HYDRAULIC CACULATION.xls

download HYDRAULIC CACULATION.xls

of 66

Transcript of HYDRAULIC CACULATION.xls

  • HYDRAULIC CALCULATION

    Proposed Bridge site at 325m d/s

    CH IN M. GL LENGTH AREA

    (D) (X) (Y) A=DxY1 2 3 4 5 6 7 8 9

    Pavero side-50 99.450 99.450 0.000 0.000 0.000 0 0.000 0.000

    -45 99.450 99.100 0.350 0.175 0.350 5 0.875 5.012

    -40 99.450 98.875 0.575 0.463 0.225 5 2.313 5.005

    -35 99.450 98.430 1.020 0.798 0.445 5 3.988 5.020

    -30 99.450 98.550 0.900 0.960 0.120 5 4.800 5.001

    -25 99.450 98.240 1.210 1.055 0.310 5 5.275 5.010

    -20 99.450 98.225 1.225 1.218 0.015 5 6.088 5.000

    -15 99.450 97.195 2.255 1.740 1.030 5 8.700 5.105

    -10 99.450 96.900 2.550 2.403 0.295 5 12.013 5.009

    -5 99.450 96.675 2.775 2.663 0.225 5 13.313 5.005

    0 99.450 96.525 2.925 2.850 0.150 5 14.250 5.002

    5 99.450 96.655 2.795 2.860 0.130 5 14.300 5.002

    10 99.450 96.750 2.700 2.748 0.095 5 13.738 5.001

    15 99.450 96.840 2.610 2.655 0.090 5 13.275 5.001

    20 99.450 96.835 2.615 2.613 0.005 5 13.063 5.000

    25 99.450 97.240 2.210 2.413 0.405 5 12.063 5.016

    30 99.450 97.535 1.915 2.063 0.295 5 10.313 5.009

    35 99.450 97.890 1.560 1.738 0.355 5 8.688 5.013

    40 99.450 98.110 1.340 1.450 0.220 5 7.250 5.005

    45 99.450 98.340 1.110 1.225 0.230 5 6.125 5.005

    50 99.450 98.365 1.085 1.098 0.025 5 5.488 5.000

    55 99.450 98.380 1.070 1.078 0.015 5 5.388 5.000

    60 99.450 98.415 1.035 1.053 0.035 5 5.263 5.000

    65 99.450 98.475 0.975 1.005 0.060 5 5.025 5.000

    70 99.450 98.760 0.690 0.833 0.285 5 4.163 5.008

    80 99.450 99.165 0.285 0.487 0.405 10 4.875 10.008

    90 99.450 99.225 0.225 0.255 0.060 10 2.550 10.000

    100 99.450 99.450 0.000 0.113 0.225 10 1.125 10.003

    Calculation of wetted perimetre and area under HFL of choraha nalla on pairo-Ghoghopuri Road

    H.F.L. IN M.

    DEPTH OF

    WATERAV.

    DEPTHDIFF. IN

    BED LEVEL

    PERIMETER IN M.

    P= /(X+Y)

  • Ghoghopuri side

    TOTAL 204.300 150.240

  • Hydraulic mean depth(R)= A/P = 1.36 M

    V = (R)/x(S) 0.970 M/sec.n

    V = 0.970 M/sec

    R = The hydraulic mean depth (A/P) 1.36 M

    S =

    = 0.001

    n = The rugosity coefficient 0.04

    Q = A x V 198.243 Cumec

    Q = Discharge in Cumec 198.243 CumecA = Cross sectional area in Sqm. 204.300 Sqm

    V = 0.970 M/sec.

    The velocity in M per sec. considered uniform throughout the cross section

    The energy slope which may be taken equal to the bed slope measured over a reasonable long reach

    The velocity in M per sec. considered uniform throughout the cross section

  • HYDRAULIC CALCULATION

    CH IN M. GL LENGTH AREA

    (D) (X) (Y) A=DxY1 2 3 4 5 6 7 8 9

    Raipur side

    390 100.500 100.500 0.000 0.000 0.000 0 0.000 0.000

    375 100.500 100.475 0.025 0.013 0.025 15 0.188 15.000

    360 100.500 100.320 0.180 0.103 0.155 15 1.538 15.001

    345 100.500 100.120 0.380 0.280 0.200 15 4.200 15.001

    330 100.500 100.000 0.500 0.440 0.120 15 6.600 15.000

    315 100.500 98.820 1.680 1.090 1.180 15 16.350 15.046

    300 100.500 99.050 1.450 1.565 0.230 15 23.475 15.002

    285 100.500 98.780 1.720 1.585 0.270 15 23.775 15.002

    270 100.500 98.700 1.800 1.760 0.080 15 26.400 15.000

    255 100.500 98.860 1.640 1.720 0.160 15 25.800 15.001

    240 100.500 98.780 1.720 1.680 0.080 15 25.200 15.000

    225 100.500 98.960 1.540 1.630 0.180 15 24.450 15.001

    210 100.500 98.780 1.720 1.630 0.180 15 24.450 15.001

    195 100.500 98.930 1.570 1.645 0.150 15 24.675 15.001

    180 100.500 98.740 1.760 1.665 0.190 15 24.975 15.001

    165 100.500 98.840 1.660 1.710 0.100 15 25.650 15.000

    150 100.500 99.070 1.430 1.545 0.230 15 23.175 15.002

    135 100.500 98.800 1.700 1.565 0.270 15 23.475 15.002

    120 100.500 98.720 1.780 1.740 0.080 15 26.100 15.000

    105 100.500 98.930 1.570 1.675 0.210 15 25.125 15.001

    90 100.500 98.750 1.750 1.660 0.180 15 24.900 15.001

    75 100.500 99.000 1.500 1.625 0.250 15 24.375 15.002

    60 100.500 98.160 2.340 1.920 0.840 15 28.800 15.024

    45 100.500 98.140 2.360 2.350 0.020 15 35.250 15.000

    30 100.500 97.400 3.100 2.730 0.740 15 40.950 15.018

    15 100.500 98.050 2.450 2.775 0.650 15 41.625 15.014

    0 100.500 98.200 2.300 2.375 0.150 15 35.625 15.001

    Calculation of wetted perimetre and area under HFL of Kolhan nalla in Km 22/8 at RAIPUR- BALODABAZAR Road

    Proposed Bridge site

    H.F.L. IN M.

    DEPTH OF

    WATERAV.

    DEPTHDIFF. IN

    BED LEVEL

    PERIMETER IN M.

    P= /(X+Y)

  • 15 100.500 98.190 2.310 2.305 0.010 15 34.575 15.000

    30 100.500 98.520 1.980 2.145 0.330 15 32.175 15.004

    45 100.500 98.720 1.780 1.880 0.200 15 28.200 15.001

    60 100.500 98.280 2.220 2.000 0.440 15 30.000 15.006

    75 100.500 97.990 2.510 2.365 0.290 15 35.475 15.003

    90 100.500 96.680 3.820 3.165 1.310 15 47.475 15.057

    105 100.500 94.500 6.000 4.910 2.180 15 73.650 15.158

    120 100.500 93.780 6.720 6.360 0.720 15 95.400 15.017

    135 100.500 96.040 4.460 5.590 2.260 15 83.850 15.169

    150 100.500 98.250 2.250 3.355 2.210 15 50.325 15.162

    165 100.500 98.300 2.200 2.225 0.050 15 33.375 15.000

    180 100.500 98.530 1.970 2.085 0.230 15 31.275 15.002

    195 100.500 98.740 1.760 1.865 0.210 15 27.975 15.001

    210 100.500 98.430 2.070 1.915 0.310 15 28.725 15.003

    225 100.500 98.520 1.980 2.025 0.090 15 30.375 15.000

    240 100.500 98.770 1.730 1.855 0.250 15 27.825 15.002

    255 100.500 98.860 1.640 1.685 0.090 15 25.275 15.000

    270 100.500 99.300 1.200 1.420 0.440 15 21.300 15.006

    285 100.500 99.220 1.280 1.240 0.080 15 18.600 15.000

    295 100.500 100.140 0.360 0.820 0.920 15 12.300 15.028

    310 100.500 100.230 0.270 0.315 0.090 15 4.725 15.000

    325 100.500 100.190 0.310 0.290 0.040 15 4.350 15.000

    340 100.500 100.170 0.330 0.320 0.020 15 4.800 15.000

    355 100.500 100.130 0.370 0.350 0.040 15 5.250 15.000

    370 100.500 100.220 0.280 0.325 0.090 15 4.875 15.000

    385 100.500 100.500 0.000 0.140 0.280 15 2.100 15.003

    Baloda bazar side

    TOTAL 1401.375 780.749

    Hydraulic mean depth(R)= A/P = 1.79 M

    V = (R)/x(S) 2.002 M/sec.n

    V = 2.002 M/sec

    R = The hydraulic mean depth (A/P) 1.79 M

    S =

    The velocity in M per sec. considered uniform throughout the cross section

    The energy slope which may be taken equal to the bed slope measured over a reasonable long reach

  • = 0.002

    n = The rugosity coefficient 0.033

    Q = A x V 2804.900 Cumec

    Q = Discharge in Cumec 2804.900 CumecA = Cross sectional area in Sqm. 1401.375 Sqm

    V = 2.00 M/sec.

