15-25% reduction in greenhouse gas emissions below 1990 levels by 2030
708 12.2162.5122018 4.362
CoalHydro GasOil
Solar and wind to provide 3% of total power generation in 2020; 30% in 2030 and 50% in
2050
25% reduction in energy intensity of GDP below 2008 levels by 2020
Renewable generation - Announced• Samruk –Kazina Kyzylorda (50MW) – Solar• Samruk-Energo Kapchagay (2MW) – Solar• Shokpa Windwarm (400MW) – Wind• ENE – (50MW) – Wind
Installed generation capacity (MW) -2017
Kazakhstan has set up
ambitious goals to move to a
more sustainable
energy matrix
1
![Page 2: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/2.jpg)
Construction
Module 1: Generation systems
Module 2: Project feasibility
Module 3:EPC
Module 4: Transmission &
Distribution models
Course structure
The following training is designed to get an overall understanding of Wind Generation from hands-on-work perspective, providing an overview of the main aspects of the Lifecyle of a wind
generation project
Wind generation
Storage
Protections
Cables
Allocation & Resources
Design & Engineering
Contracting Procurement Logistics
H&S
Grids -Mini GridsClustered DER
Mini utility, metering & Collection
Construction groundworks
Construction mechanical
Construction electromechanical
Construction handover
Utility scale
Forms of contracts
Regulation
Dimensioning & designing
Financial modelling
O&M
Inverters
2
![Page 3: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/3.jpg)
Module 1.2Types of
generators Content
Module 1: Generation Systems & grid overview
Module 2: Project Feasibility
Module 3: EPC
Module 4: Transmission & Distribution Models
3
![Page 4: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/4.jpg)
Solar PV. Solar Generation Side. Strings & Tables.
Inside a PV field the panels are fist connected in
SERIES: POSITIVE to NEGATIVE
This SUMS the VOLTAGES of all the panels connected this way.
WARNING: NEVER EXCEED THE WHOLE SYSTEMS VOLTAGE RATING PER STRING. USUALLY 1,000 V.(*). YOUR PANELS CAN CATCH FIRE !
In the past, for single user isolated systems based on rudimentary charge controllers and lead-acid batteries, with specially manufactured panels, after a short series connection a PARALLEL connection was done:
PARALLEL: POSITIVE to POSITIVE AND NEGATIVE TO NEGATIVE
This SUMS the AMPERES of all the panels or STRINGS connected this way.
WARNING: NEVER EXCEED THE CHARGER AMPERAGE RATING. YOUR CABLES WILL CATCH FIRE !
(*) There are systems designed for 1,500 V, but the whole system has to be designed for that level, panels, cables, protections and inverters. There are only 8 panel manufacturers who offer 1,500 V panels, but little stock available.
![Page 5: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/5.jpg)
Solar PV. Solar Generation Side. Strings & Tables.
Strings are organized in “tables” and tables into “arrays”.
Cables between panels shall never jump between tables.
There are many possible configurations of tables, according to how many panels are in vertical order, normally it varies between 1 and 4.
The panels can be oriented either in vertical position or horizontal position, as by where their long side is oriented.
Here are some examples of tables:
Strings must follow the table
Strings can be routed on the table to reduce cable to reach the combiner of inverter.
Multiple strings can be routed on the table in different shapes to reduce cable to reach the combiner of inverter.
![Page 6: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/6.jpg)
Wind. Generation Side. Plant layout.
T 1 T 2 T 3 T 4
> Diam x 10
T 5 T 5> Diam x 10
6
![Page 7: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/7.jpg)
Module 1.3Storage
7
![Page 8: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/8.jpg)
Generation Side. Storage Dimensioning.
TypeSingle
User/HouseSingle User Commercial
MiniGrid DEROn-Grid Solar
PV PlantDistribution
GridTransmission
Grid
OPZ Average Average NO NO NO NO
Li-Ion OK OK OKCompensate
VariabilitySmall scale(< 50 MWh)
NO
Flow NOGrid Cost
(> 1 MWh)24 h Supply (> 1 MWh)
24h Supply (> 5 MWh)
Flexibility (> 50 MWh)
Yes
Fuel Cells NO NO Average Average Average NO
Capacitors NOUser Power
QualityNO Average
Grid Power Quality
Grid Power Quality
- Electro-chemical.- Lead-acid gel, OPZ type.
