HWB Board 7 October 2013 - Joint HWB Strategy Plan Update ... Board 7 O… · Increase prevalence...
Transcript of HWB Board 7 October 2013 - Joint HWB Strategy Plan Update ... Board 7 O… · Increase prevalence...
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
1
Priority 1: Improving and Protecting health & wellbeing
Outcomes:
i. Reducing the gap in health life expectancy
ii. Improve early years development
iii. Protect people’s health from major emergencies
26 Indicators: 21 SMART targets set
Target Leads: Director of Public Health, LBS
EHOS of Community Living, LBS
Sutton CCG, Dr B Hudson
Public Health England
Data Intelligence Leads: Research Intelligence Team, LBS
Public Health Commissioning & Analyst
Agenda Ite
m 6
Page 7
1
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
2
Unique Indicator
Indicator Title
Delivery Plan
Delivery Group
Formal Multiagency sign up to SMART target
SMART target set
Monitoring Mechanism Agreed
PSED undertaken
Additional information
1a
Increase the number of 4 week & 12 week quitters
Yes by October 1
st
2013
Yes (performance monitoring group)
N/A 696 4 -week quitters for 13/14
Yes PMG Quarterly. DMT Public Health Dashboard every 2 weeks
To be refreshed by March 2014.
Risk: First year of a new provider, new structures post PH transition. Led by DPH
1b
Reduce the number of smokers known to be smokers at the time of delivery
Yes by October 1
st
2013
Yes (performance monitoring group)
N/A To reduce the baseline performance (2012) by 3% by 2015
Yes PMG Quarterly
To be refreshed by March 2014.
Risk: First year of a new provider, new structures post PH transition. Led by DPH
1c
Increase prevalence of 4-5 yr olds and 10-11 year olds being a healthy weight
By November 2013
No (to be formed as part of delivery plan)
No ( to be formed as part of delivery plan
Increase prevalence of target population as healthy weight by 1% by 2015
No ( to be formed as part of delivery plan
No (to be formed as part of delivery plan
In process of separating joint contract with Merton. To be decided by 16
th
September. Led by DPH
1d
Increase the uptake of NHS Health Check Programme.
By November 2013
No group monitored by commissioners
N/A Increase uptake to 55% by March 2014 Further target to be set, considering year on year improvement
Yes by commissioner quarterly. DMT Public Health Dashboard every 2 weeks
To be refreshed by March 2014
Led by DPH
Agenda Ite
m 6
Pa
ge 7
2
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
3
1e
Increase the proportion of school pupils travelling by sustainable means
Information to be made available by December 2013
Information to be made available by December 2013
Information to be made available by December 2013
Increase the proportion of school pupils travelling by sustainable means by 80% by 2017
Information to be made available by December 2013
Information to be made available by December 2013
Led by Eleanor Purser
1f
Increase the number of people achieving 12 wk improve in PA & Healthy Eating
Yes by October 1
st
2013
Yes (performance monitoring group)
N/A Yes. 749 lifestyle goals 2013/14
Yes PMG Quarterly
To be refreshed by March 2014.