    HYDRAULIC CALCULATION

    CH IN M. GL LENGTH AREA

    (D) (X) (Y) A=DxY1 2 3 4 5 6 7 8 9

    Sankara side0 100.650 100.650 0.000 0.000 0.000 0 0.000 0.000

    15 100.650 100.040 0.610 0.305 0.610 15 4.575 15.012

    30 100.650 98.880 1.770 1.190 1.160 15 17.850 15.045

    45 100.650 99.190 1.460 1.615 0.310 15 24.225 15.003

    60 100.650 99.170 1.480 1.470 0.020 15 22.050 15.000

    The velocity in M per sec. considered uniform throughout the cross section

    Calculation of wetted perimetre and area under HFL of Chhokra nalla in Km at SANKRA - BAHESAR Road

    Proposed Bridge site

    H.F.L. IN M.

    DEPTH OF

    WATERAV.

    DEPTHDIFF. IN

    BED LEVEL

    PERIMETER IN M.

    P= /(X+Y)

  • 75 100.650 99.050 1.600 1.540 0.120 15 23.100 15.000

    90 100.650 98.640 2.010 1.805 0.410 15 27.075 15.006

    105 100.650 98.200 2.450 2.230 0.440 15 33.450 15.006

    120 100.650 97.990 2.660 2.555 0.210 15 38.325 15.001

    135 100.650 97.880 2.770 2.715 0.110 15 40.725 15.000

    150 100.650 98.210 2.440 2.605 0.330 15 39.075 15.004

    165 100.650 97.150 3.500 2.970 1.060 15 44.550 15.037

    170 100.650 95.405 5.245 4.373 1.745 5 21.863 5.296

    175 100.650 94.780 5.870 5.558 0.625 5 27.788 5.039

    180 100.650 94.790 5.860 5.865 0.010 5 29.325 5.000

    185 100.650 95.200 5.450 5.655 0.410 5 28.275 5.017

    190 100.650 96.260 4.390 4.920 1.060 5 24.600 5.111

    205 100.650 97.200 3.450 3.920 0.940 15 58.800 15.029

    220 100.650 96.340 4.310 3.880 0.860 15 58.200 15.025

    235 100.650 97.600 3.050 3.680 1.260 15 55.200 15.053

    250 100.650 98.270 2.380 2.715 0.670 15 40.725 15.015

    265 100.650 98.700 1.950 2.165 0.430 15 32.475 15.006

    280 100.650 99.050 1.600 1.775 0.350 15 26.625 15.004

    295 100.650 99.020 1.630 1.615 0.030 15 24.225 15.000

    310 100.650 99.130 1.520 1.575 0.110 15 23.625 15.000

    325 100.650 99.970 0.680 1.100 0.840 15 16.500 15.024

    340 100.650 99.250 1.400 1.040 0.720 15 15.600 15.017

    355 100.650 99.020 1.630 1.515 0.230 15 22.725 15.002

    370 100.650 99.270 1.380 1.505 0.250 15 22.575 15.002

    385 100.650 99.380 1.270 1.325 0.110 15 19.875 15.000

    400 100.650 99.410 1.240 1.255 0.030 15 18.825 15.000

    415 100.650 99.710 0.940 1.090 0.300 15 16.350 15.003

    430 100.650 99.450 1.200 1.070 0.260 15 16.050 15.002

    445 100.650 99.650 1.000 1.100 0.200 15 16.500 15.001

    455 100.650 99.900 0.750 0.875 0.250 10 8.750 10.003

    470 100.650 100.650 0.000 0.375 0.750 15 5.625 15.019

    Bahesar side

    TOTAL 946.100 470.784Hydraulic mean depth(R)= A/P = 2.01 M

    V = (R)/x(S) 1.930 M/sec.n

  • V = 1.930 M/sec

    R = The hydraulic mean depth (A/P) 2.01 M

    S =

    = 0.0018

    n = The rugosity coefficient 0.035

    Q = A x V 1826.341 CumecQ = Discharge in Cumec 1826.341 CumecA = Cross sectional area in Sqm. 946.100 Sqm

    V = 1.930 M/sec.

    HYDRAULIC CALCULATION

    CH IN M. GL LENGTH AREA

    (D) (X) (Y) A=DxY1 2 3 4 5 6 7 8 9

    Sankara side0 100.650 100.650 0.000 0.000 0.000 0 0.000 0.000

    15 100.650 100.040 0.610 0.305 0.610 15 4.575 15.012

    30 100.650 99.880 0.770 0.690 0.160 15 10.350 15.001

    45 100.650 99.190 1.460 1.115 0.690 15 16.725 15.016

    60 100.650 99.170 1.480 1.470 0.020 15 22.050 15.000

    75 100.650 99.050 1.600 1.540 0.120 15 23.100 15.000

    90 100.650 98.640 2.010 1.805 0.410 15 27.075 15.006

    105 100.650 98.300 2.350 2.180 0.340 15 32.700 15.004

    120 100.650 98.100 2.550 2.450 0.200 15 36.750 15.001

    135 100.650 97.880 2.770 2.660 0.220 15 39.900 15.002

    150 100.650 98.210 2.440 2.605 0.330 15 39.075 15.004

    165 100.650 97.150 3.500 2.970 1.060 15 44.550 15.037

    170 100.650 95.405 5.245 4.373 1.745 5 21.863 5.296

    175 100.650 94.780 5.870 5.558 0.625 5 27.788 5.039

    The velocity in M per sec. considered uniform throughout the cross section

    The energy slope which may be taken equal to the bed slope measured over a reasonable long reach

    The velocity in M per sec. considered uniform throughout the cross section

    Calculation of wetted perimetre and area under HFL of Chhokra nalla in Km at SANKRA - BAHESAR Road

    Proposed Bridge site

    H.F.L. IN M.

    DEPTH OF

    WATERAV.

    DEPTHDIFF. IN

    BED LEVEL

    PERIMETER IN M.

    P= /(X+Y)

  • 180 100.650 94.790 5.860 5.865 0.010 5 29.325 5.000

    185 100.650 95.200 5.450 5.655 0.410 5 28.275 5.017

    190 100.650 96.260 4.390 4.920 1.060 5 24.600 5.111

    205 100.650 97.200 3.450 3.920 0.940 15 58.800 15.029

    220 100.650 97.350 3.300 3.375 0.150 15 50.625 15.001

    235 100.650 97.600 3.050 3.175 0.250 15 47.625 15.002

    250 100.650 98.270 2.380 2.715 0.670 15 40.725 15.015

    265 100.650 98.700 1.950 2.165 0.430 15 32.475 15.006

    280 100.650 99.050 1.600 1.775 0.350 15 26.625 15.004

    295 100.650 99.300 1.350 1.475 0.250 15 22.125 15.002

    310 100.650 99.430 1.220 1.285 0.130 15 19.275 15.001

    325 100.650 99.970 0.680 0.950 0.540 15 14.250 15.010

    340 100.650 99.850 0.800 0.740 0.120 15 11.100 15.000

    355 100.650 99.860 0.790 0.795 0.010 15 11.925 15.000

    370 100.650 99.890 0.760 0.775 0.030 15 11.625 15.000

    385 100.650 99.980 0.670 0.715 0.090 15 10.725 15.000

    400 100.650 99.910 0.740 0.705 0.070 15 10.575 15.000

    415 100.650 99.710 0.940 0.840 0.200 15 12.600 15.001

    430 100.650 99.650 1.000 0.970 0.060 15 14.550 15.000

    445 100.650 99.750 0.900 0.950 0.100 15 14.250 15.000

    455 100.650 99.900 0.750 0.825 0.150 10 8.250 10.001

    470 100.650 100.650 0.000 0.375 0.750 15 5.625 15.019

    Bahesar side

    TOTAL 852.450 470.638Hydraulic mean depth(R)= A/P = 1.81 M

    V = (R)/x(S) 1.576 M/sec.n

    V = 1.576 M/sec

    R = The hydraulic mean depth (A/P) 1.81 M

    S =

    = 0.0018

    n = The rugosity coefficient 0.04

    Q = A x V 1343.486 CumecQ = Discharge in Cumec 1343.486 CumecA = Cross sectional area in Sqm. 852.450 Sqm

    V = 1.576 M/sec.