- Lithium-Ion.- Flow.- Fuel Cells (Hydrogen).- Capacitors.
8
![Page 9: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/9.jpg)
9
Module 1.4Inverters
![Page 10: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/10.jpg)
Module 1.5Protections
10
![Page 11: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/11.jpg)
Module 1.6Cables
11
![Page 12: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/12.jpg)
Generation Side. Cable Loses.
Voltage Drop formula for Single Phase and DC Circuits.
VD = I × (2 × L × R / 1000)
Voltage Drop Calculation and formula for Three Phase system.
For 3 Phase 3 Wire system.VD = 0.866 × I × RVD = 0.866 × I × 2 × L× R/ 1000
For 3 Phase 4 Wire systems.VD = 0.5 × I × RVD = 0.5 × I × 2 × L× R/ 1000 Where,
VD = Voltage Drop in Volts.I = Wire Current in Amperes.R = Wire Resistance in Ohms (Ω) [Ω/km].L = wire distance in meters.
12
![Page 13: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/13.jpg)
Generation Side. Cable Loses.
13
![Page 14: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/14.jpg)
Module 2
Project Feasibility
Content
Module 1: Generation Systems
Module 2: Project Feasibility
Module 3: EPC
Module 4: Transmission & Distribution Models
14
![Page 15: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/15.jpg)
Module 2.1Allocation and
Resources
![Page 16: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/16.jpg)
Dimensioning and design of Off-Grid single user facilities.
![Page 17: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/17.jpg)
Solar PV. Dimensioning and design of Off-Grid single user facilities.
![Page 18: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/18.jpg)
Solar PV. Dimensioning and design of Off-Grid single user facilities. Load Profile
Load & Sizing
Periods Hours% Main
loadMain Load kW
Main Load kWh day
Main Load kWh Storage 3 days
Solar Generation Needed in kWp
Parameters 32 3 1,400
06.00 to 11.59 6.00 30 10 58 173
12.00 to 16.59 5.00 60 19 96 288
17.00 to 19.59 3.00 70 22 67 202
20.00 to 06.00 10.00 10 3 32 96
Totals 24.00 54 253 758 197.73
![Page 19: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/19.jpg)
Dimensioning and design of Off-Grid single user facilities.
19
![Page 20: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/20.jpg)
Module 2.1Allocation and
Resources
20
![Page 21: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/21.jpg)
Dimensioning and design of Off-Grid single user facilities.
21
![Page 22: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/22.jpg)
Wind. Dimensioning and design of Off-Grid single user facilities.
22
![Page 23: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/23.jpg)
Wind. Dimensioning and design of Off-Grid single user facilities. Load Profile.
Load & Sizing
Periods Hours% Main
loadMain Load kW
Main Load kWh day
Main Load kWh Storage 3 days
Gross Generation kWh/Year*
Parameters 32 3
06.00 to 11.59 6.00 30 10 58 173
12.00 to 16.59 5.00 60 19 96 288
17.00 to 19.59 3.00 70 22 67 202
20.00 to 06.00 10.00 10 3 32 96
Totals 24.00 54 253 758 183,270
(*) Formula : (253 * 365 + (758 * (365 / 3))) = 183,270 kWh per year
23
![Page 24: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/24.jpg)
Module 2.2Financial Feasibility
![Page 25: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/25.jpg)
Solar PV. Dimensioning and design of Off-Grid single user facilities. Cost Approach
Cost approach
USD/kWp Calculated Size kWp Lifespan years
PV System 198 25.00 Panels 400.00 79,200 Mounting 350.00 69,300 Inverters 500.00 99,000 BoS & EPC 437.50 86,625
CAPEX 1,687.50 334,125 OPEX 15.00 2,970
Lifespan kWh Generated
CAPEX Lifespan OPEX CoE USD/kWh
CoE Calculation 6,930,000 334,125 2,970 0.05
USD/kWhCalculated kWh
TotalLifespan Years
Storage (Li-Ion) 350.00 758 25.00
CAPEX 265,440 OPEX 3.00 2,275
Lifespan kWh Delivered
CAPEX Lifespan OPEX CoE USD/kWh
CoE Calculation 2,306,800 265,440 2,275 0.12
![Page 26: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/26.jpg)
Solar PV. Dimensioning and design of Off-Grid single user facilities. Cost Approach
USD/kWp Calculated Size kWp Lifespan years
PV System 66 25.00 Panels 400.00 26,400 Mounting 350.00 23,100 Inverters 500.00 33,000 BoS & EPC 437.50 28,875
CAPEX 1,687.50 111,375 OPEX 15.00 990
Lifespan kWh Generated
CAPEX Lifespan OPEX CoE USD/kWh
CoE Calculation 2,310,000 111,375 990 0.05
kW USD/kWh Calculated kWh Total Lifespan Years Lifespan Hours
Generator 115 150.00 2.44 16,000.00
CAPEX 17,280 1,536,000 OPEX 3.00 48,000 Fuel 0.99 0.25 380,160
Lifespan kWh Delivered
CAPEX Lifespan OPEX CoE USD/kWh
CoE Calculation 1,536,000 17,280 428,160 0.29
Total CoE USD/kWh 0.34
![Page 27: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/27.jpg)
Module 2.3Full Financial Model using NREL’s SAM
![Page 28: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/28.jpg)
Solar PV. Dimensioning and design. Financial Model SAM.
