Drilling Engineering
2-1
Calculation of the total drillingCost for the well 112-87
Total drilling costs for drilling is calculated as follows:-
CF = Cr+ CT+ CA+ CC+ CL
Where:
CF = average drilling and completion cost,
Cr = rig operating cost, $/hr.
CT = tangible material cost, $
CA = auxiliary equipment costs, $.
CC = intangible material costs, $.
CL = logistic services, $.
1- ) To calculate rig cost (Cr ) :
=8750*(37) +200*(37) +7300
=323750+7400+7300
=338450 $
Drilling Engineering
2-2
2- ) To calculate material tangible cost ( CT ) :
=163*35+65.68*950+44.05*2395
+33.15*2602+39.97*2602+20000+4200+6600+27000+40000+40
00+12000
=413659 $
3- ) To calculate material intangible costs ( CI ) :
=32000+68000+25000+75000+
+49300+56000+21600
=326900 $
4- ) To calculate auxiliary equipment costs (CA ) :
=27900+14400+10080+5000+
49950+13750+350000+10500+15480+4500+40000+2400
=543960 $
5- ) To calculate logistic services costs ( CL ):
=10200+125000
=135200 $
Drilling Engineering
2-3
The average drilling and completion cost ( CF )
=1758169 $
The cost of all the items mentioned in the above calculations is illustrated
in the following table:
ITEM COST, $Casing
Wellhead and manifoldHamerring
Tubing completion equipment
Downhole equipment
21185937800400040000
120000
Tangible material 413658Casing cementing and accessoriesMud and chemicalsCompletion fluidCement additives
Bits and core headsFuel and lubricants
Other material
32000
680002500075000493005600021600
Intangible material 326900
Drilling Engineering
2-4
Casing and tubing services
Mud loggingMud engineeringCement unit and
operator Directional drilling
MWDElectric logs
Jars-fishing stabsCentrifuges-hi G dryer
Casing circulating packer
Casing perf.Other services
27900
14400100805000
499501375035000010500154804500
400002400
Auxiliary services 543960
Logistic services 135200
Drilling rig 338450Total well cost 1758169
Drilling Engineering
2-5