    The velocity in M per sec. considered uniform throughout the cross section

    The energy slope which may be taken equal to the bed slope measured over a reasonable long reach

    The velocity in M per sec. considered uniform throughout the cross section

  • HYDRAULIC CALCULATION

    CH IN M. GL LENGTH AREA

    (D) (X) (Y) A=DxY1 2 3 4 5 6 7 8 9

    Raipur side30 104.16 104.160 0.000 0.000 0.000 0 0.000 0.00015 104.16 103.400 0.760 0.380 0.760 10 3.800 10.0290 104.16 102.170 1.990 1.375 1.230 15 20.625 15.050

    15 104.16 100.330 3.830 2.910 1.840 15 43.650 15.11230 104.16 99.550 4.610 4.220 0.780 15 63.300 15.02045 104.16 98.650 5.510 5.060 0.900 15 75.900 15.02760 104.16 99.750 4.410 4.960 1.100 15 74.400 15.04075 104.16 100.480 3.680 4.045 0.730 15 60.675 15.01890 104.16 100.770 3.390 3.535 0.290 15 53.025 15.003105 104.16 101.780 2.380 2.885 1.010 15 43.275 15.034120 104.16 101.870 2.290 2.335 0.090 15 35.025 15.000135 104.16 101.440 2.720 2.505 0.430 15 37.575 15.006150 104.16 99.250 4.910 3.815 2.190 15 57.225 15.159165 104.16 95.950 8.210 6.560 3.300 15 98.400 15.359180 104.16 95.215 8.945 8.578 0.735 15 128.663 15.018195 104.16 94.230 9.930 9.438 0.985 15 141.563 15.032210 104.16 92.350 11.810 10.870 1.880 15 163.050 15.117225 104.16 92.650 11.510 11.660 0.300 15 174.900 15.003240 104.16 92.850 11.310 11.410 0.200 15 171.150 15.001255 104.16 93.050 11.110 11.210 0.200 15 168.150 15.001270 104.16 92.710 11.450 11.280 0.340 15 169.200 15.004285 104.16 93.250 10.910 11.180 0.540 15 167.700 15.010300 104.16 93.310 10.850 10.880 0.060 15 163.200 15.000305 104.16 94.130 10.030 10.440 0.820 5 52.200 5.067320 104.16 96.250 7.910 9.380 2.940 15 140.700 15.285335 104.16 97.950 6.210 7.060 1.700 15 105.900 15.096350 104.16 98.730 5.430 5.820 0.780 15 87.300 15.020365 104.16 100.850 3.310 4.370 2.120 15 65.550 15.149380 104.16 100.780 3.380 3.345 0.070 15 50.175 15.000395 104.16 100.880 3.280 3.330 0.100 15 49.950 15.000410 104.16 100.980 3.180 3.230 0.100 15 48.450 15.000425 104.16 101.250 2.910 3.045 0.270 15 45.675 15.002440 104.16 101.425 2.735 2.823 0.175 15 42.338 15.001455 104.16 101.500 2.660 2.698 0.075 15 40.463 15.000470 104.16 101.685 2.475 2.568 0.185 15 38.513 15.001485 104.16 101.910 2.250 2.363 0.225 15 35.438 15.002500 104.16 101.925 2.235 2.243 0.015 15 33.638 15.000515 104.16 101.050 3.110 2.673 0.875 15 40.088 15.025530 104.16 102.210 1.950 2.530 1.160 15 37.950 15.045545 104.16 102.255 1.905 1.928 0.045 15 28.913 15.000560 104.16 102.320 1.840 1.873 0.065 15 28.088 15.000575 104.16 102.220 1.940 1.890 0.100 15 28.350 15.000

    Calculation of wetted perimetre and area under HFL of Kharun River at Murethi khudmudi Road

    Proposed Bridge site

    H.F.L. IN M.

    DEPTH OF

    WATERAV.

    DEPTHDIFF. IN

    BED LEVEL

    PERIMETER IN M.

    P= /(X+Y)

  • 590 104.16 102.350 1.810 1.875 0.130 15 28.125 15.001605 104.16 102.420 1.740 1.775 0.070 15 26.625 15.000620 104.16 102.520 1.640 1.690 0.100 15 25.350 15.000635 104.16 102.680 1.480 1.560 0.160 15 23.400 15.001650 104.16 102.780 1.380 1.430 0.100 15 21.450 15.000665 104.16 102.650 1.510 1.445 0.130 15 21.675 15.001680 104.16 102.710 1.450 1.480 0.060 15 22.200 15.000695 104.16 102.750 1.410 1.430 0.040 15 21.450 15.000710 104.16 102.800 1.360 1.385 0.050 15 20.775 15.000725 104.16 102.890 1.270 1.315 0.090 15 19.725 15.000

    740 104.16 102.900 1.260 1.265 0.010 16 20.240 16.000

    755 104.16 103.050 1.110 1.185 0.150 17 20.145 17.001

    770 104.16 103.100 1.060 1.085 0.050 18 19.530 18.000

    785 104.16 102.950 1.210 1.135 0.150 19 21.565 19.001

    800 104.16 103.150 1.010 1.110 0.200 20 22.200 20.001

    815 104.16 103.250 0.910 0.960 0.100 21 20.160 21.000

    7830 104.16 103.650 0.510 0.710 0.400 22 15.620 22.004

    845 104.16 103.755 0.405 0.457 0.105 23 10.522 23.000

    860 104.16 103.650 0.510 0.457 0.105 24 10.980 24.000

    875 104.16 103.850 0.310 0.410 0.200 25 10.250 25.001

    890 104.16 103.985 0.175 0.243 0.135 26 6.305 26.000

    905 104.16 104.000 0.160 0.167 0.015 27 4.522 27.000920 104.16 104.160 0.000 0.080 0.160 28 2.240 28.000

    945 3529.180 1037.752Hydraulic mean depth(R)= A/P = 3.40 M

    V = (R)/x(S) 3.065 M/sec.n

    V = 3.065 M/secR = The hydraulic mean depth (A/P) 3.40 MS =

    = 0.002n = The rugosity coefficient 0.033

    Q = A x V 10815.875 Cumec

    Q = Discharge in Cumec 10815.875 CumecA = Cross sectional area in Sqm. 3529.180 SqmV = 3.065 M/sec.

    The velocity in M per sec. considered uniform throughout the cross sectionThe energy slope which may be taken equal to the bed slope measured over a reasonable long reach

    The velocity in M per sec. considered uniform throughout the cross section

  • 20 99.22

    23

    x 99.25

    25 99.61

    x 20.384615385

  • 506

  • 100.650

    99.890

    98.730

    99.040

    99.020

  • 98.900

    98.490

    98.050

    97.840

    97.730

    98.060

    97.000

    95.255

    94.630

    94.640

    95.050

    96.110

    97.050

    95.740

    97.450

    98.120

    98.550

    98.900

    98.870

    98.980

    98.820

    98.805

    98.870

    99.120

    99.230

    99.260

    99.560

    99.300

    99.500

    99.750

  • 100.650

    99.890

    98.730

    99.040

    99.020

    98.900

    98.490

    98.050

    97.840

    97.730

    98.060

    97.000

    95.255

    94.630

  • 94.640

    95.050

    96.110

    97.050

    95.740

    97.450

    98.120

    98.550

    98.900

    98.870

    98.980

    98.820

    98.805

    98.870

    99.120

    99.230

    99.260

    99.560

    99.300

    99.500

    99.750

  • HYDRAULIC CALCULATION

    Proposed Bridge site at 10m u/s

    CH IN M. GL LENGTH AREA

    (D) (X) (Y) A=DxY1 2 3 4 5 6 7 8 9

    Pavero side-50 99.600 99.600 0.000 0.000 0.000 0 0.000 0.000

    -45 99.600 99.435 0.165 0.082 0.165 5 0.412 5.003

    -40 99.600 99.225 0.375 0.270 0.210 5 1.350 5.004

    -35 99.600 99.010 0.590 0.482 0.215 5 2.412 5.005

    -30 99.600 98.715 0.885 0.737 0.295 5 3.687 5.009

    -25 99.600 98.550 1.050 0.967 0.165 5 4.837 5.003

    -20 99.600 98.335 1.265 1.158 0.215 5 5.788 5.005

    -15 99.600 98.210 1.390 1.328 0.125 5 6.638 5.002

    -10 99.600 97.500 2.100 1.745 0.710 5 8.725 5.050

    -5 99.600 96.940 2.660 2.380 0.560 5 11.900 5.031

    0 99.600 97.150 2.450 2.555 0.210 5 12.775 5.004

    5 99.600 96.905 2.695 2.573 0.245 5 12.863 5.006

    10 99.600 96.885 2.715 2.705 0.020 5 13.525 5.000

    15 99.600 96.900 2.700 2.707 0.015 5 13.538 5.000

    20 99.600 96.935 2.665 2.682 0.035 5 13.413 5.000

    25 99.600 97.455 2.145 2.405 0.520 5 12.025 5.027

    30 99.600 97.835 1.765 1.955 0.380 5 9.775 5.014

    35 99.600 98.145 1.455 1.610 0.310 5 8.050 5.010

    40 99.600 98.260 1.340 1.398 0.115 5 6.987 5.001

    45 99.600 98.235 1.365 1.353 0.025 5 6.762 5.000

    50 99.600 98.265 1.335 1.350 0.030 5 6.750 5.000

    55 99.600 98.305 1.295 1.315 0.040 5 6.575 5.000

    60 99.600 98.340 1.260 1.277 0.035 5 6.387 5.000

    65 99.600 98.575 1.025 1.143 0.235 5 5.712 5.006

    70 99.600 98.885 0.715 0.870 0.310 5 4.350 5.010

    80 99.600 99.165 0.435 0.575 0.280 10 5.750 10.004

    90 99.600 99.325 0.275 0.355 0.160 10 3.550 10.001

    100 99.600 99.540 0.060 0.167 0.215 10 1.675 10.002

    110 99.600 99.610 0.010 0.035 0.050 10 0.350 10.000

    Calculation of wetted perimetre and area under HFL of choraha nalla on pairo-Ghoghopuri Road

    H.F.L. IN M.

    DEPTH OF

    WATERAV.

    DEPTHDIFF. IN

    BED LEVEL

    PERIMETER IN M.