![Page 29: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/29.jpg)
Solar PV. Dimensioning and design. Financial Model SAM.
System Minimum Selling Price: 621,853 USD
Electricity Minimum Selling Price: 0.24 USD kWh
Client / Offtaker Accepts and signs contract ?
E P CStarts
Only 10 mins Wasted
![Page 30: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/30.jpg)
Module 2.2Financial Feasibility
30
![Page 31: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/31.jpg)
Wind. Dimensioning and design of Off-Grid single user facilities. Cost Approach
Cost approach
Size kW USD/kWCalculated Size
kWLifespan years kWh Turb Year
Wind Generator 60 183,280 25.00 172,778 Turbines 60 2,450.00 147,000 Civils 60 857.50 51,450 kWh Turb HourEPC 60 992 59,535 19.710 Ancillaries 60 645 38,698
Turb Rating kW
CAPEX 4,945 296,683 60.000 OPEX 70 105,000
Lifespan kWh Generated
CAPEX Lifespan OPEX CoE USD/kWh
CoE Calculation 4,319,447 296,683 105,000 0.09
kW USD/kWCalculated kWh
TotalLifespan Years Lifespan Hours
Generator 115 150.00 2.44 16,000.00
CAPEX 17,280 1,536,000 OPEX 3.00 48,000 Fuel 0.99 0.25 380,160
Lifespan kWh Delivered
CAPEX Lifespan OPEX CoE USD/kWh
CoE Calculation 1,536,000 17,280 428,160 0.29
Total CoE USD/kWh 0.38 31
![Page 32: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/32.jpg)
Module 2.3Full Financial Model using NREL’s SAM
32
![Page 33: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/33.jpg)
Wind. Dimensioning and design. Financial Model SAM.
![Page 34: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/34.jpg)
Module 2.4Project type
and EPC guarantees
34
![Page 35: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/35.jpg)
Wind. Dimensioning and design. Financial Model SAM.
System Minimum Selling Price:XX XXX XXX USD
Electricity Minimum Selling Price: 0.XX USD kWh
Client / Offtaker Accepts and signs contract ?
SPV and PermitsFinancial Structuring
Only 10 mins Wasted
E P CStarts
35
![Page 36: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/36.jpg)
Module 3EPC Content
Module 1: Generation Systems
Module 2: Project Feasibility
Module 3: EPC
Module 4: Transmission & Distribution Models
36
![Page 37: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/37.jpg)
Module 3.1EPC
Design & engineering
37
![Page 38: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/38.jpg)
Solar PV. EPC. Design.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
1
2
3
4
2 mt
1 mt
![Page 39: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/39.jpg)
Wind. EPC. Design.
39
![Page 40: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/40.jpg)
Wind. EPC. Design.
40
![Page 41: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/41.jpg)
Wind. EPC. Design.
41
![Page 42: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/42.jpg)
Wind. EPC. Design.
42
![Page 43: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/43.jpg)
Module 3.2Procurement
LogisticsProject
management
43
![Page 44: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/44.jpg)
EPC. Engineering, Procurement and Construction.
Sourcing
Suppliers & Quotes
Payment Schedule
Construction Program
Contract for goods or services
44
![Page 45: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/45.jpg)
EPC. Engineering, Procurement and Construction.
