Hydraulic module technical manual 50Hz +201104 · 2011-06-08 · Content Unit HM25/II-28FN...
Transcript of Hydraulic module technical manual 50Hz +201104 · 2011-06-08 · Content Unit HM25/II-28FN...
Midea Commercial Air Conditioner
Hydraulic Module
For Air-cooled Modular Chiller 50Hz
2011.04
HEAT PUMP TYPE 380-415V, 50Hz, 3N For High Ambient Temperature Use
MCAC-ATSM-2011-04 Hydraulic Module 50Hz
1
Content
1 Introduction..........................................................................................................2
2 Feature ...................................................................................................................2
3 External appearance ..........................................................................................3
4 Nomenclature ......................................................................................................3
5 Product list ...........................................................................................................4
6 Application range ...............................................................................................4
7 Specification ........................................................................................................5
8 Dimension .............................................................................................................6
9 Wiring Diagram....................................................................................................8
10 Internal structure ............................................................................................10
11 System diagram ..............................................................................................11
12 Selection ...........................................................................................................12
13 Standard configure.........................................................................................13
14 Trouble shooting.............................................................................................14
15 Installation ........................................................................................................17
16 Hydraulic module system application.......................................................23
Hydraulic Module 50Hz MCAC-ATSM-2011-04
2
1 Introduction
The series hydraulic module is designed for air-cooled modular chiller unit, it has two pumps, one of them is backup. The water
pump can be automatic switching under failure (malfunction shifting). It is the use of the hydraulic system module integration
solutions, is a completely prefabricated sets strict monitoring of products, with a pump, valve, automatic replenishment, safety
components, bypass components, drain dirty sewage and control system, etc. For water cycle, constant pressure to supply water
for all water media transportation, for industrial, commercial and residential buildings, it is the best choice for water distribution
systems.
Capacity range:
Applies to air-cooled modular chiller from 25Kw to 1040Kw.
2 Feature
2.1 Backup function
Two pumps built-in, one of them is backup. It can be automatically switched between two pumps in failure.
2.2 High-class main components
For main components, dustproof and waterproof designed, they have tested at 100 over 1000 hours. For the pipe, adopts ℃
brass, stainless steel or metal with special coating and anti-rust treatment.
2.3 Good performance
Max flow of Single Pump: 200m3/h, water pumper runs more quietly and more
efficiently.
2.4 Easy installation and maintenance
The unit can be installed indoor and outdoor, suit for different customer’s
requirement. There are screw connecting and flange connecting, convenient
for connecting.
2.5 Save the installation space and cost.
Integrated design, covering area is too less. Intelligent control, it saves energy
more than 30% than traditional.
For air-cooled modular chiller, it’s no need of expansion tank.
2.6 Convenient operating, humanization design.
The electric control cabinet can be separated from the unit to install, more
convenient operating for user without nearby the unit.
2.7 Fixed pressure replenishing water valve
Indoor
Outdoor
MCAC-ATSM-2011-04 Hydraulic Module 50Hz
3
It consists of reducing valve, stainless steel filter, stop valve and check valve. The automatic replenishment valve consists
reduced pressure and stable pressure device, the pressure value can be automatically adjusted and kept, which according to
pressure gauge and the replenishment valve scale, when the system pressure is low, it will be automatically opened to filling
water, automatically close when the pressure up to setting value, avoid to damage system device cause of high pressure.
Maximum pressure of inlet water:10 bar
The pressure adjustment range:0.5~4 bar
Setting pressure in plant:1.5 bar
2.8 More safety
The motor safety class is IP54, insulation class is F.