    P= /(X+Y)

  • Ghoghopuri side

    TOTAL 196.562 160.197

  • Hydraulic mean depth(R)= A/P = 1.23 M

    V = (R)/x(S) 0.906 M/sec.n

    V = 0.906 M/sec

    R = The hydraulic mean depth (A/P) 1.23 M

    S =

    = 0.001

    n = The rugosity coefficient 0.04

    Q = A x V 178.103 Cumec

    Q = Discharge in Cumec 178.103 CumecA = Cross sectional area in Sqm. 196.562 Sqm

    V = 0.906 M/sec.

    The velocity in M per sec. considered uniform throughout the cross section

    The energy slope which may be taken equal to the bed slope measured over a reasonable long reach

    The velocity in M per sec. considered uniform throughout the cross section

  • HYDRAULIC CALCULATION

    CH IN M. GL LENGTH AREA

    (D) (X) (Y) A=DxY1 2 3 4 5 6 7 8 9

    Raipur side

    390 100.500 100.500 0.000 0.000 0.000 0 0.000 0.000

    375 100.500 100.475 0.025 0.013 0.025 15 0.188 15.000

    360 100.500 100.320 0.180 0.103 0.155 15 1.538 15.001

    345 100.500 100.120 0.380 0.280 0.200 15 4.200 15.001

    330 100.500 100.000 0.500 0.440 0.120 15 6.600 15.000

    315 100.500 98.820 1.680 1.090 1.180 15 16.350 15.046

    300 100.500 99.050 1.450 1.565 0.230 15 23.475 15.002

    285 100.500 98.780 1.720 1.585 0.270 15 23.775 15.002

    270 100.500 98.700 1.800 1.760 0.080 15 26.400 15.000

    255 100.500 98.860 1.640 1.720 0.160 15 25.800 15.001

    240 100.500 98.780 1.720 1.680 0.080 15 25.200 15.000

    225 100.500 98.960 1.540 1.630 0.180 15 24.450 15.001

    210 100.500 98.780 1.720 1.630 0.180 15 24.450 15.001

    195 100.500 98.930 1.570 1.645 0.150 15 24.675 15.001

    180 100.500 98.740 1.760 1.665 0.190 15 24.975 15.001

    165 100.500 98.840 1.660 1.710 0.100 15 25.650 15.000

    150 100.500 99.070 1.430 1.545 0.230 15 23.175 15.002

    135 100.500 98.800 1.700 1.565 0.270 15 23.475 15.002

    120 100.500 98.720 1.780 1.740 0.080 15 26.100 15.000

    105 100.500 98.930 1.570 1.675 0.210 15 25.125 15.001

    90 100.500 98.750 1.750 1.660 0.180 15 24.900 15.001

    75 100.500 99.000 1.500 1.625 0.250 15 24.375 15.002

    60 100.500 98.160 2.340 1.920 0.840 15 28.800 15.024

    45 100.500 98.140 2.360 2.350 0.020 15 35.250 15.000

    30 100.500 97.400 3.100 2.730 0.740 15 40.950 15.018

    15 100.500 98.050 2.450 2.775 0.650 15 41.625 15.014

    0 100.500 98.200 2.300 2.375 0.150 15 35.625 15.001

    15 100.500 98.190 2.310 2.305 0.010 15 34.575 15.000

    Calculation of wetted perimetre and area under HFL of Kolhan nalla in Km 22/8 at RAIPUR- BALODABAZAR Road

    Proposed Bridge site

    H.F.L. IN M.

    DEPTH OF

    WATERAV.

    DEPTHDIFF. IN

    BED LEVEL

    PERIMETER IN M.

    P= /(X+Y)

  • 30 100.500 98.520 1.980 2.145 0.330 15 32.175 15.004

    45 100.500 98.720 1.780 1.880 0.200 15 28.200 15.001

    60 100.500 98.280 2.220 2.000 0.440 15 30.000 15.006

    75 100.500 97.990 2.510 2.365 0.290 15 35.475 15.003

    90 100.500 96.680 3.820 3.165 1.310 15 47.475 15.057

    105 100.500 94.500 6.000 4.910 2.180 15 73.650 15.158

    120 100.500 93.780 6.720 6.360 0.720 15 95.400 15.017

    135 100.500 96.040 4.460 5.590 2.260 15 83.850 15.169

    150 100.500 98.250 2.250 3.355 2.210 15 50.325 15.162

    165 100.500 98.300 2.200 2.225 0.050 15 33.375 15.000

    180 100.500 98.530 1.970 2.085 0.230 15 31.275 15.002

    195 100.500 98.740 1.760 1.865 0.210 15 27.975 15.001

    210 100.500 98.430 2.070 1.915 0.310 15 28.725 15.003

    225 100.500 98.520 1.980 2.025 0.090 15 30.375 15.000

    240 100.500 98.770 1.730 1.855 0.250 15 27.825 15.002

    255 100.500 98.860 1.640 1.685 0.090 15 25.275 15.000

    270 100.500 99.300 1.200 1.420 0.440 15 21.300 15.006

    285 100.500 99.220 1.280 1.240 0.080 15 18.600 15.000

    295 100.500 100.140 0.360 0.820 0.920 15 12.300 15.028

    310 100.500 100.230 0.270 0.315 0.090 15 4.725 15.000

    325 100.500 100.190 0.310 0.290 0.040 15 4.350 15.000

    340 100.500 100.170 0.330 0.320 0.020 15 4.800 15.000

    355 100.500 100.130 0.370 0.350 0.040 15 5.250 15.000

    370 100.500 100.220 0.280 0.325 0.090 15 4.875 15.000

    385 100.500 100.500 0.000 0.140 0.280 15 2.100 15.003

    Baloda bazar side

    TOTAL 1401.375 780.749

    Hydraulic mean depth(R)= A/P = 1.79 M

    V = (R)/x(S) 2.002 M/sec.n

    V = 2.002 M/sec

    R = The hydraulic mean depth (A/P) 1.79 M

    S =

    = 0.002

    n = The rugosity coefficient 0.033

    The velocity in M per sec. considered uniform throughout the cross section

    The energy slope which may be taken equal to the bed slope measured over a reasonable long reach

  • Q = A x V 2804.900 Cumec

    Q = Discharge in Cumec 2804.900 CumecA = Cross sectional area in Sqm. 1401.375 Sqm

    V = 2.00 M/sec.

    HYDRAULIC CALCULATION

    CH IN M. GL LENGTH AREA

    (D) (X) (Y) A=DxY1 2 3 4 5 6 7 8 9

    Sankara side0 100.650 100.650 0.000 0.000 0.000 0 0.000 0.000

    15 100.650 100.040 0.610 0.305 0.610 15 4.575 15.012

    30 100.650 98.880 1.770 1.190 1.160 15 17.850 15.045

    45 100.650 99.190 1.460 1.615 0.310 15 24.225 15.003

    60 100.650 99.170 1.480 1.470 0.020 15 22.050 15.000

    75 100.650 99.050 1.600 1.540 0.120 15 23.100 15.000

    90 100.650 98.640 2.010 1.805 0.410 15 27.075 15.006

    105 100.650 98.200 2.450 2.230 0.440 15 33.450 15.006

    The velocity in M per sec. considered uniform throughout the cross section

    Calculation of wetted perimetre and area under HFL of Chhokra nalla in Km at SANKRA - BAHESAR Road

    Proposed Bridge site

    H.F.L. IN M.

    DEPTH OF

    WATERAV.

    DEPTHDIFF. IN

    BED LEVEL

    PERIMETER IN M.

    P= /(X+Y)

  • 120 100.650 97.990 2.660 2.555 0.210 15 38.325 15.001

    135 100.650 97.880 2.770 2.715 0.110 15 40.725 15.000

    150 100.650 98.210 2.440 2.605 0.330 15 39.075 15.004

    165 100.650 97.150 3.500 2.970 1.060 15 44.550 15.037

    170 100.650 95.405 5.245 4.373 1.745 5 21.863 5.296

    175 100.650 94.780 5.870 5.558 0.625 5 27.788 5.039

    180 100.650 94.790 5.860 5.865 0.010 5 29.325 5.000

    185 100.650 95.200 5.450 5.655 0.410 5 28.275 5.017

    190 100.650 96.260 4.390 4.920 1.060 5 24.600 5.111

    205 100.650 97.200 3.450 3.920 0.940 15 58.800 15.029

    220 100.650 96.340 4.310 3.880 0.860 15 58.200 15.025

    235 100.650 97.600 3.050 3.680 1.260 15 55.200 15.053

    250 100.650 98.270 2.380 2.715 0.670 15 40.725 15.015

    265 100.650 98.700 1.950 2.165 0.430 15 32.475 15.006

    280 100.650 99.050 1.600 1.775 0.350 15 26.625 15.004

    295 100.650 99.020 1.630 1.615 0.030 15 24.225 15.000

    310 100.650 99.130 1.520 1.575 0.110 15 23.625 15.000

    325 100.650 99.970 0.680 1.100 0.840 15 16.500 15.024

    340 100.650 99.250 1.400 1.040 0.720 15 15.600 15.017

    355 100.650 99.020 1.630 1.515 0.230 15 22.725 15.002

    370 100.650 99.270 1.380 1.505 0.250 15 22.575 15.002

    385 100.650 99.380 1.270 1.325 0.110 15 19.875 15.000

    400 100.650 99.410 1.240 1.255 0.030 15 18.825 15.000

    415 100.650 99.710 0.940 1.090 0.300 15 16.350 15.003

    430 100.650 99.450 1.200 1.070 0.260 15 16.050 15.002

    445 100.650 99.650 1.000 1.100 0.200 15 16.500 15.001

    455 100.650 99.900 0.750 0.875 0.250 10 8.750 10.003

    470 100.650 100.650 0.000 0.375 0.750 15 5.625 15.019

    Bahesar side

    TOTAL 946.100 470.784Hydraulic mean depth(R)= A/P = 2.01 M

    V = (R)/x(S) 1.930 M/sec.n

    V = 1.930 M/sec

    R = The hydraulic mean depth (A/P) 2.01 M

    S =

    = 0.0018

    The velocity in M per sec. considered uniform throughout the cross section

    The energy slope which may be taken equal to the bed slope measured over a reasonable long reach

  • n = The rugosity coefficient 0.035

    Q = A x V 1826.341 CumecQ = Discharge in Cumec 1826.341 CumecA = Cross sectional area in Sqm. 946.100 Sqm

    V = 1.930 M/sec.