Sourcing Suppliers
Specs
BoM & Quote
45
![Page 46: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/46.jpg)
Solar PV. EPC. Engineering, Procurement and Construction.
Dear [supplier / contractor],
We have started the procurement process for a power plant in [location/area] to provide 24/7 uninterrupted power to a farming complex which is notconnected to the grid.The total consumption has been estimated to be 253 kWh per day, with an autonomy of 3 days, calling for a total storage capacity of 880 kWh. Themain power source will be Solar PV, with an installed capacity of 198 kWp.The Solar PV subsystem will provide power to the storage bank, which will deliver constant stable power to the facilities, while a diesel generator of300 kVA will be connected to the power management unit and available as backup.The power will be delivered to the facilities buildings in low voltage under trenching, while the Solar panels will be ground mounted in a single fieldwithin the facilities perimeter.The plant design adheres to all applicable IEC regulations, IEC H&S applicable standards and National Grid Code, therefore all components and worksshall meet those requirements and certifications. All required permits have been granted. Standard IEC and related environmental practices shall befollowed on all works, including logistics and site deliveries.This procurement stage will finish [P-date] and the site mobilization is scheduled for [M-date], while the commissioning is scheduled for [C-date],providing an overall duration of [days] working days.The contracting will be done according to FIDIC standards and bankable performance warranties will be required. Payment schedule based onmilestones completion, to be defined with the awarded [supplier / contractor],
We hereby, request your detailed quote, BoM (Bill of Materials) and delivery [and installation] schedule for the following components [and services]:
Panel field of 198 kWp in 330 Wp panels (600 panels in total) with proposed layout in landscape with 4 panels in height and 50 panels wide, forming 3tables. Distance between tables is 4 mt. Panels measure 1 mt by 2 mt, weighting 24 kg each.Tilt shall be 5 deg. North.All components and materials must be cut to measure and drilled in factory prior to HDG and/or coating/galvanizing.Ground mounting structures for mechanical pile-in, with main supporting pillars in factory HDG with a minimum coating of 90 microns.Tables to be continuous over the whole width.Panel supporting beams in Aluminum 6005 A T6.Panel clamps in AL 6005 A T6, with antitheft screws.All nuts and bolts of SST and self locking.Isolating washers between HDG and AL components.Mounting system to adequate for DC cabling along the structure.Inverter mounting under the panels in H frame of the same HDG or AL material. Inverter weight 70 kg.Delivery on site, installation and assembly.
![Page 47: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/47.jpg)
Wind. EPC. Engineering, Procurement and Construction.
Dear [supplier / contractor],
We have started the procurement process for a power plant in [location/area] to provide 24/7 uninterrupted power to a farming complex which is notconnected to the grid.The total consumption has been estimated to be XXX kWh per day, with an autonomy of 3 days, calling for a total storage capacity of XXX kWh. Themain power source will be Wind, with an installed capacity of XXX kW.The generation subsystem will provide power to the storage bank, which will deliver constant stable power to the facilities, while a diesel generator of300 kVA will be connected to the power management unit and available as backup.The power will be delivered to the facilities buildings in low voltage under trenching, while the Wind generators will be ground mounted in a singlefield near the facilities perimeter.The plant design adheres to all applicable IEC regulations, IEC H&S applicable standards and National Grid Code, therefore all components and worksshall meet those requirements and certifications. All required permits have been granted. Standard IEC and related environmental practices shall befollowed on all works, including logistics and site deliveries.This procurement stage will finish [P-date] and the site mobilization is scheduled for [M-date], while the commissioning is scheduled for [C-date],providing an overall duration of [days] working days.The contracting will be done according to FIDIC standards and bankable performance warranties will be required. Payment schedule based onmilestones completion, to be defined with the awarded [supplier / contractor],
We hereby, request your detailed quote, BoM (Bill of Materials) and delivery [and installation] schedule for the following components [and services]:
Wind generators capable of providing XXX kWh in a standard 24 h cycle.Resource average is ~ XX m/s from XXX.Foundations ground is mainly composed of XXXX at foundation level and dominant Ph is XX, with a compressibility of XXXX kN and foundation depthand a lateral value of XXX kN.All metal components and materials must be cut to measure and drilled in factory prior to HDG and/or coating/galvanizing.When aluminum is to be used only 6005 T5 grade is accepted. When immersed/buried an additional resin coating is required.Incoterms 2010, FOB extended with inland and customs to delivery on site, installation and assembly.
