Requirement of Hydraulic System
To fulfill the water requirement of the Under Ground Stations To discharge the Seepage & Sewage of the Under Ground
Stations
To fulfill the water requirement of Stations Utilities
For Fire Suppression System
INTRODUCTION OF HYDRAULIC SYSTEM IN UNDERGROUND STATIONS
HydraulicSystemComponents
PTM Supply System
Raw Water Pumps and Treated Water Pumps
Seepage System
Sewage System
Service Pumps
-
8/10/2019 Hydraulic System 2
2/12
PTM SUPPLY SYSTEM
BORE WELL PUMPS
Installed at Shastri Park Depot at different locations.
Ratings from 7.5 KW to 10 KW
Supply ground water to PTM Tanks
BOOSTER PUMPSInstalled at PTM Room
Ratings from ..
Supply Water from PTM Tanks to Different U/G Stations
VALVES AND PIPES
Requires to divert the Water supply if there is any
problem in long distance pipe
-
8/10/2019 Hydraulic System 2
3/12
PTM SUPPLY ARRANGEMENT
-
8/10/2019 Hydraulic System 2
4/12
Raw Water Pumps and
Treated Water Pumps Raw Water Pump transfer the water from Raw
Water Tank (RWT) to Treated Water Tank (TWT)
through Water Treatment Plant
Water Treatment plant is nothing but is thecombination of Dual Media Filter, Iron Remover
Filter and Softener
-
8/10/2019 Hydraulic System 2
5/12
Water Treatment Plant withRWP & TWP
-
8/10/2019 Hydraulic System 2
6/12
STATION BORE WELL
Some Stations are provided with Bore wellSupply that fulfills the Water Requirement ofStation during Emergency Period.
Normally due to the high level of Hardness oflocal water it is recommended that keep the
Stations Bore well OFF.
-
8/10/2019 Hydraulic System 2
7/12
SEEPAGE SYSTEM
It is combination of two or more pumps installed atevery underground station to discharge theseepage water from Seepage Pit to MunicipalStorm Water.
Their operation based on the level sensors signalsinstalled in the seepage pits
Their Master/Slave operation decided on the basisof their run-hour recorded by the BMS
Some of the Seepage Pumps are also installed inbetween the tunnels to extract accumulated waterinside the tunnel (i.e. between NDI & RCK; RCK &
PCK; BRKR & MDHS etc.)
-
8/10/2019 Hydraulic System 2
8/12
SEEPAGE SYSTEM
To Municipal Storm
Water Main
SEEPAGE
PIT
UHL
VHL
HL
LL SEEPAGE PUMP
-
8/10/2019 Hydraulic System 2
9/12
SERVICE PUMPS
It is combination of two or more pumps installed atevery underground station to discharge theSewage/Toilet water from Sewage Pit to MunicipalSewers/Gutters.
Their operation based on the level sensors signalsinstalled in the sewage pits.
Their Master/Slave operation decided on the basisof their run-hour recorded by the BMS
-
8/10/2019 Hydraulic System 2
10/12
SEWAGE SYSTEM
To Municipal Storm
Water Main
SEWAGE
PIT
HL
LL SEWAGE PUMP
-
8/10/2019 Hydraulic System 2
11/12
SEWAGE SYSTEM
These Pumps are installed at few stations (at thistime only at RCK)
They supply the soft water to the station service
tanks to fulfill the stations requirements
Other stations soft water requirements are fulfilled
by gravitational flow of soft water
-
8/10/2019 Hydraulic System 2
12/12
SERVICE PUMPS
To Municipal Storm
Water Main
TREATED
WATER
TANK
HL
LLSEWAGE PUMP
ONE SIDE
SERVICE
TANK
OTHER SIDE
SERVICETANK