3 External appearance
4 Nomenclature
H M 120 / II- 33 F N
Pump brand N: Nan Fang pump
Special machine for air-cooled modular chiller
Rated head (m)
Double pump system
Rated water flow volume (m3/h)
Hydraulic module
Hydraulic Module 50Hz MCAC-ATSM-2011-04
4
5 Product list
Model Water flow(m3/h) Head(m) Cooling capacity(kw) Power supply
HM03/II-29FN 3 25 5~15
HM05/II-31FN 5 24 16~25
HM07/II-30FN 7 22 26~35
HM10/II-29FN 10 26 36~45
HM14/II-28FN 14 25 46~65
HM18/II-26FN 18 24 66~88
HM25/II-28FN 25 28 81~115
HM35/II-30FN 35 24 116~160
HM40/II-28FN 40 28 161~240
HM50/II-32FN 50 25 241~300
HM60/II-30FN 60 29 301~360
HM80/II-25FN 80 25 370~460
HM100/II-27FN 100 27 460~580
HM120/II-33FN 120 33 580~690
HM140/II-25FN 140 25 700~810
HM160/II-33FN 160 33 810~930
HM200/II-25FN 200 25 940~1160
380V/3N/50Hz
6 Application range
Content Running range
Running media Water, Glycol(30% of the maximum solubility)
Media temp. -15˚C~85˚C
Ambient temp. -15˚C~52˚C
Working pressure 6bar
Safety valve return pressure 0.4Mpa
Power supply 380V/3N/50Hz
Voltage tolerance Rating Voltage±10%
Phase tolerance ±2%
Power supply frequency Rating frequency±2%
Height above sea level 1000m
MCAC-ATSM-2011-04 Hydraulic Module 50Hz
5
7 Specification
Content Unit HM03/II-29FN HM05/II-31FN HM07/II-30FN HM10/II-29FN HM14/II-28FN HM18/II-26FN
Recommended
cooling capacity
corresponding to the
range selection
KW 5~15 16~25 26~35 36~45 46~65 66~88
Water flow m3/h 3 5 7 10 14 18
Pump Head m 25 24 22 26 25 24
Water pressure loss KPa 6 8 13 11 16 12
mm DN32 DN40 DN40 DN50 DN50 DN65 Pipe diameter (inlet &
outlet) inch 1-1/4” 1-1/2” 1-1/2” 2” 2” 2-1/2”
Power supply type V/N/Hz 380/3/50,with heat protection, Phase sequence protection and power supply protection
Unit rated input power KW 0.8 1.15 1.2 2.25 2.3 3.1
Dimensions (L*W*H) mm 787*620*1020 1130*792*1160
Net weight kg 142 150 155 164 170 221
Area ㎡ 0.49 ㎡ 0.49 ㎡ 0.49 ㎡ 0.49 ㎡ 0.49 ㎡ 1.04 ㎡
Content Unit HM25/II-28FN HM35/II-30FN HM40/II-28FN HM50/II-32FN HM60/II-30FN
Recommended cooling
capacity corresponding
to the range selection
KW 81~115 116~160 161~240 241~300 301~360
Water flow m3/h 25 35 40 50 60
Pump Head m 28 24 28 25 29
Water pressure loss KPa 12 18 11 16 17
mm DN80 DN80 DN100 DN100 DN100 Pipe diameter (inlet &
outlet) inch 3” 3” 4” 4” 4”
Power supply type V/N/Hz 380/3/50,with heat protection, Phase sequence protection and power supply protection
t rated input power KW 4.1 4.2 5.6 5.7 7.6
Dimensions (L*W*H) mm 1130*792*1160 1300*900*1250
Net weight kg 229 233 304 306 317
Area ㎡ 1.04 ㎡ 1.46 ㎡
Hydraulic Module 50Hz MCAC-ATSM-2011-04
6
Content Unit HM80/1I-25FN HM100/II-27FN HM120/II-33FN HM140/II-25FN HM60/II-33FN HM200/II-25FN
Recommended
cooling capacity
corresponding to
the range selection
KW 370~460 460~580 580~690 700~810 810~930 940~1160
Water flow m3/h 80 100 120 140 160 200
Pump Head m 25 27 33 25 33 25
Water pressure
loss KPa 22 22 18 20 25 26
mm DN125 DN125 DN150 DN150 DN200 DN200 Pipe diameter
(inlet & outlet) inch 5” 5” 6” 6” 8” 8”
Power supply type V/N/Hz 380/3/50,with heat protection, Phase sequence protection and power supply protection
Unit rated input
power KW 10.5 11 14 16 22 22
Dimensions
(L*W*H) mm 1700*1150*1500 1800*1150*1500 2300*1150*1700 2500*1200*1700
Net weight kg 570 575 605 610
Area ㎡ 1.96 2.07 2.65 2.65 3 3
8 Dimension
Note: R1: Water inlet R3: Replenishment water inlet R2: Water outlet R4: Pressure bypass joint inlet
MCAC-ATSM-2011-04 Hydraulic Module 50Hz
7
Unit: mm L1 L2 H1 H2 H3 H4 R1 R2 R3 R4 Net
weightModel
mm mm mm mm mm mm DN DN DN DN kg
HM03/II-29FN 787 620 1020 960 630 256 32 32 15 20 142
HM05/II-31FN 787 620 1020 960 630 256 40 40 15 20 150
HM07/II-30FN 787 620 1020 960 630 256 40 40 15 20 155