Risk: First year of a new provider, new structures post PH transition. Led by DPH
Agenda Ite
m 6
Page 7
3
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
4
Unique Indicator
Indicator Title
Delivery Plan
Delivery Group
Formal Multiagency
SMART target set
Monitoring Mechanism Agreed
PSED undertaken
Additional information
1g
Increase prevalence of breastfeeding
To be developed by January 2014
Sutton & Merton BF operational Group. To be developed by January 2014
yes Increase prevalence of breastfeeding at 6-8 week Health Visitor wk check
Sutton & Merton BF Strategy Steering Group
No to be undertaken by March 2014
Led by DPH
1h
Improve the quality of housing stock
No .To be developed by January 2014
Housing Strategy Group
yes Properties failing to meet the Decent Homes Standard 14.3% in 13/14
To be developed as part of delivery plan by January 2014
no to be undertaken by March 2014
Lead EHOS Community Living
1i
Improve the thermal efficiency of the Council housing stock
To be developed by January 2014
Housing Strategy Group
yes Average SAP (thermal efficiency) rating of Council housing stock to reach 70 by March 2014
To be developed as part of delivery plan by January 2014
no to be undertaken by March 2014
Lead EHOS Community Living
1j
Improve poor housing conditions in the private sector
To be developed by January 2014
Housing Strategy Group
yes Category 1 hazards (HHSRS) in the local authority area. To be set by March 2014
To be developed as part of delivery plan by January 2014
No to be undertaken by March 2014
Lead EHOS Community Living
Agenda Ite
m 6
Pa
ge 7
4
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
5
1k
Increase the number of Gypsy and Traveller families registered with GPs
No to be agreed by March 2014
No to be agreed by March 2014
No to be agreed by March 2014
Targets for 2014/15 and 2015/16 to be confirmed by March 2014
No to be agreed by March 2014
No to be agreed by March 2014
Lead EHOS Community Living
Agenda Ite
m 6
Page 7
5
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
6
Unique Indicator
Indicator Title
Delivery Plan
Delivery Group
Formal Multiagency
SMART target set
Monitoring Mechanism Agreed
PSED undertaken
Additional information
1l
Increasing the prevalence of 4-5 year olds living in the most deprived areas of the Borough being a healthy weight
By November 2013
No (to be formed as part of delivery plan)
No (to be formed as part of delivery plan)
No, to be set by November 2013
No (to be formed as part of delivery plan)
No (to be formed as part of delivery plan)
In process of separating joint contract with Merton. To be decided by 16
th
September. Target lead DPH
1m
Increase prevalence of breastfeeding in more deprived areas
To be developed by January 2014
Sutton & Merton BF operational Group. To be developed by January 2014
yes To increase baseline performance by 5% by 2015
Sutton & Merton BF Strategy Steering Group
By March 2014 Target lead DPH
1n
Improve the number of children who are ready for school at five years (physical, emotional, behavioural and cognitive development
Plan within inspection & advisory service plan 2013-2014
No. To be delivered by individual schools
yes No. To be set by December 2013
To be delivered by individual schools
Target lead Simon Latham
1o
As above As above yes No. To be set by December 2013
By March 2014 Target lead Simon Latham
Have systems Yes. Minimum Yes. Emergency yes To have Yes EPIG To be DPH/
Agenda Ite
m 6
Pa
ge 7
6
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
7
1p
in place that have been tested to ensure effective and adequate surveillance of health protection risks and hazards
standards for London Delivery Plan
Planning Implementation Group
robust local EP plans and procedures which meet central guidance and local needs starting in 2013.
Quarterly. Oversight by Sutton Integrated Resilience Forum
performed as part of peer review audit of EP standards. By March 2014
Emergency Planning & Policy Manager Ian Kershaw
1q
Increase the population protected by vaccination and screening (this is a lead role for PHE &NHSE but LBS &SCCG will support & challenge PHE and NHSSE to improve performance)
yes Yes. Childhood immunisations taskforce
yes Increase the uptake of childhood immunisations year on year to 2016 target of 95% uptake for primary immunisations, MMR and preschool boosters
yes No. NHSE/PHE to be advised to perform by March 2014
NHSE & PHE to deliver target. LBS & SCCG will challenge
Agenda Ite
m 6
Page 7
7
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
8
1r
As above yes Yes. Pan London Flu Steering Group
yes Increase the uptake of influenza vaccination for those aged over 65 years and those with other long term illnesses that increase their risk of influenza year to 2016 a target of 75% uptake.