    HYDRAULIC CALCULATION

    CH IN M. GL LENGTH AREA

    (D) (X) (Y) A=DxY1 2 3 4 5 6 7 8 9

    Sankara side0 100.650 100.650 0.000 0.000 0.000 0 0.000 0.000

    15 100.650 100.040 0.610 0.305 0.610 15 4.575 15.012

    30 100.650 99.880 0.770 0.690 0.160 15 10.350 15.001

    45 100.650 99.190 1.460 1.115 0.690 15 16.725 15.016

    60 100.650 99.170 1.480 1.470 0.020 15 22.050 15.000

    75 100.650 99.050 1.600 1.540 0.120 15 23.100 15.000

    90 100.650 98.640 2.010 1.805 0.410 15 27.075 15.006

    105 100.650 98.300 2.350 2.180 0.340 15 32.700 15.004

    120 100.650 98.100 2.550 2.450 0.200 15 36.750 15.001

    135 100.650 97.880 2.770 2.660 0.220 15 39.900 15.002

    150 100.650 98.210 2.440 2.605 0.330 15 39.075 15.004

    165 100.650 97.150 3.500 2.970 1.060 15 44.550 15.037

    170 100.650 95.405 5.245 4.373 1.745 5 21.863 5.296

    175 100.650 94.780 5.870 5.558 0.625 5 27.788 5.039

    180 100.650 94.790 5.860 5.865 0.010 5 29.325 5.000

    185 100.650 95.200 5.450 5.655 0.410 5 28.275 5.017

    190 100.650 96.260 4.390 4.920 1.060 5 24.600 5.111

    205 100.650 97.200 3.450 3.920 0.940 15 58.800 15.029

    220 100.650 97.350 3.300 3.375 0.150 15 50.625 15.001

    The velocity in M per sec. considered uniform throughout the cross section

    Calculation of wetted perimetre and area under HFL of Chhokra nalla in Km at SANKRA - BAHESAR Road

    Proposed Bridge site

    H.F.L. IN M.

    DEPTH OF

    WATERAV.

    DEPTHDIFF. IN

    BED LEVEL

    PERIMETER IN M.

    P= /(X+Y)

  • 235 100.650 97.600 3.050 3.175 0.250 15 47.625 15.002

    250 100.650 98.270 2.380 2.715 0.670 15 40.725 15.015

    265 100.650 98.700 1.950 2.165 0.430 15 32.475 15.006

    280 100.650 99.050 1.600 1.775 0.350 15 26.625 15.004

    295 100.650 99.300 1.350 1.475 0.250 15 22.125 15.002

    310 100.650 99.430 1.220 1.285 0.130 15 19.275 15.001

    325 100.650 99.970 0.680 0.950 0.540 15 14.250 15.010

    340 100.650 99.850 0.800 0.740 0.120 15 11.100 15.000

    355 100.650 99.860 0.790 0.795 0.010 15 11.925 15.000

    370 100.650 99.890 0.760 0.775 0.030 15 11.625 15.000

    385 100.650 99.980 0.670 0.715 0.090 15 10.725 15.000

    400 100.650 99.910 0.740 0.705 0.070 15 10.575 15.000

    415 100.650 99.710 0.940 0.840 0.200 15 12.600 15.001

    430 100.650 99.650 1.000 0.970 0.060 15 14.550 15.000

    445 100.650 99.750 0.900 0.950 0.100 15 14.250 15.000

    455 100.650 99.900 0.750 0.825 0.150 10 8.250 10.001

    470 100.650 100.650 0.000 0.375 0.750 15 5.625 15.019

    Bahesar side

    TOTAL 852.450 470.638Hydraulic mean depth(R)= A/P = 1.81 M

    V = (R)/x(S) 1.576 M/sec.n

    V = 1.576 M/sec

    R = The hydraulic mean depth (A/P) 1.81 M

    S =

    = 0.0018

    n = The rugosity coefficient 0.04

    Q = A x V 1343.486 CumecQ = Discharge in Cumec 1343.486 CumecA = Cross sectional area in Sqm. 852.450 Sqm

    V = 1.576 M/sec.

    HYDRAULIC CALCULATION

    The velocity in M per sec. considered uniform throughout the cross section

    The energy slope which may be taken equal to the bed slope measured over a reasonable long reach

    The velocity in M per sec. considered uniform throughout the cross section

  • CH IN M. GL LENGTH AREA

    (D) (X) (Y) A=DxY1 2 3 4 5 6 7 8 9

    Raipur side30 104.16 104.160 0.000 0.000 0.000 0 0.000 0.00015 104.16 103.400 0.760 0.380 0.760 10 3.800 10.0290 104.16 102.170 1.990 1.375 1.230 15 20.625 15.050

    15 104.16 100.330 3.830 2.910 1.840 15 43.650 15.11230 104.16 99.550 4.610 4.220 0.780 15 63.300 15.02045 104.16 98.650 5.510 5.060 0.900 15 75.900 15.02760 104.16 99.750 4.410 4.960 1.100 15 74.400 15.04075 104.16 100.480 3.680 4.045 0.730 15 60.675 15.01890 104.16 100.770 3.390 3.535 0.290 15 53.025 15.003

    105 104.16 101.780 2.380 2.885 1.010 15 43.275 15.034120 104.16 101.870 2.290 2.335 0.090 15 35.025 15.000135 104.16 101.440 2.720 2.505 0.430 15 37.575 15.006150 104.16 99.250 4.910 3.815 2.190 15 57.225 15.159165 104.16 95.950 8.210 6.560 3.300 15 98.400 15.359180 104.16 95.215 8.945 8.578 0.735 15 128.663 15.018195 104.16 94.230 9.930 9.438 0.985 15 141.563 15.032210 104.16 92.350 11.810 10.870 1.880 15 163.050 15.117225 104.16 92.650 11.510 11.660 0.300 15 174.900 15.003240 104.16 92.850 11.310 11.410 0.200 15 171.150 15.001255 104.16 93.050 11.110 11.210 0.200 15 168.150 15.001270 104.16 92.710 11.450 11.280 0.340 15 169.200 15.004285 104.16 93.250 10.910 11.180 0.540 15 167.700 15.010300 104.16 93.310 10.850 10.880 0.060 15 163.200 15.000305 104.16 94.130 10.030 10.440 0.820 5 52.200 5.067320 104.16 96.250 7.910 9.380 2.940 15 140.700 15.285335 104.16 97.950 6.210 7.060 1.700 15 105.900 15.096350 104.16 98.730 5.430 5.820 0.780 15 87.300 15.020365 104.16 100.850 3.310 4.370 2.120 15 65.550 15.149380 104.16 100.780 3.380 3.345 0.070 15 50.175 15.000395 104.16 100.880 3.280 3.330 0.100 15 49.950 15.000410 104.16 100.980 3.180 3.230 0.100 15 48.450 15.000425 104.16 101.250 2.910 3.045 0.270 15 45.675 15.002440 104.16 101.425 2.735 2.823 0.175 15 42.338 15.001455 104.16 101.500 2.660 2.698 0.075 15 40.463 15.000470 104.16 101.685 2.475 2.568 0.185 15 38.513 15.001485 104.16 101.910 2.250 2.363 0.225 15 35.438 15.002500 104.16 101.925 2.235 2.243 0.015 15 33.638 15.000515 104.16 101.050 3.110 2.673 0.875 15 40.088 15.025530 104.16 102.210 1.950 2.530 1.160 15 37.950 15.045545 104.16 102.255 1.905 1.928 0.045 15 28.913 15.000560 104.16 102.320 1.840 1.873 0.065 15 28.088 15.000575 104.16 102.220 1.940 1.890 0.100 15 28.350 15.000590 104.16 102.350 1.810 1.875 0.130 15 28.125 15.001605 104.16 102.420 1.740 1.775 0.070 15 26.625 15.000620 104.16 102.520 1.640 1.690 0.100 15 25.350 15.000635 104.16 102.680 1.480 1.560 0.160 15 23.400 15.001650 104.16 102.780 1.380 1.430 0.100 15 21.450 15.000665 104.16 102.650 1.510 1.445 0.130 15 21.675 15.001680 104.16 102.710 1.450 1.480 0.060 15 22.200 15.000695 104.16 102.750 1.410 1.430 0.040 15 21.450 15.000710 104.16 102.800 1.360 1.385 0.050 15 20.775 15.000

    Calculation of wetted perimetre and area under HFL of Kharun River at Murethi khudmudi Road

    Proposed Bridge site

    H.F.L. IN M.