HM10/II-29FN 787 620 1020 960 630 256 50 50 15 20 164
HM14/II-28FN 787 620 1020 960 630 305 50 50 15 25 170
HM18/II-26FN 1130 792 1160 1100 655 305 65 65 15 25 221
HM25/II-28FN 1130 792 1160 1100 655 305 80 80 15 25 229
HM35/II-30FN 1130 792 1160 1100 655 305 80 80 / 25 233
HM40/II-28FN 1300 900 1250 1190 655 305 100 100 / 40 304
HM50/II-32FN 1300 900 1250 1190 655 305 100 100 / 40 306
HM60/II-30FN 1300 900 1250 1190 700 377 100 100 / 40 317
HM80/II-25FN 1700 1150 1500 1440 700 377 125 125 / 40 570
HM100/II-27FN 1800 1150 1500 1440 793 377 125 125 / 40 570
HM120/II-33FN 2300 1150 1700 1440 793 377 150 150 / 65 575
HM140/II-25FN 2300 1150 1700 1440 820 405 150 150 / 65 605
HM160/II-33FN 2500 1200 1700 1640 820 405 200 200 / 65 610
HM200/II-25FN 2500 1200 1700 1640 820 405 200 200 / 65 610
Unit: inch L1 L2 H1 H2 H3 H4 R1 R2 R3 R4 Net weight
Model inch inch inch inch inch inch inch inch inch inch kg
HM03/II-29FN 30.98 24.41 40.16 37.80 24.80 10.08 32 1-1/4” 1/2” 3/4" 142
HM05/II-31FN 30.98 24.41 40.16 37.80 24.80 10.08 1-1/2” 1-1/2” 1/2” 3/4" 150
HM07/II-30FN 30.98 24.41 40.16 37.80 24.80 10.08 1-1/2” 1-1/2” 1/2” 3/4" 155
HM10/II-29FN 30.98 24.41 40.16 37.80 24.80 10.08 2” 2” 1/2” 3/4" 164
HM14/II-28FN 30.98 24.41 40.16 37.80 24.80 12.01 2” 2” 1/2” 1" 170
HM18/II-26FN 44.49 31.18 45.67 43.31 25.79 12.01 2-1/2” 2-1/2” 1/2” 1" 221
HM25/II-28FN 44.49 31.18 45.67 43.31 25.79 12.01 3" 3" 1/2” 1" 229
HM35/II-30FN 44.49 31.18 45.67 43.31 25.79 12.01 3" 3" / 1" 233
HM40/II-28FN 51.18 35.43 49.21 46.85 25.79 12.01 4" 4" / 1-1/2” 304
HM50/II-32FN 51.18 35.43 49.21 46.85 25.79 12.01 4" 4" / 1-1/2” 306
HM60/II-30FN 51.18 35.43 49.21 46.85 27.56 14.84 4" 4" / 1-1/2” 317
HM80/II-25FN 66.93 45.28 59.06 56.69 27.56 14.84 5" 5" / 1-1/2” 570
HM100/II-27FN 70.87 45.28 59.06 56.69 31.22 14.84 5" 5" / 1-1/2” 570
HM120/II-33FN 90.55 45.28 66.93 56.69 31.22 14.84 6" 6" / 2-1/2” 575
HM140/II-25FN 90.55 45.28 66.93 56.69 32.28 15.94 6" 6" / 2-1/2” 605
HM160/II-33FN 90.55 47.24 66.93 64.57 32.28 15.94 8" 8" / 2-1/2” 610
HM200/II-25FN 90.55 47.24 66.93 64.57 32.28 15.94 8" 8" / 2-1/2” 610
Hydraulic Module 50Hz MCAC-ATSM-2011-04
8
No. Name No. Name 1 Pressure gauge(three) 6 Drainage outlet 1
2 Lock 7 Drainage outlet 2
3 Exhausting air fan outlet 8 Pressure bypass valve
4 Water outlet 9 Water inlet
5 Power wire joint 10 Fixed pressure replenishing water inlet
9 Wiring Diagram
9.1 Electric connecting schematic diagram .
10
2 4 5
6 7 8 9
1 3 3
Pump 1
Pump 2
Fan motor 1
Fan motor 2
AC 220V(backup)
Hydraulic
module
control
cabinet
Water flow switch
Water temperature sensor
Main power supply
Pump linkage signal
Water flow switch signal
Main unit control module
MCAC-ATSM-2011-04 Hydraulic Module 50Hz
9
9.2 Wiring Diagram
Hydraulic Module 50Hz MCAC-ATSM-2011-04
10
10 Internal structure
No. Name Quantity
1 Safety valve 1
2 Vertical stop valve 1
3 Electric bypass pressure valve
1
4 Pump 2
5 Pressure gauge and thermometer
3
6 Horizontal stop valve 2
7 Expansion tank 1
8 Electric box 1
Electric control
No Name Type Quantity No Name Type Quantity
1 PLC control board 1 use,1 backup 1 7 Breaker DZ47-63 4P D20A 1
2 Wired terminal RT-2.5 26 8 Breaker DZ47-63 1P C10A 2
3 Heating relay LRD 2 9 Fuse RT28-32 Gg4A 1
4 Assistant terminal of contactor 1 open,1 close 2 10 Phase relay XJ3-D 1
5 Contactor CJX2 AC220V 2 11 Relay HH52P 2
6 Breaker DZ47-4P/D20A 1 12 Power supply AC220V/DC24V 1
1
2
3 4 5
6
7
8
9
1011 12
MCAC-ATSM-2011-04 Hydraulic Module 50Hz
11
11 System diagram
This series of hydraulic module is designed to project the system with a preparation of the pump settings to consider, select the unit of power systems and control systems.