47
![Page 48: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/48.jpg)
EPC. Engineering, Procurement and Construction.
Sourcing
Suppliers
SpecsBoM & Quote
Payment Schedule
Construction Program
Contract for goods or services
48
![Page 49: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/49.jpg)
Module 3.3 Health & Safety
49
![Page 50: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/50.jpg)
EPC. Engineering, Procurement and Construction.
Health and Safety
• Personal protection gear is mandatory inside the works area for ALL people. You and visitors included.
• HiVis vests are mandatory for ALL people while on-site, either in works area or not.
Mandatory H&S gear for works area:• Hi Vis vest.• Safety boots or shoes.• Helmet.• Safety Glasses or Googles.• Work gloves.
Additionally,• Ear covers or earbuds when close to noisy areas.• Electric insulation Gloves when works near life wires.• Electric insulating footwear when near life equipment.• Back & waist protection band when lifting weights.• Safety Knee pads when working involves kneeing.
WEARING THE H&S GEAR IS MANDATORY FOR EVERYONE. IMMEDIATE FIRE ANYONE FAILING TO DO SO.
50
![Page 51: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/51.jpg)
EPC. Engineering, Procurement and Construction.
Health and Safety
• DAILY SAFETY BRIEFING BEFORE WORK START IS MANDATORY FOR ALL PERSONNEL.
• SAFETY BRIEFING IS MANDATORY FOR ALL VISITORS PRIOR ENTERING THE SITE AND THE WORKS AREAS.
• THE DAILY SAFETY BRIEFING MUST INCLUDE UPDATE OF ALL WORKS BEING CARRIED ON THAT DAY IN EVERY AREA AND THE STATUS OF ANY HAZARDOUS ENVIRONMENT IN ANY AREA OF THE SITE.
• ALL PEOPLE MUST SIGN THE ENTRY AND EXIT FROM THE SITE.
• ALL PEOPLE MUST SIGN THE H&S LOG AFTER THE BRIEFING AND BEFORE ENTERING THE SITE AND THE WORKS AREA.
• ALL MACHINERY MUST BE CHECKED FOR FULL SAFETY OPERATION EVERY DAY BEFORE BEING USED.
• INCOMPLIANCE WITH H&S RULES MEANS EXPULSION.51
![Page 52: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/52.jpg)
Module 3.4Construction
![Page 53: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/53.jpg)
Module 3.4Construction
53
![Page 54: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/54.jpg)
Module 3.5EPC
ConstructionGroundworks
Site preparation
54
![Page 55: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/55.jpg)
EPC. Engineering, Procurement and Construction.
![Page 56: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/56.jpg)
EPC. Engineering, Procurement and Construction.
![Page 57: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/57.jpg)
EPC. Engineering, Procurement and Construction.
![Page 58: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/58.jpg)
Module 3.6EPC
ConstructionGroundworksCabling and trenching
58
![Page 59: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/59.jpg)
Module 3.6EPC
ConstructionGroundworksCabling and trenching
59
![Page 60: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/60.jpg)
Generation Side. Cable Installation.
Whole set of manual and semi automatic cable pulling equipment.
Classic trenching and pulling. Inefficient & expensive
All in One – RentalAutomatic trenching and pulling machinery. They dig the trench, remove the soil, lay the cables, cover them, lay the safety tapes, close the trench and compact the soil.
The big units can do 20 km per day. 60
![Page 61: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/61.jpg)
Generation Side. Cable Installation.
61
![Page 62: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/62.jpg)
Generation Side. Cable Installation.
Quality with low budget – OK! Quality & clean– OK! Luxury – OK!
UNACCEPTABLE
These are considered engineers professional negligence in many countries
62
![Page 63: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/63.jpg)
Generation Side. General Foundations.
Quick & easy installation, no specialized labor,Warranty by manufacturer.Cost & time efficient.Easily install 3 per day.
63
![Page 64: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/64.jpg)
Solar PV. EPC. Engineering, Procurement and Construction.
![Page 65: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/65.jpg)
Solar PV. EPC. Engineering, Procurement and Construction.
![Page 66: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/66.jpg)
Solar PV. EPC. Engineering, Procurement and Construction.
![Page 67: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/67.jpg)
Wind. EPC. Engineering, Procurement and Construction.