    DEPTH OF

    WATERAV.

    DEPTHDIFF. IN

    BED LEVEL

    PERIMETER IN M.

    P= /(X+Y)

  • 725 104.16 102.890 1.270 1.315 0.090 15 19.725 15.000

    740 104.16 102.900 1.260 1.265 0.010 16 20.240 16.000

    755 104.16 103.050 1.110 1.185 0.150 17 20.145 17.001

    770 104.16 103.100 1.060 1.085 0.050 18 19.530 18.000

    785 104.16 102.950 1.210 1.135 0.150 19 21.565 19.001

    800 104.16 103.150 1.010 1.110 0.200 20 22.200 20.001

    815 104.16 103.250 0.910 0.960 0.100 21 20.160 21.000

    7830 104.16 103.650 0.510 0.710 0.400 22 15.620 22.004

    845 104.16 103.755 0.405 0.457 0.105 23 10.522 23.000

    860 104.16 103.650 0.510 0.457 0.105 24 10.980 24.000

    875 104.16 103.850 0.310 0.410 0.200 25 10.250 25.001

    890 104.16 103.985 0.175 0.243 0.135 26 6.305 26.000

    905 104.16 104.000 0.160 0.167 0.015 27 4.522 27.000920 104.16 104.160 0.000 0.080 0.160 28 2.240 28.000

    945 3529.180 1037.752Hydraulic mean depth(R)= A/P = 3.40 M

    V = (R)/x(S) 3.065 M/sec.n

    V = 3.065 M/secR = The hydraulic mean depth (A/P) 3.40 MS =

    = 0.002n = The rugosity coefficient 0.033

    Q = A x V 10815.875 Cumec

    Q = Discharge in Cumec 10815.875 CumecA = Cross sectional area in Sqm. 3529.180 SqmV = 3.065 M/sec.

    The velocity in M per sec. considered uniform throughout the cross sectionThe energy slope which may be taken equal to the bed slope measured over a reasonable long reach

    The velocity in M per sec. considered uniform throughout the cross section

  • 20 99.22

    x 99.25

    25 99.61

    x 20.384615385

  • 506

  • 100.650

    99.890

    98.730

    99.040

    99.020

    98.900

    98.490

    98.050

  • 97.840

    97.730

    98.060

    97.000

    95.255

    94.630

    94.640

    95.050

    96.110

    97.050

    95.740

    97.450

    98.120

    98.550

    98.900

    98.870

    98.980

    98.820

    98.805

    98.870

    99.120

    99.230

    99.260

    99.560

    99.300

    99.500

    99.750

  • 100.650

    99.890

    98.730

    99.040

    99.020

    98.900

    98.490

    98.050

    97.840

    97.730

    98.060

    97.000

    95.255

    94.630

    94.640

    95.050

    96.110

    97.050

    95.740

  • 97.450

    98.120

    98.550

    98.900

    98.870

    98.980

    98.820

    98.805

    98.870

    99.120

    99.230

    99.260

    99.560

    99.300

    99.500

    99.750

  • HYDRAULIC CALCULATION

    Proposed Bridge site at 250m u/s

    CH IN M. GL LENGTH AREA

    (D) (X) (Y) A=DxY1 2 3 4 5 6 7 8 9

    Pavero side-50 99.700 99.735 0.035 0.000 0.000 0 0.000 0.000

    -45 99.700 99.640 0.060 0.047 0.025 5 0.237 5.000

    -40 99.700 99.230 0.470 0.265 0.410 5 1.325 5.017

    -35 99.700 98.990 0.710 0.590 0.240 5 2.950 5.006

    -30 99.700 98.765 0.935 0.823 0.225 5 4.113 5.005

    -25 99.700 98.750 0.950 0.943 0.015 5 4.713 5.000

    -20 99.700 98.435 1.265 1.108 0.315 5 5.538 5.010

    -15 99.700 98.015 1.685 1.475 0.420 5 7.375 5.018

    -10 99.700 97.440 2.260 1.973 0.575 5 9.863 5.033

    -5 99.700 97.230 2.470 2.365 0.210 5 11.825 5.004

    0 99.700 97.100 2.600 2.535 0.130 5 12.675 5.002

    5 99.700 97.150 2.550 2.575 0.050 5 12.875 5.000

    10 99.700 97.225 2.475 2.513 0.075 5 12.563 5.001

    15 99.700 97.365 2.335 2.405 0.140 5 12.025 5.002

    20 99.700 97.510 2.190 2.263 0.145 5 11.313 5.002

    25 99.700 97.775 1.925 2.058 0.265 5 10.288 5.007

    30 99.700 97.860 1.840 1.883 0.085 5 9.413 5.001

    35 99.700 98.220 1.480 1.660 0.360 5 8.300 5.013

    40 99.700 98.345 1.355 1.418 0.125 5 7.088 5.002

    45 99.700 98.370 1.330 1.343 0.025 5 6.713 5.000

    50 99.700 98.535 1.165 1.248 0.165 5 6.238 5.003

    55 99.700 98.670 1.030 1.098 0.135 5 5.488 5.002

    60 99.700 98.765 0.935 0.983 0.095 5 4.913 5.001

    65 99.700 98.925 0.775 0.855 0.160 5 4.275 5.003

    70 99.700 99.025 0.675 0.725 0.100 5 3.625 5.001

    80 99.700 99.180 0.520 0.597 0.155 10 5.975 10.001

    90 99.700 99.375 0.325 0.423 0.195 10 4.225 10.002

    100 99.700 99.570 0.130 0.228 0.195 10 2.275 10.002

    110 99.700 99.715 0.015 0.073 0.115 10 0.725 10.001

    Calculation of wetted perimetre and area under HFL of choraha nalla on pairo-Ghoghopuri Road

    H.F.L. IN M.

    DEPTH OF

    WATERAV.

    DEPTHDIFF. IN

    BED LEVEL

    PERIMETER IN M.

    P= /(X+Y)

  • Ghoghopuri side

    TOTAL 188.925 160.136

  • Hydraulic mean depth(R)= A/P = 1.18 M

    V = (R)/x(S) 0.883 M/sec.n

    V = 0.883 M/sec

    R = The hydraulic mean depth (A/P) 1.18 M

    S =

    = 0.001

    n = The rugosity coefficient 0.04

    Q = A x V 166.762 Cumec

    Q = Discharge in Cumec 166.762 CumecA = Cross sectional area in Sqm. 188.925 Sqm

    V = 0.883 M/sec.

    The velocity in M per sec. considered uniform throughout the cross section

    The energy slope which may be taken equal to the bed slope measured over a reasonable long reach

    The velocity in M per sec. considered uniform throughout the cross section

  • HYDRAULIC CALCULATION

    CH IN M. GL LENGTH AREA

    (D) (X) (Y) A=DxY1 2 3 4 5 6 7 8 9

    Raipur side

    390 100.500 100.500 0.000 0.000 0.000 0 0.000 0.000

    375 100.500 100.475 0.025 0.013 0.025 15 0.188 15.000

    360 100.500 100.320 0.180 0.103 0.155 15 1.538 15.001

    345 100.500 100.120 0.380 0.280 0.200 15 4.200 15.001

    330 100.500 100.000 0.500 0.440 0.120 15 6.600 15.000

    315 100.500 98.820 1.680 1.090 1.180 15 16.350 15.046

    300 100.500 99.050 1.450 1.565 0.230 15 23.475 15.002

    285 100.500 98.780 1.720 1.585 0.270 15 23.775 15.002

    270 100.500 98.700 1.800 1.760 0.080 15 26.400 15.000

    255 100.500 98.860 1.640 1.720 0.160 15 25.800 15.001

    240 100.500 98.780 1.720 1.680 0.080 15 25.200 15.000

    225 100.500 98.960 1.540 1.630 0.180 15 24.450 15.001

    210 100.500 98.780 1.720 1.630 0.180 15 24.450 15.001

    195 100.500 98.930 1.570 1.645 0.150 15 24.675 15.001

    180 100.500 98.740 1.760 1.665 0.190 15 24.975 15.001

    165 100.500 98.840 1.660 1.710 0.100 15 25.650 15.000

    150 100.500 99.070 1.430 1.545 0.230 15 23.175 15.002

    135 100.500 98.800 1.700 1.565 0.270 15 23.475 15.002

    120 100.500 98.720 1.780 1.740 0.080 15 26.100 15.000

    105 100.500 98.930 1.570 1.675 0.210 15 25.125 15.001

    90 100.500 98.750 1.750 1.660 0.180 15 24.900 15.001

    75 100.500 99.000 1.500 1.625 0.250 15 24.375 15.002

    60 100.500 98.160 2.340 1.920 0.840 15 28.800 15.024

    45 100.500 98.140 2.360 2.350 0.020 15 35.250 15.000

    30 100.500 97.400 3.100 2.730 0.740 15 40.950 15.018

    15 100.500 98.050 2.450 2.775 0.650 15 41.625 15.014

    0 100.500 98.200 2.300 2.375 0.150 15 35.625 15.001

    15 100.500 98.190 2.310 2.305 0.010 15 34.575 15.000

    Calculation of wetted perimetre and area under HFL of Kolhan nalla in Km 22/8 at RAIPUR- BALODABAZAR Road

    Proposed Bridge site

    H.F.L. IN M.