Hydraulic Module 50Hz MCAC-ATSM-2011-04
12
12 Selection
To confirm the hydraulic module, must be according to:
1. Air-cooled modular chiller capacity.
2. Designed water volume.
3. Pump head.
Power supply: 380V/3N/50Hz
Recommend combination for air-cooled modular chiller unit Hydraulic model
Water
flow(m3/h) Head(m)
Cooling
capacity
(KW) (25)30kw (60)65kw (120)130kw (180)200kw
HM03/II-29FN 3 25 5~15 / / / /
HM05/II-31FN 5 24 16~25 / / / /
HM07/II-30FN 7 22 26~35 30KW×1 / / /
HM10/II-29FN 10 26 36~45 / / / /
HM14/II-28FN 14 25 46~65 30kw×2 65KW×1 / /
HM18/II-26FN 18 24 66~88 / / / /
HM25/II-28FN 25 28 81~115 30kw×3 / / /
30kw×4 HM35/II-30FN 35 24 116~160
30kw×5 / 130KW×1 /
30kw×6 65kw×2 HM40/II-28FN 40 28 161~240
30kw×7 65kw×3 / 200KW×1
30kw×8
30kw×9 HM50/II-32FN 50 25 241~300
30kw×10
65kw×4 130kw×2 /
HM60/II-30FN 60 29 301~360 30kw×11 65kw×5 / /
30kw×12
30kw×13 65kw×6
30kw×14 HM80/II-25FN 80 25 370~460
30kw×15 65kw×7
130kw×3 200kw×2
HM100/II-27FN 100 27 460~580 30kw×16 65kw×8 130kw×4 /
65kw×9 HM120/II-33FN 120 33 580~690 /
65kw×10 130kw×5 200kw×3
65kw×11 HM140/II-25FN 140 25 700~810 /
65kw×12 130kw×6 200kw×4
65kw×13 HM160/II-33FN 160 33 810~930 /
65kw×14 130kw×7 /
65kw×15 HM200/II-25FN 200 25 940~1160 /
65kw×16 130kw×8 200kw×5
Note: 1. The hydraulic module is special matching to air-cooled modular chiller. 2. Please make sure how many water system is need, each water system match the outdoor unit combined
quantity and type. 3. Each water system design of maximum head shall not exceed 5% of the data in specification table. 4. Each water system design of maximum water flow volume shall not exceed the above-mentioned data.
MCAC-ATSM-2011-04 Hydraulic Module 50Hz
13
13 Standard configure
Name Quantity
(pcs) Function Remark
JB-5002 stop
subassembly
2 (Same as
pump quantity). Prevent water flow back.
This item must be confirmed in ordering, the
basic model has not reserved the
installation position.
KQ-044 filter
subassembly
2 (Same as
pump quantity).
Integrates filtering and draining pollution,
convenient for using.
This item must be confirmed in ordering, the
basic model has not reserved the
installation position.
HM-E-C electric
control system 1
Lake phase protection, over heating protection,
over voltage/low voltage protection, phase
sequence protection, motor reversal protection,
motor overload protection, motor cooling
protection. Can be linked any manufacturer
master unit’s active signal, source free signal
which all can connect the linkage control,
manual/automatic (linkage) operating function.
Reserving 220V power output interface.
If the master unit has electric control
system, it is unnecessary. The basic unit
has reserved installation position. Can be
installed on site.
TS-5503 fixed
pressure
replenishment valve
1 Constant pressure to supply water. No need for over HM35.This item must be
confirmed in ordering, the basic model has
not reserved the installation position.
KQ-13 pressure
bypass valve 1 Water flow protection.
Recommending use. The basic unit has
reserved installation position. Can be
installed on site.
SB series stainless
steel quick
connection hose
4 (Pump
quantity×2)
Efficiently decrease the working time,
convenient for installation in narrow space.
One side with flexible joint, another side with
outer screw.
Hydraulic Module 50Hz MCAC-ATSM-2011-04
14
14 Trouble shooting
Name Phenomenon Possible reasons Solutions
Phase sequence
failure
XJ3-G type(One light):The light
is red or off.