yes No. NHSE/PHE to be advised to perform by March 2014
NHSE & PHE to deliver target. LBS & SCCG will challenge
1s
As above NHSE/PHE to send LBS delivery plans by October 2013
NHSE/PHE to send LBS delivery plans by October 2013
NHSE/PHE to send LBS delivery plans by October 2013
Increase the percentage of women in the population eligible for cervical screening who were screened adequately within a specified period to 80%
yes No. NHSE/PHE to be advised to perform by March 2014
NHSE & PHE to deliver target. LBS & SCCG will challenge
Agenda Ite
m 6
Pa
ge 7
8
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
9
1t
Increase the number of adults leaving drug treatment free of dependence
Yes. Alcohol Harm reduction Strategy
Yes. Safer Sutton Partnership
yes Increase the number of drug users that left drug treatment successfully (free of drug(s) of dependence) who do not then re-present to treatment again within six months by 2% (by 2014)
Quarterly through partnership. Direct links to DPH/HWB
No to be agreed by March 2014
Target Lead DPH/Ian Kershaw
Agenda Ite
m 6
Page 7
9
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
10
Unique Indicator
Indicator Title
Delivery Plan
Delivery Group
Formal Multiagency sign up to SMART target
SMART target set
Monitoring Mechanism Agreed
PSED undertaken
Additional information
1u
Reduce the rate of increase of increase of alcohol related hospital admissions
Yes. Alcohol Harm reduction Strategy
Yes. Safer Sutton Partnership
yes Alcohol related hospital admissions to remain at or below current rate 1,831 DSR per 100,000 by April 2014
Quarterly through partnership. Direct links to DPH/HWB
No to be agreed by March 2014
Target Lead Head of Planning & Performance /DPH
1v
Reduce underage sales of tobacco and alcohol
Yes. Alcohol Harm reduction Strategy
Yes. Safer Sutton Partnership
yes 30 premises inspected, 4 training sessions by March 2014
Quarterly through partnership. Direct links to DPH/HWB
No to be agreed by March 2014
Target Lead Head of Planning & Performance /DPH
1w
Extending the National Food Hygiene Rating Scheme (NFHRS)
Yes. Business Regulation Plan
To be assembled by November 2013
yes 300 premises by the end of the financial year 2013/14
To be agreed as part of group planning by November 2013
To be agreed as part of group planning by November 2013
Target lead Kim Stephens
1x
The number of premises with a rating of “Very good” under the NFHRS by April 2013
Yes. Business Regulation Plan
To be assembled by November 2013
yes Increase by 5% in 2013/14
To be agreed as part of group planning by November 2013 Also Annual Statutory
To be agreed as part of group planning by November 2013
Target lead Kim Stephens Multidisciplinary BRS Team Leader
Agenda Ite
m 6
Pa
ge 8
0
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
11
reporting through LEAMS to Food Standards Agency
1y
To reduce workplace accidents
Yes ( HS Service plan with individual PIDS for projects)
No, delivered by Principal EHP, project progress reported to Head of Regulatory Services
Yes
To undertake 3 projects by 2013/14
Annual Statutory reporting through LAE1 return to HSE.
No. TBA by Match 2014
Target led by K. Nichols Principal EHP All planned work has been conducted for projects. From April 2014 review of new projects to be started.
1z
Public perception of safety
Information to be made available by December 2013
Information to be made available by December 2013
Information to be made available by December 2013
To set a target for 2014/15 based on a baseline questionnaire in 2013/14 by March 2014
Information to be made available by December 2013
Information to be made available by December 2013
Led by EHOS Community Living
Agenda Ite
m 6
Page 8
1
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
12
Priority 2: Improving the Health & Wellbeing of those who have illness or disability
Outcomes
i. Supporting people with long term conditions to live healthier lives
7 Indicators:2 SMART targets set
Target Leads:
Director of Public Health, LBS
EHOS of Community Living, LBS
Sutton CCG, Dr B Hudson
Public Health England
Data Intelligence Leads: Research Intelligence Team, LBS
Agenda Ite
m 6
Pa
ge 8
2
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
13
Unique Indicator
Indicator Title
Delivery Plan
Delivery Group
Formal Multiagency sign up to SMART target
SMART target set
Monitoring Mechanism Agreed
PSED undertaken
Additional information
2a
Reduce unplanned hospitalisations for people with LTC
Information to be collected by March 2014
Information to be collected by March 2014
Information to be collected by March 2014
To set SMART target for 2014/15 with major hospital provider by March 2014
Information to be collected by March 2014
Information to be collected by March 2014
Target leads Sutton CCG (Drs Brendon Hudson & Chris Elliott)
2b
Increased identification of "at risk" registered patients (2 or more LTCs or 2 or more emergency admissions in last 6 months)
Information to be collected by March 2014
Information to be collected by March 2014
Information to be collected by March 2014
As above Information to be collected by March 2014
Information to be collected by March 2014
Target leads CCG (Drs Brendon Hudson & Chris Elliott)
2c
Increasing the proportion of patients feeling supported to manage their own conditions
Information to be made available by December 2013
Information to be made available by December 2013
Information to be made available by December 2013
85% in 2015
Information to be made available by December 2013
Information to be made available by December 2013
Target leads CCG (Drs Brendon Hudson & Chris Elliott)
2d
Monitor the housing needs of specific client
Information to be made available by
Information to be made available by
Information to be made available by
Targets for 2014/15 and 2015/16 and
Information to be made available by
Information to be made available by
Lead: EHOS Community Living
Agenda Ite
m 6
Page 8
3
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
14
groups with LTCs on the Housing Register
December 2013
December 2013
December 2013 13/14 baseline to be confirmed, by March 2014
December 2013 December 2013 (Simon Latham)
2e
Monitor the housing needs of specific client groups with LTCs that have been re-housed
Information to be made available by March 2014
Information to be made available by March 2014
Information to be made available by March 2014
Targets for 2014/15 & 2015/16 including 13/14 baseline to be set by March 2014.