    DEPTH OF

    WATERAV.

    DEPTHDIFF. IN

    BED LEVEL

    PERIMETER IN M.

    P= /(X+Y)

  • 30 100.500 98.520 1.980 2.145 0.330 15 32.175 15.004

    45 100.500 98.720 1.780 1.880 0.200 15 28.200 15.001

    60 100.500 98.280 2.220 2.000 0.440 15 30.000 15.006

    75 100.500 97.990 2.510 2.365 0.290 15 35.475 15.003

    90 100.500 96.680 3.820 3.165 1.310 15 47.475 15.057

    105 100.500 94.500 6.000 4.910 2.180 15 73.650 15.158

    120 100.500 93.780 6.720 6.360 0.720 15 95.400 15.017

    135 100.500 96.040 4.460 5.590 2.260 15 83.850 15.169

    150 100.500 98.250 2.250 3.355 2.210 15 50.325 15.162

    165 100.500 98.300 2.200 2.225 0.050 15 33.375 15.000

    180 100.500 98.530 1.970 2.085 0.230 15 31.275 15.002

    195 100.500 98.740 1.760 1.865 0.210 15 27.975 15.001

    210 100.500 98.430 2.070 1.915 0.310 15 28.725 15.003

    225 100.500 98.520 1.980 2.025 0.090 15 30.375 15.000

    240 100.500 98.770 1.730 1.855 0.250 15 27.825 15.002

    255 100.500 98.860 1.640 1.685 0.090 15 25.275 15.000

    270 100.500 99.300 1.200 1.420 0.440 15 21.300 15.006

    285 100.500 99.220 1.280 1.240 0.080 15 18.600 15.000

    295 100.500 100.140 0.360 0.820 0.920 15 12.300 15.028

    310 100.500 100.230 0.270 0.315 0.090 15 4.725 15.000

    325 100.500 100.190 0.310 0.290 0.040 15 4.350 15.000

    340 100.500 100.170 0.330 0.320 0.020 15 4.800 15.000

    355 100.500 100.130 0.370 0.350 0.040 15 5.250 15.000

    370 100.500 100.220 0.280 0.325 0.090 15 4.875 15.000

    385 100.500 100.500 0.000 0.140 0.280 15 2.100 15.003

    Baloda bazar side

    TOTAL 1401.375 780.749

    Hydraulic mean depth(R)= A/P = 1.79 M

    V = (R)/x(S) 2.002 M/sec.n

    V = 2.002 M/sec

    R = The hydraulic mean depth (A/P) 1.79 M

    S =

    = 0.002

    n = The rugosity coefficient 0.033

    The velocity in M per sec. considered uniform throughout the cross section

    The energy slope which may be taken equal to the bed slope measured over a reasonable long reach

  • Q = A x V 2804.900 Cumec

    Q = Discharge in Cumec 2804.900 CumecA = Cross sectional area in Sqm. 1401.375 Sqm

    V = 2.00 M/sec.

    HYDRAULIC CALCULATION

    CH IN M. GL LENGTH AREA

    (D) (X) (Y) A=DxY1 2 3 4 5 6 7 8 9

    Sankara side0 100.650 100.650 0.000 0.000 0.000 0 0.000 0.000

    15 100.650 100.040 0.610 0.305 0.610 15 4.575 15.012

    30 100.650 98.880 1.770 1.190 1.160 15 17.850 15.045

    45 100.650 99.190 1.460 1.615 0.310 15 24.225 15.003

    60 100.650 99.170 1.480 1.470 0.020 15 22.050 15.000

    75 100.650 99.050 1.600 1.540 0.120 15 23.100 15.000

    90 100.650 98.640 2.010 1.805 0.410 15 27.075 15.006

    105 100.650 98.200 2.450 2.230 0.440 15 33.450 15.006

    The velocity in M per sec. considered uniform throughout the cross section

    Calculation of wetted perimetre and area under HFL of Chhokra nalla in Km at SANKRA - BAHESAR Road

    Proposed Bridge site

    H.F.L. IN M.

    DEPTH OF

    WATERAV.

    DEPTHDIFF. IN

    BED LEVEL

    PERIMETER IN M.

    P= /(X+Y)

  • 120 100.650 97.990 2.660 2.555 0.210 15 38.325 15.001

    135 100.650 97.880 2.770 2.715 0.110 15 40.725 15.000

    150 100.650 98.210 2.440 2.605 0.330 15 39.075 15.004

    165 100.650 97.150 3.500 2.970 1.060 15 44.550 15.037

    170 100.650 95.405 5.245 4.373 1.745 5 21.863 5.296

    175 100.650 94.780 5.870 5.558 0.625 5 27.788 5.039

    180 100.650 94.790 5.860 5.865 0.010 5 29.325 5.000

    185 100.650 95.200 5.450 5.655 0.410 5 28.275 5.017

    190 100.650 96.260 4.390 4.920 1.060 5 24.600 5.111

    205 100.650 97.200 3.450 3.920 0.940 15 58.800 15.029

    220 100.650 96.340 4.310 3.880 0.860 15 58.200 15.025

    235 100.650 97.600 3.050 3.680 1.260 15 55.200 15.053

    250 100.650 98.270 2.380 2.715 0.670 15 40.725 15.015

    265 100.650 98.700 1.950 2.165 0.430 15 32.475 15.006

    280 100.650 99.050 1.600 1.775 0.350 15 26.625 15.004

    295 100.650 99.020 1.630 1.615 0.030 15 24.225 15.000

    310 100.650 99.130 1.520 1.575 0.110 15 23.625 15.000

    325 100.650 99.970 0.680 1.100 0.840 15 16.500 15.024

    340 100.650 99.250 1.400 1.040 0.720 15 15.600 15.017

    355 100.650 99.020 1.630 1.515 0.230 15 22.725 15.002

    370 100.650 99.270 1.380 1.505 0.250 15 22.575 15.002

    385 100.650 99.380 1.270 1.325 0.110 15 19.875 15.000

    400 100.650 99.410 1.240 1.255 0.030 15 18.825 15.000

    415 100.650 99.710 0.940 1.090 0.300 15 16.350 15.003

    430 100.650 99.450 1.200 1.070 0.260 15 16.050 15.002

    445 100.650 99.650 1.000 1.100 0.200 15 16.500 15.001

    455 100.650 99.900 0.750 0.875 0.250 10 8.750 10.003

    470 100.650 100.650 0.000 0.375 0.750 15 5.625 15.019

    Bahesar side

    TOTAL 946.100 470.784Hydraulic mean depth(R)= A/P = 2.01 M

    V = (R)/x(S) 1.930 M/sec.n

    V = 1.930 M/sec

    R = The hydraulic mean depth (A/P) 2.01 M

    S =

    = 0.0018

    The velocity in M per sec. considered uniform throughout the cross section

    The energy slope which may be taken equal to the bed slope measured over a reasonable long reach

  • n = The rugosity coefficient 0.035

    Q = A x V 1826.341 CumecQ = Discharge in Cumec 1826.341 CumecA = Cross sectional area in Sqm. 946.100 Sqm

    V = 1.930 M/sec.

    HYDRAULIC CALCULATION

    CH IN M. GL LENGTH AREA

    (D) (X) (Y) A=DxY1 2 3 4 5 6 7 8 9

    Sankara side0 100.650 100.650 0.000 0.000 0.000 0 0.000 0.000

    15 100.650 100.040 0.610 0.305 0.610 15 4.575 15.012

    30 100.650 99.880 0.770 0.690 0.160 15 10.350 15.001

    45 100.650 99.190 1.460 1.115 0.690 15 16.725 15.016

    60 100.650 99.170 1.480 1.470 0.020 15 22.050 15.000

    75 100.650 99.050 1.600 1.540 0.120 15 23.100 15.000

    90 100.650 98.640 2.010 1.805 0.410 15 27.075 15.006

    105 100.650 98.300 2.350 2.180 0.340 15 32.700 15.004

    120 100.650 98.100 2.550 2.450 0.200 15 36.750 15.001

    135 100.650 97.880 2.770 2.660 0.220 15 39.900 15.002

    150 100.650 98.210 2.440 2.605 0.330 15 39.075 15.004

    165 100.650 97.150 3.500 2.970 1.060 15 44.550 15.037

    170 100.650 95.405 5.245 4.373 1.745 5 21.863 5.296

    175 100.650 94.780 5.870 5.558 0.625 5 27.788 5.039

    180 100.650 94.790 5.860 5.865 0.010 5 29.325 5.000

    185 100.650 95.200 5.450 5.655 0.410 5 28.275 5.017

    190 100.650 96.260 4.390 4.920 1.060 5 24.600 5.111

    205 100.650 97.200 3.450 3.920 0.940 15 58.800 15.029

    220 100.650 97.350 3.300 3.375 0.150 15 50.625 15.001

    The velocity in M per sec. considered uniform throughout the cross section

    Calculation of wetted perimetre and area under HFL of Chhokra nalla in Km at SANKRA - BAHESAR Road

    Proposed Bridge site

    H.F.L. IN M.

    DEPTH OF

    WATERAV.

    DEPTHDIFF. IN

    BED LEVEL

    PERIMETER IN M.