XJ3-D type(Three lights):The
light will be on if phase failure or
break.
① Phase sequence
failure.
② Lake phase.
① Exchange two wires of them.
② Check whether the circuit is
loose, please connect it again if yes.
Over/low voltage
protection
Power supply is normal, pump
didn’t start, the light for over/low
voltage is on.
The voltage is unstable.
The protection function will be
automatically remove after voltage
return to normal.
The pump
overloading
protection
The power supply is normal,
linkage and manual didn’t start
pump.
The pump overloading
protection.
After cut off power supply, replace
the heating relay (press blue
button), restart power supply.
Active interlock
connect to the
passive interlock by
mistake
① The pump didn’t run.
② The fuse is broken, the
pump runs.
③ The fuse is broken, the
pump didn’t run.
Linkage wire connecting is
wrong.
Replace hydraulic module and
components of main unit, confirm
the linkage signal type (tested by
multimeter) to connect rightly.)
Passive interlock
connect to the
active interlock by
mistake
The pump didn’t run. Linkage wire connecting is
wrong.
To make good connecting after
confirm the linkage signal type.
Contactor abnormal
noise.
Contactor makes abnormal
noise after close.
① The contactor inside
entered dirty or quality
problem.
② The coil voltage is low.
③ Bad contacting for
circuit.
① Replace contactor.
② Check the voltage is normal or
not.
③ Wiring again to good
connecting.
The contactor
repeated action. The contactor repeated on or off.
① The linkage wire is not
tight.
② Open circuit or
components error cause of
transportation.
Quickly stop machine!
①wiring again to good connecting.
②Check circuit, exchange failure
components.
The contactor is
broken.
Power supply and circuit are
normal, can’t start it by linkage
and manual, the coil voltage is
normal.
Cut off power supply, press
on contactor by hand, the
contactor is broken if don’t
press down.
Replace contactor.
Relay failure.
Normally start pump by manual,
active start-up failure,
corresponding light is not on.
Relay failure. Replace relay.
MCAC-ATSM-2011-04 Hydraulic Module 50Hz
15
Name Phenomenon Possible reasons Solutions
Water flow failure The main unit alarm frequently
for water flow failure.
① The system lack water.
② The water flow switch
runs not sensitively.
③ The water flow switch
selection wrong.
④ Air in system.
① Check the replenishment
pressure is normal or not.
② Testing whether water flow
switch can run normally.
③ Reset the switch type of main
unit flow or exchange flow switch.
④ Exhaust enough.
Pump with large
noise
The pump makes large noise in
running.
① Pump reversal.
② Dirty in system or pump
lock running.
③ Return water pressure
is low.
④ Air in system.
⑤ Return air inlet bad
seal.
① Correctly adjudge the running
direction of pump by pressure gauge
and adjusting.
② Clean Y type filter,(The Y type
filter must be installed, otherwise
the dirty enter into pump so that the
pump is broken, must be clean it
after the first time running )
③ Check whether the
replenishment water system is
normal.
④ Correctly install exhausting
valve (make it on the top point of
system), exhaust enough.
⑤ Check whether the joint has
smaller hole in pipeline, and fully
seal.
Leakage protection
The hydraulic module installs
leaking protection switch on
power supply inlet, start up
hydraulic module, leakage
protection switch:
① Immediate tripping.
② Tripping after a period of
running.
① Used 3P leakage
protection switch
② Only firewire from main
unit, neutral and hydraulic
module are sharing.
③ The leakage node exist
in circuit.
① Replaced 4P leakage
protection switch.
② Linkage line neutral connect
main unit neutral.
③ Eliminate leakage failure
node.
Probe of pressure
gauge water
percolating
The probe of pressure gauge
drops water after a period of
using.
① The probe is loose
cause of vibration.
② The rubber gasket will
be aged cause of high
ambient temperature.
① Fix it tightly again (Notice: not
too tight, or else the rubber gasket
is broken by pressing).
② Replace rubber gasket.
Probe of
thermometer is
loose.
The indicating and actual
temperature values deviate
greatly.
Probe of thermometer is
loose, no contact with pipe
system.
Install it again, good fixture.
The cushion
blocking is broken
by pressing.
The pump is skew, serious
shaking in running.
The cushion blocking is
broken by pressing in
transporting.
Replace cushion blocking.
Hydraulic Module 50Hz MCAC-ATSM-2011-04
16
Name Phenomenon Possible reasons Solutions
Pressure bypass
failure
Open few fan motors, the flow
failure of main unit often occur.
① The setting pressure of
pressure bypass valve is too
high.
② Haven’t opened the
bypass pipeline.