Information to be made available by March 2014
Information to be made available by March 2014
Lead: EHOS Community Living (Simon Latham)
2f
Percentage of people with learning disabilities having an annual health check
No to be prepared by March 2014
No to be agreed by March 2014
Yes (CCG, Primary Care, LD Community Nursing)
No to be set by March 2014
Not formally, to be agreed by March 2014
No Leadership for SMART target to be agreed by March 2014. Current lead Patrick Hopkinson
2g
To increase the proportion of people with a learning disability living in settled accommodation
Information to be made available by December 2013
Information to be made available by December 2013
Information to be made available by December 2013
Increase to 75% by 2015
Information to be made available by December 2013
Information to be made available by December 2013
Lead: Simon Latham Operational lead: Social Inclusion Delivery Manager
Agenda Ite
m 6
Pa
ge 8
4
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
15
Priority 3: Improving Mental Health & Wellbeing
i. Improving the mental wellbeing of our children and young people ii. Improving the life chances of adults with mental ill-health
14 Indicators: 8 SMART Targets set
Target Leads:
Director of Public Health, LBS
EHOS of Community Living, LBS
EHOS Adults & Safeguarding
Sutton Joint Mental Health Commissioner
CYLD, Colin Stewart
Data Intelligence Leads: Research Intelligence Team, LBS
CYLD, Colin Stewart
Agenda Ite
m 6
Page 8
5
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
16
Unique Indicator
Indicator Title
Delivery Plan
Delivery Group
Formal Multiagency sign up to SMART target
SMART target set
Monitoring Mechanism Agreed
PSED undertaken
Additional information
3a
Review & redesign CAMHS tier 1-4 redesign developing an outcomes based approach for new service
Within Children’s Services Improvement Plan
To be delivered through CaMHS team.
yes To be set post CAMHS review by October 2013
CYPLD reporting into Children’s Services Improvement Board
No: To be undertaken by March 2014
Data link: Colin Stewart
3b
Reducing absence rates in primary schools created by anxiety & emotional issues
To be delivered through individual schools
No (To be delivered through individual schools)
No. Target not yet set.
To be set in 14/15 Baseline set in 13/14 to be set by March 2014
School link inspectors and Borough attendance service.
No: To be undertaken by March 2014
Data link: Colin Stewart
3c For young people in the Youth Justice System the number who are in employment education & training
Yes. Youth Justice Plan & Raising Participation Readiness Plan
To be delivered through youth offending team
yes, Baseline and target to be set by the end of September 2013
Safer Sutton Young Peoples Board and Post 14 Progression & Transition Board. Quarterly monitoring
No: To be undertaken by date to be confirmed by October 2013
Lead: Colin Stewart Data required for target and baseline from DfE available from September 30
th 2013
Agenda Ite
m 6
Pa
ge 8
6
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
17
Unique Indicator
Indicator Title
Delivery Plan
Delivery Group
Formal Multiagency sign up to SMART target
SMART target set
Monitoring Mechanism Agreed
PSED undertaken
Additional Information
3d
Increase access to community mental health services for people from BME groups
To be developed and agreed by Mental Health Delivery Group by September 30
th 2013.
Mental Health Delivery Group
Yes
25% of IAPT referrals from BME groups in 2014/15
Mental Health Delivery Group reporting directly to One Sutton Board. Meeting frequency of MHDG to be agreed by September 2013.
To be agreed and undertaken by Mental Health Delivery Group by March 2014.