67
![Page 68: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/68.jpg)
Module 3.7EPC
ConstructionMechanical
![Page 69: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/69.jpg)
Module 3.7EPC
ConstructionMechanical
69
![Page 70: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/70.jpg)
Solar PV. EPC. Engineering, Procurement and Construction.
![Page 71: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/71.jpg)
Module 3.8EPC
ConstructionElectro-
Mechanical
![Page 72: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/72.jpg)
Solar PV. EPC. Engineering, Procurement and Construction.
Panel installation is a critical and delicate process.
Teams of 2 to 4 people are needed.
On 3rd and 4th panel part of the team will have to stand in a small scaffolding structure.
The lower panel always goes first and has to be perfectly fitted and aligned.
The bolting is done ONLY with power tools with torque settable drivers. The panel manufacturer will provide the right number of Nm torque.
Any broken panel must be put aside to avoid stumbling on it and injuries.
![Page 73: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/73.jpg)
Wind. EPC. Engineering, Procurement and Construction.
![Page 74: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/74.jpg)
Wind. EPC. Engineering, Procurement and Construction.
![Page 75: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/75.jpg)
Module 3.9EPC
ConstructionWeather station
![Page 76: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/76.jpg)
Module 3.10EPC
Electrical works & testing
![Page 77: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/77.jpg)
Solar PV. EPC. Engineering, Procurement and Construction.
![Page 78: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/78.jpg)
Solar PV. EPC. Engineering, Procurement and Construction.
![Page 79: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/79.jpg)
EPC. Engineering, Procurement and Construction.
![Page 80: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/80.jpg)
EPC. Engineering, Procurement and Construction.
80
![Page 81: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/81.jpg)
Solar EPC. Engineering, Procurement and Construction.
![Page 82: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/82.jpg)
Module 3.11EPC
Electrical works & testing
![Page 83: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/83.jpg)
Solar EPC. Engineering, Procurement and Construction.
![Page 84: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/84.jpg)
Module 3.8EPC
ConstructionElectro-
Mechanical
84
![Page 85: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/85.jpg)
Wind. EPC. Engineering, Procurement and Construction.
85
![Page 86: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/86.jpg)
EPC. Engineering, Procurement and Construction.
86
![Page 87: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/87.jpg)
Wind. Engineering, Procurement and Construction.
![Page 88: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/88.jpg)
Module 3.9 EPC
Completion Hand Over
88
![Page 89: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/89.jpg)
Wind. Engineering, Procurement and Construction.
![Page 90: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/90.jpg)
Module 3.12O.M.
![Page 91: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/91.jpg)
Solar O&M. Operation and Management.
![Page 92: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/92.jpg)
Module 3.10O.M.
92
![Page 93: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/93.jpg)
Module 4Transmission
and distribution models
Content
Module 1: Generation Systems
Module 2: Project Feasibility
Module 3: EPC
Module 4: Transmission & Distribution Models
93
![Page 94: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/94.jpg)
Mini Grids vs Grids. Introduction.
=
~
~
Mini Grid
“Full” Grid
~
=
94
![Page 95: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/95.jpg)
Mini Grids vs Grids. Introduction.
=
~
~ =
=
=
~
~=
=
Mesh Interconnected ClusteredMini Grid.
Interconnections are below 66 kV to avoid the cost of substations.
All generation and all consumption is shared over the whole integrated grid providing a self balanced operation.
95
![Page 96: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/96.jpg)
Mini Grids / Clusters with DER Architecture.
1. Solar PV Plant2. Inverter Grid Forming3. Inverter/Charger & Controller
4. Storage5. Diesel genset as backup.6. Wind generation and/or others.
96
![Page 97: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/97.jpg)
Mini Grids / Clusters with DER Architecture.
=~
=
=~
=
=~
=
97
![Page 98: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/98.jpg)
Power Plants. Forms of Contracts.
![Page 99: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/99.jpg)
Module 4.4 Regulation
99
![Page 100: hydrocarbon 25% reduction in energy intensity of GDP economyptfcar.org/.../Workshop_Combined_Slides_kzk_Final.pdf · BoS & EPC 437.50 86,625 CAPEX 1,687.50 334,125 OPEX 15.00 2,970](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3bf7e63c77862c61318c2a/html5/thumbnails/100.jpg)