③ Haven’t turned on the
power supply of electric
pressure bypass.
① Set pressure value again.
② Open the bypass pipeline.
③ Turn on the power switch of
electric pressure bypass valve.
Safety valve failure The safety valve leak water
continually.
① The system pressure is
too high.
② The safety valve is
broken during testing
pressure.
① Check the local water supply
pressure, please add the fixed
pressure and replenishment valve if
the pressure is too high.
② Replace safety valve (Prohibit
testing pressure with safety valve, if
want to test pressure, please
remove safety valve and stop them
by stopple.)
MCAC-ATSM-2011-04 Hydraulic Module 50Hz
17
15 Installation
1. Dimension selection of pipe
Model Unit Water
inlet/outlet Stop valve Filter
Pressure
bypass
Fixed pressure
replenishment valve
mm DN32 DN32 DN32 DN20 DN15 HM03/II-29FN
Inch 1-1/4” 1-1/4” 1-1/4” 3/4” 1/2”
mm DN40 DN40 DN40 DN20 DN15 HM05/II-31FN
Inch 1-1/2” 1-1/2” 1-1/2” 3/4” 1/2”
mm DN40 DN40 DN40 DN20 DN15 HM07/II-30FN
Inch 1-1/2” 1-1/2” 1-1/2” 3/4” 1/2”
mm DN50 DN50 DN50 DN20 DN15 HM10/II-29FN
Inch 2” 2” 2” 3/4” 1/2”
mm DN50 DN50 DN50 DN25 DN15 HM14/II-28FN
Inch 2” 2” 2” 1” 1/2”
mm DN65 DN65 DN65 DN25 DN15 HM18/II-26FN
Inch 2-1/2” 2-1/2” 2-1/2” 1” 1/2”
mm DN80 DN80 DN80 DN25 DN15 HM25/II-28FN
Inch 3” 3” 3” 1” 1/2”
mm DN80 DN80 DN80 DN25 HM35/II-30FN
Inch 3” 3” 3” 1” /
mm DN100 DN100 DN100 DN40 HM40/II-28FN
Inch 4” 4” 4” 1-1/2” /
mm DN100 DN100 DN100 DN40 HM50/II-32FN
Inch 4” 4” 4” 1-1/2” /
mm DN100 DN100 DN100 DN40 HM60/II-30FN
Inch 4” 4” 4” 1-1/2” /
mm DN125 DN125 DN125 DN40 HM80/II-25FN
Inch 5” 5” 5” 1-1/2” /
mm DN125 DN125 DN125 DN40 HM100/II-27FN
Inch 5” 5” 5” 1-1/2” /
mm DN150 DN150 DN150 DN65 HM120/II-33FN
Inch 6” 6” 6” 2-1/2” /
mm DN150 DN150 DN150 DN65 HM140/II-25FN
Inch 6” 6” 6” 2-1/2” /
mm DN200 DN200 DN200 DN65 HM160/II-33FN
Inch 8” 8” 8” 2-1/2” /
mm DN200 DN200 DN200 DN65 HM200/II-25FN
Inch 8” 8” 8” 2-1/2” /
Hydraulic Module 50Hz MCAC-ATSM-2011-04
18
2. Installation introduction and key points:
(1) Project operating instruction:
○1 .Position:
It can be laid out flexibly in the basement, roof, garage and outdoor machine room, covering an area down to 0.37 m2. Do not
take up the user indoor area. It can also be placed in the open air. It has unique waterproof casing design, which is specially
designed for the layout of outdoor equipment group.
○2 .Foundation:
Hydraulic module has own foundation.
Placement requirements:The ground must be flat and have a slope of 0.5%; around the ground all around the foundation should
be well-drained, and shall not have seeper in case of water accumulation is too deeper to affect the units. Please ensure that
circulation performance of the filtering device is good, well-drained and no water accumulated. The load bearing of ground should
be designed according to the calculation of conventional additional load; Without special demand,please provide the hydraulic
module and each type weight.
The table contains the dimension of installation.
Unit: mm
Model HM03 HM05 HM07 HM10 HM14 HM18 HM25 HM35 HM40 HM50 HM60A 620 620 620 620 620 792 792 792 850 850 850
B 787 787 787 787 787 1057 1057 1057 1200 1200 1200
C 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000
MCAC-ATSM-2011-04 Hydraulic Module 50Hz
19
Unit: mm
Model HM80 HM100 HM120 HM140 HM160 HM200A 1700 1800 2300 2300 2500 2500
B 1150 1150 1150 1150 1200 1200
C 1500 1500 1700 1700 1700 1700
○3 .Hoisting emplacement:
If set on rooftop,hydraulic module will set a supporting point at the bottom,which can undertake hoisting carrying capability. If set
indoor, it only needs to configure a trailer, drag it to indoor location specified. Please provide sizes and weights of each type of
hydraulic module, convenient to hoist and make a hole in place. Please keep the body in good packaging before installation.