Led by Sutton Joint Mental Health Commissioner
3e
Increase access to psychological therapies for people from BME groups
As above As above Yes
17% of referrals from BME groups in 14/15
As above To be agreed and undertaken by Mental Health Delivery Group by March 2014
Led by Sutton Joint Mental Health Commissioner
3f
Improving recovery following talking therapies (all ages and over 65 yrs)
As above As above Yes
2013/14 44% 2014/15 50%
As above To be agreed and undertaken by Mental Health Delivery Group by March 2014
Led by Sutton Joint Mental Health Commissioner
3g
Increase number of people with mental health
As above As above Yes
Set CPA target in 2014/15 contract by March 2014
As above To be agreed and undertaken by Mental Health
Led by Sutton Joint Mental Health Commissioner
Agenda Ite
m 6
Page 8
7
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
18
on a Care Programmed Approach
Delivery Group by March 2014
3h
Reducing the rates of hospital admissions for mental health conditions
As above As above
Yes
Set target for 2014/15 by March 2014
As above To be agreed and undertaken by Mental Health Delivery Group by March 2014
Led by Sutton Joint Mental Health Commissioner
3i
The proportion of persons in IAPT programme receiving psychological therapies
As above As above Yes
13% of people in IAPT programme have psychological therapy treatment in 2013/14 for depression and/or anxiety disorders
As above To be agreed and undertaken by Mental Health Delivery Group by March 2014
Led by Sutton Joint Mental Health Commissioner
3j
Reduce the extent of homelessness amongst people with mental health problems
Within Housing Strategy
Homelessness
Prevention
Group
Homelessness approaches where mental health was the reason for vulnerability 2013/14 target to be confirmed
No Target to be set by December 2013
Housing Strategy Group , quarterly
To be undertaken by December 2013
Led by EHOS Simon Latham
3k
Reduce the number of people with mental health problems
Within housing strategy
Homelessness
Prevention
Group
Data from SHP and housing association evictions and approaches to
To be set by March 2014
Housing Strategy Group, quarterly
To be undertaken by December 2013
Led by EHOS Simon Latham
Agenda Ite
m 6
Pa
ge 8
8
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
19
evicted from social tenancies
the Housing Centre. Targets for 2014/15 and 2015/16 to be confirmed by March 2014
3l
% of people with mental illness and eligible for social care services have a personal budget by April 2013 and either receive direct payments to manage their care themselves, or the council manage their payments for them
Information to be made available by March 2014
Information to be made available by March 2014
Information to be made available by March 2014
100% to MH to have budgets by 2014
Information to be made available by March 2014
Information to be made available by March 2014
Led by EHOS, Keith Skerman
3m
The number of people with mental health problems living in settled accommodation
Information to be made available by January 2014
Information to be made available by January 2014
Information to be made available by January 2014
Proportion of adults receiving secondary mental health services in settled accommodation increased to 85% in 2013/14
Information to be made available by January 2014
Information to be made available by January 2014
Led by EHOS Keith Skerman
Agenda Ite
m 6
Page 8
9
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
20
Priority 4: Empowering & Supporting Local Communities
Outcomes
i. Promoting Independence, Choice and Control ii. Empowering and supporting local communities and groups to encourage friends and family members to become networks of
support (creating social capital and social connectedness)
12 indicators: 4 SMART Targets set
Target Leads:
EHOS, Victoria Lawson, LBS
Royal Marsden, Ann Howers
EHOS of Community Living, LBS
EHOS, Health & Wellbeing, LBS
EHOS, EHOS Planning & Transportation, LBS
Sutton CCG
3n
More people diagnosed with dementia
Information to be made available by March 2014
Information to be made available by March 2014
Information to be made available by March 2014
1042 newly diagnosed with dementia by March 2014
Information to be made available by March 2014
Information to be made available by March 2014
Led by EHOS, Keith Skerman
Agenda Ite
m 6
Pa
ge 9
0
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
21
Data Intelligence Leads: Research Intelligence Team, LBS
Agenda Ite
m 6
Page 9
1
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
22
Unique Indicator
Indicator Title
Delivery Plan
Delivery Group
Formal Multiagency sign up to SMART target
SMART target set
Monitoring Mechanism Agreed
PSED undertaken
Additional information
4a
Commission an NHS 111 service as a source of information and advice to enable people to remain independent in their own home
N/A N/A N/A 111 service has been set up (Achieved)
N/A No Sutton CCG Sue Roostan, Director for Commissioning. Change in provider will be required before the end of November 2013 as the current provider will no longer be an NHS 111 provider.
