POWER”

Watt: “I can think of nothing else

but this machine”

Page 4: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

A new quotation for 2011.

“I sell here, Sir, what all the world desires to have,

SECURE, SUSTAINABLE

POWER.”

Page 5: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

Wind is a major source of sustainable energy.

Page 6: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This
Page 7: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

Will there be increased role for NdFeB magnets?

Page 8: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

The biggest single cost associated with off-shore wind generators is

servicing and hence reliability is an over-riding consideration. This is

why the preferred option is a direct drive rare earth magnet generator

rather than a geared induction machine.

Page 9: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

The gentle running of fewer moving components results in

minimal material and mechanical wear. Ideal for heavy demands

and for long service life. Applications such as “off-shore”

wind turbines.

Page 10: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This
Page 11: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

These represent potentially massive amounts of NdFeB sintered magnets (~0.7tonne per MW)

Page 12: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

Tidal generators using NdFeB

permanent magnets are another application.

Page 13: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This
Page 14: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

A major advantage of using hydrogen is that it can be employed effectively

as a means of energy storage.

Page 15: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This
Page 16: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

Hydrogen back to electricity

Page 17: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

By means of a Gas Turbine

or

Page 18: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

The Fuel Cell

Page 19: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

BrushedDC

Induction PM SR

SpecificTorque

13.5 7.4 23.7 6.4

RelativeWeight

2100 50 25 40

Efficiency 78% 84% 90% 85%

RelativeCost

2100 100 150 150

Cost and Performance Comparison

Comments: •Highly influenced by size ( particularly torque and efficiency figures) •Costs based on potential costs rather than current

1- Torque per unit stator volume (kNm/m3) 2- Brushed DC machine = 100 3- Overall efficiency of motor

and power electronics

Source: J.G. West - IEE Power Division

Colloquium Digest 1993/080

Page 20: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This
Page 21: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

There are obvious technical advantages in using a PM-motor,

particularly with regard to the much greater torque and lower weight.

However the resource crisis has cast a shadow over these motors.

Page 22: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

These magnets are ideal for pancake motors suitable for such applications

as electric bicycles.

Page 23: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

PM Brushless Pancake Motor

Page 24: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This
Page 25: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

A NdFeB PM-electric motor is the most efficient means of using the

stored electric energy on a vehicle. The motors also have the

ability to act as a generator in regenerative mode to recharge

the battery.

Page 26: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

Hydrogen also plays a vital role in the manufacture of NdFeB

magnets

Page 27: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This
Page 28: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This
Page 29: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This
Page 30: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

Current figure is ~100,000 tonne Growth rate ~12%per annum

Doubling time ~6 years

Page 31: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

There are major resource issues associated with this vital area of

sustainable technology.

Page 32: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

Source – Molycorp (Stan Trout) orginal data from IMCOA

Global Demand and Supply

Page 33: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This
Page 34: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

To respond to this crisis there is a pressing need to open-up new rare

earth reserves throughout the world and to recycle at the end of life.

Page 35: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

NdFeB magnets can be recycled using hydrogen and this process has been patented and developed at the University of Birmingham.

Page 36: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

Some final thoughts…

Page 37: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

I hope I have convinced you that there will be “Life after oil” but that

we do need to get on with the building of the necessary

infrastructure!

Page 38: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

Green hydrogen could be generated by electrolysis using electricity from

a NdFeB wind generator.

The ultimate sustainable process.

Page 39: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

The moral dimension.

Page 40: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

60 million people in the UK produce more CO2 than the 472 million living in Egypt, Nigeria, Pakistan and Vietnam combined

Page 41: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

The people who came before us didn’t know about climate change and the ones who come after us will be powerless to stop it. Frannay Armstrong

Film: The Age of Stupid

Page 42: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

and finally

Page 43: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This
Page 44: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

Acknowledgements

Thanks to Alex Bevan, Andy Williams, David Book, Allan Walton, Richard Sheridan, Lydia Pickering, Dipali Chandra, Alan Weban Smith for their help in the preparation of this lecture.

The Protium Project is a joint enterprise with EMPA laboratories, Zurich.

Page 45: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

Acknowledgments Protium Project

Advantage West Midlands Beacon Energy Ltd Black Country Housing Association BOC Ltd British Waterways Bryte Energy EMPA Switzerland European Commission Less Common Metals Martineau Johnson Proto Systems

SHEC/EPSRC Solar Boat Company Tempus TRW Birmingham University of Birmingham University of Sheffield

and the following individuals: Mr Michael Rawlinson Mr John McConnell Mrs Jane Tyler Professor Rex Harris Professor Ian Dillamore Professor Shotaro Kodama

Page 46: Hydrogen,Magnets, Sustainability and the …The biggest single cost associated with off-shore wind generators is servicing and hence reliability is an over-riding consideration. This

Thank you for your attention