    P= /(X+Y)

  • 235 100.650 97.600 3.050 3.175 0.250 15 47.625 15.002

    250 100.650 98.270 2.380 2.715 0.670 15 40.725 15.015

    265 100.650 98.700 1.950 2.165 0.430 15 32.475 15.006

    280 100.650 99.050 1.600 1.775 0.350 15 26.625 15.004

    295 100.650 99.300 1.350 1.475 0.250 15 22.125 15.002

    310 100.650 99.430 1.220 1.285 0.130 15 19.275 15.001

    325 100.650 99.970 0.680 0.950 0.540 15 14.250 15.010

    340 100.650 99.850 0.800 0.740 0.120 15 11.100 15.000

    355 100.650 99.860 0.790 0.795 0.010 15 11.925 15.000

    370 100.650 99.890 0.760 0.775 0.030 15 11.625 15.000

    385 100.650 99.980 0.670 0.715 0.090 15 10.725 15.000

    400 100.650 99.910 0.740 0.705 0.070 15 10.575 15.000

    415 100.650 99.710 0.940 0.840 0.200 15 12.600 15.001

    430 100.650 99.650 1.000 0.970 0.060 15 14.550 15.000

    445 100.650 99.750 0.900 0.950 0.100 15 14.250 15.000

    455 100.650 99.900 0.750 0.825 0.150 10 8.250 10.001

    470 100.650 100.650 0.000 0.375 0.750 15 5.625 15.019

    Bahesar side

    TOTAL 852.450 470.638Hydraulic mean depth(R)= A/P = 1.81 M

    V = (R)/x(S) 1.576 M/sec.n

    V = 1.576 M/sec

    R = The hydraulic mean depth (A/P) 1.81 M

    S =

    = 0.0018

    n = The rugosity coefficient 0.04

    Q = A x V 1343.486 CumecQ = Discharge in Cumec 1343.486 CumecA = Cross sectional area in Sqm. 852.450 Sqm

    V = 1.576 M/sec.

    HYDRAULIC CALCULATION

    The velocity in M per sec. considered uniform throughout the cross section

    The energy slope which may be taken equal to the bed slope measured over a reasonable long reach

    The velocity in M per sec. considered uniform throughout the cross section

  • CH IN M. GL LENGTH AREA

    (D) (X) (Y) A=DxY1 2 3 4 5 6 7 8 9

    Raipur side30 104.16 104.160 0.000 0.000 0.000 0 0.000 0.00015 104.16 103.400 0.760 0.380 0.760 10 3.800 10.0290 104.16 102.170 1.990 1.375 1.230 15 20.625 15.050

    15 104.16 100.330 3.830 2.910 1.840 15 43.650 15.11230 104.16 99.550 4.610 4.220 0.780 15 63.300 15.02045 104.16 98.650 5.510 5.060 0.900 15 75.900 15.02760 104.16 99.750 4.410 4.960 1.100 15 74.400 15.04075 104.16 100.480 3.680 4.045 0.730 15 60.675 15.01890 104.16 100.770 3.390 3.535 0.290 15 53.025 15.003

    105 104.16 101.780 2.380 2.885 1.010 15 43.275 15.034120 104.16 101.870 2.290 2.335 0.090 15 35.025 15.000135 104.16 101.440 2.720 2.505 0.430 15 37.575 15.006150 104.16 99.250 4.910 3.815 2.190 15 57.225 15.159165 104.16 95.950 8.210 6.560 3.300 15 98.400 15.359180 104.16 95.215 8.945 8.578 0.735 15 128.663 15.018195 104.16 94.230 9.930 9.438 0.985 15 141.563 15.032210 104.16 92.350 11.810 10.870 1.880 15 163.050 15.117225 104.16 92.650 11.510 11.660 0.300 15 174.900 15.003240 104.16 92.850 11.310 11.410 0.200 15 171.150 15.001255 104.16 93.050 11.110 11.210 0.200 15 168.150 15.001270 104.16 92.710 11.450 11.280 0.340 15 169.200 15.004285 104.16 93.250 10.910 11.180 0.540 15 167.700 15.010300 104.16 93.310 10.850 10.880 0.060 15 163.200 15.000305 104.16 94.130 10.030 10.440 0.820 5 52.200 5.067320 104.16 96.250 7.910 9.380 2.940 15 140.700 15.285335 104.16 97.950 6.210 7.060 1.700 15 105.900 15.096350 104.16 98.730 5.430 5.820 0.780 15 87.300 15.020365 104.16 100.850 3.310 4.370 2.120 15 65.550 15.149380 104.16 100.780 3.380 3.345 0.070 15 50.175 15.000395 104.16 100.880 3.280 3.330 0.100 15 49.950 15.000410 104.16 100.980 3.180 3.230 0.100 15 48.450 15.000425 104.16 101.250 2.910 3.045 0.270 15 45.675 15.002440 104.16 101.425 2.735 2.823 0.175 15 42.338 15.001455 104.16 101.500 2.660 2.698 0.075 15 40.463 15.000470 104.16 101.685 2.475 2.568 0.185 15 38.513 15.001485 104.16 101.910 2.250 2.363 0.225 15 35.438 15.002500 104.16 101.925 2.235 2.243 0.015 15 33.638 15.000515 104.16 101.050 3.110 2.673 0.875 15 40.088 15.025530 104.16 102.210 1.950 2.530 1.160 15 37.950 15.045545 104.16 102.255 1.905 1.928 0.045 15 28.913 15.000560 104.16 102.320 1.840 1.873 0.065 15 28.088 15.000575 104.16 102.220 1.940 1.890 0.100 15 28.350 15.000590 104.16 102.350 1.810 1.875 0.130 15 28.125 15.001605 104.16 102.420 1.740 1.775 0.070 15 26.625 15.000620 104.16 102.520 1.640 1.690 0.100 15 25.350 15.000635 104.16 102.680 1.480 1.560 0.160 15 23.400 15.001650 104.16 102.780 1.380 1.430 0.100 15 21.450 15.000665 104.16 102.650 1.510 1.445 0.130 15 21.675 15.001680 104.16 102.710 1.450 1.480 0.060 15 22.200 15.000695 104.16 102.750 1.410 1.430 0.040 15 21.450 15.000710 104.16 102.800 1.360 1.385 0.050 15 20.775 15.000

    Calculation of wetted perimetre and area under HFL of Kharun River at Murethi khudmudi Road

    Proposed Bridge site

    H.F.L. IN M.

    DEPTH OF

    WATERAV.

    DEPTHDIFF. IN

    BED LEVEL

    PERIMETER IN M.

    P= /(X+Y)

  • 725 104.16 102.890 1.270 1.315 0.090 15 19.725 15.000

    740 104.16 102.900 1.260 1.265 0.010 16 20.240 16.000

    755 104.16 103.050 1.110 1.185 0.150 17 20.145 17.001

    770 104.16 103.100 1.060 1.085 0.050 18 19.530 18.000

    785 104.16 102.950 1.210 1.135 0.150 19 21.565 19.001

    800 104.16 103.150 1.010 1.110 0.200 20 22.200 20.001

    815 104.16 103.250 0.910 0.960 0.100 21 20.160 21.000

    7830 104.16 103.650 0.510 0.710 0.400 22 15.620 22.004

    845 104.16 103.755 0.405 0.457 0.105 23 10.522 23.000

    860 104.16 103.650 0.510 0.457 0.105 24 10.980 24.000

    875 104.16 103.850 0.310 0.410 0.200 25 10.250 25.001

    890 104.16 103.985 0.175 0.243 0.135 26 6.305 26.000

    905 104.16 104.000 0.160 0.167 0.015 27 4.522 27.000920 104.16 104.160 0.000 0.080 0.160 28 2.240 28.000

    945 3529.180 1037.752Hydraulic mean depth(R)= A/P = 3.40 M

    V = (R)/x(S) 3.065 M/sec.n

    V = 3.065 M/secR = The hydraulic mean depth (A/P) 3.40 MS =

    = 0.002n = The rugosity coefficient 0.033

    Q = A x V 10815.875 Cumec

    Q = Discharge in Cumec 10815.875 CumecA = Cross sectional area in Sqm. 3529.180 SqmV = 3.065 M/sec.

    The velocity in M per sec. considered uniform throughout the cross sectionThe energy slope which may be taken equal to the bed slope measured over a reasonable long reach

    The velocity in M per sec. considered uniform throughout the cross section

  • 20 99.22

    x 99.25

    25 99.61

    x 20.384615385

  • 506

  • 100.650

    99.890

    98.730

    99.040

    99.020

    98.900

    98.490

    98.050

  • 97.840

    97.730

    98.060

    97.000

    95.255

    94.630

    94.640

    95.050

    96.110

    97.050

    95.740

    97.450

    98.120

    98.550

    98.900

    98.870

    98.980

    98.820

    98.805

    98.870

    99.120

    99.230

    99.260

    99.560

    99.300

    99.500

    99.750

  • 100.650

    99.890

    98.730

    99.040

    99.020

    98.900

    98.490

    98.050

    97.840

    97.730

    98.060

    97.000

    95.255

    94.630

    94.640

    95.050

    96.110

    97.050

    95.740

  • 97.450

    98.120

    98.550

    98.900

    98.870

    98.980

    98.820

    98.805

    98.870

    99.120

    99.230

    99.260

    99.560

    99.300

    99.500

    99.750

  • 325 DSProposed site250M US