Agenda Ite
m 6
Pa
ge 9
2
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
23
4b
Develop and implement an information and advice strategy
Within information and advice strategy
Community wellbeing programme board Social Services IT project board
yes Increase use of Voluntary sector information and advice service by 40% by 2015 Improve access to information for users and cares to 90% by 2015 Increase proportion of people accessing information via the internet by 75% by 2015
To HWB via CWP Board,
Led by Jan Underhill Information officer supporting target to be recruited by March 2013. Programme Manager –Andrew Clarke
4c
Adaptations made to private sector housing
Plans Within housing strategy
LB Sutton Housing Strategy Group LB Sutton ‘SHARM’ group
yes no LB Sutton Housing Strategy Group, quarterly
To be undertaken by December 2013
Led by EHOS Simon Latham
4d
Adaptations made to social sector housing
Within housing strategy
LB Sutton Housing Strategy Group
yes no LB Sutton Housing Strategy Group,
To be undertaken by December 2013
Led by EHOS Simon Latham
Agenda Ite
m 6
Page 9
3
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
24
LB Sutton ‘SHARM’ group
quarterly
4e
Extent of fuel poverty
Information to be made available by March 2014
Information to be made available by March 2014
Information to be made available by March 2014
Targets to be set by March 2014
Information to be made available by March 2014
Information to be made available by March 2014
Led by EHOS Simon Latham
4f
Availability of housing support
Information to be made available by March 2014
Information to be made available by March 2014
Information to be made available by March 2014
No. To be set by March 2014
Information to be made available by March 2014
Information to be made available by March 2014
Led by EHOS Simon Latham
4g
Complete an analysis of the needs of Suttons voluntary and community sector.
Information to be made available by March 2014
Information to be made available by March 2014
Information to be made available by March 2014
Analysis to be completed by March 2014.
Information to be made available by March 2014
Information to be made available by March 2014
Led by EHOS Victoria Lawson
4h Support new volunteers into suitable roles
No (leads have identified planned processes for target delivery)
No (however
part of
Strategic
Partner
Programme
work and will
be monitored
closely
through these
arrangements)
yes >600 new volunteers in 2014/15
yes No (to be agreed)
Toni Walsh, Sutton CVS/Victoria Lawson
4i Agree and develop Community
Information to be made available by
Information to be made available by
Information to be made available by
By September 2013 Community
Information to be made available by
Information to be made available by
Toni Walsh, Sutton CVS/Victoria
Agenda Ite
m 6
Pa
ge 9
4
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
25
Wellbeing Programme
December 2013
December 2013
December 2013 Wellbeing Programme developed including project plan and communication and engagement plan
December 2013
December 2013
Lawson
4j 90 mothers estimated to be part of service in 2013/14
Information to be made available by December 2013
Information to be made available by December 2013
Information to be made available by December 2013
Outcomes and outputs of FNP in 2013/14 to be notified when agreed
Information to be made available by December 2013
Information to be made available by December 2013
Ann Howers, Royal Marsden/Dr Brendan Hudson
Agenda Ite
m 6
Page 9
5
APPENDIX A
Joint Health & Wellbeing Action Plan Summary 2013-2016 2013
26
4k Increase the percentage of people that have good social contact
Information to be made available by March 2014
Information to be made available by March 2014
Information to be made available by March 2014
Targets to be set in 13/14 By March 2014
Information to be made available by March 2014
Information to be made available by March 2014
Exec Head of Service, Community Wellbeing & Health Partnerships (Jan Underhill)
4l Facilitate local communities to develop neighbourhood plans linked to community wellbeing programme
Information to be made available by December 2013
Information to be made available by December 2013
Information to be made available by December 2013
In at least two areas, one Hackbridge, by 2013/14
Information to be made available by December 2013
Information to be made available by December 2013
Target lead EHOS Planning & Transportation (Eleanor Purser)
Agenda Ite
m 6
Pa
ge 9
6