Please take care of handling, guarantee the body which is vertical and have a slope less than 15 °. Please avoid hitting other
objects when installing, and put it placidly to avoid sliding.
○4 .Pipe installation:
Provide pipe installation schematic drawing, and the name of connection orifice should be shown at the position of waterpower
module orifice, convenient to connect system pipeline. Less than HM80 modules, please obligate threaded interface, HM80 and
above module obligate flange interface.
○5 .Damping and flexible connection:
Hydraulic module has own dual damping device. When being positioned and installed, no module considers damping. Hydraulic
module and the pipeline system for hose connection, metal flexible duct for less than HM80 module will be provided by factory,
the length can be customized, convenient to be connected. For HM80 and above module, the flexible joints was configured inside
hydraulic module in factory, there is no consideration when installing.
○6 .Pressure testing:
Manufactured products has a strict strength and leak testing before leaving factory; The proposal testing pressure does not
exceed 0.8 MPa. After finished installation, will be tested for system and fully pipeline together, please take down the safety valve
(4bar)inside module and close the system by stopple. Please reinstall safety valve back after pressure testing.
○7 . Trial run:
Electric principle diagram will be provided, there are observation failure indicators in the electric control cabinets, understand
module and system operating conditions by visual observation. Please clean well the pipeline, and before trial run, turn on the
drainage valve for filtering component of the module and check pipeline cleaning status.
○8 . Acceptance:
Make sure the linkage with the main unit device is normal, confirm the action of flow switch, confirm the operation status of pump,
confirm the visual value on the hydraulic module dial is normal or not, and confirm whether the phase sequence protection,
water-lacking protection, overload protection and other functions are normal.
3. Special attention:
(1). Pay more attention to protect the units which is safe, as can as keep moving and placing smoothly, confirm equipment is not
damaged.
(2). Electric mounting must be done with the supervision of qualified electrician. Electrical installation and wiring must meet the
Hydraulic Module 50Hz MCAC-ATSM-2011-04
20
relevant standards.
(3). The power wire of units and signal wire must be separated ,it cannot parallel to the wiring, otherwise it will not make the units
working normal.
(4). When installation and using process, should beware of electric shock.
4. Transfer and installation site
(1).Please sure the reliability of hoisting equipment before transfer. Do not use shabby hoisting equipment.
(2) Please determine the correct transfer route before transfer. Try to reduce transfer times and transfer the fully machine unit to
prevent the external structure damaged in transfer.
(3) Please do not tear down the packing of the hydraulic modular before arriving installation position. Be careful not to scratch the
units if it must be dismantled. Lifting should be done as the packing direction and added two guard plates, in case of damage or
deformation.
(4) When suspension machine to moving, please use the flexible sling in order to protect the unit from damage and scratch.
(5) Please carry the products together with external package in consider of protection. If it has to be opened, please use
protecting templates or cardboard to protect units.
(6) For safety, please move slowly when using chain pulleys to lift and transfer.
(7) Please do not touch such objects as the wall, column, door, lamps and so on to avoid damage to the machine.
(8) When moving on the ground, please use roller to doing traction assignments, and ensure that there is at least four rollers to
work together.
(9). While units are in handling or moving, please try to remain horizontal and never tilt the product above 15o.
(10).The unit can be installed on the rooftop, the balcony or outside the yard .It should be noticed whether the bearing surface is
sufficient strength to withstand the weight when the unit operates. The field intensity must be strong enough, not easy to cause
resonance and noise.
(11).The unit should not be installed in the occasion filled with dust, pollutants, corrosive gas and humidity.
(12). In the occasion for unit installations, enough space must be kept for cooling and convenient to installation and maintenance
person to pass through.
(13).Keep the ambient temperature surrounding the units between 0 ~ 40℃, never more than RH75 %. Please keep sufficient
ventilation and less dust.
5. Power supply of unit distribution
(1). The power supply of the unit must be connected (switching-on) strictly on the basis of electric requirements. Please do not
sharing a power lines with other appliances.
(2). Please ensure that the unit is reliably grounded, prevent leakage accidents when installing.
(3). Operating power supply
Allow ◆ voltage range: rated voltage ±10%
Allow frequency range◆ :Rated frequency ±2%
Allow three◆ -phase voltage unbalance:±2%
MCAC-ATSM-2011-04 Hydraulic Module 50Hz
21
Allow three current imbalance: ◆ ± 5%
(4). Power supply of unit distribution (the distribution of the unit) must be connected strictly on the basis of Hydraulic module
circuit diagram (seen in distribution box cover opposite) in order to ensure proper operation.
User connecting: L1, L2, L3, N, all of others are wired in plant (Please refer to the wiring diagram on page 9).
(5). Electric parameter of the unit nameplates is the quantitative value under standard running conditions. The selection of
miniature circuit breaker, AC contactor, wiring capacity and so on has been considered while the machine is operating under the
harsh conditions.
(6). System control consists of electric control cabinet, temperature sensor, flow switch and so on.
(7). Control box can realize linkage and connected controlling through active contact, passive contact and any kind of central
air-conditioner main unit. What’s more, it can control the operation of corresponding pump and fan by receiving operating signal.
(8). According to (on the basic of) the different selection of the customers, various types of product in the control cabinet are
provided to meet the demand of customers. For example, the type with simple and dual pump with frequency conversion control
system, the type with fix frequency control system and remote communication control system and so on.
.6 Starting- up the first time
(1)Preparation
○1 Check the status of all valves.
○2 Check whether the water are full.
○3 Check all wiring is correct.
(2). Starting-up and checking
◆ Switch on general power supply.
Check whether the units' phase sequence is correct.◆
Attention!
Frequently start-up would impact the lifespan of unit. Strongly recommend: When the units started up, do not frequently start or
stop the units. Do not dump directly if it's out of necessary.
Hydraulic Module 50Hz MCAC-ATSM-2011-04
22
7. Commissioning
(1). Check whether the unit is well earthed.
(2). Check whether the air-conditioning and earth source recycle system are filled with water, whether the pipeline is emptied, the
replenishing water valve is on or not.
(3). Check whether all valves of pipeline are on correct status.
(4). Check whether the voltage of power supply is correct.
(5). Check whether the main pressure gauge is normal.
(6). Check whether the terminal equipment operate normally.
(7). Start up the water pump and confirm its running direction firstly. Check whether the water flow switch is normal. Check the
replenishing water source and turn on the exhausting valve to empty air in pipeline.
(8). After finished checking water pump and water system, start to the running testing. Before starting the unit, please check
whether the power supply is normal. After that, please record the temperature and pressure from all points pipeline. 8. Safety.
(1). If find the phenomenon as below, please quickly stop the machine, cut off power supply, check it and repaired.
A. The motor’s current is more than rated current 10% or more for a long time.
B. The unit stops running automatically and can't restore automatically by itself.
C. Can ‘t start up the units or difficultly.
(2).When the unit is in plant, different labels are pasted on the related position, please strictly comply the rules
(3). Prohibit operating all switches frequently.
(4). Don’t cut off main unit’s power supply in running time.
9. Maintenance
(1). The units have been tested strictly in plant and are in the best working condition. Please do not adjust it again.
(2). After trial running 24 hours, need to be cleaned the filter at inlet of the pump.
(3). Prohibit operating all switches frequently.
(4). Must be cut off power supply if do not use the machine for a long time.
(5). Special attentions in winter: When the ambient temp. is less than 0 ,℃ please check the heating preservation regularity, do not
cut off power supply. When no use long time in the winter, please empty the system pipeline to prevent the pipe chilled.
(6). The unit should be operated and maintained by specified person. Please stop it quickly if abnormal thing was found, find out
the reason and remove malfunction. Prohibit the machine running with trouble.
(7) Should you meet the question you can not do, please contact our after sales service.
MCAC-ATSM-2011-04 Hydraulic Module 50Hz
23
16 Hydraulic module system application
Symbol Name Symbol Name
A1 Unit side of the shut-off valve(Optional) E Associated-control input(Optional)
B1 User side of the shut-off valve(Optional) F Telecommunication input(Optional)
C Replenishment shut-off valve(Optional) G1&G2 Anti-shocking plug hose(Optional)
D Power supply 220/380V AC 50Hz
Cooling tower
Cooling side Ground source
Water source
Note: The data in this book may be changed without notice for further improvement on quality and performance
The International Division Midea Air Conditioning and Refrigeration Sector Add: Midea headquarter building, No.6 Midea Avenue, Beijiao Town, Shunde District, Foshan City, Guangdong, P.R. China Postal code: 528311 Tel:+86-757-26338346 Fax: +86-757-26339337 http://www.midea.com http://www.mideaaircon.com
GD Midea Refrigeration Equipment Co., Ltd.
Have received ISO 9001 certification for
quality assurance.
Certificate Registration
NO.01 100 019209
GD Midea Refrigeration Equipment Co., Ltd.
Have received environmental management
system
Standard ISO 14001 certification
Certificate NO.CC 1417
MCAC-ATSM-2011-04